Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology milestones”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Analysis of the Lenticular Jointed MARSIS Antenna Deployment

This paper summarizes important milestones in a yearlong comprehensive effort which culminated in successful deployments of the MARSIS antenna booms in May and June of 2005. Experimentally measured straight section and hinge properties are incorporated into specialized modeling techniques that are used to simulate the boom lenticular joints. System level models are exercised to understand the boom deployment dynamics and spacecraft level implications. Discussion includes a comparison of ADAMS simulation results to measured flight data taken during the three boom deployments. Important parameters that govern lenticular joint behavior are outlined and a short summary of lessons learned and recommendations is included to better understand future applications of this technology.

Dynamic↗

Knowledge-based decision support for Space Station assembly sequence planning

A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

Source record↗

Next Generation Heavy-Lift Launch Vehicle: Large Diameter, Hydrocarbon-Fueled Concepts

With the passage of the 2010 NASA Authorization Act, NASA was directed to begin the development of the Space Launch System (SLS) as a follow-on to the Space Shuttle Program. The SLS is envisioned as a heavy lift launch vehicle that will provide the foundation for future large-scale, beyond low Earth orbit (LEO) missions. Supporting the Mission Concept Review (MCR) milestone, several teams were formed to conduct an initial Requirements Analysis Cycle (RAC). These teams identified several vehicle concept candidates capable of meeting the preliminary system requirements. One such team, dubbed RAC Team 2, was tasked with identifying launch vehicles that are based on large stage diameters (up to the Saturn V S-IC and S-II stage diameters of 33 ft) and utilize high-thrust liquid oxygen (LOX)/RP engines as a First Stage propulsion system. While the trade space for this class of LOX/RP vehicles is relatively large, recent NASA activities (namely the Heavy Lift Launch Vehicle Study in late 2009 and the Heavy Lift Propulsion Technology Study of 2010) examined specific families within this trade space. Although the findings from these studies were incorporated in the Team 2 activity, additional branches of the trade space were examined and alternative approaches to vehicle development were considered. Furthermore, Team 2 set out to define a highly functional, flexible, and cost-effective launch vehicle concept. Utilizing this approach, a versatile two-stage launch vehicle concept was chosen as a preferred option. The preferred vehicle option has the capability to fly in several different configurations (e.g. engine arrangements) that gives this concept an inherent operational flexibility which allows the vehicle to meet a wide range of performance requirements without the need for costly block upgrades. Even still, this concept preserves the option for evolvability should the need arise in future mission scenarios. The foundation of this conceptual design is a focus on low cost and effectiveness rather than efficiency or cutting-edge technology. This paper details the approach and process, as well as the trade space analysis, leading to the preferred vehicle concept.

Holliday, Jon↗

Space reliability technology - A historical perspective

The progressive improvements in reliability of launch vehicles is traced from the Vanguard rocket to the STS. The Vanguard, built with minimal redundancy and a high mass ratio, was used as an operational vehicle midway through its test program in an attempt to meet the perceived challenge represented by the Sputnik. The fourth Vanguard failed due to inadequate contamination prevention and lack of inspection ports. Automatic firing sequences were adopted for the Titan rockets, which were an order of magnitude larger than the Vanguard and therefore had room for interior inspections. Qualification testing and reporting were introduced for components, along with X ray inspection of fuel tank welds. Dual systems were added for flight critical components when the Titan became man-rated for the Gemini program. Designs incorporated full failure mode effects and criticality analyses for the Apollo program, which exposed the limits of applicability of numerical reliability models. Fault tree analyses and program milestone reviews were initiated. The worth of man-in-the-loop in space activities for reliability was demonstrated with the rescue of Skylab after solar panel and meteoroid shield failures. It is now the reliability of the payload, rather than the vehicle, that is questioned for Shuttle launches.

Cohen, H.↗

Standardized Action Modules for Humanoid Robot Control

Humanoid robots could reduce the risks of hazardous work by replacing humans in dangerous environments and they could be useful helpers in environments designed primarily for humans. Currently, no robot is capable enough to fulfill either of these roles for any practical application, and the Humanoid Project at the Jet Propulsion Laboratory's Bio-Inspired Technologies and Systems group is striving to change that. For this summer, our goal was to endow a Fujitsu HOAP 2 humanoid robot with the necessary intelligence and knowledge to autonomously assemble a cubical frame structure from tubular bars and corner joints. Performing such a complicated task requires that the robot have a robust control architecture that allows for a multitude of abilities and Operation modes. We have designed and implemented a modular control architecture that allows reusability of existing code and the integration of work by many team members into the larger control system while providing an easy way to implement later improvements. Such a control system has allowed us to achieve important milestones in the humanoid robot assembly task.

Csaszar, Ambrus↗

An experiment to enable commercial mobile satellite service

A Mobile Satellite Experiment (MSAT-X) is described, based on a planned cooperative U.S./Canadian program. The experiment would establish network architecture, develop system and ground-segment technology, and define the technical characteristics needed to help structure the regulatory/institutional framework needed to enable a first-generation commercial satellite service. A satellite of this type would augment terrestrial systems, both cellular and noncellular, in the thin-route/rural areas of the country where service is either unavailable or inadequate. Applications range from wide-area radio/dispatch (e.g., oil exploration and interstate trucking) to extension of the public mobile telephone service. Market estimates are provided and experiment objectives and requirements are delineated. The requirements are being developed in close coordination with the Department of Communications (DOC) of Canada and with industry and potential-user organizations. The paper closes with a development plan and milestone chart.

Lovell, R. R.↗

Universal Signal Conditioning Amplifier

The Technological Research and Development Authority (TRDA) and NASA-KSC entered into a cooperative agreement in March of 1994 to achieve the utilization and commercialization of a technology development for benefiting both the Space Program and U.S. industry on a "dual-use basis". The technology involved in this transfer is a new, unique Universal Conditioning Amplifier (USCA) used in connection with various types of transducers. The project was initiated in partnership with I-Net Corporation, Lockheed Martin Telemetry & Instrumentation (formerly Loral Test and Information Systems) and Brevard Community College. The project consists of designing, miniaturizing, manufacturing, and testing an existing prototype of USCA that was developed for NASA-KSC by the I-Net Corporation. The USCA is a rugged and field-installable self (or remotely)- programmable amplifier that works in combination with a tag random access memory (RAM) attached to various types of transducers. This summary report comprises performance evaluations, TRDA partnership tasks, a project summary, project milestones and results.

Kinney, Frank↗

Electrodynamic Tether Propulsion for Spacecraft and Upper Stages

Relatively short electrodynamic tethers can use solar power to 'push' against a planetary magnetic field to achieve propulsion without the expenditure of propellant. The groundwork has been laid for this type of propulsion. Important recent milestones include retrieval of a tether in space (TSS-1, 1992), successful deployment of a 20-km-long tether in space (SEDS-1, 1993), and operation of an electrodynamic tether with tether current driven in both directions (PMG, 1993). The planned Propulsive Small Expendable Deployer System (ProSEDS) experiment will use the flight-proven Small Expendable Deployer System (SEDS) to deploy a 5 km bare copper tether from a Delta II upper stage to achieve approximately 0.4 N drag thrust, thus deorbiting the stage. The experiment will use a predominantly 'bare' tether for current collection in lieu of the endmass collector and insulated tether approach used on previous missions. The flight experiment is a precursor to utilization of the technology on the International Space Station for reboost and the electrodynamic tether upper stage demonstration mission which will be capable of orbit raising, lowering and inclination changes, all using electrodynamic thrust. In addition, the use of this type of propulsion may be attractive for future missions at Jupiter.

Johnson, Les↗

Communications Blackout Predictions for Atmospheric Entry of Mars Science Laboratory

The Mars Science Laboratory (MSL) is expected to be a long-range, long-duration science laboratory rover on the Martian surface. MSL will provide a significant milestone that paves the way for future landed missions to Mars. NASA is studying options to launch MSL as early as 2009. There are three elements to the spacecraft; carrier (cruise stage), entry vehicle, and rover. The rover will have a UHF proximity link as the primary path for EDL communications and may have an X-band direct-to-Earth link as a back-up. Given the importance of collecting critical event telemetry data during atmospheric entry, it is important to understand the ability of a signal link to be maintained, especially during the period near peak convective heating. The received telemetry during entry (or played back later) will allow for the performance of the Entry-Descent-Landing technologies to be assessed. These technologies include guided entry for precision landing, a new sky-crane landing system and powered descent. MSL will undergo an entry profile that may result in a potential communications blackout caused by ionized particles for short periods near peak heating. The vehicle will use UHF and possibly X-band during the entry phase. The purpose of this rep0rt is to quantify or bound the likelihood of any such blackout at UHF frequencies (401 MHz) and X-band frequencies (8.4 GHz). Two entry trajectory scenarios were evaluated: a stressful entry trajectory to quantify an upper-bound for any possible blackout period, and a nominal trajectory to quantify likelihood of blackout for such cases.

communications↗

Regulatory Approach for Nuclear Thermal Propulsion Reactor Systems

Nuclear Thermal Propulsion (NTP) is being developed to support crewed or cargo transfer missions to Mars. Obtaining regulatory approval for NTP engine testing proves a challenge for not only the technology maturation required but also the fabrication, launch and operational nuclear regulatory environments. Existing regulations currently apply to either (1) high power, long duration commercial power plants, or (2) low power, short duration research reactors. NTP systems find themselves in a separate and unique area due to their higher power but short operating duration. This is supplemented by use of the reactor coolant as propellant. When planning the regulatory approach for NTP systems, operations in space and testing on Earth must be considered – each have their own challenges. This paper identifies a preliminary pathway for regulatory approval to operate a NTP demonstration engine as well as supporting test data that is recommended to be generated during the development program to support major regulatory milestones and deliverables.

Regulatory↗

Regulatory Approach for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is being developed to support crewed or cargo transfer missions to Mars. Obtaining regulatory approval for NTP engine testing proves a challenge for not only the technology maturation required but also the fabrication, launch and operational nuclear regulatory environments. Existing regulations currently apply to either (1) high power, long duration commercial power plants, or (2) low power, short duration research reactors. NTP systems find themselves in a separate and unique area due to their higher power but short operating duration. This is supplemented by use of the reactor coolant as propellant. When planning the regulatory approach for NTP systems, operations in space and testing on Earth must be considered – each have their own challenges. This paper identifies a preliminary pathway for regulatory approval to operate a NTP demonstration engine as well as supporting test data that is recommended to be generated during the development program to support major regulatory milestones and deliverables.

Regulatory↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

Gateway at the Crossroads of Sustainable Lunar Exploration

The Gateway Program has made substantial design and development progress toward delivering a small, human-tended lunar space station purposefully designed to enable sustainable human exploration. The Program integrates partners and providers organizationally and physically as part of the spacecraft. The Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) with the European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) HALO Lunar Communications System (HLCS) have begun manufacturing the long lead components and will be launched first as a Co-Manifested Vehicle (CMV). The International Habitat (I-Hab) and ESPRIT Refueling Module (ERM) are passing life cycle milestones and include capabilities key for human crewmembers, such as windows, private sleeping quarters, and galley functions. The Logistics Module (LM) may provide a variety of services to Gateway depending on each mission. Requirements for the airlock have been developed, including requests that it support the integrated spacecraft with functions like augmenting heat rejection capabilities, and interfaces with new spacesuits will soon be developed in more detail. As a critical element of the architecture for solar system exploration, Gateway implements key tenets and features of international interoperability standards necessary to operate with multiple visiting vehicles and lunar assets, especially avionics, communications, and docking. Specific choices such as software architecture and standards, power standards, and robotics standards make it possible to utilize heritage or proprietary technology, yet still operate as one spacecraft. Engineering teams are evaluating many possible future missions to be executed at or utilizing the Gateway. The system architecture protects for an evolvable, extensible, and flexible capability. Designing systems robust enough to serve as a cornerstone of exploration activities for decades while remaining adaptable is not without its challenges. The detailed integration activities have revealed challenges and the need to mature key technologies. Refueling is a key component of achieving long life for Gateway, with unique operations to plan, safety concerns to mitigate, and risk reduction activities to conduct to better understand the system. The constraints and impacts of the design of visiting vehicles is also an important concern, with orientation constraints, control of attitude and orbit of the Gateway with docked visiting vehicles. Tradeoffs between robust maintainable systems and lightweight, compact systems must be balanced. Opportunities still exist for adding additional advanced capabilities to increase and extend Gateway’s benefits, such as intravehicular robotics, autonomous Guidance Navigation and Control (GN&C), and augmented control propulsion, heat rejection, or other services.

Molly S Anderson↗

Gateway at the Crossroads of Sustainable Lunar Exploration

The Gateway Program has made substantial design and development progress toward delivering a small, human-tended lunar space station purposefully designed to enable sustainable human exploration. The Program integrates partners and providers organizationally and physically as part of the spacecraft. The Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) with the European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) HALO Lunar Communications System (HLCS) have begun manufacturing the long lead components and will be launched first as a Co-Manifested Vehicle (CMV). The International Habitat (I-Hab) and ESPRIT Refueling Module (ERM) are passing life cycle milestones and include capabilities key for human crewmembers, such as windows, private sleeping quarters, and galley functions. The Logistics Module (LM) may provide a variety of services to Gateway depending on each mission. Requirements for the airlock have been developed, including requests that it support the integrated spacecraft with functions like augmenting heat rejection capabilities, and interfaces with new spacesuits will soon be developed in more detail. As a critical element of the architecture for solar system exploration, Gateway implements key tenets and features of international interoperability standards necessary to operate with multiple visiting vehicles and lunar assets, especially avionics, communications, and docking. Specific choices such as software architecture and standards, power standards, and robotics standards make it possible to utilize heritage or proprietary technology, yet still operate as one spacecraft. Engineering teams are evaluating many possible future missions to be executed at or utilizing the Gateway. The system architecture protects for an evolvable, extensible, and flexible capability. Designing systems robust enough to serve as a cornerstone of exploration activities for decades while remaining adaptable is not without its challenges. The detailed integration activities have revealed challenges and the need to mature key technologies. Refueling is a key component of achieving long life for Gateway, with unique operations to plan, safety concerns to mitigate, and risk reduction activities to conduct to better understand the system. The constraints and impacts of the design of visiting vehicles is also an important concern, with orientation constraints, control of attitude and orbit of the Gateway with docked visiting vehicles. Tradeoffs between robust maintainable systems and lightweight, compact systems must be balanced. Opportunities still exist for adding additional advanced capabilities to increase and extend Gateway’s benefits, such as intravehicular robotics, autonomous Guidance Navigation and Control (GN&C), and augmented control propulsion, heat rejection, or other services.

Molly S Anderson↗

Results from the Galileo Laser Uplink: A JPL Demonstration of Deep-Space Optical Communications

The successful completion of the Galileo Optical Experiment (GOPEX), represented the accomplishment of a significant milestone in JPL's optical communication plan. The experiment demonstrated the first transmission of a narrow laser beam to a deep-space vehicle. Laser pulses were beamed to the Galileo spacecraft by Earth-based transmitters at the Table Mountain Facility (TMF), California, and Starfire Optical Range (SOR), New Mexico. The experiment took place over an eight-day period (December 9 through December 16, 1992) as Galileo receded from Earth on its way to Jupiter, and covered ranges from 1 to 6 million kilometers (15 times the Earth-Moon distance), the laser uplink from TMF covered the longest known range for laser beam transmission and detection. This demonstration is the latest in a series of accomplishments by JPL in the development of deep-space optical communications technology.

Lasers experiment optical communications Galileo d↗

Repository-Based Software Engineering Program: Working Program Management Plan

Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

Source record↗

Turbulence, Transition, and Numerical Method Technologies

The close collaboration in the validation experimentation effort was excellent, the complementary research efforts related tofundamental numerical model development, and the activities related to effective HPC utilization on near term architectures that are coming down the pipeline were exactly what NASA should be doing. Even though the TQR panel cannot say that the success criteria were fully met, we do feel that the research funded by TTT/RCA was successful and useful in determining the next suite of CFD validation tests and the problematic flow conditions that continue to be difficult to predict using our current suite of computational tools. Given the TQR Panel’s review criteria: 1. The deliverables meet the technical requirements; 2.The appropriate technical approaches were followed in producing the deliverables; and 3. All technical caveats and concerns have been identified and the deliverables: a.Development of more accurate physics-based methods (e.g., higher moment closure); b. Large eddy simulation (LES); c. Advanced numerical methods; d. Transition prediction and modeling; e.Validation experiments; f. Multidisciplinary analysis and design (high fidelity). TQR panel feels that the technical processes were all completed and that the review criteria and all the deliverables were met. Thus, the Milestone TACP-2016-001 has been completed.

Mujeeb R Malik↗

Results from the ASTERIA CubeSat Extended Mission Experiments

Over the past two years, JPL has used the ASTERIA (Arcsecond Space Telescope Enabling Research In Astrophysics) CubeSat as an in-flight test platform during extended missions. ASTERIA successfully completed its prime mission in early 2018, and continued to operate in low Earth orbit (LEO) for an additional twenty months. This paper describes demonstrations that were performed on the spacecraft and on the ground-based testbed during the extended mission. These demonstrations fall into three categories: Autonomy technology maturation, hardware characterization, and science discovery. Autonomy technology maturation supported three development efforts. The first shifted the spacecraft commanding paradigm from time-based sequences to Task Networks (tasknets), which allow simpler commanding and more robust onboard execution. The second demonstrated onboard orbit determination in Low Earth Orbit (LEO) without GPS. This activity used a fully-independent means of spacecraft orbit determination for Earth orbiters using only passive imaging. The third technology provided in situ hardware health state estimation using a model-based reasoning technique. These three technologies were demonstrated either in flight or on the testbed individually, and then were combined to demonstrate the capability to perform autonomous navigation on board without ground intervention, even in the presence of anomalies. Hardware characterization involved both onboard and ground-based activities. On board, nonstandard attitude control modes were commanded to characterize the spacecraft pointing jitter as a function of target brightness, reaction wheel speed, controller gain, and the number of guide stars. The results provide insights into the contribution of jitter to the ASTERIA photometry and inform the feasibility of future astrophysics small satellite missions for which jitter control is an enabling technology. On the ground, the ASTERIA Operations Team coordinated with Amazon Web Services (AWS) to configure their new ground stations to communicate with ASTERIA to prove out their viability. ASTERIA used AWS ground stations for nominal operations for the last four months of the mission. Finally, ASTERIA continued to perform exoplanet science as the spacecraft was well-suited to execute long-term monitoring of stars such as alpha Centauri to search for small transiting planets. The science team also imaged a number of interesting objects including a comet, an asteroid, cities at night, and the moon, and coordinated with other projects on Targets of Opportunity for follow-up confirmations and co-observations. Throughout the prime and the extended missions, the ASTERIA spacecraft proved to be a mighty platform that “will go into history as an innovative milestone.”[1 - Zurbuchen]

Doran, Patrick↗