Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Performance Assurance Planning: Continuous Design-Level Performance of Each Energy Conservation Measure in a Utility Energy Service Contract is Fundamental to Achieving Projected Results

An energy savings performance contract energy sales agreement (ESPC ESA) is a project structure, similar to a power purchase agreement, that uses the multiyear ESPC authority to implement renewable energy projects (referred to as ESA energy conservation measures [ECMs]) on federal buildings or land. The ESA ECM is initially privately owned for tax-incentive purposes, and the federal agency purchases the electricity it produces. An ESPC ESA is one of the most cost-effective methods for implementing on-site distributed energy projects at civilian federal agency sites.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Savings Performance Contracting for Small Projects

Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that reduce energy and water use and increase operational efficiency. ESPC can help public-sector planners use tomorrow’s energy savings to fund today's facility and infrastructure upgrades. This resource highlights strategies and case studies for implementing ESPC in smaller towns, rural counties, and small school districts to complete energy upgrades and maximize energy and cost savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Energy Contracting Options and Renewable Energy Certificates

Virtual Trainings are the online version of the multi-day workshops known as In-Plants (INPLTs) offered by the DOE Better Plants program. ORNL has a 6-session weekly training on Renewable Energy Contracting Options and RECs starting August 5th 2025 (10 am ET) focused on options and resources for the manufacturing sector. This session is earmarked for Tuesday, August 26th, 10 AM ET.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Skeletal muscle fiber type composition and performance during repeated bouts of maximal, concentric contractions

Force output and fatigue and recovery patterns were studied during intermittent short-term exercise. 27 men performed three bouts of 30 maximal unilateral knee extensions on 2 different occasions. Blood flow was maintained or occluded during recovery periods (60 s). Blood flow was restricted by inflating a pneumatic cuff placed around the proximal thigh. Muscle biopsies from vastus lateralis were analyzed for identification of fast twitch (FT) and slow twitch (ST) fibers and relative FT area. Peak torque decreased during each bout of exercise and more when blood flow was restricted during recovery. Initial peak torque (IPT) and average peak torque (APT) decreased over the three exercise bouts. This response was 3 fold greater without than with blood flow during recovery. IPT and APT decreased more in individuals with mainly FT fibers than in those with mainly ST fibers. It is suggested that performance during repeated bouts of maximal concentric contractions differs between individuals with different fiber type composition. Specifically, in high intensity, intermittent exercise with emphasis on anaerobic energy release a high FT composition may not necessarily be advantageous for performance.

Muscle Contraction↗