Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

JSC Metal Finishing Waste Minimization Methods

THe paper discusses the following: Johnson Space Center (JSC) has achieved VPP Star status and is ISO 9001 compliant. The Structural Engineering Division in the Engineering Directorate is responsible for operating the metal finishing facility at JSC. The Engineering Directorate is responsible for $71.4 million of space flight hardware design, fabrication and testing. The JSC Metal Finishing Facility processes flight hardware to support the programs in particular schedule and mission critical flight hardware. The JSC Metal Finishing Facility is operated by Rothe Joint Venture. The Facility provides following processes: anodizing, alodining, passivation, and pickling. JSC Metal Finishing Facility completely rebuilt in 1998. Total cost of $366,000. All new tanks, electrical, plumbing, and ventilation installed. Designed to meet modern safety, environmental, and quality requirements. Designed to minimize contamination and provide the highest quality finishes.

Sullivan, Erica↗

Simplex turbopump design

Turbomachinery used in liquid rocket engines typically are composed of complex geometries made from high strength-to-weight super alloys and have long design and fabrication cycle times (3 to 5 years). A simple, low-cost turbopump is being designed in-house to demonstrate the ability to reduce the overall cost to $500K and compress life cycle time to 18 months. The simplex turbopump was designed to provide a discharge pressure of 1500 psia of liquid oxygen at 90 lbm/s. The turbine will be powered by gaseous oxygen. This eliminates the need for an inter-propellant seal typically required to separate the fuel-rich turbine gases from the liquid oxygen pump components. Materials used in the turbine flow paths will utilize existing characterized metals at 800 deg R that are compatible with a warm oxygen environment. This turbopump design would be suitable for integration with a 40 K pound thrust hybrid motor that provides warm oxygen from a tapped-off location to power the turbine. The preliminary and detailed analysis was completed in a year by a multiple discipline, concurrent engineering team. Manpower, schedule, and cost data were tracked during the process for a comparison to the initial goal. The Simplex hardware is the procurement cycle with the expectation of the first test to occur approximately 1.5 months behind the original schedule goal.

Marsh, Matt↗

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The LUVOIR study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale. While NASA's flagships perform exquisitely once on-orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA's future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship's lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA's current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity.. This paper briefly comments on the science motivation for NASA's flagships and on the science motivation for a LUVOIR-like mission. We argue the motivation for improving NASA's flagships development cost and schedule performance. We review the specific challenges of NASA's flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagship and other large government project lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA's flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA's future flagship's cost and schedule performance.

Crooke, Julie A.↗

LANDSAT: Non-US standard catalog no. N-33

A catalog used for dissemination of information regarding the availability of LANDSAT imagery is presented. The Image Processing Facility of the Goddard Space Flight Center, publishes a U.S. and a Non-U.S. Standard Catalog on a monthly schedule, and the catalogs identify imagery which has been processed and input to the data files during the referenced month. The U.S. Standard Catalog includes imagery covering the continental United States, Alaska and Hawaii; the Non-U.S. Catalog identifies all the remaining coverage. Imagery adjacent to the continental U.S. and Alaska borders is included in the U.S. Standard Catalog.

Source record↗

SNAP: Simulating New Acquisition Processes

Simulation models of acquisition processes range in scope from isolated applications to the 'Big Picture' captured by SNAP technology. SNAP integrates a family of models to portray the full scope of acquisition planning and management activities, including budgeting, scheduling, testing and risk analysis. SNAP replicates the dynamic management processes that underlie design, production and life-cycle support. SNAP provides the unique 'Big Picture' capability needed to simulate the entire acquisition process and explore the 'what-if' tradeoffs and consequences of alternative policies and decisions. Comparison of cost, schedule and performance tradeoffs help managers choose the lowest-risk, highest payoff at each step in the acquisition process.

Alfeld, Louis E.↗

RDD-100 and the systems engineering process

An effective systems engineering approach applied through the project life cycle can help Langley produce a better product. This paper demonstrates how an enhanced systems engineering process for in-house flight projects assures that each system will achieve its goals with quality performance and within planned budgets and schedules. This paper also describes how the systems engineering process can be used in combination with available software tools.

Averill, Robert D.↗

A dataflow analysis tool for parallel processing of algorithms

A graph-theoretic design process and software tool is presented for selecting a multiprocessing scheduling solution for a class of computational problems. The problems of interest are those that can be described using a dataflow graph and are intended to be executed repetitively on a set of identical parallel processors. Typical applications include signal processing and control law problems. Graph analysis techniques are introduced and shown to effectively determine performance bounds, scheduling constraints, and resource requirements. The software tool is shown to facilitate the application of the design process to a given problem.

Jones, Robert L., III↗

Constraint-Based Off-Nominal Behavior Modeling for Europa Clipper

The risk analysis for the Europa Clipper mission evaluates the probability of mission failure based on the failure rates of individual components and dependencies among them. The probabilities are calculated by integrating over the intervals of time within which a fault occurs, accounting for an infinite number of cases. The response of the spacecraft to different faults can result in different schedules of activities, changing the intervals of integration. Europa currently uses models of spacecraft systems and components to simulate individual flight scenarios. The goal is to develop a framework for integrating, automating, and improving this modeling process. We describe an approach to generating the schedules for the different fault cases and determining the intervals for faults. It is not enough to just simulate individual cases because we are working with continuous variables that generate an infinite number of possible futures. Instead, we determine time windows within which certain faults can occur and use these time windows as bounds for integration. We found that determining these time windows is a constraint optimization problem. In order to represent these problems, we employ a language based on ontologies of behavior and scenarios. The language enables us to specify constraints in a simple, declarative syntax. A constraint-based analysis engine uses the declarative specification to identify bounds on system parameters and fill in details of behavior. For example, we created a detailed model of power generation, power use, and the corresponding effects on the battery in order to determine when an undervoltage fault can occur. An undervoltage during a trajectory correction maneuver requires that thrusting be interrupted for just enough time to recharge the battery such that the maneuver can be completed within battery limits. This behavior is generated based on the model to minimize the interruption time. For certain scenarios the constraint optimization problems were simple enough to be solved by hand, but the framework made the process substantially faster. It also produced solutions to other problems that we could not solve by hand or with existing tools and allowed us to generate and run many scenarios at once. The scenario language and engine greatly simplified the process of identifying time bounds and separating cases.

Everline, Chester J.↗

Deep Space Network Scheduling Using Evolutionary Computational Methods

The paper presents the specific approach taken to formulate the problem in terms of gene encoding, fitness function, and genetic operations. The genome is encoded such that a subset of the scheduling constraints is automatically satisfied. Several fitness functions are formulated to emphasize different aspects of the scheduling problem. The optimal solutions of the different fitness functions demonstrate the trade-off of the scheduling problem and provide insight into a conflict resolution process.

Deep Space Network (DSN)↗

VPS GRCop-84 Liner Development Efforts

For the past several years, NASA's Marshall Space Flight Center (MSFC) has been working with Plasma Processes, Inc. (PPI) to fabricate combustion chamber liners using the Vacuum Plasma Spray (VPS) process. Multiple liners of a variety of shapes and sizes have been created. Each liner has been fabricated with GRCop-84 (a copper alloy with chromium and niobium) and a functional gradient coating (FGC) on the hot wall. While the VPS process offers versatility and a reduced fabrication schedule, the material system created with VPS allows the liners to operate at higher temperatures, with maximum blanch resistance and improved cycle life. A subscal unit (5K lbf thrust class) is being cycle tested in a LOX/Hydrogen thrust chamber assembly at MSFC. To date, over 75 hot-fire tests have been accumulated on this article. Tests include conditions normally detrimental to conventional materials, yet the VPS GRCop-84 liner has yet to show any signs of degradation. A larger chamber (15K lbf thrust class) has also been fabricated and is being prepared for hot-fire testing at MSFC near the end of 2003. Linear liners have been successfully created to further demonstrate the versatility of the process. Finally, scale up issues for the VPS process are being tackled with efforts to fabricate a full size, engine class liner. Specifically, a liner for the SSME's Main Combustion Chamber (MCC) has recently been attempted. The SSME size was chosen for convenience, since its design was readily available and its size was sufficient to tackle specific issues. Efforts to fabricate these large liners have already provided valuable lessons for using this process for engine programs. The material quality for these large units is being evaluated with destructive analysis and these results will be available by the end of 2003.

Elam, Sandra K.↗

Development of a polysilicon process based on chemical vapor deposition (phase 1)

A dichlorosilane-based reductive chemical vapor deposition (CVD) process demonstrated is capable of producing, at low cost, high quality polycrystalline silicon. Testing of decomposition reactor heat shields to insure that the shield provides adequate personnel protection assuming a worst case explosion was completed. Minor modifications to a production reactor heat shield provided adequate heat shield integrity. Construction of the redesigned PDU (Process Development Unit) to accommodate all safety related information proceeded on schedule. Structural steel work was completed as is the piping and instrumentation design work. Major pieces of process equipment were received and positioned in the support structure and all transfer piping and conduits to the PDU were installed. Construction was completed on a feed system for supplying DCS to an intermediate sized reactor. The feed system was successfully interfaced with a reactor equipped with a modified heat shield. Reactor checkout was completed.

Mccormick, J.↗

An Evaluation of the ROSE System

A request-oriented scheduling engine, better known as ROSE, is under development within the Flight Projects Directorate for the purpose of planning and scheduling of the activities and resources associated with the science experiments to be performed aboard the International Space Station (ISS). ROSE is being designed to incrementally process requests from payload developers (PDs) to model and schedule the execution of their science experiments on the ISS. The novelty of the approach comes from its web-based interface permitting the PDs to define their request via the construction of a graphical model to represent their requirements. Based on an examination of the current ROSE implementation, this paper proposes several recommendations for changes to the modeling component and makes mention of other potential applications of the ROSE system.

John M. Usher↗

Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

The Establishment of a Production-ready Manufacturing Process Utilizing Thin Silicon Substrates for Solar Cells

During the months of February and March, work towards the goals of the contract were started as scheduled. The first shipment of thin substrates were received and wafer processing was initiated. The objective of the contract is to investigate, develop and characterize the methods for establishing a production-ready manufacturing process which utilizes thin silicon substrates for solar cells. The thin substrates to be manufactured are three inches diameter, p-type Czochralski wafers of approximately 1 Omega cm resistivity. The wafers are prepared by sawing directly to thickness of 8 mils and 5 mils. To ensure removal of residual saw damage, most substrates are chemically etched to final thicknesses of 7 mils and 4 mils. The thin substrates are used to fabricate solar cells by standard processing techniques.

Pryor, R. A.↗

Automating the Processing of Earth Observation Data

NASA s vision for Earth science is to build a "sensor web": an adaptive array of heterogeneous satellites and other sensors that will track important events, such as storms, and provide real-time information about the state of the Earth to a wide variety of customers. Achieving this vision will require automation not only in the scheduling of the observations but also in the processing of the resulting data. To address this need, we are developing a planner-based agent to automatically generate and execute data-flow programs to produce the requested data products.

Golden, Keith↗

Automated Data Processing as an AI Planning Problem

NASA s vision for Earth Science is to build a "sensor web"; an adaptive array of heterogeneous satellites and other sensors that will track important events, such as storms, and provide real-time information about the state of the Earth to a wide variety of customers. Achieving his vision will require automation not only in the scheduling of the observations but also in the processing af tee resulting data. Ta address this need, we have developed a planner-based agent to automatically generate and execute data-flow programs to produce the requested data products. Data processing domains are substantially different from other planning domains that have been explored, and this has led us to substantially different choices in terms of representation and algorithms. We discuss some of these differences and discuss the approach we have adopted.

Golden, Keith↗