Biogas Utilization in Refuse Power Plants (BURP 2 )
The BURP 2 project investigated the technical and financial viability of co firing biogas with waste coal for power generation while using carbon capture and sequestration to achieve net negative emissions. A comparative assessment integrating geospatial mapping, technoeconomic analysis, and life cycle analysis was carried out to evaluate retrofitting an existing coal fired facility in West Virginia, versus developing a new greenfield power plant in Kentucky located near a low quality coal resource. The study found that CO 2 capture rates of 90% or higher, in combination with biogas feedstocks such as animal manure, could significantly reduce global warming potential compared to plants using neither biogas nor CO 2 capture systems. Economic feasibility depended heavily on federal tax credits and proximity to fuel sources. In both greenfield and retrofit scenarios, access to biogas played a key role. Because the retrofit site was located close to existing biogas resources, it represented a feasible option, whereas the greenfield site, being far from pipelines or biogas sources, would require prohibitively expensive biogas transport infrastructure. Overall, the research showed that repurposing waste or low-quality coal with renewable biogas and CO 2 capture systems could provide a viable approach for reducing carbon emissions in power production, if biogas resources are easily accessible and available in sufficient quantities.