Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Connection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

CERTS Microgrid Laboratory Test Bed

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1 a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2 an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3 a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Grid and Wind Transient Ride Through Assessment of Type-5 Synchronous Wind Turbine

The integration of the inverter-based renewable energy resources is increasing and replacing conventional synchronous generators in the evolving bulk power system (BPS), impacting the system inertia along the way. Also, the limited over-current capability of power electronic converters continues to deteriorate the grid strength of the evolving power systems. Type-5 wind turbines have the potential to mitigate these problems because this configuration interfaces with the grid through a synchronous generator; hence, its operation and consequent grid impacts might mimic the conventional synchronous generator. The drivetrain of this type of turbines, however, is different from the more common Type-3 and Type-4 turbines. A hydraulic torque converter and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine drivetrain, to isolate the wind speed variations at the wind turbine rotor from the grid connected generator side. This supports the synchronous operation of the generator. However, high fidelity models of Type-5 wind turbine drivetrain including these core components are not openly and widely available for grid integration and transient stability studies. Moreover, Type-5 turbines are not commonly deployed and hence its power generation and frequency stability characteristics are not widely publicized. This hinders appropriate assessment of Type-5 wind power plant's contribution to bulk grid resilience. This work provides transient stability assessment of a standalone Type-5 wind turbine. Normal operation and grid transient studies are performed to see the step load change and wind speed disturbance impacts on the Type-5 drivetrain and generation dispatch. Preliminary results show that Type-5 wind turbines can support load changes of between 0.6 p.u to 1.15 p.u. Beyond this point, the synchronization of the generator starts to deviate from its set point.

17 - WIND ENERGY↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Microgrid Controller Test Plan

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) DER. In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this first edition report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Laboratory Evaluation of Commercial Utility Microgrid Controller Test Results

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) distributed energy resources (DER). In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. This second edition update also includes results from applying the tests to a commercial utility microgrid controller. These results evaluate the performance and reliability of the controller under various operational scenarios. It identifies specific areas where the controller excels and highlights gaps that need to be addressed for future enhancements. The application of these test plans on real-world system behavior provides insights on commercial equipment readiness for field deployment. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Distributed Solar Electric Generation to San Antonio

This report presents an analysis of value provided by grid-connected, distributed PV in San Antonio from a utility perspective. The study quantified six value components, summarized in Table ES-1. These components represent the benefits that accrue to the utility, CPS Energy, in accepting solar onto the grid. This analysis does not treat the compensation of value, policy objectives, or cost-effectiveness from the retail consumer perspective.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Value and Technology Assessment to Enhance the Business Case for the CERTS Microgrid

The CERTS Microgrid concept is an advanced approach for enabling integration of, in principle, an unlimited quantity of distributed energy resources into the electricity grid. A key feature of a microgrid, is its ability, during a utility grid disturbance, to separate and isolate itself from the utility seamlessly with no disruption to the loads within the microgrid (including no reduction in power quality). Then, when the utility grid returns to normal, the microgrid automatically resynchronizes and reconnects itself to the grid, in an equally seamless fashion. What is unique about the CERTS Microgrid is that it can provide this technically challenging functionality without extensive (i.e., expensive) custom engineering. In addition, the design of the CERTS Microgrid also provides high system reliability and great flexibility in the placement of distributed generation within the microgrid. The CERTS Microgrid offers these functionalities at much lower costs than traditional approaches by incorporating peer-to-peer and plug-and-play concepts for each component within the Microgrid. The predecessor to the current project involved the construction of and completion of initial testing using the world's first, full-scale, inverter-based, distributed generation test bed. The project demonstrated three advanced techniques, collectively referred to as the CERTS Microgrid concept, which collectively significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques are: (1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; (2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and (3) a method for microgrid control that achieves voltage and frequency stability under both grid and islanded conditions without requiring high-speed communications. The work conducted in this phase of RD&D on the CERTS Microgrid Concept builds upon this base of technical accomplishments to prioritize, develop, and then demonstrate technology enhancements to further enhance the business case for microgrids. That is, having demonstrated the technical feasibility of microgrid functions, RD&D optimization efforts are now needed to accelerate commercial deployment. The current phase is a contribution to these efforts. This project involved seven distinct analysis, bench-, and full-scale testing tasks. The first five tasks were described in the original proposal submitted and awarded through DOE's solicitation. Two additional tasks were added to address issues that had been identified in the earlier, first phase of testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of CReST-VCT Deployment in Real-Time Environments: Communication System Examination

Incorporation of decentralized generation or distributed energy resources (DERs) such as solar and wind, is transforming the electricity grid. These resources have the potential to provide greater overall value when they are grid connected and coordinated between transmission and distribution systems. The Coordinated Real-Time Sub-Transmission Volt-VAr Control Tool (CReST-VCT) has been proposed to provide co-optimization between transmission and distribution systems maximizing DER utilization while maintaining overall grid stability. In this paper, we examine the communication systems that are necessary to support the integration of the CReST-VCT optimization mechanism in a real-time operational environment. The required communication interfaces will be identified based on the operation model of CReST-VCT. The characteristics of the communication systems at these interfaces will be described to establish the context within which CReST-VCT will operate. The related protocols and cybersecurity domain will be reviewed. Potential issues and concerns will then be identified to guide subsequent integration efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MiGRIDS

MiGRIDS is a software that models islanded microgrid power systems with different controls and components. For example, using load and resource data from a microgrid, you could model it with additional wind turbines, battery etc. You could also try out different dispatch schemes to see which one worked best. MiGRIDS is designed to help optimize the size and dispatch of grid components in a microgrid. While a grid connect feature is expected to be added in the future, islanded operation is the focus. Note that this is a basic implementation and more features and functionality (such as a GUI) are coming! MiGRIDS runs time-step energy balance simulations for different grid components and controls. In smaller microgrid environments, dispatch decisions are being made on the order of seconds. In order to fully capture their effect, this tool lets you run simulations on the order of seconds. The end result is a more realistic representation of what can be achieved by integrating different components and control strategies in a grid.

Morgan, Tawna↗

Hybrid Grid-Renewable Strategies for Green Steel Production under Electricity Market Uncertainty

Volatility in grid spot prices is expected to rise with climate change-driven demand pressures and the intermittency of renewable generation. This volatility poses financial risks for green hydrogen-based steel production. The Direct Reduced Iron− Electric Arc Furnace (H 2 -DRI-EAF) is a promising pathway to decarbonize steel, which accounts for ∼8% of global GHG emissions. This study assesses how increased grid spot price volatility influences the optimal sizing and operation of H2-DRIEAF plants under three operational scenarios: grid-connected, fully behind-the-meter (islanded), and mixed-mode (semi-islanded). Our analysis identifies the semi-islanded configuration as the most cost-effective solution, achieving a Levelized Cost of Steel (LCOS) 10−35% lower than sourcing energy solely from the grid. Modeling also shows hydrogen storage or selective electricity purchases at high prices (>$1000/MWh) generally outperform battery storage, except under extreme volatility. Additionally, the study explores cost reduction strategies to strengthen the economic viability and sustainability of green steel production.

Batteries↗

Increasing Resiliency Through Renewable Energy Microgrids

This paper describes a methodology to quantify the economic and resiliency benefit provided by renewable energy (RE) in a hybrid RE-storage-diesel microgrid. We present a case study to show how this methodology is applied to a multi-use/ multi-function telecommunications facility in southern California. In the case study, we first identify photovoltaic (PV) and battery energy storage system (BESS) technologies that minimize the lifecycle cost of energy at the site under normal, grid-connected operation. We then evaluate how those technologies could be incorporated alongside existing diesel generators in a microgrid to increase resiliency at the site, where resiliency is quantified in terms of the amount of time that the microgrid can sustain the critical load during a grid outage. We find that adding PV and BESS to the existing backup diesel generators with a fixed fuel supply extends the amount of time the site could survive an outage by 1.8 days, from 1.7 days for the existing diesel-only backup system to 3.5 days for the PV/diesel/BESS hybrid system. Furthermore, even after diesel fuel supplies are exhausted, the site can continue to operate critical loads during daytime hours using just the PV/BESS when there is sufficient solar resource. We find that the site can save approximately 100,000 dollars in energy costs over the 25-year lifecycle while doubling the amount of time they can survive an outage. Here, the methodology presented here provides a template for increasing resiliency at telecomm sites by implementing renewable energy solutions, which provide additional benefits of carbon emission reduction and energy cost savings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Distributed Wind Turbine Controls Series: Part 1-Flatirons Campus Model Overview – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

Wind turbines are typically deployed to provide energy, reduce diesel-fuel consumption, reduce carbon emissions, and reduce costs for energy and fuel transportation. However, in addition to solely providing energy to the power system, wind turbines contain rotating masses and inverter-based controls that can enable various reliability and resilience services through advance controls. As part of the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL), it is demonstrated that advanced wind turbine controls can be employed to support higher contributions of wind, and to demonstrate ways that wind can play a role in supporting grid stability in islanded or grid-connected configurations. This paper documents models of various subsystem comprising a portion of NREL's Flatirons campus that will be used in three subsequent reports to demonstrate capabilities of advanced wind turbine controls. The series of reports will detail advanced capabilities of distributed wind turbines to provide support to isolated grids, distribution grids, and microgrids. We developed models to simulate a wind turbine (600 kW), solar PV (430 kW), battery energy storage system (1 MW/1MWh), a diesel generator (2 MW) and various types of loads (critical, dynamic). The model of the subsystems in MATLAB/Simulink are validated with available data from real-world components on NREL's Flatirons Campus. These validated models can be configured for various studies including four MIRACL use cases: 1) isolated grids, 2) microgrids, and 3) behind-the-meter, and 4) front-of-the-meter wind turbine deployments.

17 WIND ENERGY↗

Identifying and Overcoming Critical Barriers to Widespread Second Use of PEV Batteries

Both the market penetration of plug-in electric vehicles (PEVs) and deployment of grid-connected energy storage systems are presently restricted by the high cost of batteries. Battery second use (B2U) strategies--in which a single battery first serves an automotive application, then is redeployed into a secondary market--could help address both issues by reducing battery costs to the primary (automotive) and secondary (electricity grid) users. This study investigates the feasibility of and major barriers to the second use of lithium-ion PEV batteries by posing and answering the following critical B2U questions: 1. When will used automotive batteries become available, and how healthy will they be? 2. What is required to repurpose used automotive batteries, and how much will it cost? 3. How will repurposed automotive batteries be used, how long will they last, and what is their value? Advanced analysis techniques are employed that consider the electrical, thermal, and degradation response of batteries in both the primary (automotive) and secondary service periods. Second use applications are treated in detail, addressing operational requirements, economic value, and market potential. The study concludes that B2U is viable and could provide considerable societal benefits due to the large possible supply of repurposed automotive batteries and substantial remaining battery life following automotive service. However, the only identified secondary market large enough to consume the supply of these batteries (utility peaker plant replacement) is expected to be a low margin market, and thus B2U is not expected to affect the upfront cost of PEVs.

25 ENERGY STORAGE↗

Design Power Control Strategies of Grid-Forming Inverters for Microgrid Application: Preprint

This paper compares two control schemes in the application control layer of a non-PLL grid-forming (GFM) inverter to gain the insights and understanding of how the two schemes affect the dynamic responses of the GFM inverters and the transition operation of microgrids. Both schemes can achieve smooth microgrid transition operation and power tracking, however, the first scheme expects to exhibit more transients due to the feedforward of the inverse dynamic model of the output filter. Simulation results show that both control schemes achieve successful transition operation with smooth transients, and the second control scheme exhibits slightly better transients in the system frequency during islanding operation and the first one has slightly superior transients in the system frequency during reconnection operation. The power tracking performance in the grid-connected mode is evaluated, which shows that the first scheme has better active power tracking and the second one has better reactive power tracking. The analysis and results are useful to develop reliable control schemes for non-PLL GFM inverters because more and more inverters will work as non-PLL grid-forming sources in the future grids due to better stability and reliability.

grid-forming inverter↗