Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMAND MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Applications of Modeling and Simulation for Flight Hardware Processing at Kennedy Space Center

The Boeing Design Visualization Group (DVG) is responsible for the creation of highly-detailed representations of both on-site facilities and flight hardware using computer-aided design (CAD) software, with a focus on the ground support equipment (GSE) used to process and prepare the hardware for space. Throughout my ten weeks at this center, I have had the opportunity to work on several projects: the modification of the Multi-Payload Processing Facility (MPPF) High Bay, weekly mapping of the Space Station Processing Facility (SSPF) floor layout, kinematics applications for the Orion Command Module (CM) hatches, and the design modification of the Ares I Upper Stage hatch for maintenance purposes. The main goal of each of these projects was to generate an authentic simulation or representation using DELMIA V5 software. This allowed for evaluation of facility layouts, support equipment placement, and greater process understanding once it was used to demonstrate future processes to customers and other partners. As such, I have had the opportunity to contribute to a skilled team working on diverse projects with a central goal of providing essential planning resources for future center operations.

Marshall, Jennifer L.↗

The NASA MLAS Flight Demonstration - A Review of a Highly Successful Test

NASA has tested the Max Launch Abort System (MLAS) as a risk-mitigation design should problems arise with the baseline Orion spacecraft launch abort design. The Max in MLAS is not Maximum, but rather dedicated to Max Faget, The renowned NASA Spacecraft designer. In the fall of 2009, the mission was flown, with great success, from the NASA Wallops Flight Facility. The MLAS flight test vehicle prototype consists of a boost ring, coast ring, and the MLAS fairing itself, which houses an Orion Command Module (CM) boilerplate. The objective of the MLAS flight test is to reorient the fairing with the CM, weighing approximately 29,000 lbs and traveling 290 fps, 180 degrees to an orientation suitable for the release of the CM during a pad abort and low altitude abort. Although multiple parachute deployments are used in the MLAS flight test vehicle to complete its objective, there are only two parachute types employed in the flight test. Five of the nine parachutes used for MLAS are 27.6 ft DO ribbon parachutes, and the remaining four are standard G-12 cargo parachutes. This paper presents an overview of the 27.6 ft DO ribbon parachute system employed on the MLAS flight test vehicle for coast ring separation, fairing reorientation, and as drogue parachutes for the CM after separation from the fairing. Discussion will include: the process used to select this design, previously proven as a spin/stall recovery parachute; descriptions of all components of the parachute system; the minor modifications necessary to adapt the parachute to the MLAS program; the techniques used to analyze the parachute for the multiple roles it performs; a discussion of the rigging techniques used to interface the parachute system to the vehicle; a brief description of how the evolution of the program affected parachute usage and analysis; and a summary of the results of the flight test, including video of the flight test and subsequent summary analysis. . A discussion of the flight test which was highly successful as well as the flight test observations will be a significant portion of the review.

Taylor, Anthony P.↗

Mars Science Laboratory Entry Guidance

The Mars Science Laboratory will be the first Mars mission to attempt a guided entry with the objective of safely delivering the entry vehicle to a survivable parachute deploy state within 12.5 km of the pre-designated parachute deploy coordinates. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control range based on deviations in range, altitude rate, and drag acceleration from a reference trajectory. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last nine years. Performance tradeoffs between ellipse size and deploy altitude will be presented, along with imposed constraints of entry acceleration and heating. Performance sensitivities to the bank reversal deadbands, heading alignment, attitude initialization error, and entry delivery errors are presented.

Mendeck, Gavin F.↗

A Review of the NASA MLAS Flight Demonstration

The NASA Engineering and Safety Center (NESC) has tested the Max Launch Abort System (MLAS) as a risk-mitigation design should problems arise with the baseline Orion spacecraft launch abort design. The Max in MLAS is not Maximum, but rather dedicated to Max Faget, the renowned NASA Spacecraft designer. In July 2009, the mission was flown, with great success, from the NASA Wallops Flight Facility. The MLAS flight test vehicle prototype consists of a boost skirt, coast skirt, and the MLAS fairing itself, which houses an Orion Command Module (CM) boilerplate. The objective of the MLAS flight test is to reorient the fairing with the CM, weighing approximately 29,000 lbs and traveling 290 fps, 180 degrees to an orientation suitable for the release of the CM during a pad abort or low altitude abort. The boost and coast skirts provide the necessary thrust and stability to establish the flight test conditions and are released prior to the reorientation of the fairing. A secondary test objective after successful release of the CM from the fairing is to demonstrate the removal of the CM forward bay cover (FBC) with the CM drogue parachutes, and subsequent deployment of the CM main parachutes attached to the FBC. Although multiple parachute deployments are used in the MLAS flight test vehicle to complete its objective, there are only two parachute types employed in the flight test. Five of the nine parachutes used for MLAS are 27.6 ft DO ribbon parachutes already proven as a spin/stall parachute for military aircraft, and the remaining four are G-12 cargo parachutes modified for increased strength and reefing. This paper presents an overview of the 27.6 ft DO ribbon parachute system employed on the MLAS flight test vehicle for coast skirt separation, fairing reorientation, and as CM drogue parachutes. Discussion will include: the process used to select this design; descriptions of all components of the parachute system; the minor modifications necessary to adapt the parachute to the MLAS program; the techniques used to analyze the parachute for the multiple roles it performs including discussions of how the evolution of the program affected parachute usage and analysis; a summary of the results of the highly successful flight test, including video of the flight test; and an overview of the subsequent post-test analysis.

Taylor, Anthony P.↗

Entry Guidance for the 2011 Mars Science Laboratory Mission

The 2011 Mars Science Laboratory will be the first Mars mission to attempt a guided entry to safely deliver the rover to a touchdown ellipse of 25 km x 20 km. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control the range flown. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range error while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last nine years. Key dispersions driving deploy ellipse and altitude performance are identified. Performance sensitivities including attitude initialization error and the velocity of transition from range control to heading alignment are presented.

Mendeck, Gavin F.↗

Spacecraft Escape Capsule

A report discusses the Gumdrop capsule a conceptual spacecraft that would enable the crew to escape safely in the event of a major equipment failure at any time from launch through atmospheric re-entry. The scaleable Gumdrop capsule would comprise a command module (CM), a service module (SM), and a crew escape system (CES). The CM would contain a pressurized crew environment that would include avionic, life-support, thermal control, propulsive attitude control, and recovery systems. The SM would provide the primary propulsion and would also supply electrical power, life-support resources, and active thermal control to the CM. The CES would include a solid rocket motor, embedded within the SM, for pushing the CM away from the SM in the event of a critical thermal-protection-system failure or loss of control. The CM and SM would normally remain integrated with each other from launch through recovery, but could be separated using the CES, if necessary, to enable the safe recovery of the crew in the CM. The crew escape motor could be used, alternatively, as a redundant means of de-orbit propulsion for the CM in the event of a major system failure in the SM.

Robertson, Edward A.↗

Subscale Test Program for the Orion Conical Ribbon Drogue Parachute

A subscale wind tunnel test program for Orion's conical ribbon drogue parachute is under development. The desired goals of the program are to quantify aerodynamic performance of the parachute in the wake of the entry vehicle, including understanding of the coupling of the parachute and command module dynamics, and an improved understanding of the load distribution within the textile elements of the parachute. The test program is ten percent of full scale conducted in a 3x2.1 m (10x7 ft) closed loop subsonic wind tunnel. The subscale test program is uniquely suited to probing the aerodynamic and structural environment in both a quantitative and qualitative manner. Non-intrusive diagnostics, including Particle Image Velocimetry for wake velocity surveys, high speed pressure transducers for canopy pressure distribution, and a high speed photogrammetric reconstruction, will be used to quantify the parachute's performance.

parachute↗

Moonwalk Series: The Moon on Earth - Program 4

This episode (4th and last in the series) opens with Michael Collins in the Command Module, Columbia. It then shows the flight of the Lunar Excursion Module (LEM) and the rendezvous with Columbia. The reentry into the Earth's atmosphere, the parachutes deployment, followed by the splashdown is shown. Next we see shots of various parades welcoming the three astronauts home. Following these celebrations, we see the Lunar Receiving Lab, where the Lunar rocks are processed, and the various questions that science hopes to begin to answer about the moon, the development of the solar system and the evolution of life on earth, with the close examination of the rocks are asked.

Source record↗

2012 Ground Testing Highlights

As part of the Fundamental Aeronautics Program and a collaborative effort with Boeing, and Lockheed Martin this past year a series of sonic boom test were completed in the NASA Ames Unitary Plan Wind Tunnel (UPWT). One of the goals was to develop new test techniques and hardware for measuring sonic boom signatures in the transonic and supersonic regimes. Data for various model designs and configurations were collected and will be used to validate CFD predictions of sonic boom signatures. Reactivation of the NASA Ames Mitsubishi compressor system was completed this past year. The compressor is intended to replace and augment the existing UPWT Clark Compressor as the primary Make Up Air (MUA) source. The MUA system provides air and vacuum pumping capability to the Ames UPWT. It will improve productivity and reliability of the UPWT as a vital testing and research facility for the U.S. aerospace industry and NASA. Funding for this task was provided from the American Recovery Investment Act (ARRA). Installation and validation of a Noncontact Stress Monitoring System (NSMS) for the 3-stage compressor was completed at the 11-foot Transonic Wind Tunnel. The system, originally developed at AEDC, consists of 36 pairs of LED light sources with optic beam send and receive probes along a 1-per rev signal. The new system allows for continuous monitoring and recording of compressor blade bending and torsion stress during normal test operations. A very unusual test was completed in the 11 FT TWT to acquire aerodynamic and flow field data for the Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS) to validate CFD methods and tools. Surface pressure distribution measurements and velocity measurements in the wake of the command module back to the drogues parachute location were acquired. Testing methods included Particle Image Velocimetry (PIV), Pressure Sensitive Paint (PSP), Schlieren Infrared Imaging (IR) and boundary layer survey and skin friction.

Buchholz, Steven J.↗

Post-Flight EDL Entry Guidance Performance of the 2011 Mars Science Laboratory Mission

The 2011 Mars Science Laboratory was the first Mars guided entry which safely delivered the rover to a landing within a touchdown ellipse of 19.1 km x 6.9 km. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control the range flown. The guided entry performed as designed without any significant exceptions. The Curiosity rover was delivered about 2.2 km from the expected touchdown. This miss distance is attributed to little time to correct the downrange drift from the final bank reversal and a suspected tailwind during heading alignment. The successful guided entry for the Mars Science Laboratory lays the foundation for future Mars missions to improve upon.

Mendeck, Gavin F.↗

The Vacuum-Compacted Regolith Gripping Mechanism and Unmanned Flights via Quad-Rotors

During the course of the Kennedy Space Center Summer Internship, two main experiments were performed: The Vacuum-Compacted Regolith Gripping Mechanism and Unmanned Flights via Quad-copters. The objectives of the Vacuum-Compacted Regolith Gripping Mechanism, often abbreviated as the Granular Gripper, are to exhibit Space Technology, such as a soft robotic hand, lift different apparatuses used to excavate regolith, and conserve energy while executing its intended task. The project is being conducted to test how much weight the Granular Gripper can hold. With the use of an Animatronic Robotic Hand, Arduino Uno, and other components, the system was calibrated before actually conducting the intended weight test. The maximum weight each finger could hold with the servos running, in the order of pinky, ring, middle, and index fingers, are as follows: 1.340N, 1.456 N, 0.9579 N, and 1.358 N. Using the small vacuum pump system, the maximum weight each finger could hold, in the same order, was: 4.076 N, 6.159 N, 5.454 N, and 4.052 N. The maximum torques on each of the fingers when the servos were running, in the same respective order, was: 0.0777 Nm, 0.0533 Nm, 0.0648 Nm, and 0.0532 Nm. The maximum torques on the individual fingers, when the small vacuum pump was in effect, in the same order as above, was: 0.2318 Nm, 0.3032 Nm, 0.2741 Nm, and 0.1618 Nm. In testing all the fingers with the servos running, the total weight was 5.112 N and the maximum torque on the all the fingers was 0.2515 Nm. However, when the small vacuum pump system was used, the total weight was 19.741 N and the maximum torque on the all the fingers was 0.9713 Nm. The conclusion that was drawn stated that using the small vacuum pump system proved nearly 4 times more effective when testing how much weigh the hand could hold. The resistance provided by the compacted sand in the glove allowed more weight to be held by the hand and glove. Also, when the servos turned off and the hand still retaining its position, energy is being saved because the vacuum created the same resistance the running servos did without using power. The Unmanned Flights via Quad-rotors are built because multi-rotor dynamics are an important starting point and fair analog for space craft control systems and they make good terrestrial development platforms for various aspects of control for space crafts. The project is being conducted to see what the thrust response is going to be when a pulse width modulation command is sent to the control system since the quad-rotors are PWM controlled. A simulation environment in constructed so that one can quickly iterate and test different designs such as control systems, PID control vs. LDR control, and state estimation. Using two DIY Quad Kits, APM 2.6, testing apparatus (called a data acquisition system) to test the quad-rotors, and a simulation program such as Simulink, two quad-rotors are built and controlled via a simulation program, which is designed to be as realistic as possible and not idealistic. Due to the quad-rotors not being completely built nor ready for testing, there are no results or conclusions to report.

Granular Gripper↗

Creating the Thermal Environment for Safely Testing the James Webb Space Telescope at the Johnson Space Center's Chamber A

Chamber A is the largest thermal vacuum chamber at the Johnson Space Center and is one of the largest space environment chambers in the world. The chamber is 19.8 m (65 ft) in diameter and 36.6 m (120 ft) tall and is equipped with cryogenic liquid nitrogen panels (shrouds) and gaseous helium shrouds to create a simulated space environment. The chamber was originally built to support testing of the Apollo Service and Command Module for lunar missions, but underwent major modifications to be able to test the James Webb Space Telescope in a simulated deep space environment. To date seven tests have been performed in preparation of testing the flight optics for the James Webb Space Telescope (JWST). Each test has had a uniquie thermal profile and set of thermal requirements for cooling down and warming up, controlling contamination, and releasing condensed air. These range from temperatures from 335K to 15K, with tight uniformity and controllability for maintining thermal stability and pressure control. One unique requirement for two test was structurally proof loading hardware by creating thermal gradients at specific temperatures. This paper will discuss the thermal requirements and goals of the tests, the original requirements of the chamber thermal systems for planned operation, and how the new requirements were met by the team using the hardware, system flexiblilty, and engineering creativity. It will also discuss the mistakes and successes to meet the unique goals, especially when meeting the thermal proof load.

Homan, Jonathan L.↗

ASTP Visual Observation Debriefing

This document is the transcription of the post-flight experiments debriefing conducted by the ASTP (Apollo Soyuz Test Project) crew at the Lunar Science Institute on August 12, 1975. The companion document to this transcription is the Experiments Debriefing. Where possible, questioners have been identified by their last names. However, the attendees and questioners are too numerous to identify or list here. The astronaut participants are as follows: Thomas P. Stafford, Commander; Vance D. Brand, Command Module Pilot; Donald K. Slayton, Docking Module Pilot.

Source record↗

Apollo 11 Technical Air-to-Ground Voice Transcription (GOSS NET 1)

This is the transcription of the Technical Air-to-Ground Voice Transmission (GOSS NET 1) from the Apollo 11 mission. Communicators in the text may be identified according to the following list [in part]: Commander: Neil A. Armstrong; Command Module Pilot: Michael Collins; Lunar Module Pilot: Edwin E. Aldrin, Jr.

Source record↗

One Giant Leap to Protect All Mankind: An Overview of the Lunar Receiving Laboratory

Motivation. In 1961, President John F. Kennedy charged the nation "to land a man on the moon and return him safely to Earth." Eight years later, the Apollo 11 astronauts splashed down in the Pacific Ocean after this first 8-day journey to the moon. As humans had never ventured to another extraterrestrial body, the U.S. government noted the great uncertainty associated with the unknown exposures related to this historic mission. Overview. With this uncertainty in mind, a newly formed Interagency Committee on Back Contamination (ICBC) was established to review the potential for lunar contaminants and establish the prevention of their escape into the biosphere during crew and sample recovery operations from the floating command module to the mobile quarantine facility on the recovery ship and return to the Johnson Space Center. Significance. As a result of the ICBC recommendations, in 1966 NASA planned and built the Lunar Receiving Laboratory (LRL) at the Johnson Space Center in Houston, Texas. The LRL served a great role in service of human space exploration to quarantine Apollo crewmembers, their space vehicles, and the lunar samples collected. Almost an afterthought in the space race to the Moon, the 83,000-square-foot LRL was designed and completed in 1967 for $7.8 million. The core purpose of the LRL was "to protect the public's health, agriculture, and other living resources; to provide lunar sample distribution to approved scientific investigators; and to preserve the scientific integrity of the lunar samples at all times." Its layout was comprised of three major zones: a quarantined Crew Area, a separate but also quarantined Sample Operations Area, and a Support and Administration Area outside the controlled biological barrier. This facility required trained personnel to live and perform within it for several weeks post-flight, to include astronaut crewmembers, flight surgeons, scientists, and vehicle recovery engineers. The LRL holds memories of these historic events but has since been repurposed for NASA's medical and environmental sciences activities, in what is now known as Building 37. As we approach its 50th anniversary, the LRL story will end in demolition as NASA advances its facilities for the next steps in human exploration of space. Learning Objectives: 1. To capture the historical relevance of the NASA Lunar Receiving Laboratory 2. To understand the requirements of receiving crew and samples from the moon for the first time 3. To describe the facility capabilities in protection of public health.

Hayes, Judith↗

The Quest for Engineering Innovation at NASA's Marshall Space Flight (MSFC)

A recent NASA team, chartered to examine innovation within the Agency, captured the meaning of the word innovation as the "application of creative ideas to improve and generate value for the organization". The former NASA Administrator Charles Bolden shared his own thoughts about innovation in a memo with all employees that stated, "At NASA, we are dedicated to innovation, bold ideas, and excellence." Innovation turns out to be one of the major driving forces behind the work produced at NASA. It seems failure is often what has driven NASA to be more innovative. Fifty years ago, the Apollo 1 tragedy killed three astronauts when fire erupted in their command module. NASA had to bear the responsibility of such loss and at the same time work smarter in order to obtain the dream to reach the moon by the end of the 1960s. Through this circumstance, NASA engineers developed a revolutionary replacement for the combustible nylon astronaut suits so the Apollo program could continue. A material called Beta Cloth was born. This material was used to produce noncombustible space suits for all Apollo astronauts, enabling the United States to ultimately land 12 Americans on the moon. Eventually this material was used as the roof system in the Denver International Airport, showing relevance and applications of NASA innovations to real-world need. Innovative ideas are also driven by the need to accomplish NASA missions and to improve the way we produce our products. MSFC engineers are advancing technologies in additive manufacturing of liquid rocket engines in order to reduce the number of parts, design time, and the cost of the engines. NASA is working with academia to eliminate the need for miles of sensor cables by investigating innovations in wireless sensors. In order to enable future exploration missions to Mars, MSFC engineers are pursuing innovative approaches in diverse areas such as the use of ionic liquids for life support systems and composite cryogenic tanks, very low leakage valves to contain propulsion fluids, and natural, non-toxic inhibitors to eliminate the buildup of biofilms in the water systems planned for future crewed Mars missions. Although results are encouraging, we cannot rest on our past accomplishments. In order to overcome breathtaking technical challenges in space exploration, we must continue to promote a culture supporting growth, breakthroughs and disruptive innovations.

Turner, James E.↗

Translational Cell & Animal Research in Space 1965-2011

Translational Cell and Animal Research (TCAR). For nearly 50 years, the NASA Space Biology Program has funded, and Ames Research Center (ARC) has managed, a robust program of fundamental research including studies using a wide range of animal cells, tissues and organisms. Much of this research was conducted on spacecraft in microgravity environments including diverse platforms such as: Gemini Spacecraft, US Biosatellites, Apollo Command Modules, Skylabs, Russian Biosatellites, NASA Space Shuttles, NASA/Mir, and most recently, the International Space Station (ISS). During the Space Shuttle Era (1981–2011), the science of space biology took an enormous step forward with 45 missions that afforded researchers with new opportunities to conduct systematic and complex experiments aimed at a deeper understanding of how life adapts to the space environment. Beginning in the 1990s, the products of these experiments, comprised of research summaries and rare, unused biospecimens, were collected and catalogued within the ARC Life Sciences Data Archiving Office, a branch of NASA’s Life Sciences Data Archive (LSDA) managed from the NASA Johnson Spaceflight Center.

Ronca, April E.↗

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand↗