Search NASA⌕ Search

SEARCH · Search NASA

Results for “power distribution planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Equitable Energy Transition Planning in Holyoke, Massachusetts: A Technical Analysis for Strategic Gas Decommissioning and Grid Resiliency

Buildings account for 30% of the emissions in Massachusetts and are the largest source of emissions in the United States, along with transportation. Pipeline-delivered methane gas is the dominant heating source in Massachusetts, representing 51% of heating in the state. The current gas network in Massachusetts and across many other US states is aging, a relic of the coal gas era, with thousands of miles of cast iron and unprotected steel pipes that are considered leak prone. Even newer plastic pipes are subject to degradation and in need of replacement, an upgrade that averages $2.8 million per mile of pipeline replacement across investor-owned utilities in Massachusetts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Framework for Assessing Economic and Environmental Trade-offs of Internalized Emission Costs in ERCOT Grid Planning

The power grid is on the cusp of a massive transition driven by three major areas: 1) the growth in demand for electricity, 2) efforts to decarbonize the United States economy, and 3) a desire to mitigate social disparities from the impact of electricity generation on local populations. However, most studies of the electricity sector do not include equity impacts in their models. This study seeks to do so by developing a comprehensive and generalizable model tailored to the Electric Reliability Council of Texas (ERCOT) grid, designed to incorporate the equity impacts of electricity generation in a decarbonized and resilient framework. To integrate equity into our research, we incorporate environmental externalities into our capacity expansion model of ERCOT. Specifically, we factor in intermediate-level local marginal damages of precursor pollutants (NH3, NOx, primary PM2.5, SO2, and VOC) and global pollutant CO2 into the cost of generating electricity. We do this by taking into account county population, county ambient pollution concentration, and generator emission rates. Leveraging open-source modeling tools, such as PowerGenome, pyGRETA, and GenX we construct a county-level model to account for these costs. We integrate these marginal damages into the variable operations and maintenance costs of generators, for both existing and potential future builds. This study’s findings suggest that the value of a dynamic social cost of carbon (SSC) will cover criteria pollutant marginal damages within the ERCOT grid and solar and wind is expected to increase out to 2035. Key metrics evaluated within this research include fuel mix distribution across technologies, transmission and grid infrastructure costs, CO2 emissions, local pollutants marginal damages, and the variation in generation capacity built by the model. These results and framework can be used to support grid decisions that explicitly include distributional and procedural equity within a decarbonized and sustainable grid framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Overview of environmental test plans for Space Station Freedom work package 4

The generation and distribution of electric power for Space Station Freedom (SSF) is critical to the station's success. Work Package 4 (WP-04) has the responsibility for the design, development, test, and delivery of the Electric Power System (EPS) for the SSF. During launch, assembly, and operation, the EPS will be subjected to various environments. A test and verification approach has been developed to assure that the EPS will function in these environments. An overview of that test program is presented with emphasis on environmental testing of hardware. Two key areas of the test program are highlighted in the overview. One area is the verification of the Solar Power Module (SPM) and associated cargo element hardware. This area includes detailing the plans for development and qualification testing of the SPM hardware. One series of tests, including modal and acoustic, has been completed on a development cargo element. Another area highlighted is the acceptance testing of high-power Orbital Replacement Units (ORU). The environmental test equipment plans are presented and reviewed in light of an aggressive production rate, which delivers ORU's to the WP-04 and other Space Station Work Packages. Through implementing the test program as outlined, the EPS hardware will be certified for flight and operation on the Space Station Freedom.

Peterson, Tom J.↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space Station module Power Management And Distribution (PMAD) system

This project consists of several tasks which are unified toward experimentally demonstrating the operation of a highly autonomous, user-supportive power management and distribution system for Space Station Freedom (SSF) habitation/laboratory modules. This goal will be extended to a demonstration of autonomous, cooperative power system operation for the whole SSF power system through a joint effort with NASA's Lewis Research Center, using their Autonomous Power System. Short term goals for the space station module power management and distribution include having an operational breadboard reflecting current plans for SSF, improving performance of the system communications, and improving the organization and mutability of the artificial intelligence (AI) systems. In the middle term, intermediate levels of autonomy will be added, user interfaces will be modified, and enhanced modeling capabilities will be integrated in the system. Long term goals involve conversion of all software into Ada, vigorous verification and validation efforts and, finally, seeing an impact of this research on the operation of SSF. Conversion of the system to a DC Star configuration is now in progress, and should be completed by the end of October, 1989. This configuration reflects the latest SSF module architecture. Hardware is now being procured which will improve system communications significantly. The Knowledge-Based Management System (KBMS) is initially developed and the rules from FRAMES have been implemented in the KBMS. Rules in the other two AI systems are also being grouped modularly, making them more tractable, and easier to eventually move into the KBMS. Adding an intermediate level of autonomy will require development of a planning utility, which will also be built using the KBMS. These changes will require having the user interface for the whole system available from one interface. An Enhanced Model will be developed, which will allow exercise of the system through the interface without requiring all of the power hardware to be operational. The functionality of the AI systems will continue to be advanced, including incipient failure detection. Ada conversion will begin with the lowest level processor (LLP) code. Then selected pieces of the higher level functionality will be recorded in Ada and, where possible, moved to the LLP level. Validation and verification will be done on the Ada code, and will complete sometimes after completion of the Ada conversion.

Walls, Bryan↗

REopt for Resilient Buildings: Leveraging Energy Efficiency and Distributed Energy Resources for Resilience Solutions

Community resilience hubs are locally identified and community-serving facilities that provide residents year-round access to support resources. During extreme weather, they can reduce the burden on emergency response teams by supplying power before, during, and after grid outages through onsite energy systems. This presentation analyzes how NREL's REopt tool can leverage energy efficiency, distributed generation, and storage resources to ensure critical community facilities are online when they are needed most. We showcase the tool's capabilities and application through a case study that focuses on achieving resilience for critical facilities in Manatee County.

better buildings↗

The Value of Sharing and Consolidating Critical Community, Electricity, and Natural Hazard Information

The California Public Utilities Commission (CPUC) sought support for the development of database schema specifications for a bi-directional data portal that would foster cross-jurisdictional collaboration necessary to improve resilient energy infrastructure planning processes. This technical assistance activity involved Berkeley Lab researchers reviewing 34 local/tribal government hazard mitigation plans to assess (1) the natural hazards that communities are most concerned about; (2) the variety of–and terminology used to describe–critical community infrastructure; and (3) the availability of GIS information that could be incorporated into CPUC-mandated "Microgrid Planning Portals". In addition, we develop a common, but generic data taxonomy showing what fields to collect to encourage consolidating and sharing of this information in the future. Finally, we partnered with the Bishop Paiute tribal government to demonstrate the value of combining electricity infrastructure, natural hazard layers, and critical community infrastructure into a series of maps. The project demonstrated that a single system containing both electric utility and community infrastructure data—as well as information about natural hazards—will help the state of California, the IOUs, first responders, and long-term planners better prepare for—and thus lower their exposure to these ongoing and emerging hazards. The project also identified a number of challenges that will need to be overcome before it is possible to stand up a single system to display this information.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Network Capacity Market Design: Marginal Distribution Capacity Pricing Mechanism for Efficient Investment and Cost Allocation

As electricity markets begin to shift from reliance on large, centralized power plants and towards distributed energy resources (DERs), there is a growing acknowledgement that more efficient planning, operations, and oversight is needed in the distribution system. This paper addresses one step in that direction by proposing an auction mechanism that uses a detailed distribution system planning model that allocates permits to end-used customers who request capacity to install new devices at their location and network upgrade contracts to utilities or 3rd-party companies who offer to upgrade system components. The resulting plan maximizes market surplus, that is, maximizes the total benefit to consumers minus the cost of network upgrades. We apply a marginal pricing scheme to the auction’s results such that the cost of each permits or contracts is differentiated by time and location, based on the Lagrangian multipliers of binding network constraints. These prices are shown to be no greater than the bid price of any awarded contract and no less than the offered cost of any awarded upgrade contract. Furthermore, the nonlinearity of power flows in the planning model result in an additional surplus that would be collected by the entity that hosts the auction, which could then be refunded to market participants or used to cover overhead costs of running the market. We provide four example auction results in a simple three-node distribution feeder to demonstrate the properties of the design. Results suggest that larger or more realistic case studies could be a promising next step.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Function Instead of Steady-State Assumption in Time-Series Simulation

The quasi-steady-state assumption in time-series simulation is inadequate to model phenomena of interest to energy system integration such as inverter clipping, sell-back of excess electricity to a utility and utility hosting capacity, and battery throughput. Researchers are working on stochastic modeling, higher-resolution time series data, and machine learning approaches to address this need. This poster describes a distribution function that allows a maximum value, minimum value, and shape to the curve that can vary within each time-step based only on data inputs at the resolution of that time step (eg. Hourly). The distribution function is not used to synthesize high-resolution data, rather scalar integrals are used to calculate the quantities of interest within each time step. The form of the distribution function shows significant reduction in error when compared to 1 minute data and commercial software employing the distribution function (HOMER Pro version 14.3 and higher) shows a much improved estimate of inverter clipping in an example.

battery↗

Performance Metrics to Evaluate Utility Resilience Investments

In 2019, Sandia National Laboratories (Sandia) contracted Synapse Energy Economics (Synapse) to research the integration of community and electric grid resilience investment planning as part of the Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis (BCA), performance metrics, microgrids, and regulatory mechanisms. This report focuses on BCA. BCA is an approach that electric utilities, electric utility regulators, and communities can use to evaluate the costs and benefits of a wide range of grid resilience investments in a comprehensive and consistent way. While BCA is regularly applied to some types of grid investments, application of BCA to grid resilience investments is in the early stages of development. Though resilience is increasingly cited in connection with grid investment proposals and plans, the resilience- related costs and benefits of grid resilience investments are typically not fully identified, infrequently quantified, and almost never monetized. Without complete assessments of costs and benefits, regulators can be hesitant to approve some types of grid resilience investments. This report provides the first application of the framework developed in the 2020 National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources (NSPM for DERs) to grid resilience investments. We provide guidance on next steps for implementation to enable grid resilience investments to receive due consideration. We suggest developing BCA principles and standards for jurisdiction-specific BCA tests. We also recommend identifying the resilience impacts of the investments and quantification of these impacts by establishing utility performance metrics for resilience. Proactive integration of grid resilience investments into existing regulatory processes and practices can increase the capacity of jurisdictions to respond to and recover from the consequences of extreme events. 1 National Energy Screening Project. 2020. National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand Response in Industrial Facilities: Peak Electric Demand

The US Department of Energy’s (DOE’s) Better Buildings, Better Plants Program (Better Plants) is a voluntary energy efficiency leadership initiative for US manufacturers and water/wastewater entities. The program encourages organizations to commit to reducing the energy intensity of their US operations over a 10-year period, typically by 25%. Companies joining Better Plants are recognized by DOE for their leadership in implementing energy efficiency practices and for reducing their energy intensity. Better Plants Partners are assigned to a Technical Account Manager, who can help companies establish energy intensity baselines, develop energy management plans, and identify key resources and incentives from DOE, other federal agencies, states, utilities, and other organizations that can enable them to reach their goals. Better Plants Partners are expected to report their progress to DOE once a year. This involves establishing an energy intensity baseline upon joining the program and then tracking their progress over time. Demand Response in Industrial Facilities: Peak Electrical Demand is intended to help companies understand peak demand response programs offering by their local utility. Manufacturing industries can learn about time-varying rates and smart technologies they can use to help them reduce their energy bills. This guidance document is applicable to companies participating at either the program or challenge level. Although this guide is intended primarily to assist companies participating in Better Plants, the methodologies and guidance within the document are applicable to any organization interested in understanding peak demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Hawaii Meteorology, Energy and Transmission (MET) Toolkit

Reliable long-term resource adequacy and grid planning in Hawaii require precise, multi-decadal meteorological records. This paper introduces the Hawaii Meteorology, Energy and Transmission (MET) Toolkit, a 26-year (2000-2025) high-fidelity atmospheric dataset developed by the National Laboratory of the Rockies (NLR). We present a validation study of the underlying WRF model configurations, comparing the legacy MYNN PBL scheme against an alternative YSU formulation. Using vertical lidar profiles and surface buoy data, our analysis identified a foundational geometric distortion in the legacy NOW-23 Hawaii dataset caused by an incorrect grid projection. When evaluated on a corrected, zero-distortion grid, the YSU scheme demonstrated superior performance in bias and cRMSE compared to the legacy setup. To address these findings, the MET Toolkit has been re-produced as a unified 26-year record using the optimized YSU setup and corrected geometry. This dataset offers the Hawaii power sector a robust, validated, and homogenous reference for future grid resilience and energy integration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MegaWatt Mayhem: Grid Operator Challenges Center Loads

This report provides a summary of the challenges faced by United States electricity grid operators in accommodating and anticipating the rapid deployment of large loads, particularly data centers, based on academic literature and industry working groups. The report highlights the unique requirements and operational characteristics of data centers, which differ significantly from traditional industrial loads. Key issues addressed utility planning considerations, with emphasis on the implications for grid operators, impacts to normal operations for grid operators, reliability considerations during periods of grid stress, and resilience considerations for the changing operational paradigms based on data centers. Real-world examples are used to highlight these challenges and the changes that grid operators must address. The findings underscore the necessity for coordinated efforts and innovative solutions from both grid operators and regulatory bodies to ensure the stable integration of large loads into the grid. This report is the first in a series that will explore the challenges of data center deployments based on several key power system perspectives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Northeast Freight Corridor Charging Plan (Roadmap Report)

Final report produced as part of grant awarded to National Grid. The final report is a roadmap of 39 prioritized sites. These sites would create a minimum viable network of charging infrastructure, enabling the electrification of trucks across the Northeast

02 PETROLEUM↗

Bridging the Gap on Data, Metrics, and Analyses for Grid Resilience to Weather Events: Information that utilities can provide regulators, state energy offices, and other stakeholders

A growing number of states require regulated utilities to file resilience plans to improve the electric grid’s ability to anticipate, withstand, adapt to and recover from increasingly severe weather events. This report aims to help state regulators identify and request data, metrics, and analyses from utilities and use it in decisions on utility resilience plans and investments. The report reviews state requirements and utility plans focused on overall grid resilience, climate change resilience and vulnerabilities, infrastructure modernization, storm protection, and wildfire mitigation. It details types of data, metrics, and analyses across five categories--and provides examples of each from the utility plans. The first category is vulnerability assessments, or evaluations of the susceptibility of systems, communities, or assets to potential harm from identified hazards. The second is data on hazards and the exposure of utility assets and customers to these hazards. The third is attribute metrics, or system characteristics that contribute to or describe the resilience of a system. The fourth is performance metrics, which are impacts of resilience investments on system performance--typically a reduction of negative impacts from hazard events. Finally, evaluation and prioritization are analyses that utilities conduct to estimate impacts from resilience measures (evaluation) and prioritize measures based on costs and estimated impacts (prioritization). The report concludes with examples of key trends and emerging best practices for states and utilities, and identifies areas for further research.

24 POWER TRANSMISSION AND DISTRIBUTION↗