Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Aerial Measuring System (AMS)/Israel Atomic Energy Commission (IAEC) Joint Comparison Study Report

Under the 13th Bilateral Meeting to Combat Nuclear Terrorism conducted on January 8–9, 2013, the committee approved the development of a cost-effective proposal to conduct a Comparison Study of the Aerial Measuring System (AMS) of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and Israel Atomic Energy Commission (IAEC). The study was to be held at the Remote Sensing Laboratory (RSL), Nellis Air Force Base, Las Vegas, Nevada, with measurements at the Nevada National Security Site (NNSS). The goal of the AMS and the IAEC joint survey was to compare the responses of the two agencies’ aerial radiation detection systems to varied radioactive surface contamination levels and isotopic composition experienced at the NNSS, and the differing data processing techniques utilized by the respective teams. Considering that for the comparison both teams were using custom designed and built systems, the main focus of the short campaign was to investigate the impact of the detector size and data analysis techniques used by both teams. The AMS system, SPectral Advanced Radiological Computer System, Model A (SPARCS-A), designed and built by RSL, incorporates four different size sodium iodide (NaI) crystals: 1" × 1", 2" × 4" × 4", 2" × 4" ×16", and an “up-looking” 2" × 4" × 4". The Israel AMS System, Air RAM 2000, was designed by the IAEC Nuclear Research Center – Negev (NRCN) and built commercially by ROTEM Industries (Israel) and incorporates two 2" diameter × 2" long NaI crystals. The operational comparison was conducted at RSL-Nellis in Las Vegas, Nevada, during week of June 24–27, 2013. The Israeli system, Air RAM 2000, was shipped to RSL-Nellis and mounted together with the DOE SPARCS on a DOE Bell-412 helicopter for a series of aerial comparison measurements at local test ranges, including the Desert Rock Airport and Area 3 at the NNSS. A 4-person Israeli team from the IAEC NRCN supported the activity together with 11 members of the RSL team, which consisted of pilots, mechanics, scientists, a data analyst, equipment operators, and operation specialists. All planned flight activities followed by scientific discussions on the collected data were completed. For IAEC, the joint survey provided an opportunity to characterize their system’s response to extended sources of various fission products at the NNSS. As both systems play an important role in their respective countries’ (United States and Israel) national framework of radiological emergency response and are subject to multiple mutual cooperation agreements, it was important for each country to obtain more thorough knowledge of how they would employ these important assets and define the roles that they would each play in an actual response.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A framework for monitoring-based commissioning: Identifying variables that act as barriers and enablers to the process

The practice of monitoring-based commissioning (MBCx) using energy management and information systems (EMIS) has been shown to enable and help sustain up to 20% energy savings in buildings. Despite research that has quantified the costs, benefits, and energy savings of MBCx, the process remains under-utilized. To understand why MBCx is not more frequently adopted and how to encourage its use, this research synthesizes qualitative data from over 40 organizations, currently engaging in MBCx. The outcome of this research is a framework containing variables that emerged from the qualitative data, marked as barriers or enablers, organized by phases of the MBCx process. The framework is comprised of 51 emergent variables that fall within 13 different categories. The variables that most frequently act as barriers are data configuration, measurement & verification (M&V), developing specifications for EMIS, and data architecture. Although some variables that act as barriers for one organization were identified as enablers for another. For example, payback/ROI was considered a barrier 7 times and an enabler 3 times. One organization had difficulty making the business case for the initial investment for MBCx due to lack of cost information, while another was able to justify large investments with documented savings of previously implemented measures identified through MBCx. The framework formally validates barriers found in previous research, and can be used by practitioners to better understand common experiences with MBCx. This research also highlights the need for a similar collective data set to validate common enablers to MBCx and also the need for empirical research to determine relationships between variables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commissioning of the ATLAS Liquid Argon Calorimeters

A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies is presented. It includes a coherent noise study, a measurement of the quality of the ionization pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Commissioning Of A Three Dimensional Depolarized Neutron Beamline For Studying The Magnetic Correlation Length Of A Magnetic Material At Tsing Hua Open-Pool Reactor

A new three dimensional neutron depolarization beamline was commissioning at W3 beam port of Tsing Hua Open Pool Reactor (THOR, 2 MW) located in Hsinchu, Taiwan. The beamline consists of a pair of Heusler crystals as neutron polarizer and analyzer. Two three-dimensional rotators were placed before and after the sample position. The sample chamber was enclosed in a mu-metal enclosure with a gradient field at incident and exit ports. Typically, 0.237 nm of monoenergetic neutron was selected for experiments. A flipping ratio of 23 can be obtained which corresponds to a polarization ratio of 92% of this beamline. The typical intensity is 400 n/cm{sup 2}s at 1 MW operation. Magnetic correlation lengths of Ni-ferrite powders with different packing densities were measured to understand the characteristics of this beamline. The magnetic correlation lengths were observed to be 2 mum at virgin state and about 3.1 mum at remanent state. This magnetic correlation length in the virgin state is similar than the particle size. No significant change of domain size at packing density up to 60% implies that the domain wall motion is hindered by the porosity of the sample.

36 MATERIALS SCIENCE↗

Commissioning of the cryogenics of the LHC long straight sections

The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most powering interfaces to the LHC are located in these sections where the particle beams are focused and shaped for collision, cleaning and acceleration. The LSSs are constituted of several unique cryogenic devices and systems like electrical feed-boxes, standalone superconducting magnets, superconducting links, RF cavities and final focusing superconducting magnets. This paper presents the cryogenic commissioning and the main results obtained during the first operation of the LHC Long Straight Sections.

43 PARTICLE ACCELERATORS↗

ASSEMBLY, INSTALLATION, AND COMMISSIONING OF THE ATLAS UPGRADE CRYOMODULE

A new cryomodule containing seven low-beta superconducting radio frequency (SRF) cavities has been added to the ATLAS heavy ion linac, providing an additional 15 MV accelerating potential to the existing accelerator. We describe the final stages of cryomodule assembly, commissioning, and installation in the ATLAS accelerator. The clean techniques used to achieve low-particulate rf surfaces are presented, as are the module design features which enable clean assembly and reliable high-gradient operation. The thermal performance of the cryomodule is described, along with performance data for the SRF cavities. Details on subsystem performance including helium and nitrogen systems, vacuum systems, thermal and magnetic shields, slow and fast tuners, and survey/alignment systems are given.

43 PARTICLE ACCELERATORS↗

Commissioning of electron cyclotron emission imaging instrument on the DIII-D tokamak and first data

A new electron cyclotron emission imaging diagnostic has been commissioned on the DIII-D tokamak. Dual detector arrays provide simultaneous two-dimensional images of T{sub e} fluctuations over radially distinct and reconfigurable regions, each with both vertical and radial zoom capability. A total of 320 (20 verticalx16 radial) channels are available. First data from this diagnostic demonstrate the acquisition of coherent electron temperature fluctuations as low as 0.1% with excellent clarity and spatial resolution. Details of the diagnostic features and capabilities are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of Angle Dispersive X-ray Diffraction Beamline on Indus-2

An Angle dispersive x-ray diffraction (ADXRD) beamline on bending magnet source of Indus-2 synchrotron (2.5 GeV, 300 mA) has been commissioned, for the study of single and polycrystalline samples. The beamline optics is based on vertically focusing Pt-coated pre and post mirrors and sagittal focusing Si (311) based double crystal monochromator. Experimental station consists of a six circle diffractometer equipped with scintillation detector and an image plate area detector for powder diffraction. XRD experiments have been performed to study single crystal and polycrystalline samples.

43 PARTICLE ACCELERATORS↗

Conceptual Design, Implementation and Commissioning of Data Acquisition and Control System for Negative Ion Source at IPR

Negative ion Experimental facility has been setup at IPR. The facility consists of a RF based negative ion source (ROBIN)--procured under a license agreement with IPP Garching, as a replica of BATMAN, presently operating in IPP, 100 kW 1 MHz RF generators and a set of low and high voltage power supplies, vacuum system and diagnostics. 35 keV 10A H- beam is expected from this setup. Automated successful operation of the system requires an advanced, rugged, time proven and flexible control system. Further the data generated in the experimental phase needs to be acquired, monitored and analyzed to verify and judge the system performance. In the present test bed, this is done using a combination of PLC based control system and a PXI based data acquisition system. The control system consists of three different Siemens PLC systems viz. (1) S-7 400 PLC as a Master Control, (2) S-7 300 PLC for Vacuum system control and (3) C-7 PLC for RF generator control. Master control PLC directly controls all the subsystems except the Vacuum system and RF generator. The Vacuum system and RF generator have their own dedicated PLCs (S-7 300 and C-7 respectively). Further, these two PLC systems work as a slave for the Master control PLC system. Communication between PLC S-7 400, S-7 300 and central control room computer is done through Industrial Ethernet (IE). Control program and GUI are developed in Siemens Step-7 PLC programming software and Wincc SCADA software, respectively. There are approximately 150 analog and 200 digital control and monitoring signals required to perform complete closed loop control of the system. Since the source floats at high potential ({approx}35 kV); a combination of galvanic and fiber optic isolation has been implemented. PXI based Data Acquisition system (DAS) is a combination of PXI RT (Real time) system, front end signal conditioning electronics, host system and DAQ program. All the acquisition signals coming from various sub-systems are connected and acquired by the PXI RT system, through only fiber optics link for signal conditioning, electrical isolation and better noise immunity. Real time and Host application programs are developed in LabVIEW and the data shall be stored with a facility of online display of selected parameters. Mathematical calculations and report generation will take place at the end of each beam shot. The paper describes in detail about the design approach, implementation strategy, program development, commissioning and operational test result of ROBIN through a data acquisition and control system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A new neutral particle analyzer diagnostic and its first commissioning on HL-2A

A new neutral particle analyzer diagnostic has been developed for HuanLiuqi-2A (commonly referred to as HL-2A), which can provide the neutral particle flux measurement along 11 separate sightlines, simultaneously, within a wider energy range (1-70 keV). It is an electrostatic type analyzer with a removable pinhole and special-shape condenser. The energy analysis can be flexibly achieved by controlling a preset stepwise high voltage on the condenser. It is compact and its field of view covers HL-2A cross section from -33 cm to 33 cm without 'cross-talk.' The energy spectra and ion temperature profile have been obtained during its commissioning.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

AEgIS experiment commissioning at CERN

The AEgIS Experiment is an international collaboration based at CERN whose aim is to perform the first direct measurement of the gravitational acceleration g of antihydrogen in the gravitational field of the Earth. Cold antihydrogen will be produced with a pulsed charge exchange reaction in a cylindrical Penning trap where antiprotons will be cooled to 100mK. The cold antihydrogen will be produced in an excited Rydberg state and subsequently formed into a beam. The deflection of the antihydrogen beam will be measured by using Moire deflectometer gratings. After being approved in late 2008, AEgIS started taking data in a commissioning phase early 2012. This report presents an overview of the AEgIS experiment, describes its current status and shows the first measurements on antiproton catching and cooling in the 5 T Penning catching trap. We will also present details on the techniques needed for the 100mK antihydrogen production, such as pulsed positronium production and its excitation with lasers.

74 ATOMIC AND MOLECULAR PHYSICS↗

Commissioning of helium injector for coupled radio frequency quadrupole and separated function radio frequency quadrupole accelerator

A project to study a new type of acceleration structure has been launched at Peking University, in which a traditional radio frequency quadrupole (RFQ) and a separated function radio frequency quadrupole are coupled in one cavity to accelerate the He+ beam. A helium injector for this project is developed. The injector consists of a 2.45 GHz permanent magnet electron cyclotron resonance ion source and a 1.16 m long low energy beam transport (LEBT). The commissioning of this injector was carried out and an onsite test was held in June 2013. A 14 mA He+ beam with the energy of 30 keV has been delivered to the end of the LEBT, where a diaphragm with the diameter of 7 mm is located. The position of the diaphragm corresponds to the entrance of the RFQ electrodes. The beam emittance and fraction were measured after the 7 mm diaphragm. Its rms emittance is about 0.14 π mm mrad and the fraction of He+ is about 99%.

43 PARTICLE ACCELERATORS↗

Design parameters and commissioning of vertical inserts used for testing the XFEL superconducting cavities

The European XFEL is a new research facility currently under construction at DESY in the Hamburg area in Germany. From 2015 on, it will generate extremely intense X-ray flashes that will be used by researchers from all over the world. The superconducting XFEL linear accelerator consists of 100 accelerator modules with more than 800 RF-cavities inside. The accelerator modules, superconducting magnets and cavities will be tested in the accelerator module test facility (AMTF). This paper gives an overview of the design parameters and the commissioning of the vertical insert, used in two cryostats (XATC) of the AMTF-hall. The Insert serves as a holder for 4 nine-cell cavities. This gives the possibility to cool down 4 cavities to 2K in parallel and, consequently, to reduce the testing time. The following RF measurement, selected as quality check, will be done separately for each cavity. Afterwards the cavities will be warmed up again and will be sent to the accelerator module assembly.

43 PARTICLE ACCELERATORS↗

Design and commissioning of vertical test cryostats for XFEL superconducting cavities measurements

The European X-ray Free Electron Laser (XFEL), now under construction at DESY in Hamburg, will make an extensive use of 1.3 GHz superconducting cavities aimed at accelerating the electrons to the energy of 17.5 GeV. The cavities will be operated at 2 K with the use of saturated HeII. Prior to their assembly in accelerator cryomodules, the RF performance of the cavities will be cold-tested in two dedicated vertical cryostats. Each cryostat allows a simultaneous testing of 4 cavities mounted on a dedicated insert. The cryostats are equipped with external lines allowing their supply with liquid helium and further conversion of the helium into superfluid He II. The paper describes the test stand flow scheme, the technical key elements, including a recuperative heat exchanger, and the cold commissioning. The thermodynamic analysis of the cryostat cool down and steady-state operation is given. A Second Law of Thermodynamics based theoretical model of the heat exchanger performance, and the model experimental validation, is presented.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Concept, implementation and commissioning of the automation system for the accelerator module test facility AMTF

The European XFEL project launched on June 5, 2007 will require about 103 accelerator modules as a main part of the XFEL linear accelerator. All superconducting components constituting the accelerator module like cavities and magnets have to be tested before the assembly. For the tests of the individual cavities and the complete modules an XFEL Accelerator Module Test Facility (AMTF) has been erected at DESY. The process control system EPICS (Experimental Physics and Industrial Control System) is used to control and operate the cryogenic plant and all its subcomponents. A complementary component of EPICS is the Open Source software suit CSS (Control System Studio). CSS is an integrated engineering, maintenance and operating tool for EPICS. CSS enables local and remote operating and monitoring of the complete system and thus represents the human machine interface. More than 250 PROFIBUS nodes work at the accelerator module test facility. DESY installed an extensive diagnostic and condition monitoring system. With these diagnostic tools it is possible to examine the correct installation and configuration of all PROFIBUS nodes in real time. The condition monitoring system based on FDT/DTM technology shows the state of the PROFIBUS devices at a glance. This information can be used for preventive maintenance which is mandatory for continuous operation of the AMTF facility. The poster will describe all steps form engineering to implementation and commissioning.

43 PARTICLE ACCELERATORS↗

Commissioning and first results of scanning type EXAFS beamline (BL-09) at INDUS-2 synchrotron source

An Energy Scanning X-ray Absorption Fine Structure spectroscopy beamline has recently been installed and commissioned at BL-09 bending magnet port of INDUS-2 synchrotron source, Indore. The beamline uses an UHV compatible fixed exit double crystal monochromator (DCM) with two Si (111) crystals. Two grazing incidence cylindrical mirrors are also used in this beamline; the pre-mirror is used as a collimating mirror while the post mirror is used for vertical focusing and higher harmonic rejection. In this beamline it is possible to carry out EXAFS measurements both in transmission and fluorescence mode on various types of samples, using Ionization chamber detectors and solid state drift detector respectively. In this paper, results from first experiments of the Energy Scanning EXAFS beamline are presented.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Design studies and commissioning plans for plasma acceleration research station experimental program

Plasma acceleration research station is an electron beam driven plasma wakefield acceleration test stand proposed for CLARA facility in Daresbury Laboratory. In this paper, the interaction between the electron beam and the plasma is numerically characterised via 2D numerical studies by using VSIM code. The wakefields induced by a single bunch travelling through the plasma were found to vary from 200 MV/m to 3 GV/m for a range of bunch length, bunch radius, and plasma densities. Energy gain for the particles populating the bunch tail through the wakefields driven by the head of the bunch was demonstrated. After determining the achievable field for various beams and plasma configurations, a reference setting was determined for further studies. Considering this reference setting, the beam quality studies were performed for a two-bunch acceleration case. The maximum energy gain as well as the energy spread mitigation by benefiting from the beam loading was investigated by positioning the witness and driver bunches with respect to each other. Emittance growth mechanisms were studied considering the beam-plasma and beam-wakefield interactions. Eventually, regarding the findings, the initial commissioning plans and the aims for the later stages were summarised.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Operation and commissioning of IFMIF (International Fusion Materials Irradiation Facility) LIPAc injector

The objective of linear IFMIF prototype accelerator is to demonstrate 125 mA/CW deuterium ion beam acceleration up to 9 MeV. The injector has been developed in CEA Saclay and already demonstrated 140 mA/100 keV deuterium beam [R. Gobin et al., Rev. Sci. Instrum. 85, 02A918 (2014)]. The injector was disassembled and delivered to the International Fusion Energy Research Center in Rokkasho, Japan. After reassembling the injector, commissioning has started in 2014. Up to now, 100 keV/120 mA/CW hydrogen and 100 keV/90 mA/CW deuterium ion beams have been produced stably from a 10 mm diameter extraction aperture with a low beam emittance of 0.21 π mm mrad (rms, normalized). Neutron production by D-D reaction up to 2.4 × 10{sup 9} n/s has been observed in the deuterium operation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗