Search NASA⌕ Search

SEARCH · Search NASA

Results for “Cooling Load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Steady state thermo-mechanics and material property definition framework for analyzing DCLL blanket in the fusion nuclear science facility

In this work, a thermo-mechanics model that relies on creating the material property definition framework (MPDF) and multiphysics coupling of the heat transfer and the solid mechanics modules is developed to determine the structural integrity of the recently designed dual cooled lead lithium (DCLL) inboard blanket (IB) for the Fusion Nuclear Science Facility under steady state loads. The MPDF is called to supply fusion relevant neutron irradiation and temperature induced changes in material properties during multiphysics finite element runs, and PbLi temperature profiles are used to approximate Magnetohydrodynamics effect and the nuclear volumetric heating on the PbLi. Neutron irradiation and temperature induced reduction of the yield and ultimate strengths of F82H steel at the first wall (FW) are quantified for one year. A blanket in an assembly with gaps between blanket sectors and another blanket in an assembly with no gaps between blanket sectors, both exposed to radiation damage that lasted for one year are analyzed. Analysis using the elastic ITER structural design criteria for in-vessel components (ITER SDC-IC) design rules and a linear isotropic-hardening-type elastoplastic material model are used where most appropriate. The IB blanket with gaps between blanket sectors will withstand the steady state combined thermal and coolant loads for one year operational period but will fail if no gaps are allowed between blanket sectors. It is recommended that a gap of about 7.62 mm should be provided between IB blanket sectors during assembly which would close up during service, stop neutron streaming, reduce stresses and reduce bending of the FW into the scrape-off layer.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Airfoil leading edge blowing to control bow shock waves

Abstract This manuscript presents a detailed characterization of active control of bow shock waves via leading edge injection, including subsonic coolant ejection and the appearance of Coanda effects. The flow phenomena occurring at steady and pulsating flow injection regimes were analyzed using steady and unsteady two-dimensional Reynolds-Averaged Navier Stokes, leading to a precise evaluation of the thermal load and drag reductions. Steady supersonic injection yields the largest abatement in thermal load and aerodynamic drag, while subsonic or fluctuating ones can also provide significant improvements at reduced cooling mass flow rates. Furthermore, a Coanda effect, causing a non-symmetric flow topology, was observed and analyzed for reduced injection port size. This Coanda effect is due to the sudden expansion happening from the injection port to the main flow and it causes the flow topology at the leading edge to become non-symmetric despite the complete symmetry of the problem. This is the first time in the literature such a phenomenon is documented for a supersonic airfoil leading edge injection. Furthermore, it enables the design of novel flow control strategies for the leading edge shock topology and flow structures in supersonic flows.

42 ENGINEERING↗

Performance Assessment of a Dual-purpose HP-TES for a Typical Year Comparing Different Climate Zones

Complete electrification of heating and cooling systems in the United States would overload the existing electrical grid. To this end, recent research efforts have focused on energy storage as one way to reduce ever-increasing peak electricity demands. One such technology is heat pump integrated thermal-energy storage (HP-TES) systems, which can enable load-shifting and reduce demand during peak hours. In this work, a Modelica model of a 4-Ton, dual-mode (heating and cooling) HP-TES system using a room-temperature phase-change material (PCM) integrated through a secondary hydronic loop was developed and simulated for a typical meteorological year in Riverside, CA (ASHRAE Climate Zone 2B), and Chicago, IL (ASHRAE Climate Zone 5A), for a DOE small office prototype building. The COP improvement and demand reduction were analyzed during the time-of-use peak hours along with the required recharge cycle energy demand. A typical summer in Riverside, CA resulted in model-predicted peak COP increases of 50 – 100% compared to the baseline heat pump, especially at higher outdoor temperatures, coupled with maximum peak energy reductions of 22%. During shoulder and winter season simulations, heating energy savings were higher as outdoor temperatures dropped below the PCM phase change temperature. For Chicago, IL, backup heating was necessary to meet the required system capacity for very cold ambient conditions, resulting in winter peak energy savings between 16 – 60% when accounting for backup heating requirements. The recharge energy was found to be mostly below the baseline HP energy during the peak. With improved component selections and controls, the recharge energy may be reduced. The outcomes from the simulations can provide first-order estimates for potential peak energy savings, challenges, and required controls in any location before conducting any field testing.

25 ENERGY STORAGE↗

Design and performance assessment of a dual-mode latent thermal storage integrated heat pump across multiple climate zones

The electrification of space cooling and heating systems risks overloading the existing electrical grid during peak hours. Heat pumps integrated with thermal energy storage (HP-TES) offer a promising solution by shifting peak loads to off-peak hours, reducing grid strains. This work presents the design and assessment of a dual-mode HP-TES that uses a single 22°C phase-change material (PCM) as a heat source or sink in heating and cooling modes, respectively. Performance assessment was conducted using Modelica-based transient models, and full-year simulations were conducted across eight US climate zones using typical weather data. Two HP-TES performance metrics: peak energy reduction and recharge energy increases, were defined by comparing HP-TES energy consumption with base HP peak consumptions. Annual heating demand reductions (40–65%) exceeded cooling demand reductions (15–20%) due to the elimination of peak-hour backup heating. Cooling mode recharge energy requirements (0–10%) were reduced in locations with lower summer nighttime temperatures, while heating recharge requirements were lower than the high base-peak energy demand from backup heating. Simplified rapid methods that were 10 7 times faster than annual simulations were developed to predict seasonal cooling and heating energy reductions, and recharge energy requirements, with maximum deviations of ±2.5% and ±3.5% points. These methods enabled rapid parametric studies that identified optimal location-specific PCM temperatures between 22°C and 27°C, highlighting the need to consider both discharge and recharge energy requirements to achieve sustainable, energy-efficient peak load shifting across various climate zones.

25 ENERGY STORAGE↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

Technoeconomic Design Optimization for Fast Reactors. Part I: Workflow Development and Case Study for Small LFR District Energy Application

The nuclear industry is developing small reactor designs that can target a variety of deployment locations and energy products. Smaller nuclear designs have traditionally struggled to handle the steep trade-offs between size and cost that have historically incentivized large reactors. This motivates computational optimization of small reactors to minimize costs and quantify the trade-off between size and cost. In this paper, the cost/size trade-off for a small fast reactor is derived using a multi-objective genetic algorithm optimization, with steady-state, transient, and cost analysis of the fast reactor being performed. Specifically, the method is demonstrated on a small 10- to 120-MW(thermal) U-Pu-Zr–fueled lead-cooled fast reactor with a 10-year core life for district energy applications, which can have a thermal load compatible with this range. The results reinforced that fast reactor cores at the lower end of this power range suffer cost penalties due to critical mass considerations. It was found that high power density cores with strong reactivity swings and many control rods were favored over designing to minimize reactivity swing. Furthermore, this contrasts with some traditional configurations designed using engineering judgment and demonstrates that optimizers can find nontraditional but realistic solutions, along with demonstrating the value of incorporating cost functions into whole-reactor design optimization.

Fast reactor↗

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

Quantification of Energy Savings and Demand Reduction for a Heat Pump Integrated with Thermal Energy Storage (Final Report)

To mitigate the variation in demand on the electric grid, thermal energy storage (TES) is an alternative to electric batteries or installing new peaking power plants. Stakeholders and policy makers across the United States have expressed interests in promoting TES, as demonstrated by the US Department of Energy’s Grid-Interactive Efficient Buildings program and the efforts of various state legislatures. However, the cost value provided by TES are unclear. If reliable cost benefits were determined, stakeholders would have a clearer picture of the financial returns that can be gained from their investment in TES. The study in this report is conducted by ORNL with collaboration with Emerson the Helix Innovation Center. In the first part of this report, EnergyPlus was used to perform whole-building simulations for two residential buildings in Indianapolis and Atlanta. The HVAC system in both buildings were equipped with phase change material TES. The TES tank was charged in off-peak hours and discharged in peak hours to perform load shifting. First, the economic value implied by existing time-of-use (TOU) rates offered by utility companies was analyzed via whole-building simulation. Second, existing demand reduction (DR) incentives sourced from 3 different electrical grid administrators (i.e., California, Texas, and New England region) were surveyed to determine their implied value. The study suggests that the traditional value analysis that focuses on ROI for the building owner significantly undervalues TES technology making economic viability difficult. A more comprehensive value analysis that includes peak demand management and deferred capital for peaking power plants shows that TES should be economically viable but here the value is greater for the utility and requires large market penetration and aggregation to fully realize the benefits. Therefore, to facilitate commercialization, new business models are needed that include a broader range of stakeholders and distribute the value of TES proportionally. In the 2 nd part of this project, the benefits of a novel phase change material (PCM) integrated heat pump configuration were evaluated via detailed component based simulation. A one-dimensional PCM heat exchanger model which discretizes the PCM tank and refrigerant tubes into small control volumes is developed. Each control volume can have different PCM temperatures, PCM properties, and heat transfer coefficients. The PCM tank is charged by a wrapped tank condenser and discharged by an internal refrigerant coil. The PCM heat exchanger model is integrated into DOE/ORNL Heat Pump Design Model for heat pump system simulation. To demonstrate the performance of the PCM integrated heat pump, a case study in Chicago was performed. A Time-of-Use utility structure-based control strategy is implemented to schedule the PCM tank charging and discharging mode switching. Compared with a conventional electric heat pump, the PCM integrated heat pump shows superior performance on load shifting and utility cost reduction. As a result, the proposed system demonstrates 24.6% utility saving for cooling application and 25.8% utility saving for heating application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma: Preprint

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

An Online Tool for Preliminary Design and Techno-Economic Analysis of District Geothermal Heating and Cooling Systems

District geothermal heating and cooling systems (DGHCS) have significant benefits for reducing energy consumption as well as building- and grid-level peak electric demand. Currently, no publicly available tools are available to effectively design and conduct techno-economic analysis of DGHCS. GeoWISE was originally developed for preliminary design and techno-economic analysis of geothermal heating and cooling systems in an individual commercial or residential building. This paper introduces recent upgrades of GeoWISE that allow users to design and conduct techno-economic analysis of DGHCS. Several new features are implemented in GeoWISE to allow selection and specification of multiple new or existing buildings. A database of information for over 125 million existing U.S. buildings was used in GeoWISE that allows users easily locate existing buildings of interest based on street addresses, and optionally edit information of the buildings (e.g., footprint, vintage, principal functions, number of floors, window-to-wall ratio). Unique energy simulation models of the selected buildings are then automatically created using the Automatic Building Energy Modeling (AutoBEM) and EnergyPlus simulations are performed to predict thermal loads of the buildings. A simplified DGHCS is then designed and simulated to predict its energy use. A central borehole heat exchanger (BHE) of the DGHCS is sized using the RowWise algorithm of GHEDesigner to meet the thermal loads within user-specified land areas for installing BHE. The upgraded GeoWISE reports the needed capacity of heating and cooling equipment in each building, design of the central BHE, energy consumption reduction, and energy cost saving resulting from using DGHCS compared with conventional HVAC systems. A case study is showcased using the upgraded GeoWISE to design and conduct techno-economic analysis of a simplified DGHCS.

Prem Anand Jayaprabha, Jyothis Anand [ORNL] (ORCID↗

Modeling Assessment of Residential Air-to-Water Heat Pumps Coupled with Cooling Thermal Storage

This study explored the performance and operating cost viability of air-to-water heat pumps (AWHPs) coupled with thermal energy storage (TES) in efficient new residential construction. AWHPs are an emerging technology in this country, but offer promise in terms of high efficiency, fully contained and factory charged outdoor refrigeration system, and hydronic delivery capabilities, which facilitates zoning, ducts in conditioned space, and TES integration for summer load-shifting. Although this AWHP+TES strategy is not yet mainstream, the authors feel that in ten years as decarbonization efforts proceed and TOU rates become more common, strategies such as this will be more accessible. Validated EnergyPlus simulation models were developed based on detailed monitoring data collected over several years at Pacific Gas and Electric's CVRH laboratory test homes located in Stockton, California. One of the CVRH test homes (1,962 ft 2 two-story) had been testing various AWHP systems and configurations over the past six years. The validated model was then updated with high efficiency IECC ZERH envelope and component requirements for climate zones 1-5, including ducts in conditioned space thermal distribution. Simulations were completed for the 1,962 ft 2 home in each climate zone for a minimum efficiency ASHP, an AWHP coupled with a fan coil, and an AWHP coupled with TES sized to eliminate summer on-peak compressor operation. To maintain consistency in reporting energy use estimates, all cases were run with a similar indoor thermostat control strategy to pre-cool the house below the nominal 76 degrees Fahrenheit set point prior to the on-peak period and float slightly above the set point during the peak period. The AWHP+TES configuration was controlled to alternately condition the indoor space or to charge the TES tanks prior to the beginning of the on-peak. Three composite TOU rates were developed based on existing TOU rates across the U.S. to provide differing economic scenarios to evaluate customer bill impacts throughout the summer. Two of the TOU rates had short three-hour peak periods, while the third rate had a longer seven-hour duration peak period. AWHP modeling projections were based on the observed field performance of the Chiltrix CX34 variable speed unit. Other products on the market or entering the market in the near term would likely perform differently.

25 ENERGY STORAGE↗

Ultra-low thermal resistance and pressure drop copper and copper-tungsten diamond-shaped pin fin cold plates for liquid cooling of electronics

Modern and future data centers face increasing cooling challenges due to increasing chip thermal design power and die size, along with the need to reduce energy consumption used for cooling. High performance cooling solutions that maintain a low chip junction temperature are needed to ensure electronics reliability. This work develops an ultra-low thermal resistance and low pressure drop 75 mm × 75 mm cold plate, intended for next-generation electronics cooling. The cold plate features an array of diamond-shaped pin fins and integrated copper tungsten heat spreader, selected for its low coefficient of thermal expansion which reduces thermomechanical deformation and allows for closer integration of the cold plate with silicon dies. Starting with 300 candidate designs, three-dimensional computational fluid dynamics simulations predict the thermal-hydraulic performance of cold plate subsections. The highest performing geometries are evaluated with high fidelity simulations. Four cold plates are manufactured for experiments: three with diamond-shaped pin fins and one with straights fins for comparison purposes. The cold plates are fabricated from copper-tungsten (CuW), copper (Cu), or aluminum-silicon-magnesium alloy (AlSi10Mg). The diamond-shaped pin fins achieve a roughly 15 % lower thermal resistance compared to the conventional straight fin microchannel. The highest performing design achieves a chip-to-coolant (including thermal interface material) thermal resistance of 9.0 K/kW in CuW and 6.9 K/kW in Cu under a 1 kW heat load with an inlet-to-outlet pressure drop of 9.0 kPa and water as the working fluid. This work demonstrates ultra-low thermal resistance and pressure drop cold plates for large die, high heat load applications, and shows that CuW is an attractive cold plate material for improved reliability in next generation data center cooling.

Coefficient of thermal expansion↗

MPEX High Heat Flux Plasma Dump Design, Manufacture, and Articles Test

Here, the Material Plasma Exposure eXperiment (MPEX) device is a steady-state linear plasma device currently in the final design phase at the Oak Ridge National Laboratory. This device will reach ion fluences up to 10 31 m -2 and will be used to expose neutron-irradiated materials to divertor-relevant plasmas and to study the effects of plasma-material interactions. These studies will elucidate the complex effects of plasmas with divertor candidate materials capable of withstanding high heat flux and high fluences for next-generation fusion devices. Bidirectional plasma will be generated using a high-power (200 kW) helicon source. Plasma will be confined by superconducting magnets. The last plasma-facing component on the upstream side of the MPEX device is the dump, which has been designed to intercept plasma and energetic particles. The dump will have a total heat load of 9.2 kW. A copper alloy (Glidcop AL-15) was selected for use in the water-cooled flange design because of its high thermal conductivity, its retaining strength at elevated temperatures, and its ability to be used in the high-temperature braze joints used in this application. Titanium-zirconium-molybdenum (TZM) tiles are brazed to the Glidcop AL-15 flange using high-temperature braze alloy. External water-cooling channels are used on the dump flange to prevent water leakage inside the vacuum space. This article discusses the details of the high heat flux dump design, including the computational fluid dynamics (CFD) and structural analyses performed to validate the design to meet the operational requirements of the MPEX device.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design, Prototyping, Fabrication and Test of the Mu2e AC-Dipole Magnet

Fermilab Magnet Systems is building three High-frequency AC-Dipole Magnets for the Mu2e experiment at Fermilab. These magnets are composed of three single-loop one-meter-long ferrite loaded segments. The excitation consists of a copper tube, which is also used as a means for its cooling with the inherited challenges of Voltage and Frequency uncoupling. These magnets are designed to operate either at 300 kHz or 4.4 MHz via resonance tuning. Following the completion of the design, prototyping, and analysis phases, all ferrites and other components were procured, and the magnets were fabricated to meet vacuum compatibility requirements using strict procedures. Each magnet undergoes thorough baking and testing before being installed in the experiment. This paper discusses the magnets' role in proton background suppression as it represents a unique and essential device for the Mu2e experiment at Fermilab. We present the magnet design choices, modeling approach, and the challenges encountered during fabrication. Additionally, we outline the power supply driving mechanism, the testing that was performed, and our results.

Elementi, Luciano [Fermilab] (ORCID:00000002766372↗

Design of a System Interface for Flexible Thermal Power Extraction from Two Advanced Reactors

This report presents the design of system interfaces enabling flexible thermal power extraction from two advanced nuclear reactor concepts: a sodium-cooled fast reactor (SFR) operating on a Rankine cycle, and a gas-cooled reactor (GCR) utilizing a Brayton cycle. The study addresses the dual challenge of ensuring reliable base-load electricity generation while meeting the variable high-temperature steam demands of industrial processes (IPs).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An analysis of Potential Benefits of Adding Diurnal Thermal Storage in Geothermal Heat Pump Systems

Geothermal heat pumps (GHP) are highly efficient for space heating and cooling, utilizing the subsurface of the ground as seasonal energy storage through borehole heat exchangers (i.e., heat stored in summer is used to provide heating in winter, and cold stored in winter is used to provide cooling in summer). On the other hand, diurnal thermal energy storage can actively be charged and discharged for load shifting. Conventional thermal energy storage uses tanks filled with thermal storage media (such as phase change materials) and heat exchangers. It occupies building floor space or land areas outside the building, which may not be available especially in residential buildings. This paper will introduce a novel configuration that can utilize existing GHP system for both diurnal and seasonal thermal storage. This system can actively charge the ground on daily basis by injecting heat or cold in borehole heat exchangers. A simulation model was created for the novel configuration. Computer simulations were conducted using the model for the new GHP system serving a typical single-family house in three U.S. cities representing hot, warm, and cold climates. Based on simulation results, the potential benefits of load shifting and downsize of the expensive ground heat exchangers used by the GHP system were assessed.

Anees, Fady [ORNL]↗