Search NASA⌕ Search

SEARCH · Search NASA

Results for “Gateway”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

Summary of NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel Robinson↗

Summary of NASA Progress on the Development and Qualification of a 12 kW Hall Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel W Robinson↗

Thermal Analysis of Refueling Propellant Systems for PPE

To support the sustainability of Gateway, approach the challenge of sustainable presence beyond low earth orbit, and provide proving grounds for future missions beyond the surface of the moon, refueling capabilities must be incorporated into Gateway. The objective is to replenish propellants into the Power and Propulsion Element (PPE) from the European System Providing Refueling, Infrastructure and Telecommunications (ESPIRIT) through the Habitation and logistics outpost (HALO). PPE refueling will consist of a bipropellant transfer system, as well as a main propellant transfer system. Refueling the Power and Propulsion Element in near rectilinear halo orbit can present various issues, and to thermally maintain the refueling system during this event requires diligent planning and thermal design. Presently, a thermal model exists to analyze the components of the refueling system as the development of PPE continues. The analysis from the thermal model will verify the integrity of the all the components during a refueling event throughout the duration of the mission given various environmental differences. To confidently refuel PPE, thermal analysis, and various tests of the refueling components, must be completed to achieve the desired sustainability of Gateway.

Ethan Sparks↗

Carrier and sampling frequency offset estimation for RF communication with crystal-less nodes

When the ultra-low power mm-scale sensor node does not have a crystal oscillator and phase-lock loop, it inevitably exhibits significant carrier frequency offset (CFO) and sampling frequency offset (SFO) with respect to the reference frequencies in the gateway. This disclosure enables efficient real-time calculation of accurate SFO and CFO at the gateway, thus the ultra-low power mm-scale sensor node can be realized without a costly and bulky clock reference crystal and also power-hungry phase lock loop. In the proposed system, the crystal-less sensor starts transmission with repetitive RF pulses with a constant interval, followed by the data payload using pulse-position modulation (PPM). A proposed algorithm uses a two-dimensional (2D) fast Fourier transform (FFT) based process that identifies the SFO and CFO at the same time to establish successful wireless communication between the gateway and crystal-less sensor nodes.

Kim, Hun-Seok↗

Measuring success for a future vision: Defining impact in science gateways/virtual research environments

Scholars worldwide leverage science gateways/virtual research environments (VREs) for a wide variety of research and education endeavors spanning diverse scientific fields. Evaluating the value of a given science gateway/VRE to its constituent community is critical in obtaining the financial and human resources necessary to sustain operations and increase adoption in the user community. In this article, we feature a variety of exemplar science gateways/VREs and detail how they define impact in terms of, for example, their purpose, operation principles, and size of user base. Further, the exemplars recognize that their science gateways/VREs will continuously evolve with technological advancements and standards in cloud computing platforms, web service architectures, data management tools and cybersecurity. We also present a number of technology advances that could be incorporated in next-generation science gateways/VREs to enhance their scope and scale of their operations for greater success/impact. The exemplars are selected from owners of science gateways in the Science Gateways Community Institute (SGCI) clientele in the United States, and from the owners of VREs in the International Virtual Research Environment Interest Group (VRE-IG) of the Research Data Alliance. Thus, community-driven best practices and technology advances are compiled from diverse expert groups with an international perspective to envisage futuristic science gateway/VRE innovations.

97 MATHEMATICS AND COMPUTING↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Plume Impingement Studies in Space Environments for NASA Deep Space Logistics

NASA’s Artemis program is preparing to return Americans to the moon, in preparation for future deep space missions to Mars and beyond. The Lunar Gateway – a space station to be placed in orbit around the moon – serves as a critical component of the Artemis program, and will be the launchpad for future astronauts to visit the lunar surface and for humanity to learn how to live in a deep space environment. Much like the ISS, during operations and visiting vehicles approaches, the Lunar Gateway structures will be impinged upon from various plume sources: reaction control system rocket engine plumes, wastewater venting plumes, and plasma plumes from electric thrusters for station keeping. This presentation will describe the engineering challenges associated with each of these plume impingement scenarios and will detail the physical models and simulation approaches to predict the thermomechanical loading, contamination accretion, and erosion of station components due to plume impingement in space environments.

Plume Impingement↗

Perturbation Modeling and Navigation Tuning for a Crewed Station in Near Rectilinear Halo Orbit

NASA's Gateway program will build a crew-tended station in an Earth-Moon Near Rectilinear Halo Orbit (NRHO) to support deep space missions to the lunar surface and heliocentric space. The station in the NRHO will be visited by crewed vehicles including lunar landers that are high mass relative to Gateway. Docking events with large vehicles induce significant thruster plume and docking contact velocity perturbations. Crewed vehicles induce significant venting perturbations that can stress the navigation filter's ability to remain converged about an estimated state. The torques that arise from venting and lunar gravity gradient require reaction control system (RCS) thruster intervention, which themselves induce a velocity perturbation. The best method to model RCS thruster perturbations is currently in development. This paper simulates different RCS perturbation models, schedules, and an increasing magnitude to investigate the navigation sensitivity to different RCS perturbation models. From the RCS perturbation models simulated, a worst-case scenario is chosen for further scrutiny. The navigation filter is further tuned to handle the most disruptive perturbation modeling and the resulting performance is analyzed.

Navigation↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

The Role of SnO2 Processing on Ionic Distribution in Double-Cation-Double Halide Perovskites

Moving toward a future of efficient, accessible, and less carbon-reliant energy devices has been at the forefront of energy research innovations for the past 30 years. Metal-halide perovskite (MHP) thin films have gained significant attention due to their flexibility of device applications and tunable capabilities for improving power conversion efficiency. Serving as a gateway to optimize device performance, consideration must be given to chemical synthesis processing techniques. Therefore, how does common substrate processing techniques influence the behavior of MHP phenomena such as ion migration and strain? Here, we demonstrate how a hybrid approach of chemical bath deposition (CBD) and nanoparticle SnO2 substrate processing significantly improves the performance of (FAPbI3)0.97(MAPbBr3)0.03 by reducing micro-strain in the SnO2 lattice, allowing distribution of K+ from K-Cl treatment of substrates to passivate defects formed at the interface and produce higher current in light and dark environments. X-ray diffraction reveals differences in lattice strain behavior with respect to SnO2 substrate processing methods. Through use of conductive atomic force microscopy (c-AFM), conductivity is measured spatially with MHP morphology, showing higher generation of current in both light and dark conditions for films with hybrid processing. Additionally, time-of-flight secondary ionization mass spectrometry (ToF-SIMS) observed the distribution of K+ at the perovskite/SnO2 interface, indicating K+ passivation of defects to improve the power conversion efficiency (PCE) and device stability. We show how understanding the role of ion distribution at the SnO2 and perovskite interface can help reduce the creating of defects and promote a more efficient MHP device.

conductive atomic force microscopy↗

Real-Time Hardware-in-the-Loop Distributed Energy Resources System Testbed using IEEE 2030.5 Standard

IEEE 2030.5 standard is drawing special attention among communication protocols for smart inverters and distributed energy resources (DER). Moreover, California Rule 21 mandates new DER must be ready to communicate to a host utility using the IEEE 2030.5 standard. Therefore, development of an effective real-time simulation method for managing DER using IEEE 2030.5 network is crucial. This paper presents a real-time hardware-in-the-loop (HIL) DER system testbed using the IEEE 2030.5 standard. The proposed real-time co-simulation testbed consists of a DER physical system simulation using OP AL-RT real-time simulator and a cyber system simulation including DER gateways and a DER management system (DERMS) cloud server. Custom-built client and server programs are developed to meet the compliant with IEEE 2030.5-2018 standard and implemented in the DER gateways and a DERMS server, respectively. Furthermore, the feasibility of the proposed testbed for DER systems is validated by experiments.

42 ENGINEERING↗

Seamless Wireless Communication Platform for Internet of Things Applications

The rapid growth of the Internet of Things (IoT) devices resulted in the proliferation of wireless technologies to cater to their increasing data rate requirements and support multiple applications. However, such ever-increasing wireless technologies present numerous challenges such as incompatible wireless standards, increased energy consumption, and insecure communication. The traditional gateways proposed in the literature suffers from limitations such as computational complexity, resource requirements, increased cost, and device size. We vision an era of seamless wireless communication to alleviate the aforementioned challenges in IoT applications. through three inter-dependent functionalities namely detection and identification of wireless technologies, energy-efficient transmit power control, and secure end-to-end communication. To prove the concept, a new gateway is proposed to achieve these three functionalities with only physical layer measurements so that the different communication protocols in the higher layers can be avoided. Novel schemes are conceptualized for resource-limited seamless IoT applications. Moreover, the conceptual seamless IoT platform is validated through software-based computer simulation and software-defined radio-based testbed implementation. Finally, the preliminary analysis demonstrates that the proposed platform has great potential in advancing seamless IoT applications.

97 MATHEMATICS AND COMPUTING↗

Packaged SMIP Smart Connector for Ectron Computers

The project provides appropriate software modules, which allow to represent a physical oven as a virtual oven model. For that a virtual oven model is developed, which defines oven parameters like temperature, power consumption but also the door status and the humidity. To connect a real oven to the virtual model for monitoring and control multiple sensors are used to collect data. Using a MQTT based data connection the measured parameters are send to the CESMII environment for further processing and monitoring. Within this project the CESMII model for the general oven was developed and provided. Further the sensors were connected to the actual oven. The sensor data is collected via means of a MQTT based data transfer protocol to a gateway module. The gateway module then translates and transfers the collected data to the actual CESMII oven model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exponential Backoff and Its Security Implications for Safety-Critical OT Protocols over TCP/IP Networks

The convergence of Operational Technology (OT) and Information Technology (IT) networks has become increasingly prevalent with the growth of Industrial Internet of Things (IIoT) applications. This shift, while enabling enhanced automation, remote monitoring, and data sharing, also introduces new challenges related to communication latency and cybersecurity. Oftentimes, legacy OT protocols were adapted to the TCP/IP stack without an extensive review of the ramifications to their robustness, performance, or safety objectives. To further accommodate the IT/OT convergence, protocol gateways were introduced to facilitate the migration from serial protocols to TCP/IP protocol stacks within modern IT/OT infrastructure. However, they often introduce additional vulnerabilities by exposing traditionally isolated protocols to external threats. This study investigates the security and reliability implications of migrating serial protocols to TCP/IP stacks and the impact of protocol gateways, utilizing two widely used OT protocols: Modbus TCP and DNP3. Our protocol analysis finds a significant safety-critical vulnerability resulting from this migration, and our subsequent tests clearly demonstrate its presence and impact. A multi-tiered testbed, consisting of both physical and emulated components, is used to evaluate protocol performance and the effects of device-specific implementation flaws. Through this analysis of specifications and behaviors during communication interruptions, we identify critical differences in fault handling and the impact on time-sensitive data delivery. The findings highlight how reliance on lower-level IT protocols can undermine OT system resilience, and they inform the development of mitigation strategies to enhance the robustness of industrial communication networks.

DNP3↗

Computer simulator for a mobile telephone system

A software simulator was developed to assist NASA in the design of the land mobile satellite service. Structured programming techniques were used by developing the algorithm using an ALCOL-like pseudo language and then encoding the algorithm into FORTRAN 4. The basic input data to the system is a sine wave signal although future plans call for actual sampled voice as the input signal. The simulator is capable of studying all the possible combinations of types and modes of calls through the use of five communication scenarios: single hop systems; double hop, signal gateway system; double hop, double gateway system; mobile to wireline system; and wireline to mobile system. The transmitter, fading channel, and interference source simulation are also discussed.

Schilling, D. L.↗