Search NASA⌕ Search

SEARCH · Search NASA

Results for “rover simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗

Preliminary investigation of parameter sensitivities for atmospheric entry and aerobraking at Mars

The proposed manned Mars mission will need to be as weight efficient as possible. A way of lowering the weight of the vehicle by using aeroassist braking instead of retro-rockets to slow a craft once it reaches its destination is discussed. The two vehicles studied are a small vehicle similar in size to the Mars Rover Sample Return (MRSR) vehicle and a larger vehicle similar in size to a six-person Manned Mars Mission (MMM) vehicle. Simulated entries were made using various coefficients of lift (C sub L), coefficients of drag (C sub D), and lift-to-drag ratios (L/D). A range of acceptable flight path angles with their corresponding bank angle profiles was found for each case studied. These ranges were then compared, and the results are reported here. The sensitivity of velocity and acceleration to changes in flight path angle and bank angle is also included to indicate potential problem areas for guidance and navigation system design.

Lee, Mary C.↗

National Aeronautics and Space Administration (NASA)/american Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1991, Volume 2

The objectives of the program are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participant's institutions; and (4) to contribute to the research objectives of the NASA Centers. A compilation of the final reports on the research projects done by the faculty fellows during the summer of 1991 are presented. Some of the topics covered include: collision avoidance for rover vehicles, bioinstrumentation, neural nets, total quality management of flexible space structures, project scheduling, nondestructive tests, orthostatic intolerance to bedrest, hypersonic reentry simulation, measuring human energy expenditure, tribological models, trace element movement in Anarctic ice, gastrointestinal function, and computer assisted instruction.

Hyman, William A.↗

Thermo Physics Facilities Branch Brochure ARC Jet Complex Fact Sheets, Hypervelocity Free-Flight Aerodynamic Facility Fact Sheets, Ames Vertical Gun Range Fact Sheets

The Ames Arc Jet Complex has a rich heritage of over 40 years in Thermal Protection System (TPS) development for every NASA Space Transportation and Planetary program, including Apollo, Space Shuttle, Viking, Pioneer-Venus, Galileo, Mars Pathfinder,Stardust, NASP,X-33,X-34,SHARP-B1 and B2,X-37 and Mars Exploration Rovers. With this early TPS history came a long heritage in the development of the arc jet facilities. These are used to simulate the aerodynamic heating that occurs on the nose cap, wing leading edges and on other areas of the spacecraft requiring thermal protection. TPS samples have been run in the arc jets from a few minutes to over an hour,from one exposure to multiple exposures of the same sample, in order t o understand the TPS materials response to a hot gas flow environment (representative of real hyperthermal environments experienced in flight). The Ames Arc l e t Complex is a key enabler for customers involved in the three major areas of TPS development: selection, validation, and qualification. The arc jet data are critical for validating TPS thermal models, heat shield designs and repairs, and ultimately for flight qualification.

Fretter, E. F.↗

Rotor CFD Analysis at Terrestrial and Martian Atmospheric Densities

Much effort has been made to enhance exploration on Mars. In addition to a rover and Mars-orbiting satellites, a Mars helicopter (MH) was proposed in order to augment planetary research. Computational Fluid Dynamics (CFD) simulations have been performed to have a better understanding of the behavior and performance of vertical lift Planetary Aerial Vehicles (PAV). Due to the large differences in atmospheric conditions between Mars and Earth, predicting and testing rotorcraft performance is a complex task. The goal of this project is to understand the capability of the mid-fidelity CFD software RotCFD to predict rotor performance in terms of thrust at 1013.25 milibar and 14 milibar corresponding to Terrestrial and Martian conditions, respectively. Also, in order to characterize the wind tunnel wall effects free field and wind tunnel simulations were performed, analyzed and compared. Different analytical tools have been used in order to aid with the design process for the future vertical lift planetary aerial vehicles. One of them includes experimental tests performed on a rotor in the Aeolian Wind Tunnel (AWT) facility at NASA Ames Research Center under different pressure conditions ranging from Terrestrial to Martian atmospheric conditions. Other software was used as well in order to capture the aerodynamic coefficients of the corresponding rotor sections based on the Mach and Reynolds numbers used for the experimental tests. The aerodynamic coefficients were input into RotCFD, and various simulations were performed under Terrestrial and Martian conditions in order to mimic the experimental test. Then, the obtained results from RotCFD were compared with the AWT collected data.

Atmospheric Pressures↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗

Constructing an Educational Mars Simulation

January 14th 2004, President George Bush announces his plans to catalyst the space program into a new era of space exploration and discovery. His vision encompasses a robotics program to explore our solar system, a return to the moon, the human exploration of Mars, and to promote international prosperity towards our endeavors. We at NASA now have the task of constructing this vision in a very real timeframe. I have been chosen to begin phase 1 of making this vision a reality. I will be working on creating an Educational Mars Simulation of human exploration of Mars to stimulate interest and involvement with the project from investors and the community. GRC s Computer Services Division (CSD) in collaboration with the Office of Education Programs will be designing models, constructing terrain, and programming this simulation to create a realistic portrayal of human exploration on mars. With recent and past technological breakthroughs in computing, my primary goal can be accomplished with only the aid of 3-4 software packages. Lightwave 3D is the modeling package we have selected to use for the creation of our digital objects. This includes a Mars pressurized rover, rover cockpit, landscape/terrain, and habitat. Once we have the models completed they need textured so Photoshop and Macromedia Fireworks are handy for bringing these objects to life. Before directly importing all of this data into a simulation environment, it is necessary to first render a stunning animation of the desired final product. This animation with represent what we hope to capture out of the simulation and it will include all of the accessories like ray-tracing, fog effects, shadows, anti-aliasing, particle effects, volumetric lighting, and lens flares. Adobe Premier will more than likely be used for video editing and adding ambient noises and music. Lastly, V-Tree is the real-time 3D graphics engine which will facilitate our realistic simulation. Additional information is included in the original extended abstract.

Henke, Stephen A.↗

Opening Loads Analyses for Various Disk-Gap-Band Parachutes

Detailed opening loads data is presented for 18 tests of Disk-Gap-Band (DGB) parachutes of varying geometry with nominal diameters ranging from 43.2 to 50.1 ft. All of the test parachutes were deployed from a mortar. Six of these tests were conducted via drop testing with drop test vehicles weighing approximately 3,000 or 8,000 lb. Twelve tests were conducted in the National Full-Scale Aerodynamics Complex 80- by 120-foot wind tunnel at the NASA Ames Research Center. The purpose of these tests was to structurally qualify the parachute for the Mars Exploration Rover mission. A key requirement of all tests was that peak parachute load had to be reached at full inflation to more closely simulate the load profile encountered during operation at Mars. Peak loads measured during the tests were in the range from 12,889 to 30,027 lb. Of the two test methods, the wind tunnel tests yielded more accurate and repeatable data. Application of an apparent mass model to the opening loads data yielded insights into the nature of these loads. Although the apparent mass model could reconstruct specific tests with reasonable accuracy, the use of this model for predictive analyses was not accurate enough to set test conditions for either the drop or wind tunnel tests. A simpler empirical model was found to be suitable for predicting opening loads for the wind tunnel tests to a satisfactory level of accuracy. However, this simple empirical model is not applicable to the drop tests.

Cruz, J. R.↗

Advanced Stirling Convertor Testing at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Systems (LMSS), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science and exploration missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. The ASRG will utilize two Advanced Stirling Convertors (ASC) to convert thermal energy from a radioisotope heat source to electricity. NASA GRC has initiated several experiments to demonstrate the functionality of the ASC, including: in-air extended operation, thermal vacuum extended operation, and ASRG simulation for mobile applications. The in-air and thermal vacuum test articles are intended to provide convertor performance data over an extended operating time. These test articles mimic some features of the ASRG without the requirement of low system mass. Operation in thermal vacuum adds the element of simulating deep space. This test article is being used to gather convertor performance and thermal data in a relevant environment. The ASRG simulator was designed to incorporate a minimum amount of support equipment, allowing integration onto devices powered directly by the convertors, such as a rover. This paper discusses the design, fabrication, and implementation of these experiments.

Oriti, Salvatore↗

Advanced Stirling Convertor Testing at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Systems (LMSS), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science and exploration missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. The ASRG will utilize two Advanced Stirling Convertors (ASC) to convert thermal energy from a radioisotope heat source to electricity. NASA GRC has initiated several experiments to demonstrate the functionality of the ASC, including: in-air extended operation, thermal vacuum extended operation, and ASRG simulation for mobile applications. The in-air and thermal vacuum test articles are intended to provide convertor performance data over an extended operating time. These test articles mimic some features of the ASRG without the requirement of low system mass. Operation in thermal vacuum adds the element of simulating deep space. This test article is being used to gather convertor performance and thermal data in a relevant environment. The ASRG simulator was designed to incorporate a minimum amount of support equipment, allowing integration onto devices powered directly by the convertors, such as a rover. This paper discusses the design, fabrication, and implementation of these experiments.

Oriti, Salvatore M.↗

Tele-Operated Lunar Rover Navigation Using Lidar

Near real-time tele-operated driving on the lunar surface remains constrained by bandwidth and signal latency despite the Moon s relative proximity. As part of our work within NASA s Human-Robotic Systems Project (HRS), we have developed a stand-alone modular LIDAR based safeguarded tele-operation system of hardware, middleware, navigation software and user interface. The system has been installed and tested on two distinct NASA rovers-JSC s Centaur2 lunar rover prototype and ARC s KRex research rover- and tested over several kilometers of tele-operated driving at average sustained speeds of 0.15 - 0.25 m/s around rocks, slopes and simulated lunar craters using a deliberately constrained telemetry link. The navigation system builds onboard terrain and hazard maps, returning highest priority sections to the off-board operator as permitted by bandwidth availability. It also analyzes hazard maps onboard and can stop the vehicle prior to contacting hazards. It is robust to severe pose errors and uses a novel scan alignment algorithm to compensate for attitude and elevation errors.

Pedersen, Liam↗

Mars Science Laboratory Flight Software Internal Testing

The Mars Science Laboratory (MSL) team is sending the rover, Curiosity, to Mars, and therefore is physically and technically complex. During my stay, I have assisted the MSL Flight Software (FSW) team in implementing functional test scripts to ensure that the FSW performs to the best of its abilities. There are a large number of FSW requirements that have been written up for implementation; however I have only been assigned a few sections of these requirements. There are many stages within testing; one of the early stages is FSW Internal Testing (FIT). The FIT team can accomplish this with simulation software and the MSL Test Automation Kit (MTAK). MTAK has the ability to integrate with the Software Simulation Equipment (SSE) and the Mission Processing and Control System (MPCS) software which makes it a powerful tool within the MSL FSW development process. The MSL team must ensure that the rover accomplishes all stages of the mission successfully. Due to the natural complexity of this project there is a strong emphasis on testing, as failure is not an option. The entire mission could be jeopardized if something is overlooked.

entry, descent, and landing (EDL)↗

Comparison of Martian Surface Radiation Predictions to the Measurements of Mars Science Laboratory Radiation Assessment Detector (MSL/RAD)

For the analysis of radiation risks to astronauts and planning exploratory space missions, detailed knowledge of particle spectra is an important factor. Detailed measurements of the energetic particle radiation environment on the surface of Mars have been made by the Mars Science Laboratory Radiation Assessment Detector (MSL-RAD) on the Curiosity rover since August 2012, and particle fluxes for a wide range of ion species (up to several hundred MeV/u) and high energy neutrons (8 - 1000 MeV) have been available for the first 200 sols. Although the data obtained on the surface of Mars for 200 sols are limited in the narrow energy spectra, the simulation results using the Badhwar-O'Neill galactic cosmic ray (GCR) environment model and the high-charge and energy transport (HZETRN) code are compared to the data. For the nuclear interactions of primary GCR through Mars atmosphere and Curiosity rover, the quantum multiple scattering theory of nuclear fragmentation (QMSFRG) is used, which includes direct knockout, evaporation and nuclear coalescence. Daily atmospheric pressure measurements at Gale Crater by the MSL Rover Environmental Monitoring Station are implemented into transport calculations for describing the daily column depth of atmosphere. Particles impinging on top of the Martian atmosphere reach the RAD after traversing varying depths of atmosphere that depend on the slant angles, and the model accounts for shielding of the RAD by the rest of the instrument. Calculations of stopping particle spectra are in good agreement with the RAD measurements for the first 200 sols by accounting changing heliospheric conditions and atmospheric pressure. Detailed comparisons between model predictions and spectral data of various particle types provide the validation of radiation transport models, and thus increase the accuracy of the predictions of future radiation environments on Mars. These contributions lend support to the understanding of radiation health risks to astronauts for the planning of various mission scenarios.

Kim, Myung-Hee Y.↗

A Distributed Simulation-to-Flight Framework to Support Investigating Trust/Trustworthiness in Multi-Agent Systems

As autonomous systems continue to grow both in use and complexity, the necessity for robust and extensible simulation-to-flight frameworks is paramount for establishing an effective architecture for autonomous systems. Hardware test flights are time-consuming and cost prohibitive during early system design and development. Simulation environments can be useful tools to accelerate algorithm development and testing. However, transitions from simulation to flight (sim-to-flight) can be challenging, unless systems are designed with this transition in mind and with the necessary capabilities built into the architecture and framework. One of the objectives of Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) was to design and develop a distributed mixed-reality simulation environment to begin establishing a basis for certification of autonomous systems via research into trust and trustworthiness. ATTRACTOR’s objective was to construct computational concepts of trustworthiness and justifiable trust in multi-agent autonomous teams, to inform future certification of safety-critical and time-critical autonomous systems in aviation. In this paper, we present an autonomous systems architecture and development framework paired with a persistent distributed modeling and simulation (ModSim) environment for test and evaluation of autonomous systems. They were designed under ATTRACTOR in order to measure and establish trustworthiness and trust in single-and multi-agent human-machine systems whether these machines are fixed-wing general aviation, rotary-wing Unmanned Aerial Vehicles (UAVs), ground rovers, or even spacecraft. The Autonomous Entity Operational Network (AEON) framework enables autonomous system development with an easily extensible collection of libraries and plug-n-play nodes facilitated by the Data Distribution Service (DDS) communication protocol standard. The Baseline Environment for Autonomous Modeling (BEAM) simulation environment is a distributed mixed-reality Unity™-based environment built around the same DDS communication paradigm allowing for easy integration with AEON-based autonomous applications, enabling sim-to-flight with minimal configuration changes. Using AEON and BEAM, source code that runs in simulation ports directly to hardware and has successfully flown in the National Airspace System (NAS) at NASA LaRC many times over the lifetime of ATTRACTOR.

Benjamin N Kelley↗

Promoting Real-Time Science in the Classroom using Wireless PDA Technology

The year is 2004, NASA has landed and deployed a fleet of rovers on the surface of Mars to continue the exploration of that planet and prepare the way for human visitors. Middle school students at Milton Elementary have been following the mission through the media and Internet as part of Mr. Johnson's Earth and space sciences class. The kids have been working in teams to track the rovers as they move across the surface of Mars on a scale model of the landing site they built from sand and rocks using pictures and video downloaded from the Internet. They also built their own version of a rover that can be driven around the model. The time is 3:36pm. Jim and a couple of his fellow students from class are sitting in the cafeteria waiting for a student council meeting to begin. Mary and several others are on the bus riding home. Kathy is in her father's car waiting to leave the parking lot. On Mars, Rover-3 has just stopped and issued an alert to ground control at NASA's Jet Propulsion Laboratory (JPL). Back at Milton Elementary chimes can be heard going off in the cafeteria, on the school bus, and in Kathy's car. The students are familiar with the drill and each brings up the Mars mission status display on their hand-held PDA device. They've been using their PDAs (those Palm devices that seem to be everywhere today) to obtain real-time position information for each of the rovers throughout the mission. The mission status display tells them that Rover-3 has stopped on the edge of a small gully and isn't quite sure what to do. The students begin considering the options amongst themselves. Should the rover just drive through the gully? If it does, what happens if it gets stuck? Maybe it should turnaround and look for away around the gully? Trough questions. Real questions. Real problems. The students know they will need to be prepared to discuss the options and conduct their own simulations using the models they built in Mr. Johnson's class tomorrow. Much the same way engineers and scientists will be working to solve the problem at NASA. It's a couple of days later, NASA has made a decision on what to do and has issued new commands for Rover-3 to execute at 9:15am Milton Elementary time. Interestingly, NASA's solution to the problem differs from the one favored by the students. 9:16am, chimes can be heard going off throughout Milton Elementary.

Matusow, David↗

Lunar rovers and local positioning system

Telerobotic rovers equipped with adequate actuators and sensors are clearly necessary for extraterrestrial construction. They will be employed as substitutes for humans, to perform jobs like surveying, sensing, signaling, manipulating, and the handling of small materials. Important design criteria for these rovers include versatility and robustness. They must be easily programmed and reprogrammed to perform a wide variety of different functions, and they must be robust so that construction work will not be jeopardized by parts failures. The key qualities and functions necessary for these rovers to achieve the required versatility and robustness are modularity, redundancy, and coordination. Three robotic rovers are being built by CSC as a test bed to implement the concepts of modularity and coordination. The specific goal of the design and construction of these robots is to demonstrate the software modularity and multirobot control algorithms required for the physical manipulation of constructible elements. Each rover consists of a transporter platform, bus manager, simple manipulator, and positioning receivers. These robots will be controlled from a central control console via a radio-frequency local area network (LAN). To date, one prototype transporter platform frame was built with batteries, motors, a prototype single-motor controller, and two prototype internal LAN boards. Software modules were developed in C language for monitor functions, i/o, and parallel port usage in each computer board. Also completed are the fabrication of half of the required number of computer boards, the procurement of 19.2 Kbaud RF modems for inter-robot communications, and the simulation of processing requirements for positioning receivers. In addition to the robotic platform, the fabrication of a local positioning system based on infrared signals is nearly completed. This positioning system will make the rovers into a moving reference system capable of performing site surveys. In addition, a four degree mechanical manipulator especially suited for coordinated teleoperation was conceptually designed and is currently being analyzed. This manipulator will be integrated into the rovers as their end effector. Twenty internal LAN cards fabricated by a commercial firm are being used, a prototype manipulator and a range finder for a positioning system were built, a prototype two-motor controller was designed, and one of the robots is performing its first telerobotic motion. In addition, the robots' internal LAN's were coordinated and tested, hardware design upgrades based on fabrication and fit experience were completed, and the positioning system is running. The rover system is able to perform simple tasks such as sensing and signaling; coordination systems which allow construction tasks to begin were established, and soon coordinated teams of robots in the laboratory will be able to manipulate common objects.

Avery, James↗

Simulation of Liquid Injection Thrust Vector Control for Mars Ascent Vehicle

The Jet Propulsion Laboratory is currently in the initial design phase for a potential Mars Ascent Vehicle; which will be landed on Mars, stay on the surface for period of time, collect samples from the Mars 2020 rover, and then lift these samples into orbit around Mars. The engineers at JPL have down selected to a hybrid wax-based fuel rocket using a liquid oxidizer based on nitrogen tetroxide, or a Mixed Oxide of Nitrogen. To lower the gross lift-off mass of the vehicle the thrust vector control system will use liquid injection of the oxidizer to deflect the thrust of the main nozzle instead of using a gimbaled nozzle. The disadvantage of going with the liquid injection system is the low technology readiness level with a hybrid rocket. Presented in this paper is an effort to simulate the Mars Ascent Vehicle hybrid rocket nozzle and liquid injection thrust vector control system using the computational fluid dynamic flow solver Loci/Chem. This effort also includes determining the sensitivity of the thrust vector control system to a number of different design variables for the injection ports; including axial location, number of adjacent ports, injection angle, and distance between the ports.

Gudenkauf, Jared↗