Search NASA⌕ Search

SEARCH · Search NASA

Results for “system performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

One way and two way VHF ranging system performance for tracking and data relay applications

The trajectory of an orbiting spacecraft is determined from an orbit determination program. Two inputs to this program, among others, are the range and range rate relative to some known location. The arithmetic and measurement errors in the determinations of the range, range rate, and range differences were identified and evaluated. These uncertainties are tabulated for one way and two way systems. A comparison of the measurement error contributions illustrate the predominance of thermal noise effects under low power budget conditions, with the other error sources becoming relevent for the high power budget case. The evaluated uncertainties are summarized as root sum squared noise and bias errors.

Bryan, J. W.↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.

Kevin Alex Murphy↗

System performance conclusions

The advantages and disadvantages of reducing power levels and using antennas with diameters smaller than 1 Km were evaluated if rectenna costs and land usage requirements become major factors, operating at 5800 megahertz should be considered. Three sequences (random, incoherent phasing, and concentric rings - center to edge) provided satisfactory performance in that the resultant sidelobe levels during startup/ shutdown were lower than the steady-state levels present during normal operations. Grating lobe peaks and scattered power levels were used to determine the array/subarray mechanical alignment requirements. The antenna alignment requirement is 1 min or 3 min depending on phase control configuration. System error parameters were defined to minimize scattered microwave power.

Arndt, G. D.↗

The Effects of Mode Impurity of Ka-band System Performance

Problems associated with spurious mode generation in the proposed Ka-Band gyroklystron transmitter tube, overmoded transmission line, and feed are discussed. A brief description of the overall problem is presented. The theory used to evaluate feed and antenna performance when spurious modes are present is given. Results for feed patterns and overall antenna patterns for various levels and types of spurious modes are presented. Worst case antenna efficiency is calculated as a function of spurious mode level. Conclusions are drawn regarding the results of this study and their application to specifications on the transmitter tube and transmission line system.

Hoppe, D. J.↗

K sub A-band weather-dependent system performance estimates for Goldstone

A K sub A band atmospheric noise temperature and attenuation statistical model is developed for Goldstone, based on water vapor radiometer measurements at 31.4 GHz made during winter and spring 1981. An equivalent X-band model is derived from these measurements, and the two sets of data are compared to determine the possible advantages of developing DSN telecommunications links at 32 GHz. For a nominal elevation angle of 30 degrees and identical antennas, it is found that a K sub A band system at Goldstone will show a 5 to 1 dB signal-to-noise ratio advantage oer an X-band system more than 99 percent of the time.

Clauss, R. C.↗

Advanced Communications Technology Satellite (ACTS): Four-Year System Performance

The Advanced Communications Technology Satellite (ACTS) was conceived at the National Aeronautics and Space Administration (NASA) in the late 1970's as a follow-on program to ATS and CTS to continue NASA's long history of satellite communications projects. The ACTS project set the stage for the C-band satellites that started the industry, and later the ACTS project established the use of Ku-band for video distribution and direct-to-home broadcasting. ACTS, launched in September 1993 from the space shuttle, created a revolution in satellite system architecture by using digital communications techniques employing key technologies such as a fast hopping multibeam antenna, an on-board baseband processor, a wide-band microwave switch matrix, adaptive rain fade compensation, and the use of 900 MHz transponders operating at Ka-band frequencies. This paper describes the lessons learned in each of the key ACTS technology areas, as well as in the propagation investigations.

Acosta, Roberto J.↗

Effects of atmospheric variations on acoustic system performance

Acoustic propagation over medium to long ranges in the atmosphere is subject to many complex, interacting effects. Of particular interest at this point is modeling low frequency (less than 500 Hz) propagation for the purpose of predicting ranges and bearing accuracies at which acoustic sources can be detected. A simple means of estimating how much of the received signal power propagated directly from the source to the receiver and how much was received by turbulent scattering was developed. The correlations between the propagation mechanism and detection thresholds, beamformer bearing estimation accuracies, and beamformer processing gain of passive acoustic signal detection systems were explored.

Nation, Robert↗

Predicting Ares I Reaction Control System Performance by Utilizing Analysis Anchored with Development Test Data

The Ares I launch vehicle is an integral part of NASA s Constellation Program, providing a foundation for a new era of space access. The Ares I is designed to lift the Orion Crew Module and will enable humans to return to the Moon as well as explore Mars.1 The Ares I is comprised of two inline stages: a Space Shuttle-derived five-segment Solid Rocket Booster (SRB) First Stage (FS) and an Upper Stage (US) powered by a Saturn V-derived J-2X engine. A dedicated Roll Control System (RoCS) located on the connecting interstage provides roll control prior to FS separation. Induced yaw and pitch moments are handled by the SRB nozzle vectoring. The FS SRB operates for approximately two minutes after which the US separates from the vehicle and the US Reaction Control System (ReCS) continues to provide reaction control for the remainder of the mission. A representation of the Ares I launch vehicle in the stacked configuration and including the Orion Crew Exploration Vehicle (CEV) is shown in Figure 1. Each Reaction Control System (RCS) design incorporates a Gaseous Helium (GHe) pressurization system combined with a monopropellant Hydrazine (N2H4) propulsion system. Both systems have two diametrically opposed thruster modules. This architecture provides one failure tolerance for function and prevention of catastrophic hazards such as inadvertent thruster firing, bulk propellant leakage, and over-pressurization. The pressurization system on the RoCS includes two ambient pressure-referenced regulators on parallel strings in order to attain the required system level single Fault Tolerant (FT) design for function while the ReCS utilizes a blow-down approach. A single burst disk and relief valve assembly is also included on the RoCS to ensure single failure tolerance for must-not-occur catastrophic hazards. The Reaction Control Systems are designed to support simultaneously firing multiple thrusters as required

Stein, William B.↗

The effects of transmitter/receiver clock time-base instability on coherent communication system performance

The purpose of this paper is to present a model and associated analysis of the deleterious effects which both transmitter and receiver data clock time-base instability have on bit-error probability. The types of time-base instability modeled and analyzed include what is commonly referred to as bit jitter (epoch jitter), bit-jitter rate (time interval jitter), and data asymmetry. The bit-error probability is determined as a function of the statistical characteristics of the time-base instability, the data-transition density, the signal-to-noise ratio in the bit-rate bandwidth and the mechanizations of both the data-bit detector and bit synchronizer. The latter is manifested through the bit synchronizer's natural frequency and loop-damping parameters. Numerical results which indicate the sensitivity of the system bit-error rate to various parameters of the model are provided.

Chie, C. M.↗

Altitude-Wind-Tunnel Investigation of Oil-System Performance of XR-4360-8 Engine in XTB2D-1 Airplane

An investigation was conducted in the Cleveland altitude wind tunnel to determine the aerodynamic characteristics and the oil delivery critical altitude of the oil-cooler installation of an XTB2D-1 airplane. The investigation was made with the propeller removed end with the engine operating at 1800 brake horsepower, an altitude of 15,000 feet (except for tests of oil-delivery critical altitude), oil-cooler flap deflections from -20 degrees to 20 degrees and inclinations of the thrust axis of 0 degrees, 1.5 degrees, and 6 degrees. At an inclination of the thrust axis of 0 degrees and with the propeller operating, the total-pressure recovery coefficient at the face of the oil cooler varied from 0.84 to 1.10 depending on the flap deflection. With the propeller removed, the best pressure recovery at the face of the oil cooler was obtained at an inclination of the thrust axis of 1.5 degrees. Air-flow separation occurred on the inner surface of the upper lip of the oil-cooler duct inlet at an inclination of the thrust axis of 0 degrees and on the inner surface of the lower lip at 6 degrees. Static pressure coefficients over the duct lips were sufficiently low that no trouble from compressibility would be encountered in level flight. The oil-delivery critical altitude at cruising power (2230 rpm, 1675 bhp) was approximately 18,500 feet for the oil system tested.

Conrad, E. William↗

Digital data averager improves conventional measurement system performance

Multipurpose digital averager provides measurement improvement in noisy signal environments. It provides increased measurement accuracy and resolution to basic instrumentation devices by an arithmetical process in real time. It is used with standard conventional measurement equipment and digital data printers.

Naylor, T. K.↗