Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SPC-70702 Rev 0 Zircaloy-4 Debris Shields for Use in MARVEL Build to Print Fabrication Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Zircaloy-4 debris shields. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70773 Rev 0 MARVEL Central Insurance Absorber Gray Rod Build to Print Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Central Insurance Absorber Structure (CIAS) Gray Rod (Hafnium). B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70774 Rev 0 MARVEL Black Rod B4C Pellets Print Fabrication Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Black Rod B4C pellets. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70808 Rev 0 AL-30 Secondary Support Standoff Blocks Build to Print Fabrication for Use in MARVEL

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL AL-30 Secondary Support Standoff Blocks manufactured by Zircar. The design requires twelve blocks; however, the requested quantity shall be 16 to account for required testing after receipt of materials. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-2772 Rev 2 General Build to Print Fabrication Specification for Nuclear Use Items

This specification is for use with Safety Significant structures, systems, and components. The scope is for build to print fabrication including, but not limited to, machining, forming, welding, cutting, assembling, etc. Specific scope and associated requirements will be identified in drawings and/or additional procurement documents. ASME B31 fabrication is not included in the scope of this specification. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70804 Rev 1 Zircar ZAL-45 Alumina Standoff Plates for Use in MARVEL

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL ZAL-45 standoff plates manufactured by Zircar. The design requires eight (8) ceramic standoff plates; however, the requested quantity shall be twelve to account for required testing after receipt of materials. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70843 Rev 0 MARVEL Control Drum Actuator Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of components that make up the control drum (CD) actuators. This specification outlines the requirements for fabrication, acknowledging that specific elements will integrate into final assemblies, while others will be delivered as standalone components. The Subcontractor is not responsible for the CD actuator’s final assembly. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Development of a Fluxless Flip Chip Bonding Process for Optical Military Electronics

As military electronics tend to become lighter, smaller, thinner, and lower cost, the use of flip chip technology is becoming more common place to meet system requirements, yet survive environments. This paper explores the development of an optical flip chip application and details the selection/qualification of the substrate. The selected assembly consists of a procured 1x12 Vertical Cavity Surface Emitting Laser (VCSEL) die, having 80um diameter eutectic AuSn solder bumps at 250um pitch and flip chip bonded to a .006” thick 99.6% alumina substrate with .006” diameter thru holes and metallized with 500Å WTi, under minimum 2.0-3.0μm (80-120μ”) thin film deposited Au. An 8 run, 3 factor, 2 level Full Factorial Design of Experiments (DOE) was completed on procured detector arrays and procured ceramic substrates using the Suss Microtec FC150. The optimum settings for the peak temperature, peak time and final die z-height were selected using the ANOVA results and interaction plots. Additional studies were completed to qualify in-house produced substrates. An epoxy glob-top encapsulant was selected to dissipate stress on the flip chip solder joints and to enhance thermal shock performance.

42 ENGINEERING↗

JEFFERSON LAB 12 GEV CEBAF UPGRADE

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

43 PARTICLE ACCELERATORS↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning

Recent changes to the principal causes of energy shortage events on the electric grid have necessitated are thinking of paradigms for resource adequacy (RA) assessment and the related topic of procurement of a reliable portfolio. Prior studies have laid out elements of a modern paradigm for these planning activities, but there does not exist a comprehensive overview of the topic spanning academic and gray literature, and the relationship of these suggested paradigms to methods used in industry has also not been surveyed. In this paper we review recent literature establishing best practices for RA assessment and reliable portfolio procurement, and survey current practices used in industry in relation to these best practices. We establish seven key best practices for RA assessment, cover a modern methodology for capacity accreditation, and find that industry practices are not far behind the identified best practices, though some key gaps remain. We also present a suggested agenda for both academic research on the topic and opportunities for advancement in the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY11 Level-2 Milestone 3953: TLCC2 contract awarded

This report documents completion of FY11 L2 milestone No.3953-TLCC2 contract award. This milestone was scheduled for completion on 3/31/11 and was completed on 4/14/11. There is a separate milestone (3856), due at the end of the fiscal year, concerned with installation of the first LLNL SU and early user access. Efforts related to this tri-lab L2 milestone started early in 2010 with the development of tri-lab requirements for the second ASC capacity system procurement. The SOW was then developed along with necessary RFP paperwork and sent to HQ/DOE for their review prior to being released. There was significant delay in getting this step completed which led to this milestone being put at risk for several months. However, once the RFP was approved and released we were able to get the procurement back on track with aggressive proposal response and review timelines.

97 MATHEMATICS AND COMPUTING↗

TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33% and 40% renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33% and 40% renewable scenarios. A storage device that can participate in energy and ancillary service markets provides the grid with the greatest benefit; the mandated storage requirement of 1,325 MW was estimated to reduce the total cost of production by about 78 million per year in the 33% scenario and 144 million per year in the 40% scenario. Much of this value is derived from the avoided start and stop costs of thermal generators and provision of ancillary services. A device on the 2024 California grid and participating in only ancillary service markets can provide the system with over 90% of the value as the energy and ancillary service device. The analysis points to the challenge of new storage providing regulation reserve, as the added storage could provide about 75% of the regulation up requirement for all of California, which would likely greatly reduce regulation prices and potential revenue. The addition of storage in California decreases renewable curtailment, particularly in the 40% RPS case. Following previous analysis, storage has a mixed impact on emissions, generally reducing emissions, but also creating additional incentives for increased emissions from out-of-state coal generations. Overall, storage shows significant system cost savings, but analysis also points to additional challenges associated with full valuation of energy storage, including capturing the operational benefits calculated here, but also recovering additional benefits associated avoided generation, transmission, and distribution capacity, and avoided losses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Solar Market Pathway for Independent Colleges in Virginia

Building on its history of facilitating collaboration among its members, in 2014 the Council of Independent Colleges in Virginia submitted a proposal for a United States Department of Energy Solar Market Pathways grant, a program of the U.S. Department of Energy’s SunShot Initiative. Fifteen CICV member institutions signed onto the proposal to increase solar energy use at Independent Colleges in Virginia, and the application was successful. The primary objective of the Solar Market Pathway for Independent Colleges in Virginia (SMP-ICV) project was to enable a statewide network of private colleges to plan for and jointly procure solar photovoltaic (PV) arrays for deployment on their campuses. While the primary goal of the project was to create a revolving joint procurement model to be implemented over the course of 5 years, the process itself was also important and brought significant value to the participating colleges and their communities. This report outlines the results of the project.

14 SOLAR ENERGY↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗