Search NASA⌕ Search

SEARCH · Search NASA

Results for “James Webb Space Telescop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Integrated Modeling Activities for the James Webb Space Telescope: Structural-Thermal-Optical Analysis

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal-optical, often referred to as STOP, analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. Temperatures predicted using geometric and thermal math models are mapped to a structural finite element model in order to predict thermally induced deformations. Motions and deformations at optical surfaces are then input to optical models, and optical performance is predicted using either an optical ray trace or a linear optical analysis tool. In addition to baseline performance predictions, a process for performing sensitivity studies to assess modeling uncertainties is described.

Johnston, John D.↗

James Webb Space Telescope Studies of Dark Energy

The Hubble Space Telescope (HST) has contributed significantly to studies of dark energy. It was used to find the first evidence of deceleration at z=1.8 (Riess et al. 2001) through the serendipitous discovery of a type 1a supernova (SN1a) in the Hubble Deep Field. The discovery of deceleration at z greater than 1 was confirmation that the apparent acceleration at low redshift (Riess et al. 1998; Perlmutter et al. 1999) was due to dark energy rather than observational or astrophysical effects such as systematic errors, evolution in the SN1a population or intergalactic dust. The GOODS project and associated follow-up discovered 21 SN1a, expanding on this result (Riess et al. 2007). HST has also been used to constrain cosmological parameters and dark energy through weak lensing measurements in the COSMOS survey (Massey et al 2007; Schrabback et al 2009) and strong gravitational lensing with measured time delays (Suyu et al 2010). Constraints on dark energy are often parameterized as the equation of state, w = P/p. For the cosmological constant model, w = -1 at all times; other models predict a change with time, sometimes parameterized generally as w(a) or approximated as w(sub 0)+(1-a)w(sub a), where a = (1+z)(sup -1) is the scale factor of the universe relative to its current scale. Dark energy can be constrained through several measurements. Standard candles, such as SN1a, provide a direct measurement of the luminosity distance as a function of redshift, which can be converted to H(z), the change in the Hubble constant with redshift. An analysis of weak lensing in a galaxy field can be used to derive the angular-diameter distance from the weak-lensing equation and to measure the power spectrum of dark-matter halos, which constrains the growth of structure in the Universe. Baryonic acoustic oscillations (BAO), imprinted on the distribution of matter at recombination, provide a standard rod for measuring the cosmological geometry. Strong gravitational lensing of a time-variable source gives the angular diameter distance through measured time delays of multiple images. Finally, the growth of structure can also be constrained by measuring the mass of the largest galaxy clusters over cosmic time. HST has contributed to the study of dark energy through SN1a and gravitational lensing, as discussed above. HST has also helped to characterize galaxy clusters and the HST-measured constraints on the current Hubble constant H(sub 0) are relevant to the interpretation of dark energy measurements (Riess et al 2009a). HST has not been used to constrain BAO as the large number of galaxy redshifts required, of order 100 million, is poorly matched to HST's capabilities. As the successor to HST, the James Webb Space Telescope (JWST; Gardner et al 2006) will continue and extend HST's dark energy work in several ways.

Gardner, Jonathan P.↗

Seasonal Variations of the James Webb Space Telescope Orbital Dynamics

LV separation state is fixed ECEF, so inertial states vary with hourly, daily, monthly, and yearly frequencies The net effect of all frequencies leads to significant variations in orbit geometry Injection states can be matched with invariant manifolds of periodic orbits in the CR3BP to explain observed final orbit.

Three Body Problem↗

The James Webb Space Telescope: Observatory Status and the Path to Launch

JWST will carry out transformative science from the very early universe and across cosmic time. JWST OTE and ISIM have been combined to form OTIS, which will commence environmental testing. The full JWST team has made tremendous progress since the last AT+I meeting in 2014.JWST on track following 2011 replan and remains on schedule to launch in October 2018.

OTE↗

James Webb Space Telescope Fuel Slosh Estimation

The mitigation of fuel slosh in microgravity environments is a pressing matter for the control of both manned and unmanned spacecraft. This paper investigates the attitude perturbations caused by fuel slosh aboard the James Webb Space Telescope (JWST). We develop a dynamical model to parse these perturbations from slew telemetry data. This model uses special Euclidean group SE(3) as well as a novel, N-body variational integrator. The enhanced ability to validate fuel slosh models offers the reduction of settling time after slew operations and, accordingly, the maximization of available science time.

GN&C↗

Fabrication of Microshutter Arrays for James Webb Space Telescope

Two-dimensional MEMS microshutter arrays are being developed at NASA Goddard Space Flight Center for use in the near-infrared region on the Next Generation Space Telescope (NGST). The microshutter arrays are designed for the selective transmission of light with high efficiency and high contrast. The NGST environment requires cryogenic operation at 45K. Microshutter arrays are fabricated out of silicon-oxide-insulated (SOI) silicon wafers. Arrays are close-packed silicon nitride membranes with a pixel size of 100x100 microns. Individual shutters are patterned with a torsion flexure permitting shutters to open 90 degrees with a minimized mechanical stress concentration. The mechanical shutter arrays are fabricated using MEMS technologies. The processing includes a multi-layer metal deposition and patterning of shutter electrodes and magnetic pads, reactive ion etching (RE) of the front side to form shutters out of the nitride membrane, an anisotropic back-etch for wafer thinning, followed by a deep RIE (DRIE) back-etch down to the nitride shutter membrane to form frames and relieve shutters from the silicon substrate. An additional metal deposition and patterning is used to form back electrodes. Shutters are actuated using a magnetic force and latched using an electrostatic force.

Li, Mary J.↗

Integrated Modeling Activities for the James Webb Space Telescope (JWST): Structural-Thermal-Optical Analysis

This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal- optical, often referred to as "STOP", analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. The paper begins an overview of multi-disciplinary engineering analysis, or integrated modeling, which is a critical element of the JWST mission. The STOP analysis process is then described. This process consists of the following steps: thermal analysis, structural analysis, and optical analysis. Temperatures predicted using geometric and thermal math models are mapped to the structural finite element model in order to predict thermally-induced deformations. Motions and deformations at optical surfaces are input to optical models and optical performance is predicted using either an optical ray trace or WFE estimation techniques based on prior ray traces or first order optics. Following the discussion of the analysis process, results based on models representing the design at the time of the System Requirements Review. In addition to baseline performance predictions, sensitivity studies are performed to assess modeling uncertainties. Of particular interest is the sensitivity of optical performance to uncertainties in temperature predictions and variations in metal properties. The paper concludes with a discussion of modeling uncertainty as it pertains to STOP analysis.

Johnston, John D.↗

Optical Modeling Activities for the James Webb Space Telescope (JWST) Project: Determining Image Motion and Wavefront Error Over an Extended Field of View with a Segmented Optical System - II

This is part two of a series on the optical modeling activities for JWST. Starting with the linear optical model discussed in part one, we develop centroid and wavefront error sensitivities for the special case of a segmented optical system such as JWST, where the primary mirror consists of 18 individual segments. Our approach extends standard sensitivity matrix methods used for systems consisting of monolithic optics, where the image motion is approximated by averaging ray coordinates at the image and residual wavefront error is determined with global tip/tilt removed. We develop an exact formulation using the linear optical model, and extend it to cover multiple field points for performance prediction at each instrument aboard JWST. This optical model is then driven by thermal and dynamic structural perturbations in an integrated modeling environment. Results are presented.

Howard, Joseph M.↗

James Webb Space Telescope - L2 Communications for Science Data Processing

JWST is the first NASA mission at the second Lagrange point (L2) to identify the need for data rates higher than 10 megabits per second (Mbps). JWST will produce approximately 235 Gigabits of science data every day that will be downlinked to the Deep Space Network (DSN). To get the data rates desired required moving away from X-band frequencies to Ka-band frequencies. To accomplish this transition, the DSN is upgrading its infrastructure. This new range of frequencies are becoming the new standard for high data rate science missions at L2. With the new frequency range, the issues of alternatives antenna deployment, off nominal scenarios, NASA implementation of the Ka-band 26 GHz, and navigation requirements will be discussed in this paper. JWST is also using Consultative Committee for Space Data Systems (CCSDS) standard process for reliable file transfer using CCSDS File Delivery Protocol (CFDP). For JWST the use of the CFDP protocol provides level zero processing at the DSN site. This paper will address NASA implementations of Ground Stations in support of Ka-band 26 GHz and lesson learned from implementing a file base (CFDP) protocol operational system.

Johns, Alan↗

From the Big Bang to the Nobel Prize and on to the James Webb Space Telescope

The history of the universe in a nutshell, from the Big Bang to now. and on to the future - John Mather will tell the story of how we got here, how the Universe began with a Big Bang, how it could have produced an Earth where sentient beings can live, and how those beings are discovering their history. Mather was Project Scientist for NASA's Cosmic Background Explorer (COBE) satellite, which measured the spectrum (the color) of the heat radiation from the Big Bang, discovered hot and cold spots in that radiation, and hunted for the first objects that formed after the great explosion. He will explain Einstein's biggest mistake, show how Edwin Hubble discovered the expansion of the univerre, how the COBE mission was built, and how the COBE data support the Big Bang theory. He will also show NASA's plans for the next great telescope in space, the Jarnes Webb Space Telescope. It will look even farther back in time than the Hubble Space Telescope, and will look inside the dusty cocoons where rtars and planets are being born today. Planned for launch in 2013, it may lead to another Nobel Prize for some lucky observer.

Mather, John C.↗

James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers

JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.

Gardner, Jonathan P.↗

James Webb Space Telescope Project Overview and Status for the SPIE

Often described as the successor to the Hubble Space Telescope, the JWST will serve astronomers world-wide in much the same way: Science & mission operations managed by the Space Telescope Science Institute The science investigations performed by the JWST will be determined by the General Observer community. Observing time allocated through annual peer-reviewed proposal cycles Four science themes have been defined by a succession of international community working groups to guide engineering development of the JWST: a) Identify the first bright objects that formed in the early Universe, and follow the ionization history. b) Determine how galaxies and dark matter, including gas, stars, metals, overall morphology and active nuclei evolved to the present day. c) Observe the birth and early development of stars and the formation of planets. d) Study the physical and chemical properties of solar systems (including our own) and where the building blocks of life may be present.

Sabelhaus, Phillip A.↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗