Search NASA⌕ Search

SEARCH · Search NASA

Results for “webb”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Creating the Required Deep Space Environments for Testing the James Webb Space Telescope (JWST) at NASA Johnson Space Center's Chamber A

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA was directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper will discuss the thermal vacuum test of the Optical Telescope Element (OTE) plus Integrated Science Instrument Module (ISIM) (OTIS) as well as the extensive series of tests that were performed to incrementally validate the operations and performance of the Chamber and Ground Support Equipment (GSE). Each test required a unique thermal vacuum profile for cool down and warm up, steady state operations, GSE testing and contamination control. Select results will be presented on Facility Functional Testing, Chamber Bake-out, GSE Cryo-Proof Testing, Chamber Commissioning, the Optical Ground Support Equipment (OGSE) Test series and the final thermal vacuum test of the OTIS with respect to facility operations to meet JWST program test requirements.

Francis, Andrew↗

Modernization of NASA Johnson Space Center's Chamber A to Support Cryogenic Vacuum Optical Testing of the James Webb Space Telescope (JWST)

Final document is attached. NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA is directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper describes the upgrades to the Chamber A facility: Thermal Shrouds, Helium Refrigeration, Liquid Nitrogen System, High Vacuum System, Clean Airflow System, and Utilities.

Thermal vacuum testing↗

Refurbishment of NASA's Johnson Space Center Liquid Nitrogen Bulk Storage Tanks in Preparation for Thermal Vacuum Optical Testing of the James Webb Space Telescope (JWST)

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2019. It is directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. Chamber A utilizes Liquid Nitrogen as a thermal barrier between the 300 Kelvin vessel wall and the 20 Kelvin helium environmental conditioning shrouds. The 155,000 gallon capacity of the six vessels support long duration testing which support low and deep space simulations for today's testing. This paper describe the challenges of refurbishing six liquid nitrogen bulk storage vessels that are 60 year old. The vessels were refurbished in place and focused primarily on the vacuum annulus. The challenges of vessel research, design engineering and project management will be discussed. The refurbishment of the vessels has extended the life of the vessels for another 35-50 years on the vacuum annulus integrity. The survivability of the bulk storage vessels was tested during the historic hurricane Harvey of 2017 during the 100 day JWST thermal-vacuum test.

Garcia, Sammy↗

Breaking the Cost Curve: Applying Lessons Learned from the James Webb Space Telescope Development

This paper looks at the key programmatic and technical drivers of the James Webb Space Telescope and assesses ways to building more cost-effective telescopes in the future. The paper evaluates the top level programmatics for JWST along with the key technical drivers from design through integration and testing. Actual data and metrics from JWST are studied to identify what ultimately drove cost on JWST. Finally, the paper assesses areas where applying lessons learned can reduce costs on future observatories and will provide better insights into critical areas to optimize for cost.

Feinberg, Lee↗

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

L2 Station Keeping Maneuver Strategy for the James Webb Space Telescope

The station-keeping plan for the James Webb Space Telescope is zero velocity in the x-component at the fourth successive crossing of the XZ plane of the rotation libration point frame. A differential corrector is employed to determine the necessary delta-v. Maneuvering along the position component of the stable eigenvector of the monodromy matrix produces a minimum delta-v solution. The techniques developed to determine the minimum maneuver direction in a full ephemeris model, along with strategies to cope with the attitude constraints imposed by the sunshield that prevents the ability to maneuver along the stable eigenvector, are examined in this study.

Libration Point Orbit↗

Libration Orbit Eclipse Avoidance Maneuver Study for the James Webb Space Telescope Mission

Mission analysis of libration orbit trajectories at Sun-Earth/Moon L2 typically includes predictions of lunar and Earth eclipses during the mission life-time. The NASA James Webb Space Telescope (JWST) trajectory, by design, avoids these eclipses by pruning its launch window. In an off-nominal scenario where an eclipse is predicted, a maneuver strategy is needed. In this paper, trade studies are examined for JWST that characterize the burn magnitude, location, and epochs of multiple maneuver plans to avoid an eclipse. The results enable analysts to explore the space of feasible maneuver strategies during routine operations.

Maneuver design↗

Mid-Course Correction Contingency Analysis for the James Webb Space Telescope

This investigation details two analyses performed as part of an early orbit contingency operations study related to the James Webb Space Telescope’s limited ability to maneuver in a sunward direction. First, contingency planning developed by the Flight Dynamics Team and shared with the Science and Operations Center to quickly assess the available timeline in the event of a delayed mid-course correction maneuver is presented. Second, the methods for recovering from a maneuver over-burn using observatory geometry to exploit the solar radiation pressure perturbation contributions from the large sunshield as well as adjusting the maneuver campaign to recover the observatory are examined.

JWST↗

Solar Radiation Pressure Effects on the Orbital Motion at SEL2 for the James Webb Space Telescope

Due to James Webb Space Telescope’s large sunshield, which will always be facing the Sun to protect the observatory’s instruments, Solar Radiation Pressure (SRP) has an important effect on its orbital motion around SEL2. Moreover, SRP is highly dependent on the observatory’s attitude with respect to the Sun observatory line. This paper explores the impact of SRP for different attitude profiles on the size of a reference orbit.

Libration Point Orbit↗

The James Webb Space Telescope: Mission Overview and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 m2 aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 um. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < λ < 5.0 µm spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < λ < 29 µm spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2021.

Greenhouse, Matthew↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

High Speed Interferometry for James Webb Space Telescope Testing

High speed interferometry (HSI) was one of the enabling technologies to the successful development and testing of the James Webb Space Telescope (JWST) optical system that consists of a 6.5 meter diameter, segmented, lightweight primary mirror and lightweight carbon fiber composite structure. This paper reviews the interferometry that was used first to demonstrate that the lightweight mirror and lightweight composite structure technologies were ready for JWST and later to verify performance of the fully assembled primary mirror and the telescope at cryogenic temperature. The tools and techniques developed for JWST are being advanced to benefit future missions that require stable mirrors, precision metering structures, active controls and diagnostic metrology.

B Saif↗

Data Processing for High-Contrast Imaging with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will probe circumstellar environments at an unprecedented sensitivity.However, the performance of high-contrast imaging instruments is limited by the residual light from the star at close separations (<2-3”), where the incidence of exoplanets increases rapidly. There is currently no solution to get rid of the residual light down to the photon noise level at those separations, which may prevent some crucial discoveries. JWST’s debut is planned for October 2021 for a baseline mission lifetime of only five years. Thus,it is crucial to find a solution to this problem before its launch. We are further developing and implementing an innovative approach of post-processing built on a Bayesian framework that provides a more robust determination of faint astrophysical structures around a bright source. This approach uses a model of high-contrast imaging instrument that takes advantage of prior information, such as data from wavefront sensing (WFS) operations on JWST, to estimate simultaneously instrumental aberrations and the circumstellar environment. With this approach, our goal is to further improve the contrast gain over the contrast that can be achieved with JWST instruments, starting with NIRCam imaging and coronagraphic imaging. This work will pave the way for the future space-based high-contrast imaging instruments such as the Nancy Grace Roman Space Telescope Coronagraph Instrument (Roman CGI). This technique will be crucial to make the best use of the telemetry data that will be collected during the CGI operations.

Jewell, Jeffrey B.↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Orbit Determination for the James Webb Space Telescope During Launch and Early Orbit

The NASA James Webb Space Telescope (JWST) mission successfully launched on December 25, 2021, at 12:20 UTC. This paper details several novel challenges encountered in the orbit determination (OD) of JWST during the launch and early orbit. The first OD solution used only 6.5 hours of tracking data, much less than the 24 hours of data usually required for libration orbiters on an outbound trajectory. In addition, the observatory area exposed to solar radiation pressure changed through a series of sunshield deployments while concurrent momentum unloads and attitude telemetry outages occurred. This paper covers how the Flight Dynamics Team (FDT) prepared for these challenges, how these challenges were handled on-orbit, and the performance of the resulting OD solutions.

Orbit Determination↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Maneuver Planning↗