At least 325 records · Page 18

Design, Fabrication and Test of WFIRST-AFTA GRISM Assembly

The Wide-Field Infra-Red Survey Telescope (WFIRST) is designed to perform wide-field imaging and slitless spectroscopic survey of the sky. A compound Grism assembly is selected as its slitless dispersing element. Compared to the grisms in several instruments installed on the Hubble space telescope, the challenge of this grism is the much wider Field Of View (FOV), larger dispersion, and smaller f. The image quality of the slitless spectrometer is directly related to how deep of the sky the spectrometer is able to see. This paper discusses how to use a diffractive lens surface to compensate the wavelength dependent aberration created by the grating in non-collimated space to make the spectrometer diffraction limited, as well as how to intelligently combine the two diffractive surfaces (lens and grating) to reduce the unwanted diffraction orders from the grating. The paper also discusses how to improve the diffraction efficiency of the diffractive surfaces, as well as how to align and assemble the optics.

Diffractive Optics↗

AUP first Pre-series Cold Mass Installation into the Cryostat

For the Hi-Lumi LHC Upgrade (HL-LHC) new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP) ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested and delivered to CERN. The first of the LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during the fall of 2022 and spring 2023. We will present the integration work of the Cold Mass assembly into the Cryostat Kit provided by CERN. Each Cold Mass contains two trained MQXFA magnets of ~ 5 m length installed in a stainless-steel helium pressure vessel. The Cold Mass will be surrounded by cryostat shields, piping, and vacuum vessel. We will discuss the metrology survey results and present the LQXFA measurements prior testing at the Fermilab Magnet Test facility and lessons learned.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Data Analytics for Residential PV from Permit to Interconnect (Final Technical Report)

The main objective of this research is to provide novel insights into the effects of permitting, inspection, and interconnection (PII) processes on PV system installations—and in particular, into the relationship between PII processes and adoption timelines. This research can then be used to clarify the potential effect of various process changes on reducing PII timelines, customer cancellation rates, and related costs nationwide. NREL completed this research by assembling a data set of distributed, largely residential rooftop solar systems less than 50 kilowatts in size from participating solar installers. NREL produced five publications describing the effects that PII processes can have on adoption timelines nationwide, in addition to publishing an interactive data viewer with five years of PII cycle time data. This tool can be used by stakeholders to identify potential adoption timelines by local government.

14 SOLAR ENERGY↗

Assessment of Light-Duty Plug-in Electric Vehicles in the United States (2010 - 2020)

This report examines properties of plug-in electric vehicles (PEVs) sold in the United States from 2010 to 2020, exploring vehicle sales, miles driven, electricity consumption, petroleum reduction, vehicle manufacturing, and battery production, among other factors. Over 1.7 million PEVs have been sold, driving 52 billion miles on electricity since 2010, thereby reducing national gasoline consumption by 0.42% in 2020 and 1.9 billion gallons cumulatively through 2020. In 2020, PEVs used 4.4 terawatt-hours of electricity to drive 13.7 billion miles, offsetting 500 million gallons of gasoline. Since 2010, 68% of PEVs sold in the United States have been assembled domestically, and 77 gigawatt-hours of lithium-ion batteries have been installed in vehicles to date.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Forward Pixel Detector for the Phase 2 Upgrade of CMS And Module Testing at UIC

High-Luminosity Large Hadron Collider (HL-LHC) upgrade aims to increase performance. In order to efficiently handle the larger particle flux and increased radiation, an upgrade is planned for the inner Tracker of the Compact Muon Solenoid (CMS) detector, which is located at the innermost part of the CMS. To efficiently reconstruct and track particles, the existing pixel tracker will be upgraded with novel sensors, readout chips, and front-end electronics designed to handle increased data rates. These improvements will allow the detector to track particles more precisely. In the United States, we are working on assembling new sensor modules to be inserted into disks, referred to as TFPX, for installation in the CMS detector for the HL-LHC era. We are currently testing the prototype of TFPX modules to ensure the upgrade is carried out in the best way possible. The University of Ilinois Chicago has been tasked with testing the final versions of the TFPX sensor modules before they are sent to CERN to be installed into the CMS detector. This work is supported by NSF.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Seven ways to make a hypertext project fail

Hypertext is an exciting concept, but designing and developing hypertext applications of practical scale is hard. To make a project feasible and successful 'hypertext engineers' must overcome the following problems: (1) developing realistic expectations in the face of hypertext hype; (2) assembling a multidisciplinary project team; (3) establishing and following design guidelines; (4) dealing with installed base constraints; (5) obtaining usable source files; (6) finding appropriate software technology and methods; and (7) overcoming legal uncertainties about intellectual property concerns.

Glushko, Robert J.↗

Shuttle Processing

This slide presentation details shuttle processing flow which starts with wheel stop and ends with launching. The flow is from landing the orbiter is rolled into the Orbiter Processing Facility (OPF), where processing is performed, it is then rolled over to the Vehicle Assembly Building (VAB) where it is mated with the propellant tanks, and payloads are installed. A different flow is detailed if the weather at Kennedy Space Center requires a landing at Dryden.

Guodace, Kimberly A.↗

26th Space Simulation Conference Proceedings. Environmental Testing: The Path Forward

Topics covered include: A Multifunctional Space Environment Simulation Facility for Accelerated Spacecraft Materials Testing; Exposure of Spacecraft Surface Coatings in a Simulated GEO Radiation Environment; Gravity-Offloading System for Large-Displacement Ground Testing of Spacecraft Mechanisms; Microscopic Shutters Controlled by cRIO in Sounding Rocket; Application of a Physics-Based Stabilization Criterion to Flight System Thermal Testing; Upgrade of a Thermal Vacuum Chamber for 20 Kelvin Operations; A New Approach to Improve the Uniformity of Solar Simulator; A Perfect Space Simulation Storm; A Planetary Environmental Simulator/Test Facility; Collimation Mirror Segment Refurbishment inside ESA s Large Space; Space Simulation of the CBERS 3 and 4 Satellite Thermal Model in the New Brazilian 6x8m Thermal Vacuum Chamber; The Certification of Environmental Chambers for Testing Flight Hardware; Space Systems Environmental Test Facility Database (SSETFD), Website Development Status; Wallops Flight Facility: Current and Future Test Capabilities for Suborbital and Orbital Projects; Force Limited Vibration Testing of JWST NIRSpec Instrument Using Strain Gages; Investigation of Acoustic Field Uniformity in Direct Field Acoustic Testing; Recent Developments in Direct Field Acoustic Testing; Assembly, Integration and Test Centre in Malaysia: Integration between Building Construction Works and Equipment Installation; Complex Ground Support Equipment for Satellite Thermal Vacuum Test; Effect of Charging Electron Exposure on 1064nm Transmission through Bare Sapphire Optics and SiO2 over HfO2 AR-Coated Sapphire Optics; Environmental Testing Activities and Capabilities for Turkish Space Industry; Integrated Circuit Reliability Simulation in Space Environments; Micrometeoroid Impacts and Optical Scatter in Space Environment; Overcoming Unintended Consequences of Ambient Pressure Thermal Cycling Environmental Tests; Performance and Functionality Improvements to Next Generation Thermal Vacuum Control System; Robotic Lunar Lander Development Project: Three-Dimensional Dynamic Stability Testing and Analysis; Thermal Physical Properties of Thermal Coatings for Spacecraft in Wide Range of Environmental Conditions: Experimental and Theoretical Study; Molecular Contamination Generated in Thermal Vacuum Chambers; Preventing Cross Contamination of Hardware in Thermal Vacuum Chambers; Towards Validation of Particulate Transport Code; Updated Trends in Materials' Outgassing Technology; Electrical Power and Data Acquisition Setup for the CBER 3 and 4 Satellite TBT; Method of Obtaining High Resolution Intrinsic Wire Boom Damping Parameters for Multi-Body Dynamics Simulations; and Thermal Vacuum Testing with Scalable Software Developed In-House.

Packard, Edward A.↗

STS-112 Mission Highlights Resource Tape Part 2 of 3

An overview of the STS-112 Mission is presented. The fourth flight day begins with a view inside of the Destiny Laboratory of the International Space Station where Expedition Five Commander Valery Korzun is shown. The robotics workstation where Mission Specialist Sandra Mangus and Flight Engineer Peggy Whitson operate Canadarm 2 to lift the S(1) Truss segment out of the payload bay of the Space Shuttle Atlantis and maneuver it for installation onto the S(1) Truss is presented. Mission Specialist Piers Sellers is shown preparing for his six and one half hour spacewalk by performing breathing exercises. Animation of the installation of the S(1) Truss, and also the unbirthing of the S(1) truss is also presented. Mission Specialists David Wolf and Piers Sellers are shown getting suited for their spacewalks. During the spacewalk, David Wolf is removing the antenna assembly from its launched position and Piers Sellers is releasing launch restraints from the Radiator Beam Assembly. A beautiful view of the coast of Texas is captured during this spacewalk. Flight day five shows pilot Pam Melroy and Mission Specialist Dave Wolf working inside of the International Space Station's Quest Airlock. Flight day six is shown with Dave Wolf and Piers Sellers exiting their spacesuits inside of the Quest Airlock Module after a successful spacewalk. This presentation ends with views of the International Space Station's installed S(1) Truss, rotation of the radiator assembly and the radiator's coolant tubing.

Source record↗

Reliable Bonding of Composite Laminates Using Reflowable Epoxy Resins

Epoxy matrix composites assembled with adhesives maximize the performance of aerospace structures, but the possibility of forming weak bonds requires the installation of redundant fasteners, which add weight and manufacturing cost. Co-cured joints (e.g. unitized composite structures) are immune to weak bonds because the uncured resin undergoes diffusion and mixing through the joint. A means of co-curing complex structures may reduce the need for redundant fasteners in bondlines. To this end, NASA started the AERoBOND project to develop novel joining materials to enable a “secondary-co-cure” assembly process. Aerospace epoxy resin systems reformulated with offset stoichiometry prevented the resin from advancing beyond the gel point during a conventional autoclave cure cycle up to 180 °C. The offset resins were applied to the joining surfaces of laminate preforms as prepreg. Two surfaces with complimentary offset resins were joined using conventional secondary bonding techniques. Preliminary efforts have indicated that the resulting joint has no discernable interface and appears as a conventional co-cured laminate under optical magnification. This report will discuss the initial work performed regarding formulation of the epoxy resin system using calorimetry, rheology, and mechanical testing.

Palmieri, Frank L.↗

Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

NREL assessed the supply chain and workforce considerations for the OCG-Wind floater technology, a floating semi-submersible offshore wind substructure, as well sharing vessel needs to inform their installation strategy. This technical assistance was in support of the FLoating Offshore Wind ReadINess (FLOWIN) Prize Phase 2 submission. NREL provided an assessment of domestic supplier capabilities for the main components of their floating offshore wind platform design and analyzed US regional and national supply chain constraints and gaps. Thirteen interviews with companies including steel distributors, forges, foundries, ports, large component fabricators, subcomponent fabricators, and secondary suppliers provided key insights such as 1) assembly ports are the key infrastructure barrier standing in the way of unlocking the domestic assembly and component fabrication for steel-based FOW platforms, 2) domestic steel producers can supply the types and quantities of steel necessary for FOW platforms, and 3) coordination between stakeholders will be a vital part of successfully developing the supply chain and infrastructure needed to domestically produce FOW platforms. In the workforce assessment, NREL documented a step-by-step approach to conduct a place-based assessment of the foundational workforce consideration for recruiting, upskilling, and retaining a workforce, such as supportive local and state policy, nearby education and training programs, and existing relevant industry. This approach was applied to Tacoma, Washington. Tacoma was indicated to have the potential be a successful location for fabrication and assembly of floating offshore wind energy in terms of workforce development. To share data on vessel requirements to install the OCG-Wind floater, NREL compiled resources that help answer the questions related to anchor handling tug vessels, shared a database of cable laying vessels, and answered questions on complying with the Jones Act.

17 WIND ENERGY↗

Seal ring installation tool

A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

Haselmaier, L. Haynes↗

Construction and control of large space structures

Recent NASA research efforts on space construction are reviewed. Preliminary results of the EASE/ACCESS Shuttle experiments are discussed. A 45-foot beam was constructed on orbit in 30 minutes using a manual assembly technique at a work station. A large tetrahedron was constructed several times using a free floating technique. The capability of repair, utilities installation, and handling the structures using a mobile foot restraint on the RMS was also demonstrated. Implications of the experiments for space station are presented. Models of 5-meter space station structure together with neutral buoyancy simulations suggest manual assembly techniques are feasible. Selected research on control of flexible structures is discussed.

Card, M. F.↗

Construction and control of large space structures

Recent NASA research efforts on space construction are reviewed. Preliminary results of the EASE/ACCESS Shuttle experiments are discussed. A 45-foot beam was constructed on orbit in 30 minutes using a manual assembly technique at a work station. A large tetrahedron was constructed several times using a free floating technique. The capability of repair, utilities installation, and handling the structures using a mobile foot restraint on the RMS was also demonstrated. Implications of the experiments for Space Station are presented. Models of 5-meter Space Station structure together with neutral buoyancy simulations suggest manual assembly techniques are feasible. Selected research on control of flexible structures is discussed. To support planned flight experiments, studies of the design and optimal placement of distributed active dampers are underway.

Card, M. F.↗

Viper cabin-fuselage structural design concept with engine installation and wing structural design

This report describes the process and considerations in designing the cabin, nose, drive shaft, and wing assemblies for the 'Viper' concept aircraft. Interfaces of these assemblies, as well as interfaces with the sections of the aircraft aft of the cabin, are also discussed. The results of the design process are included. The goal of this project is to provide a structural design which complies with FAR 23 requirements regarding occupant safety, emergency landing loads, and maneuvering loads. The design must also address the interfaces of the various systems in the cabin, nose, and wing, including the drive shaft, venting, vacuum, electrical, fuel, and control systems. Interfaces between the cabin assembly and the wing carrythrough and empennage assemblies were required, as well. In the design of the wing assemblies, consistency with the existing cabin design was required. The major areas considered in this report are materials and construction, loading, maintenance, environmental considerations, wing assembly fatigue, and weight. The first three areas are developed separately for the nose, cabin, drive shaft, and wing assemblies, while the last three are discussed for the entire design. For each assembly, loading calculations were performed to determine the proper sizing of major load carrying components. Table 1.0 lists the resulting margins of safety for these key components, along with the types of the loads involved, and the page number upon which they are discussed.

Marchesseault, B.↗

Progress of the laser ion source upgrade (LION2) for RHIC and NSRL program at Brookhaven National Laboratory

At Brookhaven National Laboratory (BNL), the LION2 ion source is being constructed to replace an existing laser ion ablation ion source (LIS) at the EBIS facility, which provides heavy ion beams of multiple ion species for the operation of NASA Space Radiation Laboratory (NSRL) and Relativistic Heavy Ion Collider (RHIC). The LION1 ion source currently provides singly charged ions of Li, B, C, O, Al, Si, Ca, Ti, Fe, Cu, Zr, Nb, Ag, Tb, Ta, W, Au, Bi, and Th with a rapid-species-change capability. An electron beam ion source, Extended-EBIS captures, confines, and ionizes the ions to high charge state, suitable for injection and acceleration by an RFQ accelerator. Typically, single pulses of the LIS ion species for NSRL are changed sequentially during Galactic Cosmic Ray experiments, while multiple pulses of a given ion beam are provided quasi-simultaneously for RHIC. LION2 will have the same capability of the rapid-species-change with improved beam performance and reliability. LION2 is being constructed in a remote assembly location and is expected to finish in December 2023. The removal of LION1 and installation of LION2 is planned during the December 2023 or summer 2024 shutdown.

43 PARTICLE ACCELERATORS↗

Technology Innovation Pathways for Distributed Wind Balance-of-System Cost Reduction

This exploratory analysis characterizes the balance-of-system (BOS) cost reduction opportunity for small, commercial, medium, and large distributed wind systems. To do this, we used the National Renewable Energy Laboratory’s (NREL’s) Land-based Balance of System Systems Engineering (LandBOSSE) model (Eberle et al. 2019). This model calculates the capital expenditures (CapEx) associated with installation and the system components (e.g., foundation and electrical infrastructure) other than the rotor nacelle assembly and tower. Then, building on the cost reduction potential assessment, we provide a more qualitative evaluation of prospective technology innovation concepts that may enable realization of those cost reductions for distributed wind systems.

17 WIND ENERGY↗

Assessment of Light-Duty Plug-in Electric Vehicles in the United States, 2010 – 2021

The number of plug-in electric vehicles (PEVs) sold in the United States has consistently grown since 2010, reaching 4% of the light-duty vehicle market in 2021. This report examines how the characteristics for these PEVs has changed over this decade, evaluating range, energy efficiency, costs, and performance. Given the vehicle characteristics, this report estimates miles driven, electricity consumption, petroleum reduction, and greenhouse gas emissions attributable to electric vehicles. This report also explores vehicle manufacturing and battery production, considering supply chains from battery cells to assembly. Over 2.1 million PEVs have been sold in the United States through December 2021, with 1.3 million of these all fully-electric battery electric vehicles (BEV), and 800,000 plug-in hybrid electric vehicles (PHEV) which have the capability of using gasoline. The sales-weighted average range for BEVs reached 290 miles in 2021 and 28 miles for PHEVs. We estimate that electric vehicles have driven 68 billion miles on electricity since 2010, thereby reducing national gasoline consumption by 0.54% in 2021 and 2.5 billion gallons cumulatively through 2021. In 2021, PEVs used 6.1 terawatt-hours of electricity to drive 19.1 billion miles, offsetting 700 million gallons of gasoline. We find that this fuel switching reduced consumer fuel costs by $1.3 billion in 2021. Since 2010, 65% of PEVs sold in the United States have been assembled domestically, and over 110 gigawatt-hours of lithium-ion batteries have been installed in vehicles to date.

25 ENERGY STORAGE↗