Search NASA⌕ Search

SEARCH · Search NASA

Results for “Aqueous waste”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Dodecane Radiolysis Yields by Time-Resolved and Steady-State Methods

Liquid organic molecules are present as solvents, complexing ligands, and additives in both used nuclear fuel reprocessing solvent systems and in their subsequent nuclear waste streams. Under these extreme environments, these organic molecules are constantly exposed to ionizing radiation which promotes their radiolysis, forming a variety of short-lived, highly energetic, excited state and radical species.1-4 Here, we demonstrate new experimental results for the steady-state and time-resolved irradiations of dodecane (C12H26), a long chain, liquid, aliphatic hydrocarbon that is the prototypical solvent used for benchtop studies of aqueous-organic solvent extraction systems. When ionizing radiation interacts with neat dodecane, the energy transfer can result in molecular ionization, to give the dodecane radical cation (C12H26+•) and the solvated electron (eS–), and molecular electronic excitation (C12H26*), which rapidly produces transient carbon-centered radical fragments (CxHy•) and hydrogen atoms (H•).1-4 Studies on the initial yields of the ionization and excitation products were performed using time-resolved picosecond electron pulse radiolysis with the use of molecular probes. Using steady-state cobalt-60 gamma irradiations, the suite of products formed by dodecane radiolysis in aerated and deaerated solutions was determined. Then, using iodine as an alkyl radical scavenger, the loss of molecular iodine with dose was quantified, and by correlating with the molecular hydrogen yields of the system, the initial yields of the various carbon-centered radicals were also determined. Finally, the rates of reactions of the C12H26+• and eS– with ligands proposed for use in spent nuclear fuel reprocessing were studied as a function of temperature from 10 – 40 °C.

38 - RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCL↗

Per- and Polyfluoroalkyl Substances Confirmatory Sampling Report, South Repeater Building (SWMU 121), Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization

PFAS↗

Corrosion of 316 SS in direct contact with Zircaloy-4 in repository relevant conditions

The effects of interfacial contact between 316 stainless steel (316 SS) waste canister and spent fuel cladding material (Zircaloy-4) in case of water intrusion into a deep geological repository are investigated. Hydrothermal corrosion experiments of 316 SS and Zircaloy-4 in direct contact were performed at elevated temperatures in MilliQ water and simulated Mont Terri groundwater. Hematite, magnetite, chromite, and baddeleyite form as secondary phases. pH of the Mont Terri solution increases with corrosion duration and magnetite forms preferentially instead of hematite. Thermodynamic modeling shows that iron oxidation in 316 SS controls the pH and redox potential of the aqueous environment and is in good agreement with experimental Mont Terri results, showing that experimental Mont Terri results trend to equilibrium. All oxides except hematite are predicted to exist at thermodynamic equilibrium based on calculations, implying that experimentally formed hematite will be reduced or transformed to magnetite at equilibrium. The thermodynamically predicted chromite was observed to form only at the interface where 316 SS was in contact with Zircaloy-4 at 250°C, showing that contact with Zircaloy-4 seems to accelerate the 316 SS corrosion to thermodynamic equilibrium. Finally, Mont Terri groundwater readily trends towards thermodynamic equilibrium, leading to a pH and redox buffered system that is dominated by iron in solution coming from the accelerated corrosion of 316 SS caused by Zircaloy-4 contact.

316 stainless steel↗

Uranium Immobility in Tims Branch Wetland

The objective of this study was to address an item identified by the Low-Level Waste Disposal Facility Federal Review Group (LFRG) panel during their review of the Savannah River Site’s Composite Analysis. Their concern was that the Tims Branch wetland, which has elevated levels of uranium (U) originating from site operations between 1952 to 1985, may be a secondary source term, posing a human health risk. This report briefly describes three studies dealing with: 1) quantifying the mass of U remaining in the wetland, 2) quantifying the tendency of U to release from Tims Branch sediment, and 3) describing the distribution of U in aqueous and suspended solids in Tims Branch water during episodic storm events. The Tims Branch wetland has been extremely effective for the last 50 years at immobilizing U released to the system. A detailed map including 270,000 gamma spectra of the U distribution in the wetland indicated that 84% of the initial 43,500 kg U introduced in the system remain there after 50 years (Kaplan et al., 2020). The effectiveness of immobilizing U is supported by stream water measurements collected over the last several decades indicating that U concentrations have been consistently below drinking water regulatory limits (i.e., the EPA Maximum Contaminant Level, 30 pg/L (SRNS, 2019)). Furthermore, using contaminated Tims Branch sediments, in situ desorption Kd values (ratio of U sediment/U Water) were extremely high, ranging from 104to 106 L/kg, suggesting the U is strongly bound to these wetland sediments. Finally, a detailed study of Tims Branch stream water properties during episodic rain events indicated that essentially all the U transported in this stream was associated with suspended solids (Batson et al., 1996). Together these findings indicate that the Tims Branch wetland is extremely effective in its present state at immobilizing U and that the small masses of U released downstream will be predominantly in association with suspended solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synthetic Calcium Carbonate Production by Carbon Dioxide (CO 2 ) Mineralization of Industrial Waste Brines

The global scale of CO 2 emission has crossed 36 B tons, and the United State represents 14% of the total emissions. In light of the high cost associated with current CO 2 capture processes ($60-to-150 per ton of CO 2 ), carbon capture and utilization (CCU), wherein CO 2 is converted to beneficial products, provides a pragmatic path to overcome the economic barrier for CO 2 emissions control. In particular, CO 2 mineralization offers an attractive route as it produces high-value mineral carbonates that sequester CO 2 in a stable form. For instance, fine precipitated calcium carbonate, a valuable product with unit price in the range of $230-280/t and a global market projected to reach 99 M tons in 2020, can be produced by capturing CO 2 within aqueous Ca 2+ solution. However, two critical challenges need to be overcome—(i) the need for costly processes such as electrolysis or addition of alkali hydroxides to maintain alkalinity during mineralization, and (ii) the geographic availability of Ca-rich solutions (or brines) which often renders efficient integration with power plants impractical. To simultaneously address these challenges, this project developed two novel routes to enable carbonate production based on efficient CO 2 mineralization. In one variation, the project developed a new alkaline carbonation process to capture CO 2 and produce calcite precipitates from coal ashes. Herein, coal ash is carbonated first in a sodium carbonate solution. The carbonation reaction produces sodium hydroxide and raises the solution pH. This high-pH hydroxide solution is then used for CO 2 capture, which converts the sodium hydroxide solution back to sodium carbonate to repeat the carbonation cycle. The carbonated ash residue is refined with a CO 2 pressure swing step to produce high-purity precipitated calcium carbonate. In another variation, Ca-rich produced water brine serves as the Ca-source to mineralize CO 2 . An H + /Na + ion-exchange cycle was designed to provision alkalinity during mineralization and regenerate the ion-exchange reagent in brines with high salinity. Ca-depleted brines can then be treated within a centralized water treatment facility. Both variations beneficially utilize reject streams—such as coal ashes and brines from oil and gas extraction or CO 2 storage operations—that are available at substantial quantities in the vicinity of coal power plants within the U.S. In addition to technology development, this project included techno-economic and life-cycle analysis to identify technically and economically appropriate solutions for power plants in different geographic locations. Taken together, the project provides a unique route to integrate CO 2 emissions control and waste handling/treatment for coal power plants, while producing a high-value product to offset the economic burden associated with waste management. The developed processes utilize post-desulfurization flue gas from coal-fired power plants as is. The CO 2 conversion reactions are performed in alkaline brines at ambient pressure from the flue gas, thereby minimizing the energy burden. By beneficiation of industrial waste streams with low energy input, the processes offers significant technical advantages in energy and CO 2 footprint over the current paradigm of precipitated calcium carbonate production, which involves calcination of limestone at processing temperatures in excess of 800 °C. Overall, this project developed viable CO 2 mineralization processes while strategically maximizing the economic benefit.

01 COAL, LIGNITE, AND PEAT↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Verification Testing of OLI Systems Mixed Solvent Electrolyte Model for the Na-K-Mg-Ca-H-Cl-SO 4 -OH-HCO 3 -CO 3 -CO 2 -H 2 ) System to High Ionic Strength at 25°C

This technical report summarizes model verification results and summary statistics for 41 evaporite mineral solubility cases evaluated by Savannah River National Laboratory using OLI Systems’ aqueous electrolyte thermodynamic modeling software. The 41 verification cases containing a total of 60 solubility curves comprise mineral solubility data from low to high ionic strength at 25°C for the eight-component system Na-K-Mg-Ca-H-Cl-SO 4 -OH-HCO 3 -CO 3 -CO 2 -H 2 O as reported by Harvie et al. (1984). Thermodynamic calculations were executed using OLI Systems’ Stream Analyzer computation module within the OLI Studio software platform (Ver. 11.0, Rev. 11.0.1.9). The Mixed Solvent Electrolyte (MSE) thermodynamic framework was chosen for this investigation because of its superiority in modeling high ionic-strength inorganic salt solutions and actinide redox chemistry and solubility, both of which are relevant to the geological repository conditions at the Waste Isolation Pilot Plant in Carlsbad, New Mexico. Mineral solubility data in various inorganic salt solutions were digitized and extracted from figures generated by Harvie et al. (1984). For each of the 60 solubility curves, a case-specific chemistry model and input file were generated in OLI Studio using OLI Stream Analyzer and the MSE (H 3 O + ion) public databank provided by OLI Systems. Model simulation results were exported to Microsoft Excel to calculate summary statistics and to generate graphs comparing the OLI model predictions to the solubility data. Summary statistics include residuals (model – data) and concordance (accuracy × precision, where precision is indicated by the Pearson correlation coefficient and accuracy accounts for bias and scale differential). Private databanks were not developed, and activity coefficient model regressions were not performed to improve OLI model fits to the data. Of the 41 model verification plots, 83% have a mean of the percent residuals less than or equal to 25%. Similarly, 75% display a concordance greater than or equal to 0.75. Only seven of the 41 verification plots fail to show good agreement between the model and data. Of these seven, three are relevant to the WIPP repository because they involve the Mg-OH-Cl-SO 4 -CO 3 aqueous system. The remaining four address salt solubilities at the pH extremes (strong acid and strong base). It should be noted that in two of the three Mg-OH-Cl-SO 4 -CO 3 system cases, the regressed Harvie et al. (1984) solubility curve also deviated from the data. Lack of agreement between the OLI model-predicted solubility curves and the data is attributable to one or more of the following: specific solid species are not included in the OLI MSE databank; there is significant variation among the different solubility datasets chosen by Harvie et al. (1984); the OLI MSE model’s thermodynamic parameters were determined using different solubility datasets; and the activity coefficient parameters for certain relevant ion-ion and ion-molecule pairs have not been optimized via data regression. Two recommendations for future work are to (1) evaluate solubility data for the Mg-OH-Cl-SO 4 -CO 3 system at high ionic strength and, if necessary, develop a private OLI MSE database that includes missing species and, where necessary, regressed standard state properties and interaction parameters; (2) perform similar verification testing of the OLI model for actinide solubility data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Using Volcanic Ash to Remove Dissolved Uranium and Lead

Experiments have shown that significant fractions of uranium, lead, and possibly other toxic and/or radioactive substances can be removed from an aqueous solution by simply exposing the solution, at ambient temperature, to a treatment medium that includes weathered volcanic ash from Pu'u Nene, which is a cinder cone on the Island of Hawaii. Heretofore, this specific volcanic ash has been used for an entirely different purpose: simulating the spectral properties of Martian soil. The treatment medium can consist of the volcanic ash alone or in combination with chitosan, which is a natural polymer that can be produced from seafood waste or easily extracted from fungi, some bacteria, and some algae. The medium is harmless to plants and animals and, because of the abundance and natural origin of its ingredient( s), is inexpensive. The medium can be used in a variety of ways and settings: it can be incorporated into water-filtration systems; placed in contact or mixed with water-containing solids (e.g., soils and sludges); immersed in bodies of water (e.g., reservoirs, lakes, rivers, or wells); or placed in and around nuclear power plants, mines, and farm fields.

McKay, David S.↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Current Needs in Radiochemistry

There are a number of current needs in the development of the Pu and Am separations that underpin larger interest areas including nuclear waste issues, nuclear weapons, nuclear forensics, nuclear fuels and similarly related fields. In the large areas of interest, there are a number of sub-fields that include corrosion chemistry, pyrochemistry, solution-phase chemistry, rapid separations, environmental speciation, and other similar efforts. However, in all of the these fields it is important to realize that the underlying chemistry that underpins these efforts is similar in that Pu and Am are bound to ligands that can be in the solid, aqueous, or gas phase and separations occurs due to the preferential binding of the ligand to Pu or Am based on a number of factors that include pH, concentration, oxidation state, etc. In the past, most of the Pu and Am chemistry has occurred in limited scope within universities where micro-scale and bench-top scale chemistry are the dominate investigative theme. At US national laboratory and their international counterparts, larger scale reactions have been attempted such that industrial scale chemistry has been completed. Some of this technology has been harnessed in radiopharmaceuticals and nuclear fuel reprocessing. However, such bench-top research is expensive to due to the safety and security that is concerned when dealing with Pu, and scale-up of reactions is even more resource intensive. In an effort to offset this expensive, it would be of interest to explore the ability to predict selectivity based on the computational modeling of actinide chemistry. This has historically been limited by the abilities of large supercomputers, but with the emphasis on developing exascale computers within the US and similar efforts by other countries this predictive modeling has potential to produce significant results that would yield improved understanding of actinide chemistry.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Multiscale Investigation of the Mechanisms Controlling the Corrosion of Borosilicate Glasses in Hyper-Alkaline Media

The overarching goal of the present multiscale investigation is to unearth the kinetics and mechanisms of corrosion of borosilicate glasses in hyper-alkaline (pH = 13) environments as a function of their chemical composition. Accordingly, a series of 3- to 6-component borosilicate glasses have been designed starting from Na 2 O–B 2 O 3 –SiO 2 ternary, wherein the compositional complexity has been added in a systematic tiered approach, finally resulting in the composition of the well-known international simple glass (ISG). Tetramethylammonium hydroxide (TMAH), one of the most widely used alkaline etchant in the glass and electronics industry, has been used as the corrosion media. A series of state-of-the-art characterization techniques including magic angle spinning nuclear magnetic resonance spectroscopy, X-ray photoelectron spectroscopy, inductively coupled plasma optical emission spectroscopy, elastic recoil detection analysis, and high-resolution transmission electron microscopy have been employed to unearth the compositional dependence of glass corrosion in hyper-alkaline environments. The glass compositions underwent congruent corrosion in the forward rate regime, whereas the controlling mechanism of corrosion in the residual rate regime depends on the presence/absence of Ca in the surrounding environment and can be explained on the basis of the dissolution–reprecipitation model. The dependence of corrosion kinetics and the chemistry of alteration products (in the residual rate regime) on the glass composition have been discussed. Here, the results presented in this contribution will ultimately supplement the scientific literature attempting to understand the fundamental science governing the aqueous corrosion of silicate-based glass chemistries and add to the growing database required to develop non-empirical predictive models for designing glasses with controlled dissolution rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probing the pH Effect on Boehmite Particles in Water Using Vacuum Ultraviolet Single-Photon Ionization Mass Spectrometry

Boehmite has been widely used in theoretical research and industry, especially for hazardous material processing. For the liquid-phase treating process, the interfacial properties of boehmite are believed to be affected by pH conditions, which change its physicochemical behavior. However, molecular-level detection on cluster ions is challenging when using bulk approaches. Herein we employ in situ vacuum ultraviolet single-photon ionization mass spectrometry (VUV SPI-MS) coupled with a vacuum-compatible microreactor system for analysis at the liquid–vacuum interface (SALVI) to investigate the solute molecular composition of boehmite under different pH conditions for the first time. The mass spectral results show that more complex clustering of solute molecules exists at the solid–liquid (s–l) interface than conventionally perceived in a “simple” aqueous solution. Besides solute ions, such as boehmite molecules and fragments, the composition and appearance energies of these newly discovered solvated cluster ions are determined by VUV SPI-MS in different pH solutions. We offer new results for the pH-dependent effect of boehmite and provide insights into a more detailed solvation mechanism at the s–l interface. By comparing the key products under different pH conditions, fundamental understanding of boehmite dissolution is revealed to assist the engineering design of waste processing and storage solutions.

SALVI↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Flash Graphene from Plastic Waste

In this work, an approach to upcycling plastic waste (PW) products is presented. The method relies on flash Joule heating (FJH) to convert PW into flash graphene (FG). In addition to FG, the process results in the formation of carbon oligomers, hydrogen, and light hydrocarbons. In order to make high quality graphene, a sequential alternating current (AC) and direct current (DC) flash is used. Here, the FJH process requires no catalyst and works for PW mixtures, which makes the process suitable for handling landfill PW. The energy required to convert PW to FG is ~ 23 kJ/g or ~ $125 in electricity per ton of PW, potentially making this process economically attractive for scale-up. The FG was characterized by Raman spectroscopy and had a I 2D /I G peak ratio up to 6 with a low-intensity D band. Moreover, transmission electron microscopy and X-ray diffraction analysis show that the FG is turbostratic with an interlayer spacing of 3.45 Å. The large interlayer spacing will facilitate its dispersion in liquids and composites. Analysis of FG dispersions in 1% Pluronic aqueous solution shows that concentrations up to 1.2 mg/mL can be achieved. The carbon oligomers that distilled from the process were characterized by Fourier-transform infrared spectroscopy and have chemical structures similar to the starting PW. Initial analysis of gas phase products shows the formation of considerable amounts of hydrogen along with other light hydrocarbons. Since graphene is naturally occurring and it shows a low toxicity profile, this could be an environmentally beneficial method to upcycle PE.

54 ENVIRONMENTAL SCIENCES↗

Sol–gel synthesis of iodosodalite precursors and subsequent consolidation with a glass binder made from oxides and sol–gel routes

Radioiodine accumulates in aqueous solutions and off-gas streams during nuclear fuel reprocessing due to its solubility in aqueous solutions and volatility, respectively. Additionally, radioiodine is highly mobile in geological environments and iodine-129 has been found to be one of the largest long-term contributors to chronic dose to humans in scenarios of radionuclide migration from geological repositories. Most of the radioiodine can be captured during fuel reprocessing in off-gas streams using solid sorbents and scrubbing solutions. Once iodine is captured, it must be stored in a durable form for eventual disposal. Iodosodalite has been investigated as a waste form for radioiodine, however these synthesis processes typically result in mixed products and iodine volatilization during consolidation. Therefore, this paper proposes a novel approach to synthesizing iodosodalite utilizing a sol-gel method. This method was chosen to lower processing temperatures and improve product yield. Preliminary experiments conducted to determine the viability of this synthetic method are presented. Additionally, consolidation of sol-gel derived iodosodalite with a glass-binder was explored using three different methods: 1) incorporating the glass-binder during gel preparation using alkoxide precursors; 2) separately preparing the glass binder using a sol-gel method; and 3) separately preparing the glass-binder using a melt-quench technique. Glass-bonded iodosodalite was successfully synthesized using these novel sol-gel approaches.

36 MATERIALS SCIENCE↗

Investigation and Analysis of Dolomite Dissolution in Variable Strength Systems Relevant to the WIPP

The Waste Isolation Pilot Plant (WIPP) was opened in 1999 as a solution to the long-term disposal of the nation's nuclear defense-generated transuranic (TRU) waste. The salt beds were recommended as the ideal location because they are free from flowing fresh water, easily mined, impermeable, and geologically stable. However, for performance assessment modeling, release scenarios must be considered. The most likely release scenario was determined to be human intrusion leading to direct and/or long-term brine release (US DOE 1995, US DOE 1996, Perkins et al., 1999). The focus of this research is the Rustler formation because it is located above the WIPP and is the most transmissive layer (Perkins et al., 1999). Objective: To determine the effect of chelating ligands ( e.g. EDTA) on dissolution of dolomite in high ionic strength systems. Do brines impact dolomite dissolution and how is it affected by EDTA binding with cations? By varying the ionic strengths, different brine conditions can be simulated similar to those in and around the Culebra member and evaluate trends of dissolved Ca and Mg in the aqueous phase from the quantified data. Conclusions: <2% of dolomite dissolved over one week at pH 8.5. Greater dissolution occurred at higher ionic strength and in the presence of NaCl with approximately 0.4 vs. 0.9% of Mg removed from dolomite in 0.1 and 1.0 M Na. Further, 0.3 vs. 0.9% of Mg was removed from dolomite in 1.0 M IS CaCl{sub 2} versus NaCl. EDTA increased dissolution of dolomite at low ionic strength due to its strong complexation affinity for Ca/Mg with slightly greater removal of Ca than Mg. Significant differences were not observed at high ionic strength due to the presence of large concentrations of competing cations (Na, Ca, Mg). Slightly higher concentrations of Ca were removed from dolomite than Mg after one week, suggesting either incongruent dissolution or release through ion exchange of Ca from trace mineral impurities. Further, when EDTA was present, it may have increased Ca removal due to its greater complexation for Ca than Mg. Environmental Implications: High ionic strength brines and low ionic strength solutions with organic ligands increase dissolution of dolomite. Due to the long half-lives of radionuclides in the TRU waste, it may be important to consider the long term impact of dolomite dissolution for potential release scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Change in Uranium Mobility in Sediments from the Hanford 300-FF-5 Stage B Polyphosphate Field Injection

The purpose of this study was to evaluate the change in uranium mobility in the periodically re-wetted zone (PRZ) and upper unconfined aquifer of the Hanford Site’s 300-FF-5 operable unit as a result of Stage B polyphosphate (PO 4 ) injections. These 300 Area sediments are beneath or near the former North Process Pond, which has previously been shown to contain metatorbernite [Cu(UO 2 ) 2 (PO 4 ) 2 •8H 2 O] and uranophane [Ca(UO 2 ) 2 (SiO 3 OH) 2 •5H 2 O], along with aqueous and adsorbed uranium (U), and small amounts of U in calcite as a result of acidic disposal with a significant number of co-contaminants. Previous laboratory-scale studies have identified multiple mechanisms that decrease uranium mobility with polyphosphate injection: (a) precipitation of a low-solubility uranium-phosphate mineral (autunite); (b) precipitation of a Ca-phosphate solid that incorporates U; (c) precipitation of Ca-phosphate mineral (apatite group minerals) that coats existing uranium phases (i.e., U in calcite, U in Fe-oxides), reducing uranium leaching; and (d) aqueous Ca-U-carbonate species adsorption onto apatite. Given the significant amount of apatite precipitation, other U phases such as carbonates could also coprecipitate with apatite. To quantify differences in solubility, leachability, and phases of uranium between pre- and post-PO 4 -treated sediments, different types of analyses were conducted, including analysis of uranium in (a) a carbonate solution extraction from sediment over 1000 h (41.67 days), (b) six sequential liquid extractions from sediment over approximately 1 week, (c) leaching of uranium from sediments in one dimensional (1-D) column experiments over 2 months, and (d) solid phase characterization of select sediments. An additional extraction and solid phase measurements were conducted to evaluate phosphate precipitate formation. Metals were also analyzed in sequential liquid extractions as indicators of (a) amendment injection delivery, (b) co-contaminant movement, and (c) changes in solid phases. Aqueous and solid phase carbonate measurements were also conducted to evaluate changes in carbonates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗