Search NASA⌕ Search

SEARCH · Search NASA

Results for “End of Year”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The Clementine Mission: Initial Results from lunar mapping

Clementine was a mission designed to test the space-worthiness of a variety of advanced sensors for use on military surveillance satellites while, at the same time, gathering useful scientific information on the composition and structure of the Moon and a near-Earth asteroid. Conducted jointly by the Ballistic Missile Defense Organization (BMDO, formerly the Strategic Defense Initiative Organization) of the US Department of Defense and NASA, Clementine was dispatched for an extended stay in the vicinity of Earth's moon on 25 January 1994 and arrived at the Moon on 20 February 1994. The spacecraft started systematic mapping on 26 February, completed mapping on 22 April, and left lunar orbit on 3 May. The entire Clementine project, from conception through end-of-mission, lasted approximately 3 years.

Spudis, P. D.↗

The Clementine mission: Initial results from lunar mapping

Clementine was a mission designed to test the space worthiness of a variety of advanced sensors for use on military surveillance satellites while, at the same time, gathering useful scientific information on the composition and structure of the Moon and a near Earth asteroid. Clementine was dispatched for an extended stay in the vicinity of Earth's Moon on 25 Jan. 1994 and arrived at the Moon on 20 Feb. 1994. The spacecraft started systematic mapping on 26 Feb., completed mapping on 22 Apr., and left lunar orbit on 3 May. The entire Clementine project, from conception through end of mission, lasted approximately three years. Topographic profiles derived from lidar laser altimetry permitted construction of a global topographic map of the Moon. Clementine also aimed at mapping the color of the Moon in eleven different wavelengths in the visible and near infrared parts of the system. With rock and soil samples of known geological context available from the Apollo and Lunar programs, the Clementine mission offers the data needed to construct a global digital image model of the Moon.

Spudis, P. D.↗

International Space Station: Past, Present, and Future

The presentation intended to provide a broad overview of what the International Space Station LISS) is and how it is being developed, who the International Partners are, and the vision for the Space Station. The presentation is predominantly pictorial with top-level station information included such as the size and weight, the amount of pressurized volume, amount of power, etc. that will be available when the station is completed. The presentation also acknowledges the countries participating in the ISS Program, the contributions of the International Partners in terms of both hardware elements and launches, the Crews that have helped assemble, outfit, and/or occupy the Station, and the research that is already underway onboard. The major hardware elements to be delivered over the next several years are shown and the presentation ends with slides giving the overall functionality and capabilities the International Space Station will provide when complete.

Davis, N. Jan↗

Transitioning to Intel-based Linux Servers in the Payload Operations Integration Center

The MSFC Payload Operations Integration Center (POIC) is the focal point for International Space Station (ISS) payload operations. The POIC contains the facilities, hardware, software and communication interface necessary to support payload operations. ISS ground system support for processing and display of real-time spacecraft and telemetry and command data has been operational for several years. The hardware components were reaching end of life and vendor costs were increasing while ISS budgets were becoming severely constrained. Therefore it has been necessary to migrate the Unix portions of our ground systems to commodity priced Intel-based Linux servers. hardware architecture including networks, data storage, and highly available resources. This paper will concentrate on the Linux migration implementation for the software portion of our ground system. The migration began with 3.5 million lines of code running on Unix platforms with separate servers for telemetry, command, Payload information management systems, web, system control, remote server interface and databases. The Intel-based system is scheduled to be available for initial operational use by August 2004 The overall migration to Intel-based Linux servers in the control center involves changes to the This paper will address the Linux migration study approach including the proof of concept, criticality of customer buy-in and importance of beginning with POSlX compliant code. It will focus on the development approach explaining the software lifecycle. Other aspects of development will be covered including phased implementation, interim milestones and metrics measurements and reporting mechanisms. This paper will also address the testing approach covering all levels of testing including development, development integration, IV&V, user beta testing and acceptance testing. Test results including performance numbers compared with Unix servers will be included. need for a smooth transition while maintaining real-time support. An important aspect of the paper will involve challenges and lessons learned. product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support. This paper will also address the deployment approach including user involvement in testing and the , This includes COTS product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support.

Guillebeau, P. L.↗

Implementation and Testing of VLBI Software Correlation at the USNO

The Washington Correlator (WACO) at the U.S. Naval Observatory (USNO) is a dedicated VLBI processor based on dedicated hardware of ASIC design. The WACO is currently over 10 years old and is nearing the end of its expected lifetime. Plans for implementation and testing of software correlation at the USNO are currently being considered. The VLBI correlation process is, by its very nature, well suited to a parallelized computing environment. Commercial off-the-shelf computer hardware has advanced in processing power to the point where software correlation is now both economically and technologically feasible. The advantages of software correlation are manifold but include flexibility, scalability, and easy adaptability to changing environments and requirements. We discuss our experience with and plans for use of software correlation at USNO with emphasis on the use of the DiFX software correlator.

Fey, Alan↗

TRMM Version 7 Level 3 Gridded Monthly Accumulations of GPROF Precipitation Retrievals

In July 2011, improved versions of the retrieval algorithms were approved for TRMM. All data starting with June 2011 are produced only with the version 7 code. At the same time, version 7 reprocessing of all TRMM mission data was started. By the end of August 2011, the 14+ years of the reprocessed mission data became available online to users. This reprocessing provided the opportunity to redo and enhance upon an analysis of V7 impacts on L3 data accumulations that was presented at the 2010 EGU General Assembly. This paper will discuss the impact of algorithm changes made in th GPROF retrieval on the Level 2 swath products. Perhaps the most important change in that retrieval was to replacement of a model based a priori database with one created from Precipitation Radar (PR) and TMI brightness temperature (Tb) data. The radar pays a major role in the V7 GPROF (GPROF2010) in determining existence of rain. The level 2 retrieval algorithm also introduced a field providing the probability of rain. This combined use of the PR has some impact on the retrievals and created areas, particularly over ocean, where many areas of low-probability precipitation are retrieved whereas in version 6, these areas contained zero rain rates. This paper will discuss how these impacts get translated to the space/time averaged monthly products that use the GPROF retrievals. The level 3 products discussed are the gridded text product 3G68 and the standard 3A12 and 3B31 products. The paper provides an overview of the changes and explanation of how the level 3 products dealt with the change in the retrieval approach. Using the .25 deg x .25 degree grid, the paper will show that agreement between the swath product and the level 3 remains very high. It will also present comparisons of V6 and V7 GPROF retrievals as seen both at the swath level and the level 3 time/space gridded accumulations. It will show that the various L3 products based on GPROF level 2 retrievals are in close agreement. The paper concludes by outlining some of the challenges of the TRMM version 7 level 3 products.

Stocker, E. F.↗

An Enhanced TIMESAT Algorithm for Estimating Vegetation Phenology Metrics from MODIS Data

An enhanced TIMESAT algorithm was developed for retrieving vegetation phenology metrics from 250 m and 500 m spatial resolution Moderate Resolution Imaging Spectroradiometer (MODIS) vegetation indexes (VI) over North America. MODIS VI data were pre-processed using snow-cover and land surface temperature data, and temporally smoothed with the enhanced TIMESAT algorithm. An objective third derivative test was applied to define key phenology dates and retrieve a set of phenology metrics. This algorithm has been applied to two MODIS VIs: Normalized Difference Vegetation Index (NDVI) and Enhanced Vegetation Index (EVI). In this paper, we describe the algorithm and use EVI as an example to compare three sets of TIMESAT algorithm/MODIS VI combinations: a) original TIMESAT algorithm with original MODIS VI, b) original TIMESAT algorithm with pre-processed MODIS VI, and c) enhanced TIMESAT and pre-processed MODIS VI. All retrievals were compared with ground phenology observations, some made available through the National Phenology Network. Our results show that for MODIS data in middle to high latitude regions, snow and land surface temperature information is critical in retrieving phenology metrics from satellite observations. The results also show that the enhanced TIMESAT algorithm can better accommodate growing season start and end dates that vary significantly from year to year. The TIMESAT algorithm improvements contribute to more spatial coverage and more accurate retrievals of the phenology metrics. Among three sets of TIMESAT/MODIS VI combinations, the start of the growing season metric predicted by the enhanced TIMESAT algorithm using pre-processed MODIS VIs has the best associations with ground observed vegetation greenup dates.

Tan, Bin↗

Estimating Uncertainty in Long Term Total Ozone Records from Multiple Sources

Total ozone measurements derived from the TOMS and SBUV backscattered solar UV instrument series cover the period from late 1978 to the present. As the SBUV series of instruments comes to an end, we look to the 10 years of data from the AURA Ozone Monitoring Instrument (OMI) and two years of data from the Ozone Mapping Profiler Suite (OMPS) on board the Suomi National Polar-orbiting Partnership satellite to continue the record. When combining these records to construct a single long-term data set for analysis we must estimate the uncertainty in the record resulting from potential biases and drifts in the individual measurement records. In this study we present a Monte Carlo analysis used to estimate uncertainties in the Merged Ozone Dataset (MOD), constructed from the Version 8.6 SBUV2 series of instruments. We extend this analysis to incorporate OMI and OMPS total ozone data into the record and investigate the impact of multiple overlapping measurements on the estimated error. We also present an updated column ozone trend analysis and compare the size of statistical error (error from variability not explained by our linear regression model) to that from instrument uncertainty.

TOMS and SBUV↗

Impact of AMS-02 Measurements on Reducing GCR Model Uncertainties

For vehicle design, shield optimization, mission planning, and astronaut risk assessment, the exposure from galactic cosmic rays (GCR) poses a significant and complex problem both in low Earth orbit and in deep space. To address this problem, various computational tools have been developed to quantify the exposure and risk in a wide range of scenarios. Generally, the tool used to describe the ambient GCR environment provides the input into subsequent computational tools and is therefore a critical component of end-to-end procedures. Over the past few years, several researchers have independently and very carefully compared some of the widely used GCR models to more rigorously characterize model differences and quantify uncertainties. All of the GCR models studied rely heavily on calibrating to available near-Earth measurements of GCR particle energy spectra, typically over restricted energy regions and short time periods. In this work, we first review recent sensitivity studies quantifying the ions and energies in the ambient GCR environment of greatest importance to exposure quantities behind shielding. Currently available measurements used to calibrate and validate GCR models are also summarized within this context. It is shown that the AMS-II measurements will fill a critically important gap in the measurement database. The emergence of AMS-II measurements also provides a unique opportunity to validate existing models against measurements that were not used to calibrate free parameters in the empirical descriptions. Discussion is given regarding rigorous approaches to implement the independent validation efforts, followed by recalibration of empirical parameters.

Slaba, T. C.↗

ISS Potable Water Sampling and Chemical Analysis Results for 2016

This paper continues the annual tradition, at this conference, of summarizing the results of chemical analyses performed on archival potable water samples returned from the International Space Station (ISS). 2016 represented a banner year for life aboard the ISS, including the successful conclusion for 2 crewmembers of a record 1-year mission. Water reclaimed from urine and/or humidity condensate remained the primary source of potable water for the crewmembers of ISS Expeditions 46-50. The year was also marked by the end of a long-standing tradition of U.S. sampling and monitoring of Russian Segment potable water sources. Two water samples, taken during Expedition 46 and returned on Soyuz 44 in March 2016, represented the final Russian Segment samples to be collected and analyzed by the U.S. side. Although anticipated for 2016, a rise in the total organic carbon (TOC) concentration of the product water from the U.S. water processor assembly due to breakthrough of organic contaminants from the system did not materialize, as evidenced by the onboard TOC analyzer and archival sample results.

Straub, John E., II↗

Nasa's Search for Habitable Worlds

NASA's Kepler Mission launched in 2009 to scan a particular region of the sky for Earth-size planets transiting Sun-like stars in the habitable zone. After nearly ten years of observations, Kepler's mission ended, revealing over 2600 previously unknown exoplanets, most of which are smaller than 2X the size of Earth, and teaching us that small planets are common throughout the galaxy. NASA's TESS Mission launched in 2018 to continue NASA's quest for the search for life and is conducting a near all-sky survey for exoplanets orbiting stars 10X closer and 100X brighter than those observed by Kepler, permitting us to follow up many of the planetary discoveries to determine their masses, densities, and with future missions, to detect and characterize their atmospheres, and ultimately to potentially discover signs of life on these planets.

Jenkins, Jon M.↗

Coping with Higher Sea Levels and Increased Coastal Flooding in New York City

The 837 km New York City shoreline is lined by significant economic assets and dense population vulnerable to sea level rise and coastal flooding. After Hurricane Sandy in 2012, New York City developed a comprehensive plan to mitigate future climate risks, drawing upon the scientific expertise of the New York City Panel on Climate Change (NPCC), a special advisory group comprised of university and private-sector experts. This paper highlights current NPCC findings regarding sea level rise and coastal flooding, with some of the City's ongoing and planned responses. Twentieth century sea level rise in New York City (2.8 cm/decade) exceeded the global average (1.7 cm/decade), underscoring the enhanced regional risk to coastal hazards. NPCC (2015) projects future sea level rise at the Battery of 28 - 53 cm by the 2050s and 46 - 99 cm by the 2080s, relative to 2000 - 2004 (mid-range, 25th - 75th percentile). High-end SLR estimates (90th percentile) reach 76 cm by the 2050s, and 1.9 m by 2100. Combining these projections with updated FEMA flood return period curves, assuming static flood dynamics and storm behavior, flood heights for the 100-year storm (excluding waves) attain 3.9-4.5 m (mid-range), relative to the NAVD88 tidal datum, and 4.9 m (high end) by the 2080s, up from 3.4 m in the 2000s. Flood heights with a 1% annual chance of occurrence in the 2000s increase to 2.0 - 5.4% (mid-range) and 12.7% per year (high-end), by the 2080s. Guided by NPCC (2013, 2015) findings, New York City has embarked on a suite of initiatives to strengthen coastal defenses, employing various approaches tailored to specific neighborhood needs. NPCC continues its collaboration with the city to investigate vulnerability to extreme climate events, including heat waves, inland floods and coastal storms. Current research entails higher-resolution neighborhood-level coastal flood mapping, changes in storm characteristics, surge height interactions with sea level rise, and stronger engagement with stakeholders and community-based organizations.

Coastal flooding↗

SP-100 power system development status

The SP-100 ground engineering system development project objectives, approach and status are described. The SP-100 GES development project is phase II of a three-phase program funded and directed by three United States Federal Agencies (NASA, DOD and DOE) to develop space reactor power systems for space applications in the 10 to 1000 KWe power range. The first phase of the program lasted three years, and this was completed at the end of FY 1985. SP-100 Phase I analytically and experimentally reviewed all near-term space reactor power system candidates and selected one system that best met the project mission requirements for future civilian and military space applications. The SP-100 Phase II started in fiscal year 1986 to develop the Phase I selected space reactor power system to be technically ready for space applications in the mid- to late 1990s.

Mondt, Jack F.↗

Analysis and effects of the advanced solid rocket motor on the Space Shuttle elements

This interim final report summarizes the activities and major accomplishments under NASA/MSFC Contract NAS8-39235 for the initial two year contractual effort beginning October 1, 1991, and ending September 30, 1993. It is not intended as an exhaustive treatment or review of any particular technical issue which was addressed during this two-year period, but does provide an overview of the many induced environment studies and test support activities undertaken by REMTECH and its subcontractors during this two-year period. The initial scope of work has been pursued vigorously through this two-year period by separating the effort into five functional areas. The five functional areas are ascent plume radiation, ascent plume convection, ascent aerodynamic heating, launch stand environments, and reentry heating. A work breakdown structure (WBS) for each functional area was devised to permit nearly autonomous activities within each functional responsibility while maintaining commonality in reporting procedures and cost accounting. The contract was modified 11 times to provide incremental funding and to expand the scope of work. Additional work breakdown structure was incorporated to meet the expanded scope. A contract chronology is provided in Section 2. The initial scope of work, expanded scope, and corresponding WBS designation are described in Section 3. A summary review of major accomplishments is also provided in Section 4 to show the breadth of activities and extent of reporting. Reports, meetings, test activities, and other accomplishments within each functional area are also summarized by WBS heading in the appendices.

Source record↗

Objective Lightning Probability Forecasting for Kennedy Space Center and Cape Canaveral Air Force Station, Phase III

The AMU created new logistic regression equations in an effort to increase the skill of the Objective Lightning Forecast Tool developed in Phase II (Lambert 2007). One equation was created for each of five sub-seasons based on the daily lightning climatology instead of by month as was done in Phase II. The assumption was that these equations would capture the physical attributes that contribute to thunderstorm formation more so than monthly equations. However, the SS values in Section 5.3.2 showed that the Phase III equations had worse skill than the Phase II equations and, therefore, will not be transitioned into operations. The current Objective Lightning Forecast Tool developed in Phase II will continue to be used operationally in MIDDS. Three warm seasons were added to the Phase II dataset to increase the POR from 17 to 20 years (1989-2008), and data for October were included since the daily climatology showed lightning occurrence extending into that month. None of the three methods tested to determine the start of the subseason in each individual year were able to discern the start dates with consistent accuracy. Therefore, the start dates were determined by the daily climatology shown in Figure 10 and were the same in every year. The procedures used to create the predictors and develop the equations were identical to those in Phase II. The equations were made up of one to three predictors. TI and the flow regime probabilities were the top predictors followed by 1-day persistence, then VT and Ll. Each equation outperformed four other forecast methods by 7-57% using the verification dataset, but the new equations were outperformed by the Phase II equations in every sub-season. The reason for the degradation may be due to the fact that the same sub-season start dates were used in every year. It is likely there was overlap of sub-season days at the beginning and end of each defined sub-season in each individual year, which could very well affect equation performance.

Crawford, Winifred C.↗

Ensuring Cassini's End-of-Mission Propellant Margins

The Cassini spacecraft is in its final years. On September 15, 2017, Cassini will plunge deep into Saturn's atmosphere never to reemerge; thus concluding its second extended mission and 13 years in orbit around the ringed planet. As of October 2014, the spacecraft is four years in to its seven-year, second extended mission, the Cassini Solstice Mission (CSM). With three years left and only 2.5% of its loaded bipropellant and 37% of its loaded monopropellant remaining, the Cassini project actively manages the predicted end-of-mission propellant margins to maintain a high confidence in the spacecraft's ability to complete the CSM as designed.

Sturm, Erick J., II↗

Performance of a 2.5 THz Receiver Front-End for Spaceborne Applications

The OH radical plays a significant role in a great many of the known ozone destruction cycles, and has become the focus of an important radiometer development effort for NASA's Earth Observing System Chem I satellite, which will monitor and study many tropospheric and stratospheric gases and is scheduled for launch in 2002. Here we describe the design, fabrication, and testing of a receiver front end used to detect the OH signals at 2.5 THz. This is to be the first Terahertz heterodyne receiver to be flown in space. The challenges of producing the necessary high-performance mixers are numerous, but for this application, there is the added challenge of designing a robust receiver which can withstand the environmental extremes of a rocket launch and five years in space. The receiver front-end consists of the following components: a four-port dual-polarization diplexer, off-axis elliptical feed mirrors, mixers for horizontal and vertical polarization, support structures allowing simple and rugged alignment, low noise IF amplification from 7.7 to 21.1 GHz, and mixer DC bias circuitry. The front-end design, alignment, and operation will be covered in depth, followed by a discussion of the most recent results in receiver noise and dual-mode horn beam patterns. JPL MOMED mixers are employed, and have resulted in receiver noise temperatures of 14,500 K, DSB with LO frequency 2.522 GHz and IF of 12.8 GHz. Horn beam patterns correspond well with theory, with no significant sidelobes above the -25 dB level. Considering the high-quality beam of this receiver, these results are competitive with the best reported in the literature.

Gaidis, Michael C.↗

Survey of Experimental Results From One Year of PASP PLUS Orbital Operation

With PASP Plus as its primary payload, the APEX satellite was launched by a standard Pegasus rocket released from a NASA B-52 aircraft on 3 August 1994. A 70 deg inclination, 363 km X 2550 km orbit was achieved, allowing both investigation of space plasma effects on high-voltage operation in the perigee region and investigation of space radiation effects on array power output from passage through the inner radiation belt in the apogee region. Data gathering by PASP Plus was begun on 7 Aug 94 and ended on 11 Aug 95. In one year, PASP Plus collected an order of magnitude more data on environmental interactions on solar arrays than all previous space-borne photovoltaic experiments combined. The test arrays flown and the interactions-measuring and space-environment sensors of PASP Plus are described. The results of measurements of leakage current under test-array positive biasing and arc rates under negative biasing as a function of bias voltage, plasma density, array orientation, and other conditions are presented. The results of measurements of test-array power-output degradation caused by space radiation are also examined.

PHOTOVOLTAIC EFFECT↗