At least 325 records · Page 18

Width Criterion For Weld-Seam-Tracking Data

Image-processing algorithm in "through-torch-vision" (T3V) system developed to guide gas/tungsten arc welding robot along weld seam modified, according to proposal, reducing incidence of inaccurate tracking of weld seam. Developmental system intended to provide closed-loop control of motion of welding robot along weld seam on basis of lines in T3V image identified by use of image-processing algorithm and assumed to coincide with edges of weld seam. Use of width criterion prevents tracking of many false pairs of lines, with consequent decrease in incidence of inaccurate tracking and increase in confidence in weld-tracking capability of robotic welding system.

Lincir, Mark R.↗

Tracking Motions Of Manually Controlled Welding Torches

Techniques for measuring motions of manually controlled welding torches undergoing development. Positions, orientations, and velocities determined in real time during manual arc welding. Makes possible to treat manual welding processes more systematically so manual welds made more predictable, especially in cases in which mechanical strengths and other properties of welded parts highly sensitive to heat inputs and thus to velocities and orientations of welding torches.

Russell, Carolyn↗

Similar Exposure Group [Stick Welding without LEV - Manganese - RiskLevel 4]

This memorandum is presented to summarize quantitative worker exposure data collected while performing shielded metal arc welding (“SMAW” or “stick”) without local exhaust ventilation (LEV) and to validate if the appropriate risk level has been assigned to this task using Bayesian Decision Analysis (BDA). The purpose of this exposure assessment is to determine if it can be stated with at least 75% certainty that the true exposure profile (i.e., 95 th percentile) of the SEG is at or below the risk level currently assigned to this SEG.

61 RADIATION PROTECTION AND DOSIMETRY↗

ARC length control for plasma welding

A control system to be used with a plasma arc welding apparatus is disclosed. The plasma arc welding apparatus includes a plasma arc power supply, a contactor, and an electrode assembly for moving the electrode relative to a work piece. The electrode assembly is raised or lowered by a drive motor. The present apparatus includes a plasma arc adapter connected across the power supply to measure the voltage across the plasma arc. The plasma arc adapter forms a dc output signal input to a differential amplifier. A second input is defined by an adjustable resistor connected to a dc voltage supply to permit operator control. The differential amplifier forms an output difference signal provided to an adder circuit. The adder circuit then connects with a power amplifier which forms the driving signal for the motor. In addition, the motor connects to a tachometor which forms a feedback signal delivered to the adder to provide damping, therby avoiding servo loop overshoot.

William F Iceland↗

Vacuum vapor deposition

A method and apparatus is described for vapor deposition of a thin metallic film utilizing an ionized gas arc directed onto a source material spaced from a substrate to be coated in a substantial vacuum while providing a pressure differential between the source and the substrate so that, as a portion of the source is vaporized, the vapors are carried to the substrate. The apparatus includes a modified tungsten arc welding torch having a hollow electrode through which a gas, preferably inert, flows and an arc is struck between the electrode and the source. The torch, source, and substrate are confined within a chamber within which a vacuum is drawn. When the arc is struck, a portion of the source is vaporized and the vapors flow rapidly toward the substrate. A reflecting shield is positioned about the torch above the electrode and the source to ensure that the arc is struck between the electrode and the source at startup. The electrode and the source may be confined within a vapor guide housing having a duct opening toward the substrate for directing the vapors onto the substrate.

Poorman, Richard M.↗

Robotic Welding Of Injector Manifold

Brief report presents history, up through October 1990, of continuing efforts to convert from manual to robotic gas/tungsten arc welding in fabrication of main injector inlet manifold of main engine of Space Shuttle. Includes photographs of welding machinery, welds, and weld preparations. Of interest to engineers considering establishment of robotic-welding facilities.

Gilbert, Jeffrey L.↗

Factors influencing design and selection of GTAW robotic welding machines for the Space Shuttle main engine

Proposed hardware and software for microprocessor-controlled power supplies and welding machines are described. The application of the automatic seven-axis welding machine, which is to be preprogrammed to allow minimum intervention by the welding operator during the actual process, to the welding of the Space Shuttle main engine is discussed. The production requirements for the gas tungsten arc welds for the Space Shuttle main engine are examined. Consideration is given to positioner design, welding variables, inert shielding gas management, filler metal wire control, the up loading and down loading of data from off-line computers, process improvements, tooling, the welding variable library, and adaptive sensor control.

Flanigan, L.↗

Trailing Shield For Welding On Pipes

Trailing shield ensures layer of inert gas covers hot, newly formed bead between two tubes or pipes joined by plasma arc welding. Inert gas protects weld bead from oxidation by air until cooler and less vulnerable to oxidation. Intended for use on nickel-base alloy pipes, on which weld beads remain hot enough to oxidize after primary inert-gas purge from welding-torch cup has passed.

Coby, John B., Jr.↗

Optimization of a Welding Procedure for Making Critical Aluminum Welds on the LBNF Absorber Core Block

The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard 1514 Class I quality welds on the aluminum core blocks. This was not successful in all cases. An existing Gas Tungsten Arc Welding Procedure Specification was fine tuned to minimize, in most cases, and eliminate detect-able tungsten inclusions in the welds. All the weld coupons, however passed welding inspection as per the piping code: ASME B31.3 Normal Fluid Service. Tungsten electrode diameter, type, and manufacturer were varied. Some of the samples were pre-heated and others were not. It was observed that larger diameter electrodes, 5/32 in., with pre-heated joints resulted in welds with the least number of tungsten inclusions. It is hypothesized that thinner electrodes breakdown easily and get lodged into the weld pool during the welding process. This breakdown is further enhanced by the large temperature differential between the un-preheated sample and the hot electrode.

43 PARTICLE ACCELERATORS↗

Optimization of a Welding Procedure for Making Critical Aluminum Welds on the LBNF Absorber Core Block

he LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard (NAS) 1514 Class I quality welds on the aluminum core blocks. This was not successful in all cases. An existing Gas Tungsten Arc Welding (GTAW) Welding Procedure Specification (WPS) was fine tuned to minimize, in most cases, and eliminate detectable tungsten inclusions in the welds. All the weld coupons however, passed welding inspection as per the piping code: ASME B31.3 Normal Fluid Service. Tungsten electrode diameter, type, and manufacturer were varied. Some of the samples were pre-heated and others were not. It was observed that larger diameter electrodes, 5/32 in., with pre-heated joints resulted in welds with the least number of tungsten inclusions. It is hypothesized that thinner electrodes breakdown easily and get lodged into the weld pool during the welding process. This breakdown is further enhanced by the large temperature differential between the un-preheated sample and the hot electrode.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

A preliminary design for a weldable truss joint for on-orbit assembly of large space structures is described. The joint was designed for ease of assembly, for structural efficiency, and to allow passage of fluid (for active cooling or other purposes) along the member through the joint. The truss members were assumed to consist of graphite/epoxy tubes to which were bonded 2219-T87 aluminum alloy end fittings for welding on-orbit to truss nodes of the same alloy. A modified form of gas tungsten arc welding was assumed to be the welding process. The joint was designed to withstand the thermal and structural loading associated with a 120-ft diameter tetrahedral truss intended as an aerobrake for a mission to Mars.

Rule, W. K.↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

In the future, some spacecraft will be so large that they must be assembled on-orbit. These spacecraft will be used for such tasks as manned missions to Mars or used as orbiting platforms for monitoring the Earth or observing the universe. Some large spacecraft will probably consist of planar truss structures to which will be attached special purpose, self-contained modules. The modules will most likely be taken to orbit fully outfitted and ready for use in heavy-lift launch vehicles. The truss members will also similarly be taken to orbit, but most unassembled. The truss structures will need to be assembled robotically because of the high costs and risks of extra-vehicular activities. Some missions will involve very large loads. To date, very few structures of any kind have been constructed in space. Two relatively simple trusses were assembled in the Space Shuttle bay in late 1985. Here the development of a design of a welded joint for on-orbit, robotic truss assembly is described. Mechanical joints for this application have been considered previously. Welded joints have the advantage of allowing the truss members to carry fluids for active cooling or other purposes. In addition, welded joints can be made more efficient structurally than mechanical joints. Also, welded joints require little maintenance (will not shake loose), and have no slop which would cause the structure to shudder under load reversal. The disadvantages of welded joints are that a more sophisticated assembly robot is required, weld flaws may be difficult to detect on-orbit, the welding process is hazardous, and welding introduces contamination to the environment. In addition, welded joints provide less structural damping than do mechanical joints. Welding on-orbit was first investigated aboard a Soyuz-6 mission in 1969 and then during a Skylab electron beam welding experiment in 1973. A hand held electron beam welding apparatus is currently being prepared for use on the MIR space station. Presently, Marshall Space Flight Center is evaluating processes appropriate for on-orbit welding. A low gravity environment has been found to have very minor effects on the welding processes appropriate for this application. This is based on tests run on-orbit as well as low gravity environments achieved by flying aircraft in parabolic trajectories. It appears that a modified form of gas tungsten arc welding (GTAW) will be most appropriate for welding together structures on-oribt. The process has been modified to work in a vacuum by providing gas to the arc zone by means of a hollow tungsten electrode with special shielding. A commercial tube welding head has been successfully modified for use on-orbit with a gas leakage rate of approximately 2.5 liters/min. To develop as realistic a joint as possible, a specific truss structure was selected on which to base the design. The structure considered was based on the 120 foot diameter aerobrake tetrahedral truss structure. The truss members were assumed to consist of graphite/epoxy tubes. Also, it was assumed that the nodes were constructed of 2219-T87 aluminum alloy. The magnitude of the member load assumed for design purposes was 100 kips.

Rule, William K.↗

Report on FY 2023 Welding R&D at ORNL in support of ASME Alloy 709 Code Case Development

As part of the Alloy 709 (A709) ASME Code Case development effort under the Advanced Reactor Technologies (ART) Program, this work covers the development of the technical basis for weld fabrication and weld qualification of A709. This report summarizes the A709 welding research conducted at Oak Ridge National Laboratory (ORNL) in FY 2023. One of the focuses of the A709 welding research at ORNL is to relax the restriction of the P content in the A709 filler metal weld wire. In this report, we show the success in welding of high phosphorus (P) commercial A709 plates using A709 weld wires with relaxed P content of 80 wppm. A test weld was fabricated with the 80 wppm weld wire on the first commercial heat A709 base metal with 140 wppm P content using gas tungsten arc welding (GTAW). The test weld passed all weld qualification tests without issues. This study concludes that A709 matching filler metal with moderate amount of P of less than 80 wppm could be used to produce code qualified A709 welds with standard welding process without special treatment. It is recommended that the P level in the weld wire to be kept low to avoid hot cracking. Cross-weld specimens were machined from the two A709 production welds.. Cross welding creep rupture Code Case testing on these two production welds was initiated . The preliminary cross-weld creep tests results continue to show little or no creep strength reduction relative to the base metal.

36 MATERIALS SCIENCE↗

Effect of Through-Thickness Friction Stir Processing Parameters on Weld Repair and Modification of Fusion-Welded AA6061 Aluminum Alloy

Through-thickness friction stir processing was successfully carried out for microstructure modification and elimination of fusion defects of the gas metal arc welds by applying the process on as-welded joints. Variation in rotational speed from 750 to 1050 rpm and traveling speed from 50 to 200 mm/min resulted in minor changes (approximately 1 µm) in the grain size of nugget zone, while this variation in elongation result was up to 40%. The hardness profile, the width of softening zone, minimum hardness and fracture location also changed for different processing conditions. Furthermore, the defects were vanished efficiently across the welds profile by this method. The results also verified the geometric dynamic recrystallization phenomena as a dominant mechanism of microstructural modification.

36 MATERIALS SCIENCE↗

Analysis of thermal stress and metal movement during welding

Objectives of study were: investigation of temperature changes caused by welding arc with analysis of temperature distribution; development of system of mathematical statements describing thermal stresses and plastic strains during welding; and development of system of mathematical solutions and computer programs for one-dimensional analysis.

Andrews, J. B.↗

Hydrogen accelerated fatigue crack growth of friction stir welded X52 steel pipe

Friction stir welded steel pipelines were tested in high pressure hydrogen gas to examine the effects of hydrogen accelerated fatigue crack growth. Fatigue crack growth rate (da/dN) vs. stress-intensity factor range (ΔK) relationships were measured for an X52 friction stir welded pipe tested in 21 MPa hydrogen gas at a frequency of 1 Hz and R = 0.5. Tests were performed on three regions: base metal (BM), center of friction stir weld (FSW), and 15 mm off-center of the weld. For all three material regions, tests in hydrogen exhibited accelerated fatigue crack growth rates that exceeded an order of magnitude compared to companion tests in air. Among tests in hydrogen, fatigue crack growth rates were modestly higher in the FSW than the BM and 15 mm off-center tests. Select regions of the fracture surfaces associated with specified ΔK levels were examined which revealed intergranular fracture in the BM and 15 mm off-center specimens but an absence of intergranular features in the FSW specimens. In conclusion, the X52 friction stir weld and base metal tested in hydrogen exhibited fatigue crack growth rate relationships that are comparable to those for conventional arc welded steel pipeline of similar strength found in the literature.

08 HYDROGEN↗

The potential of a GAS can with payload G-169

The feasibility of using welding for the construction, expansion and emergency repair of space based structures is discussed and the advantages of gas tungsten arc welding (GTAW) over other welding techniques are briefly examined. The objective and design concept for the G-169 Get Away Special payload are described. The G-169 experiment will allow the comparison of a space GTA welded joint with a terrestrial GTA welded joint with all parameters held constant except for gravitational forces. Specifically, a bead-on-plate weld around the perimeter of a 2 inch diameter stainless steel pipe section will be performed. The use of Learjet microgravity simulation for the G-169 and other Get Away Special experiments is also addressed.

Tamir, David↗

Real-time Canister Welding Health Monitoring and Prediction System for Spent Fuel Dry Storage

In this report, the salt mist corrosion testing at controlled temperature was carried out successfully on 304L SS submerged arc welded coupons by Unifog Dispersion Tower at ORNL. Corrosion in-situ monitoring system from Intelligent Automation, Inc. (IAI) was setup in the corrosion test and running smoothly to record signals during the corrosion test. Parts and device selection, sensors attachment, and experimental procedures are discussed. There wasn’t any visible corrosion or crack propagation on the weld coupon after about a month of corrosion testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗