Search NASA⌕ Search

SEARCH · Search NASA

Results for “CASE STUDIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Case Studies and Parametric Analysis of Heliostat Performance With a Tradeoff-Informed Technoeconomic Analysis Metric

The Heliostat Consortium (HelioCon) was launched in 2021 to advance heliostat technology. Here this work presents a collection of baseline case studies for the technoeconomic analysis (TEA) of candidate heliostat improvements for concentrating solar power (CSP) and concentrated solar thermal (CST) systems that employ central receivers. The case studies we develop include a large-scale CSP plant, a smaller, modular CSP plant, and a small CST plant used for industrial process heat. In this work, we also propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. Finally, we perform a parametric analysis to show the impact of candidate technologies on the levelized cost of heat and, by extension, equivalent breakeven installed cost.

14 SOLAR ENERGY↗

Technology Solutions Case Study: Combustion Safety for Appliances Using Indoor Air

This case study describes how to assess and carry out the combustion safety procedures for appliances and heating equipment that uses indoor air for combustion in low-rise residential buildings. Only appliances installed in the living space, or in an area freely communicating with the living space, vented alone or in tandem with another appliance are considered here. This document is for inspectors, auditors, and technicians working in homes where energy upgrades are being conducted whether or not air infiltration control is included in the package of measures being applied. In the indoor combustion air case, guidelines summarized here are based on language provided in several of the codes to establish minimum requirements for the space using simplified prescriptive measures. In addition, building performance testing procedures are provided by testing agencies. The codes in combination with the test procedures offer comprehensive combustion safety coverage to address safety concerns, allowing inexperienced residential energy retrofit inspectors to effectively address combustion safety issues and allow energy retrofits to proceed.

Building America↗

The Significance of Strategic Foresight in Verification Technologies: A Case Study of the INF Treaty

Verification technologies can serve as important tools of statecraft in arms control efforts beyond providing monitoring capabilities and deterring noncompliance. The INF Treaty provides an insightful case study of the strategic side of verification technologies, illuminating how these capabilities can be used to shape negotiation positions and treaty content, provide domestic and international assurance, and manage tensions in the treaty implementation process. Operationalizing verification technologies in this way expands the tools available at the diplomatic and policy levels, but it requires foresight and preparedness to identify and develop the relevant technical capabilities. The most important finding of this case study is that technical preparedness had an important impact, but only after a period of latency. The verification approaches used in the INF Treaty were developed before the topic was raised in the negotiations, and thus the capabilities were available when certain political shifts had occurred

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Technical Approach and Results from the Fuels Pathway on an Alternative Selection Case Study

The report presents a detailed plan for conducting case studies to characterize probabilistic safety margins associated with different fuel cladding types in a way that supports a valid comparison of different fuels' performance. Recent work performed in other programs is described briefly and used to illustrate the challenges posed by characterization of margin in a probabilistic way. It is additionally pointed out that consistency of evaluation of performance across different cladding types is not easy to assure; a process for achieving the needed consistency is described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Case Study – Idling Reduction Technologies for Emergency Service Vehicles

This case study explores the use of idle reduction technologies (IRTs) on emergency service vehicles in police, fire, and ambulance applications. Various commercially available IRT systems and approaches can decrease, or ultimately eliminate, engine idling. Fleets will thus save money on fuel, and will also decrease their criteria pollutant emissions, greenhouse gas emissions, and noise.

33 ADVANCED PROPULSION SYSTEMS↗

Case study: Lockheed-Georgia Company integrated design process

A case study of the development of an Integrated Design Process is presented. The approach taken in preparing for the development of an integrated design process includes some of the IPAD approaches such as developing a Design Process Model, cataloging Technical Program Elements (TPE's), and examining data characteristics and interfaces between contiguous TPE's. The implementation plan is based on an incremental development of capabilities over a period of time with each step directed toward, and consistent with, the final architecture of a total integrated system. Because of time schedules and different computer hardware, this system will not be the same as the final IPAD release; however, many IPAD concepts will no doubt prove applicable as the best approach. Full advantage will be taken of the IPAD development experience. A scenario that could be typical for many companies, even outside the aerospace industry, in developing an integrated design process for an IPAD-type environment is represented.

Waldrop, C. T.↗

Exploration case studies

NASA's Office of Exploration has undertaken four case studies for prospective expansion of manned space activities beyond earth orbit. The subjects of these studies are (1) an expedition to the Martian moon Phobos; (2) a three-mission expedition to Mars; (3) the construction of a man-tended lunar observatory; and (4) the construction of a lunar outpost to serve as the basis for construction of a Martian outpost. The fourth alternative would follow the recommendation of the National Commission on Space for the creation of a 'bridge between worlds' in which explorers would develop ways in which to 'live off the land' in a space environment.

Underwood, Jimmy M.↗

DOE Challenge Home Case Study: e2 Homes – Winter Park, Florida

This Challenge Home case study describes the first certified DOE Challenge Home as constructed by e2 Homes. Completed in May 2012, the “Wilson Residence” in Winter Park, Florida, is a 4,305-ft2 custom home that scores a HERS 57 without solar and a better than zero net-energy HERS -7 with solar.

Builders Challenge↗

DOE Zero Energy Ready Home Case Study: Near Zero Maine Home II - Vassalboro, Maine

This case study describes a DOE Zero Energy Ready home in Vassalboro, Maine, that scored HERS 35 without PV and HERS 11 with PV. This 1,200 ft2 home has 10.5-inch-thick double-walls with 3 layers of mineral wool batt insulation, an R-20 insulated slab, R-70 cellulose in the attic, extensive air sealing, a mini-split heat pump, an heat recovery ventilator, solar water heating, LED lighting, 3.9 kWh PV, and triple-pane windows.

builder↗

DOE ZERH Case Study: Mandalay Homes, Vision Hill Lot 1, Glendale, AZ

Case study of a DOE 2015 Housing Innovation Award winning production home in the hot-dry climate that got a HERS 52 without PV, or HERS -2 with PV, with 2x6 16” on center walls with R-14 ocsf plus R-4 rigid exterior; slab on grade with R-8 slab edge; sealed attic with R-31 ocsf under roof deck; 92 AFUE furnace, 15 SEER AC, 100% LED.

Building America↗

DOE ZERH Case Study: Mantell-Hecathorn Builders, Shenandoah Circle, Durango, CO

Case study of a DOE 2015 Housing Innovation Award winning custom home in the cold climate that got a HERS 50 without PV, or HERS 21 with PV, with 2x6 24” on center walls with R-13 ccsf plus 3.5” blown fiberglass, plus R-10 rigid exterior; R-22 ICF basement walls; vented attic with spray foam over top plates, R-65 blown fiberglass; 96 AFUE furnace, triple-pane windows, 80% LED.

Building America↗

DOE ZERH Case Study: TC Legend Homes, Bellingham Power House, Bellingham, WA

Case study of a DOE 2015 Housing Innovation Award winning custom home in the marine climate that got HERS 34 without PV or HERS -12 with PV, with 6” SIP walls and 10” SIP roof; R-28 ICF around slab, R-20 rigid foam under slab; radiant floor heat and passive design; air-to-water heat pump COP 4.4; HRV; earth tube ventilation; triple-pane windows, 100% LED.

Building America↗

DOE ZERH Case Study: Evolutionary Home Builders, The Adaptation Home, Geneva, IL

Case study of a DOE 2015 Housing Innovation Award winning custom home in the cold climate that got a HERS 30 without PV, with 2x8 24” on center walls with blown fiberglass and 4” polysio rigid foam; basement with 2” XPS interior, 4” under slab, 4” exterior of foundation wall; vented attic with R-100 blown cellulose; wo air-to-air heat pumps SEER 14.1; HSPF 9.6; heat pump water heater.

Building America↗