Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Design and Optimization of Photovoltaics Recycling Infrastructure

With the growing production and installation of photovoltaics (PV) around the world constrained by the limited availability of resources, end-of-life management of PV is becoming very important. A few major PV manufacturers currently are operating several PV recycling technologies at the process level. The management of the total recycling infrastructure, including reverse-logistics planning, is being started in Europe. In this paper, we overview the current status of photovoltaics recycling planning and discuss our mathematic modeling of the economic feasibility and the environmental viability of several PV recycling infrastructure scenarios in Germany; our findings suggest the optimum locations of the anticipated PV take-back centers. Short-term 5-10 year planning for PV manufacturing scraps is the focus of this article. Although we discuss the German situation, we expect the generic model will be applicable to any region, such as the whole of Europe and the United States.

14 SOLAR ENERGY↗

Hybrid Resources: Challenges, Implications, Opportunities, and Innovation

The electric power system has historically been designed to provide reliable energy to loads by using a relatively small number of well-understood generators. The distinction between load, generation, and transmission resources has been quite clear. Most of the responsibility for planning and operating a system - building a highly reliable network from less reliable parts - has been with the system manager, whether that be a utility, a regional market operator, or some similar entity. Given this historical context, many experts were initially perplexed by the rapidly growing popularity of hybrid resources, which combine multiple technologies into a single entity. Rather than depending on a system operator to provide instructions to individual technologies, hybrid resources intentionally take on more operational responsibility by optimizing and scheduling their combined functions. Interconnection queues in many regions reveal a large and growing interest in hybrids, suggesting that project developers and investors see them as providing advantages.

generators↗

A retrospective planning analysis comparing intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) using two optimization algorithms for the treatment of early-stage prostate cancer

The primary aim of this study is to compare intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) for the radical treatment of prostate cancer using version 10.0 (v10.0) of Varian Medical Systems, RapidArc radiation oncology system. Particular focus was placed on plan quality and the implications on departmental resources. The secondary objective was to compare the results in v10.0 to the preceding version 8.6 (v8.6). Twenty prostate cancer cases were retrospectively planned using v10.0 of Varian's Eclipse and RapidArc software. Three planning techniques were performed: a 5-field IMRT, VMAT using one arc (VMAT-1A), and VMAT with two arcs (VMAT-2A). Plan quality was assessed by examining homogeneity, conformity, the number of monitor units (MUs) utilized, and dose to the organs at risk (OAR). Resource implications were assessed by examining planning and treatment times. The results obtained using v10.0 were also compared to those previously reported by our group for v8.6. In v10.0, each technique was able to produce a dose distribution that achieved the departmental planning guidelines. The IMRT plans were produced faster than VMAT plans and displayed improved homogeneity. The VMAT plans provided better conformity to the target volume, improved dose to the OAR, and required fewer MUs. Treatments using VMAT-1A were significantly faster than both IMRT and VMAT-2A. Comparison between versions 8.6 and 10.0 revealed that in the newer version, VMAT planning was significantly faster and the quality of the VMAT dose distributions produced were of a better quality. VMAT (v10.0) using one or two arcs provides an acceptable alternative to IMRT for the treatment of prostate cancer. VMAT-1A has the greatest impact on reducing treatment time.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Optimizing Microgrid Energy Delivery Under High Uncertainty

One of the largest transitions in the power system today is the shift to a more sustainable and resilient power system. This is being driven by public opinion, changes in regulatory policies, and advancements in smart grid technologies. The most noticeable changes taking place is the integration of distributed energy sources (DERs); this study uses the term DER in the most general way as a resource that can be manipulated to alter energy delivery and flow in the transmission and distribution networks. Also, here it is preferred to focus on energy as the true need while power is a function of the equipment rating. As such, wind and solar, demand that can be manipulated, electric vehicles, electric energy storage, thermal storage, and storage in water system are all considered DERs. These additions to the distribution system are evolving the operation of distribution feeders into microgrids- communication, computing, and control-enabled resources that produce, transport, and utilize energy in a manner that provides cost, reliability, and resilience benefits. As this evolution progresses, the planning and operational management (scheduling and control) must explicitly include the consideration of risk. The management of system risk is currently in the purview of the utility and will likely remain so in the future. However, as each microgrid, as well as federation of microgrids, sees autonomy in order to provide maximum benefits to their constituents, they must assume responsibility to manage their internal risk. The primary scope of this study is the scheduling of resources in a distribution feeder(s) operating as microgrids. The study explores a distribution algorithm to develop the transactive schedule for the DERs, to minimize cost and risk over a time horizon, and an initial laboratory-scale to conduct implementation on distributed hardware. Results from case studies are presented that show that solutions derived by the distributed algorithm are valid. This study also discusses the continuing work on the expansion of: 1) the distributed algorithm from a deterministic to stochastic optimization formulation, and 2) implementation of the distributed algorithm into real-time simulation within the Power System laboratory at New Mexico State University (NMSU) and expanding to the Southwest Technology Development Institute located at NMSU where actual solar, energy storage, and demand response resources are installed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigation into Scalable and Detection-Enhanced Satellite Conjunction Assessment

Imaging opportunities (viewable conjunctions) of Resident Space Objects (RSOs) by satellites are not continuously discovered. We propose to continuously produce and report viewable conjunctions among objects in orbit. Viewable conjunctions are events in space and time when a satellite may favorably view a Resident Space Object (RSO). Favorability is defined by a set of constraints, e.g., solar illumination, distance between observer and target, orbital location for viewable event. Computing viewable conjunctions requires calculation of orbital propagation while considering constraints based on the state vectors of position, velocity, with covariance for both satellite and RSO. We propose two parallel lanes of effort: acceleration and research. The objective of acceleration is to avoid missed opportunities and reduce latency for satellite maneuver requests through continuous prediction and reporting of viewable conjunctions. The effort will begin by deploying currently available software on dedicated systems and continue with optimizing the code for high performance computing hardware. The research lane aims to expand RSO inspection and modeling capabilities. Among our current research ideas are spectral characterization of RSO materials and planning multiple observations to recover RSO 3D form. Computing resources at Oak Ridge National Laboratory (ORNL) are available for the acceleration work. Laika, Maxar conjunction prediction dashboard software, and Bluesim, Maxar orbital propagation software, are expected to be the first software in the acceleration lane. Laike and Bluesim are to be provided by the sponsor, and output will be made accessible through its dashboard. Deliverables will follow a gated schedule to the sponsor. ORNL will provide progressively more robust viewable conjunction assessments from both modelled and actual ephemerides.

97 MATHEMATICS AND COMPUTING↗

Initial Findings from US Department of Energy’s Better Plants Virtual in-Plant Training on 50001 Ready

Manufacturing facilities use about 35% of the domestic energy in the United States every year. Implementing an effective energy management system (EnMS) is one of the most important approaches to improve energy efficiency. However, the implementation of EnMS is low for many countries (including the US) and even for energy-intensive sectors. The reasons for the low implementation rate of energy management systems had been investigated by multiple researchers, but very few studies have focused on the barriers and challenges of implementing ISO 50001-based energy management systems. To contribute to this understudied area, this paper discusses the implementation and outcomes of the first Better Plants 50001 Ready Virtual In-plant Training. This paper first provides an overview of 50001 Ready and the 50001 Ready Navigator Tool. Then, it provides details on this training event and its outcomes. Finally, it discusses findings from the responses to 40 live polling questions about the status of the 25 tasks of the 50001 Ready Navigator for participating companies, key components of the participating manufacturing companies’ energy management systems, and challenges and barriers that these companies are facing. The findings suggest that although many companies understood the importance of an effective energy management system, about half of them do not understand the required resources for building energy management systems, and most of them have only just begun establishing these systems and need more assistance and resources in multiple areas. More specifically, more assistance is necessary for the following: (1) improving corporate management’s understanding of the time and resources needed to build an EnMS as well as the benefits; (2) creating linear regression models for more accurate energy performance tracking; (3) understanding energy use, collecting and analyzing energy performance data; (4) optimizing equipment operational controls, and creating action plans.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distributed Energy Resources On-Site Optimization for Commercial Buildings with Electric and Thermal Storage Technologies

The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic as well as environmental attractiveness of on-site generation (e.g., PV, fuel cells, reciprocating engines or microturbines operating with or without CHP) and contribute to enhanced demand response. In order to examine the impact of storage technologies on demand response and carbon emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that has the minimization of annual energy costs as its objective function. By implementing this approach in the General Algebraic Modeling System (GAMS), the problem is solved for a given test year at representative customer sites, such as schools and nursing homes, to obtain not only the level of technology investment, but also the optimal hourly operating schedules. This paper focuses on analysis of storage technologies in DER optimization on a building level, with example applications for commercial buildings. Preliminary analysis indicates that storage technologies respond effectively to time-varying electricity prices, i.e., by charging batteries during periods of low electricity prices and discharging them during peak hours. The results also indicate that storage technologies significantly alter the residual load profile, which can contribute to lower carbon emissions depending on the test site, its load profile, and its adopted DER technologies.

25 ENERGY STORAGE↗

Robust and resilient coordination of feeders with uncertain distributed energy resources: from real-time control to long-term planning

To enable flexible demand and ensure reliable and economical operation of distribution systems, we present a novel hierarchical scheme that actively coordinates responsive behind-the-meter grid resources, including distributed energy resources (DERs), to reliably manage each unbalanced distribution feeder and exploits the available flexibility to economically optimize the entire network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

14 SOLAR ENERGY↗

Probabilistic Reasoning for Robustness in Automated Planning

A general-purpose computer program for planning the actions of a spacecraft or other complex system has been augmented by incorporating a subprogram that reasons about uncertainties in such continuous variables as times taken to perform tasks and amounts of resources to be consumed. This subprogram computes parametric probability distributions for time and resource variables on the basis of user-supplied models of actions and resources that they consume. The current system accepts bounded Gaussian distributions over action duration and resource use. The distributions are then combined during planning to determine the net probability distribution of each resource at any time point. In addition to a full combinatoric approach, several approximations for arriving at these combined distributions are available, including maximum-likelihood and pessimistic algorithms. Each such probability distribution can then be integrated to obtain a probability that execution of the plan under consideration would violate any constraints on the resource. The key idea is to use these probabilities of conflict to score potential plans and drive a search toward planning low-risk actions. An output plan provides a balance between the user s specified averseness to risk and other measures of optimality.

Schaffer, Steven↗

Autonomous Energy Systems: Building Reliable, Resilient, and Secure Electrified Communities

Technological changes across energy systems are forcing utilities and operators to reconsider their methods for managing power delivery, but few operators have adopted advanced controls and operational software. Their challenge is that every system has peculiar requirements, and the available solutions are relatively new, untested, and difficult to integrate into an operational environment. Through extensive collaboration with utilities and cooperatives, the National Renewable Energy Laboratory has realized the need for autonomous and optimized management of energy resources, leading to the development of Autonomous Energy Systems, a packaged set of controls that is ready to be integrated into existing control rooms.

automation↗

RECOVERY ACT - Robust Optimization for Connectivity and Flows in Dynamic Complex Networks

The goal of this project was to study robust connectivity and flow patterns of complex multi-scale systems modeled as networks. Networks provide effective ways to study global, system level properties, as well as local, multi-scale interactions at a component level. Numerous applications from power systems, telecommunication, transportation, biology, social science, and other areas have benefited from novel network-based models and their analysis. Modeling and optimization techniques that employ appropriate measures of risk for identifying robust clusters and resilient network designs in networks subject to uncertain failures were investigated in this collaborative multi-university project. In many practical situations one has to deal with uncertainties associated with possible failures of network components, thereby affecting the overall efficiency and performance of the system (e.g., every node/connection has a probability of partial or complete failure). Some extreme examples include power grid component failures, airline hub failures due to weather, or freeway closures due to emergencies. These are also situations in which people, materials, or other resources need to be managed efficiently. Important practical examples include rerouting flow through power grids, adjusting flight plans, and identifying routes for emergency services and supplies, in the event network elements fail unexpectedly. Solutions that are robust under uncertainty, in addition to being economically efficient, are needed. This project has led to the development of novel models and methodologies that can tackle the optimization problems arising in such situations. A number of new concepts, which have not been previously applied in this setting, were investigated in the framework of the project. The results can potentially help decision-makers to better control and identify robust or risk-averse decisions in such situations. Formulations and optimal solutions of the considered problems need to capture uncertainty and risk using appropriate probabilistic, statistical and optimization concepts. The main difficulty arising in addressing these issues is the dramatic increase in the computational complexity of the resulting optimization problems. This project studied novel models and methodologies for risk-averse network optimization- specifically, network design, network flows and cluster detection problems under uncertainty. The approach taken was to incorporate a quantitative risk measure known as conditional value-at-risk that is widely used in financial applications. This approach presents a viable alternate modeling and optimization framework to chance-constrained optimization and mean-variance optimization, one that also facilitates the detection of risk-averse solutions.

97 MATHEMATICS AND COMPUTING↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decision support for integrated water-energy planning.

Currently, electrical power generation uses about 140 billion gallons of water per day accounting for over 39% of all freshwater withdrawals thus competing with irrigated agriculture as the leading user of water. Coupled to this water use is the required pumping, conveyance, treatment, storage and distribution of the water which requires on average 3% of all electric power generated. While water and energy use are tightly coupled, planning and management of these fundamental resources are rarely treated in an integrated fashion. Toward this need, a decision support framework has been developed that targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. The framework integrates analysis and optimization capabilities to identify trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., national, state, county, watershed, NERC region). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. Ultimately, this open and interactive modeling framework provides a tool for evaluating competing policy and technical options relevant to the energy-water nexus.

13 HYDRO ENERGY↗

Contingency contractor optimization Phase 2, model description and formulation

The goal of Phase 2 the OSD ATL Contingency Contractor Optimization project is to create a prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. Additional features allow the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements and recommend where investments in manpower capabilities might minimize the overall total force costs in future operations.

Gearhart, Jared L.↗

Contingency Contractor Optimization: Phase 3, Model Description and Formulation

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗

Contingency contractor optimization.

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗

Bamboo Bio-composite Truck/Trailer Decking

Bamboo is one of the fastest growing plants in the world. Massively productive, bamboo will maintain that productivity with limited inputs and minimal management resulting in predictable volume and operating margins and with low overhead. The goal of this project was to develop a bamboo bio-composite trailer decking product that replaces apitong, is lighter weight, stronger and luminescent. The collaboration partners, Fontaine, Resource Fiber and IACMI, worked closely to develop the bamboo bio-composite decking to Fontaine Trailer’s (end-user) specifications. The various technological objectives were (a) To conduct a comprehensive Design of Experiments study for bamboo composites to understand the structure-property relationships for different resin composites and bamboo forms (strips, woven, bulk etc); (b) To establish the nail pull out characteristics of trailer deck geometry bamboo composite form. The nail pull out is a critical test in trailer decks; (c) To design, process and prototype select number of trailer decking planks for Fontaine evaluation; and (d) To conduct life cycle analysis to conduct energy calculations from the various conversion steps of the bamboo from crop to product. The project meets DOE/IACMI metrics of reduced embodied energy, lightweighting and lowering the cost of the end product. It also offers a green solution to a value-added application, i.e. trailer decking. The development goals and benefits of bamboo composite decking included: A. Decreased weight when compared to Apitong and Gen 1, thereby reducing operating costs and petroleum usage due to increased miles per gallon. B. Flexibility to allow camber design into trailers. C. Luminescence to increase safety during low light and dark conditions. D. Composite material to maximize use of bamboo bio-composites as substitute for petroleum-based composites. E. Embedded layer(s) of conditioned bamboo for added strength and stability. F. Improved safety over Apitong by temporary cargo indentation in planks for better stability. G. Cradle-to-cradle design so end-of-life becomes beginning-of-life for other products. Resource Fiber’s bamboo biocomposite trailer decking passed nail pullout tests as compared to apitong (incumbent), was lighter weight than apitong, and used less embodied energy particularly when bamboo is sourced domestically. The planks were optimized in the lab setting to the extent possible and successfully installed on the trailer at Fontaine for field testing. Despite the process not being fully optimized due to through-heat and tooling limitations within the budget constraints, the prototype decking withstood 400 cycles of reverse fatigue loading of a 107,000 lb Caterpillar 349F which was extreme conditions of field testing by Fontaine Trailer. Resource Fiber plans to outsource production of a next round of planks with a commercial pultrusion processor, then to do a re-test with Fontaine Trailers. Tooling specific to the part is required. Long-term commercial plans are to continue outsourcing production while supplying bamboo fiber and mats. Commercial markets include heavy haul trailers, military trailers, and decking for marine, industrial and residential use.

36 MATERIALS SCIENCE↗

Analytical Modeling of Planetary Excavation for in Situ Resource Utilization

The space-faring capabilities of humans are dependent on the ability to interact with plan-etary surfaces safely and efficiently and utilize local re-sources. Since planetary regolith will be the primary feedstock for in situ resource utilization (ISRU) and infrastructure development activities [1,2], the site-specific geomechanical properties must be understood to optimize excavation operations [3]. Excavating planetary regolith is challenging due to its unique geomechanical properties, 1/6th G reduced gravity extreme conditions, and limited energy resources. Therefore, it is critical to develop technologies that reduce excavation force requirements and minimize tool path inefficiencies to save time and energy during planetary re-source acquisition and infrastructure development [3]. There have been several experimental investigations of methods to optimize planetary excavations [4,5], but none developed predictive capabilities. This abstract presents a simple analytical method that will be used to model laboratory and mission excavation data. Future work will build on the simple analytical method here to include high-fidelity numerical simulations of planetary excavation mechanics.

Regolith↗