Search NASA⌕ Search

SEARCH · Search NASA

Results for “webb”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Mid-Course Correction Contingency Analysis for the James Webb Space Telescope

This investigation details two analyses performed as part of an early orbit contingency operations study related to the James Webb Space Telescope’s limited ability to maneuver in a sunward direction. First, contingency planning developed by the Flight Dynamics Team and shared with the Science and Operations Center to quickly assess the available timeline in the event of a delayed mid-course correction maneuver is presented. Second, the methods for recovering from a maneuver over-burn using observatory geometry to exploit the solar radiation pressure perturbation contributions from the large sunshield as well as adjusting the maneuver campaign to recover the observatory are examined.

JWST↗

Solar Radiation Pressure Effects on the Orbital Motion at SEL2 for the James Webb Space Telescope

Due to James Webb Space Telescope’s large sunshield, which will always be facing the Sun to protect the observatory’s instruments, Solar Radiation Pressure (SRP) has an important effect on its orbital motion around SEL2. Moreover, SRP is highly dependent on the observatory’s attitude with respect to the Sun observatory line. This paper explores the impact of SRP for different attitude profiles on the size of a reference orbit.

Libration Point Orbit↗

The James Webb Space Telescope: Mission Overview and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 m2 aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 um. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < λ < 5.0 µm spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < λ < 29 µm spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2021.

Greenhouse, Matthew↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

High Speed Interferometry for James Webb Space Telescope Testing

High speed interferometry (HSI) was one of the enabling technologies to the successful development and testing of the James Webb Space Telescope (JWST) optical system that consists of a 6.5 meter diameter, segmented, lightweight primary mirror and lightweight carbon fiber composite structure. This paper reviews the interferometry that was used first to demonstrate that the lightweight mirror and lightweight composite structure technologies were ready for JWST and later to verify performance of the fully assembled primary mirror and the telescope at cryogenic temperature. The tools and techniques developed for JWST are being advanced to benefit future missions that require stable mirrors, precision metering structures, active controls and diagnostic metrology.

B Saif↗

Data Processing for High-Contrast Imaging with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will probe circumstellar environments at an unprecedented sensitivity.However, the performance of high-contrast imaging instruments is limited by the residual light from the star at close separations (<2-3”), where the incidence of exoplanets increases rapidly. There is currently no solution to get rid of the residual light down to the photon noise level at those separations, which may prevent some crucial discoveries. JWST’s debut is planned for October 2021 for a baseline mission lifetime of only five years. Thus,it is crucial to find a solution to this problem before its launch. We are further developing and implementing an innovative approach of post-processing built on a Bayesian framework that provides a more robust determination of faint astrophysical structures around a bright source. This approach uses a model of high-contrast imaging instrument that takes advantage of prior information, such as data from wavefront sensing (WFS) operations on JWST, to estimate simultaneously instrumental aberrations and the circumstellar environment. With this approach, our goal is to further improve the contrast gain over the contrast that can be achieved with JWST instruments, starting with NIRCam imaging and coronagraphic imaging. This work will pave the way for the future space-based high-contrast imaging instruments such as the Nancy Grace Roman Space Telescope Coronagraph Instrument (Roman CGI). This technique will be crucial to make the best use of the telemetry data that will be collected during the CGI operations.

Jewell, Jeffrey B.↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Orbit Determination for the James Webb Space Telescope During Launch and Early Orbit

The NASA James Webb Space Telescope (JWST) mission successfully launched on December 25, 2021, at 12:20 UTC. This paper details several novel challenges encountered in the orbit determination (OD) of JWST during the launch and early orbit. The first OD solution used only 6.5 hours of tracking data, much less than the 24 hours of data usually required for libration orbiters on an outbound trajectory. In addition, the observatory area exposed to solar radiation pressure changed through a series of sunshield deployments while concurrent momentum unloads and attitude telemetry outages occurred. This paper covers how the Flight Dynamics Team (FDT) prepared for these challenges, how these challenges were handled on-orbit, and the performance of the resulting OD solutions.

Orbit Determination↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Maneuver Planning↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Orbit Determination For The James Webb Space Telescope During Launch And Early Orbit

The NASA James Webb Space Telescope (JWST) mission successfully launched on December 25, 2021, at 12:20 UTC. This paper details several novel challenges encountered in the orbit determination (OD) of JWST during the launch and early orbit. The first OD solution used only 6.5 hours of tracking data, much less than the 24 hours of data usually required for libration orbiters on an outbound trajectory. In addition, the observatory area exposed to solar radiation pressure changed through a series of sunshield deployments while concurrent momentum unloads and attitude telemetry outages occurred. This paper covers how the Flight Dynamics Team (FDT) prepared for these challenges, how these challenges were handled on-orbit, and the performance of the resulting OD solutions.

Orbit Determination↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Jeremy Peterson↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

The Meteoroid Environment Encountered By the James Webb Space Telescope

All spacecraft run the risk of being damaged by meteoroids at a rate proportional to the spacecraft's surface area. The exceptionally large James Webb Space Telescope (JWST) has endured 20 impacts on its primary mirror in its first year of operation. While most of the impacts experienced were commensurate with pre-launch predictions, one particularly large impact in May 2022 prompted the program to take a fresh look at the meteoroid environment in order to determine whether potentially unaccounted-for meteoroid risks can be mitigated. In this talk, we present a directional model of the meteoroid environment encountered by the spacecraft and compare it with the observed impact rate. Because of JWST’s ability to measure nanometer-size changes to the primary mirror surface, our results indicate that meteoroids carrying as little as 1 Joule of kinetic energy can produce measurable effects. We also find that the impact rate is highest when JWST faces in the direction of orbital motion about the Sun. By implementing a "meteoroid avoidance zone" that discourages observations within 75° of the ram direction, we estimate that JWST has reduced the impact rate by more than half.

Althea Moorhead↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

The James Webb Space Telescope Mission: Optical Telescope Element Design, Development, and Performance

The James Webb Space Telescope (JWST) is a large, infrared space telescope that has recently started its science program which will enable breakthroughs in astrophysics and planetary science. Notably, JWST will provide the very first observations of the earliest luminous objects in the universe and start a new era of exoplanet atmospheric characterization. This transformative science is enabled by a 6.6 m telescope that is passively cooled with a 5 layer sunshield. The primary mirror is comprised of 18 controllable, low areal density hexagonal segments, that were aligned and phased relative to each other in orbit using innovative image-based wave front sensing and control algorithms. This revolutionary telescope took more than two decades to develop with a widely distributed team across engineering disciplines. We present an overview of the telescope requirements, architecture, development, superb on-orbit performance, and lessons learned. JWST successfully demonstrates a segmented aperture space telescope and establishes a path to building even larger space telescopes.

Infrared observatories↗