Search NASA⌕ Search

SEARCH · Search NASA

Results for “Action”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

USAID Colombia Young Leaders Workforce Training Program Action Plans: Forecasting Distributed Photovoltaic Adoption in Barranquilla, Colombia

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, the Association of Renewable Energies Colombia (SER) participants leveraged their training and professional experience to develop an action plan for modeling the projected adoption of distributed solar photovoltaics (PV) out to 2050 for the city of Barranquilla, Colombia. This case study provides an overview of the key activities and outcomes of the Distributed Generation Market Demand Model (dGen™) Colombia project.

14 SOLAR ENERGY↗

Post-Closure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report documents the biennial postclosure site inspections conducted in June 2018 at the surface Corrective Action Unit (CA U) 417 at the Central Nevada Test Area, Nevada, Site. The UC-I, UC-3, and UC-4 sites are inspected every 2 years, in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report published in 2001. The requirements for postclosure monitoring have been modified over the years through negotiations with the Nevada Division of Environmental Protection (NDEP). Modifications were documented through three separate Records of Technical Change to the Closure Report, which were approved by NDEP in 2003, 2011, and 2015. The UC-1, UC-3, and UC-4 sites were all observed as being in good condition during the 2018 inspections. A few minor cracks on the UC-1 Central Mud Pit cover were repaired during the UC- I inspection. A concrete monument at the northeast corner of Mud Pit U3E at the UC-3 site had some damage near the top of the monument, but the damage has not impacted the functionality of the monument or survey pin on top of the monument. No issues were identified at the UC-4 site. No maintenance or additional repair activities are recommended at the UC-1, UC-3, and UC-4 sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Monitoring Letter Report for Corrective Action Unit (CAU) 97: Yucca Flat/Climax Mine; CAU 98: Frenchman Flat; and CAU 99: Rainier Mesa/Shoshone Mountain, Underground Test Area, Nevada National Security Site, Nevada, for Calendar Year 2020 (Rev. 1, May 2021)

This letter serves as the annual post-closure letter for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine (YF/CM); CAU 98, Frenchman Flat (FF); and CAU 99, Rainier Mesa/Shoshone Mountain (RM/SM) for calendar year (CY) 2020. This letter will discuss the post-closure monitoring activities that occurred during CY 2020, identify any triggers reached, and summarize water usage on the Nevada National Security Site (NNSS) and surrounding hydrographic basins at the three CAUs.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Radiological Dispersal Device (RDD) Recovery Guidance: After Action Report from Pilots - Responding to Feedback from Pilots Reviewing RDD Recovery Guidance

The goal of this After Action report is to utilize feedback from the pilot participants to improve the guidance for responding to radiological dispersal device (RDD) events, which can include deliberate acts to release radioactive materials into the environment using explosives or other means or accidental releases (e.g., release from a medical isotope source). This longer-term recovery guidance is an extension of the initial response guidance that was released in a 2017 interagency report called RDD Response Guidance: Planning for the First 100 Minutes. Recovery teams reviewed the longer-term recovery guidance during pilot sessions that were held in Harris County, Texas (March 8-10, 2022) and Seattle, Washington (May 2-3, 2022). The pilot teams reviewed the RDD Recovery Guidance Presentation, which contains a summary of the more detailed RDD Recovery Guidance draft document. The feedback from both pilots was grouped and binned into unique themes (e.g., “checkpoint challenges”) that align with the recovery missions and tactics that they reviewed. PNNL authors of the recovery guidance then prepared responses that describe how they recommend addressing the feedback for each theme. The responses typically included recommendation plans for improving the guidance document, but also described when no changes are needed because the guidance already contains the suggested improvement. These pilot recommendations will be brought to the interagency team to finalize plans for updating and improving recovery guidance materials.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Connective Actions for Educational Institutions and Wind Industry Firms [Slides]

As a part of the National Wind Workforce Assessment, four presentations have been created in conjunction with the technical report to provide more insight into key findings. The four presentations are catered towards specific stakeholder groups that include: educators, wind industry firms, students, and current wind industry employees. This presentation is intended for use by wind industry firms and educational institutions looking to gain insight into key levers and actionable steps that can be taken to help narrow the wind workforce gap. Data and guidance on how wind industry firms and education institutions can collaborate to 1) grow the number of graduates applying into wind occupational roles through increasing awareness of opportunities in the industry and 2) increase the quality of applicants applying into wind through relevant experience gaining opportunities like internships and apprenticeships is included in the presentation.

17 WIND ENERGY↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Calendar Year 2022

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 (Rev. 6) associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches. All post-closure inspections and evaluations were performed in accordance with requirements set out in RCRA Permit NEV HW0101, Rev. 6.

54 ENVIRONMENTAL SCIENCES↗

Addendum to Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada

This addendum to the CR for CAU 98, Frenchman Flat, NNSS, Nevada (compiled in DOE/EMNV, 2019) defines the long-term monitoring approach after a five-year evaluation of water sampling results, water-level measurements, and trends in water-level measurements. The approach was developed by Navarro and discussed in the report Corrective Action Unit 98: Frenchman Flat Five-Year Evaluation Nevada National Security Site, Nevada (DOE/EMNV, 2022), which was approved by NDEP. Sections 4.0 and 5.0 of the CR were rewritten to reflect the approach discussed in the five-year evaluation. Appendix C contains well construction diagrams that have been updated since the original CR was published. Appendix D contains updated Use Restriction (UR) forms and maps. NDEP requested an addendum instead of a complete revision to the Frenchman Flat CR so the history of the CR would not be lost.

54 ENVIRONMENTAL SCIENCES↗

Exceedance Response Action (ERA) Level 2 Technical Report Update

The Sandia National Laboratories, California (SNL/CA) site comprises approximately 410 acres and is located in the eastern portion of Livermore, Alameda County, California. The property is owned by the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) and is being managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS). Operations at the SNL/CA facility consist of DOE statutory responsibilities for nuclear weapon research and design, development of energy technologies, and basic scientific research. Specific industrial activities occur in discrete buildings and include electroplating or anodizing, machine shop, permitted hazardous waste treatment, storage and disposal facility (TSDF), and a scrap yard. This report provides an update to the ERA Level 2 Technical Report Update previously submitted in June 2022 (2022 ERA L2 Technical Report Update) for iron, aluminum, and pH. In accordance with the California’s General Permit for Discharges of Storm Water Associated with Industrial Activities (IGP) Section XII.D.3.c, an ERA Level 2 Technical Report update is to be submitted with the annual report when a facility utilizing an Industrial Activity Best Management Practice (BMP) Demonstration (IABMPD) experiences additional exceedances of the numeric action levels.

54 ENVIRONMENTAL SCIENCES↗

Action Effectiveness Monitoring and Research of Dredged Material Placement at Woodland Islands (Final Report)

Benthic invertebrates play critical ecosystem roles including the breakdown of organic matter, sediment mixing, and nutrient cycling. In the lower Columbia River and estuary, benthic invertebrates provide a foraging resource for threatened and endangered juvenile salmon. Driven by the goal to create low velocity, shallow water, and riparian shrub habitats to benefit juvenile salmon, the USACE placed 237,000 CY of dredged material, resulting in the deposition of 13.5 acres of sand on the off-channel margins at Woodland Islands. The Pacific Northwest National Laboratory (PNNL) designed and implemented an action effectiveness research study to understand how dredged material placement at Woodland Islands affected sediment conditions and benthic invertebrate assemblages. A Before-After-Control-Impact, or BACI, study design was used to evaluate the response of environmental conditions and benthic invertebrates to dredged material placement. The design included one impact site and two control sites. Sampling occurred for two years prior to dredged material placement and two years after. Our study found that spatial variation was a significant factor for both environmental and biological response variables which suggests local conditions are important considerations for mechanisms affecting benthic assemblages. We found that off-channel habitats across all locations sampled were producing benthic invertebrates, many of which are common prey items for juvenile salmon and steelhead—e.g., insects, chironomids, crustaceans, and corophium. There was a significant BACI effect (i.e., an effect at the dredged material placement site, relative to conditions at the control sites) for concentration of carbon and ammonium in sediment, but not for phosphorous concentrations or for percent sand. The estimated abundance for the three invertebrate response variables—total abundance, total chironomid abundance, and total corophium abundance—was significantly lower at the impact site after dredged material placement, compared to the control sites. At Woodland Island, the estimated mean abundance for all invertebrates combined decreased 28% after dredged material placement. Estimated mean abundances of chironomid and corophium decreased by 8% and 88%, respectively. While invertebrate abundances were lower after dredged placement, the composition of benthic invertebrates was similar before and after placement suggesting that as the new habitat feature evolves recolonization will likely follow. These findings provide a foundation for understanding potential benefits and consequences of repurposing dredged material for habitat creation in the LCRE.

54 ENVIRONMENTAL SCIENCES↗

Community Energy Action Plan: Pastillo Tibes

The Energy Community Action Plan for Pastillo Tibes is a comprehensive strategy aimed at strengthening the community's resilience against energy challenges. This draft document emphasizes the importance of community ownership, inclusivity, and adaptability in the planning process, and is specifically tailored for this community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Guide for Creating a Building-Level Action Plan to Manage Refrigerants in Buildings

The Guide for Creating a Building-Level Action Plan to Manage Refrigerants in Buildings has been developed in response to stakeholder feedback and interest received during the Better Buildings Managing Refrigerants Working Group. This guide includes best practices and a step-by-step guide to create a plan to manage their organization's refrigerants. Stakeholders were interested in guidance for refrigerant management to help reduce costs and protect efficiency of equipment, to mitigate risk related to increased maintenance and operational budgets, and to manage costs of using legacy refrigerants.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data Center Cybersecurity, Supply Chain Risk Management, and Emerging Regulation Cohort Summary: Takeaways and Action Plans

This report summarizes the outcomes of the Data Center Cohort under the Department of Energy’s Technical Assistance for Digital Assurance (TADA) initiative, aimed at enhancing grid resilience through cybersecurity, supply chain risk management (SCRM), and Cyber-Informed Engineering (CIE). The cohort engaged 17 organizations across utilities, data center operators, vendors, and technology providers in three sessions combining presentations, discussions, and exercises. Key topics included AI-driven load behavior, cybersecurity vulnerabilities in UPS/BESS and cooling systems, governance gaps at utility–data center boundaries, and supply chain integrity. Five cross-cutting themes emerged: interconnection architecture vulnerabilities, fragmented governance, AI-driven stability risks, lack of regulatory frameworks, and long-term supply chain concerns. Actionable recommendations were developed, including implementing DMZ segmentation, formalizing vendor access agreements, designing AI workload limits, and advancing standards through NERC and state-level programs. These strategies aim to strengthen resilience, clarify responsibilities, and ensure secure integration of data centers into the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Mechanisms of Action of Dorsal Root Ganglion Stimulation

The dorsal root ganglion (DRG) serves as a pivotal site for managing chronic pain through dorsal root ganglion stimulation (DRG-S). In recent years, the DRG-S has emerged as an attractive modality in the armamentarium of neuromodulation therapy due to its accessibility and efficacy in alleviating chronic pain refractory to conventional treatments. Despite its therapeutic advantages, the precise mechanisms underlying DRG-S-induced analgesia remain elusive, attributed in part to the diverse sensory neuron population within the DRG and its modulation of both peripheral and central sensory processing pathways. Emerging evidence suggests that DRG-S may alleviate pain by several mechanisms, including the reduction of nociceptive signals at the T-junction of sensory neurons, modulation of pain gating pathways within the dorsal horn, and regulation of neuronal excitability within the DRG itself. However, elucidating the full extent of DRG-S mechanisms necessitates further exploration, particularly regarding its supraspinal effects and its interactions with cognitive and affective networks. Understanding these mechanisms is crucial for optimizing neurostimulation technologies and improving clinical outcomes of DRG-S for chronic pain management. This review provides a comprehensive overview of the DRG anatomy, mechanisms of action of the DRG-S, and its significance in neuromodulation therapy for chronic pain.

60 APPLIED LIFE SCIENCES↗

Porting the WAVEWATCH III (v6.07) wave action source terms to GPU

Abstract. Surface gravity waves play a critical role in several processes, including mixing, coastal inundation, and surface fluxes. Despite the growing literature on the importance of ocean surface waves, wind–wave processes have traditionally been excluded from Earth system models (ESMs) due to the high computational costs of running spectral wave models. The development of the Next Generation Ocean Model for the DOE’s (Department of Energy) E3SM (Energy Exascale Earth System Model) Project partly focuses on the inclusion of a wave model, WAVEWATCH III (WW3), into E3SM. WW3, which was originally developed for operational wave forecasting, needs to be computationally less expensive before it can be integrated into ESMs. To accomplish this, we take advantage of heterogeneous architectures at DOE leadership computing facilities and the increasing computing power of general-purpose graphics processing units (GPUs). This paper identifies the wave action source terms, W3SRCEMD, as the most computationally intensive module in WW3 and then accelerates them via GPU. Our experiments on two computing platforms, Kodiak (P100 GPU and Intel(R) Xeon(R) central processing unit, CPU, E5-2695 v4) and Summit (V100 GPU and IBM POWER9 CPU) show respective average speedups of 2× and 4× when mapping one Message Passing Interface (MPI) per GPU. An average speedup of 1.4× was achieved using all 42 CPU cores and 6 GPUs on a Summit node (with 7 MPI ranks per GPU). However, the GPU speedup over the 42 CPU cores remains relatively unchanged (∼ 1.3×) even when using 4 MPI ranks per GPU (24 ranks in total) and 3 MPI ranks per GPU (18 ranks in total). This corresponds to a 35 %–40 % decrease in both simulation time and usage of resources. Due to too many local scalars and arrays in the W3SRCEMD subroutine and the huge WW3 memory requirement, GPU performance is currently limited by the data transfer bandwidth between the CPU and the GPU. Ideally, OpenACC routine directives could be used to further improve performance. However, W3SRCEMD would require significant code refactoring to make this possible. We also discuss how the trade-off between the occupancy, register, and latency affects the GPU performance of WW3.

58 GEOSCIENCES↗

Call to Action for Global Access to and Harmonization of Quality Information of Individual Earth Science Datasets

Knowledge about the quality of data and metadata is important to support informed decisions on the (re)use of individual datasets and is an essential part of the ecosystem that supports open science. Quality assessments reflect the reliability and usability of data. They need to be consistently curated, fully traceable, and adequately documented, as these are crucial for sound decision- and policy-making efforts that rely on data. Quality assessments also need to be consistently represented and readily integrated across systems and tools to allow for improved sharing of information on quality at the dataset level for individual quality attribute or dimension. Although the need for assessing the quality of data and associated information is well recognized, methodologies for an evaluation framework and presentation of resultant quality information to end users may not have been comprehensively addressed within and across disciplines. Global interdisciplinary domain experts have come together to systematically explore needs, challenges and impacts of consistently curating and representing quality information through the entire lifecycle of a dataset. This paper describes the findings of that effort, argues the importance of sharing dataset quality information, calls for community action to develop practical guidelines, and outlines community recommendations for developing such guidelines. Practical guidelines will allow for global access to and harmonization of quality information at the level of individual Earth science datasets, which in turn will support open science.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

An Optimization-Based Law of Mass Action Precipitation/Dissolution Model

Rare earth elements (REE) and many other critical minerals are necessary for the manufacturing of modern everyday technologies, including microchips, batteries and electric motors. Recovery of these materials typically involves aqueous systems which can be modeled as chemical equilibrium problems. One common method for solving these problems is the law of mass action approach (LMA), where a system of non-linear equations involving the equilibrium constants is solved. However, despite being theoretically simple, these problems are in practice very difficult to solve. Currently, the use of iterative heuristics based on saturation indices to decide on which species and reactions to include in the calculations is the state of the art to arrive at a solution. Here, we present an optimization-based alternative to solve chemical equilibria problems involving precipitation/dissolution reactions without the need for such heuristics. Our approach is first validated against the LMA software MINTEQ and PHREEQC for a number of case studies, and then applied to a novel REE recovery process reported in the literature. Overall, our approach was found to have close agreement with MINTEQ and PHREEQC, and we were able to successfully replicate the reported yield and purity for the published REE process.

42 ENGINEERING↗