Search NASA⌕ Search

SEARCH · Search NASA

Results for “NEUTRON SCIENCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Neutron inelastic scattering and reactions in natural Pb as a background in neutrinoless double-{beta}-decay experiments

Inelastic neutron scattering and reactions on Pb isotopes can result in {gamma} rays near the signature end-point energy in a number of {beta}{beta} isotopes. In particular, there are {gamma}-ray transitions in {sup 206,207,208}Pb that might produce energy deposits at the {sup 76}GeQ{sub {beta}}{sub {beta}} in Ge detectors used for 0{nu}{beta}{beta} searches. The levels that produce these {gamma} rays can be excited by (n,n{sup '}{gamma}) or (n,xn{gamma}) reactions, but the cross sections are small and previously unmeasured. This work uses the pulsed neutron beam at the Los Alamos Neutron Science Center to directly measure reactions of interest to {beta}{beta}-decay experiments. The cross section on {sup nat}Pb to produce the 2041-keV {gamma} ray from {sup 206}Pb is measured to be 3.6 {+-} 0.7 (stat.) {+-} 0.3 (syst.) mb at {approx_equal}9.6 MeV. The cross section on {sup nat}Pb to produce the 3061,3062-keV {gamma} rays from {sup 207}Pb and {sup 208}Pb is measured to be 3.9 {+-} 0.8 (stat.) {+-} 0.4 (syst.) mb at the same energy. We report cross sections or place upper limits on the cross sections for exciting some other levels in Pb that have transition energies corresponding to Q{sub {beta}}{sub {beta}} in other {beta}{beta} isotopes.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Effect of ion excape velocity and conversion surface material on H- production

According to generally accepted models surface production of negative ions depends on ion escape velocity and work function of the surface. We have conducted an experimental study addressing the role of the ion escape velocity on H{sup -} production. A converter-type ion source at Los Alamos Neutron Science Center was employed for the experiment. The ion escape velocity was changed by varying the bias voltage of the converter electrode. It was observed that due to enhanced stripping of H{sup -} no direct gain of extracted beam current can be achieved by increasing the converter voltage. At the same time the conversion efficiency of H{sup -} was observed to vary with converter voltage and follow the existing theories in qualitative manner. We discuss the role of surface material on H{sup -} formation probability and present calculations predicting relative H{sup -} yields from different cesiated surfaces. These calculations are compared with experimental observations from different types of H{sup -} ion sources. The effects caused by varying cesium coverage are also discussed. Finally, we present a novel idea of utilizing materials exhibiting so-called negative electron affinity in H{sup -}/D{sup -} production under UV-light exposure.

43 PARTICLE ACCELERATORS↗

First 3{sup -} excited state of {sup 56}Fe

There is no reliable evidence for the existence of the 3.076 MeV (3{sup -}) level adopted in the ENSDF evaluation for {sup 56}Fe although it has been reported in a few experiments. Previous reports of the observation of this level appear to be based on an incorrect assignment in early (e,e{sup '}) work. Recent neutron inelastic scattering measurements by Demidov et al. [Phys. At. Nucl. 67, 1884, (2004)] show that the assigned {gamma}-ray decay of this state does not occur at a level consistent with known properties of inelastic scattering. In the present work the {sup 56}Fe(n,n{sup '}{gamma}) reaction was used to populate excited states in {sup 56}Fe. Neutrons in the energy range from 1 to 250 MeV were provided by the pulsed neutron source of the Los Alamos Neutron Science Center's WNR facility. Deexciting {gamma} rays were detected with the GEANIE spectrometer, a Compton suppressed array of 26 Ge detectors. The {gamma}-{gamma} data obtained with GEANIE were used to establish coincidence relations between transitions. All previously reported levels up to E{sub x}=3.6 MeV excitation energy were observed except for the 3.076 MeV (3{sup -}) level. The 991- and 2229-keV transitions, previously reported to deexcite this level, were not observed in the {gamma}-{gamma} coincidence data obtained in the present experiment. The present work supports the assignment of the 4509.6 keV level as the first 3{sup -} excited state in {sup 56}Fe by observation of two previously known transitions deexciting this state.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Wire Scanner Beam Profile Measurements: LANSCE Facility Beam Development

The Los Alamos Neutron Science Center (LANSCE) is replacing Wire Scanner (WS) beam profile measurement systems. Three beam development tests have taken place to test the new wire scanners under beam conditions. These beam development tests have integrated the WS actuator, cable plant, electronics processors and associated software and have used H{sup -} beams of different beam energy and current conditions. In addition, the WS measurement-system beam tests verified actuator control systems for minimum profile bin repeatability and speed, checked for actuator backlash and positional stability, tested the replacement of simple broadband potentiometers with narrow band resolvers, and tested resolver use with National Instruments Compact Reconfigurable Input and Output (cRIO) Virtual Instrumentation. These beam tests also have verified how trans-impedance amplifiers react with various types of beam line background noise and how noise currents were not generated. This paper will describe these beam development tests and show some resulting data.

43 PARTICLE ACCELERATORS↗

Test of the statistical model in {sup 96}Mo with the BaF{sub 2}{gamma} calorimeter DANCE array

The {gamma}-ray cascades following the {sup 95}Mo(n,{gamma}){sup 96}Mo reaction were studied with the {gamma} calorimeter DANCE (Detector for Advanced Neutron Capture Experiments) consisting of 160 BaF{sub 2} scintillation detectors at the Los Alamos Neutron Science Center. The {gamma}-ray energy spectra for different multiplicities were measured for s- and p-wave resonances below 2 keV. The shapes of these spectra were found to be in very good agreement with simulations using the DICEBOX statistical model code. The relevant model parameters used for the level density and photon strength functions were identical with those that provided the best fit of the data from a recent measurement of the thermal {sup 95}Mo(n,{gamma}){sup 96}Mo reaction with the two-step-cascade method. The reported results strongly suggest that the extreme statistical model works very well in the mass region near A=100.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Mechanical Design and Evaluation of the MP-11-Like Wire Scanner Prototype

A wire scanner (WS) is a linearly actuated diagnostic device that uses fiber wires (such as Tungsten or Silicon Carbide) to obtain the position and intensity profile of the proton beam at the Los Alamos Neutron Science Center (LANSCE) particle accelerator. LANSCE will be installing approximately 86 new WS in the near future as part of the LANSCE Risk Mitigation project. These 86 new WS include the replacement of many current WS and some newly added to the current linear accelerator and other beam lines. The reason for the replacement and addition of WS is that many of the existing actuators have parts that are no longer readily available and are difficult to find, thus making maintenance very difficult. One of the main goals is to construct the new WS with as many commercially-available-off-the-shelf components as possible. In addition, faster beam scans (both mechanically and in term of data acquisition) are desired for better operation of the accelerator. This document outlines the mechanical design of the new MP-11-like WS prototype and compares it to a previously built and tested SNS-like WS prototype.

42 ENGINEERING↗

PHELIX for flux compression studies

PHELIX (Precision High Energy-density Liner Implosion eXperiment) is a concept for studying electromagnetic implosions using proton radiography. This approach requires a portable pulsed power and liner implosion apparatus that can be operated in conjunction with an 800 MeV proton beam at the Los Alamos Neutron Science Center. The high resolution (< 100 micron) provided by proton radiography combined with similar precision of liner implosions driven electromagnetically can permit close comparisons of multi-frame experimental data and numerical simulations within a single dynamic event. To achieve a portable implosion system for use at high energy-density in a proton laboratory area requires sub-megajoule energies applied to implosions only a few cms in radial and axial dimension. The associated inductance changes are therefore relatively modest, so a current step-up transformer arrangement is employed to avoid excessive loss to parasitic inductances that are relatively large for low-energy banks comprising only several capacitors and switches. We describe the design, construction and operation of the PHELIX system and discuss application to liner-driven, magnetic flux compression experiments. For the latter, the ability of strong magnetic fields to deflect the proton beam may offer a novel technique for measurement of field distributions near perturbed surfaces.

42 ENGINEERING↗

Beam Position and Phase Monitors Characterized and Installed in the LANSCE CCL

The Los Alamos Neutron Science Center - Risk Mitigation Project is in the process of replacing older Coupled-Cavity-Linac (CCL) Beam-Position Monitors (BPMs) with newer Beam Position and Phase Monitors (BPPMs) and their associated electronics and cable plants. In many locations, these older BPMs include a separate Delta-T loop for measuring the beam's central phase and energy. Thirty-one BPPMs have been installed and many have monitored the charged particle beam. The installation of these newer BPPMs is the first step to installing complete BPPM measurement systems. Prior to the installation, a characterization of each BPPM took place. The characterization procedure includes a mechanical inspection, a vacuum testing, and associated electrical tests. The BPPM electrical tests for all four electrodes include contact resistance measurements, Time Domain Reflectometer (TDR) measurements, relative 201.25-MHz phase measurements, and finally a set of position-sensitive mapping measurements were performed which included associated fitting routines. This paper will show these data for a typical characterized BPPM.

43 PARTICLE ACCELERATORS↗

Wire Scanner Beam Profile Measurements for the LANSCE Facility

The Los Alamos Neutron Science Center (LANSCE) is replacing beam profile measurement systems, commonly known as Wire Scanners (WS). Using the principal of secondary electron emission, the WS measurement system moves a wire or fiber across an impinging particle beam, sampling a projected transverse-beam distribution. Because existing WS actuators and electronic components are either no longer manufactured or home-built with antiquated parts, a new WS beam profile measurement is being designed, fabricated, and tested. The goals for these new WS's include using off-the-shelf components while eliminating antiquated components, providing quick operation while allowing for easy maintainability, and tolerating external radioactivation. The WS measurement system consists of beam line actuators, a cable plant, an electronics processor chassis, and software located both in the electronics chassis (National Instruments LabVIEW) and in the Central Control Room (EPICS-based client software). This WS measurement system will measure Hand H{sup +} LANSCE-facility beams and will also measure less common beams. This paper describes these WS measurement systems.

43 PARTICLE ACCELERATORS↗

New High Power Test Facility for VHF Power Amplifiers at LANSCE

A new test facility was designed and constructed at Los Alamos Neutron Science Center (LANSCE) for testing the Thales TH628 Diacrode{sup R} and TH781 tetrode power amplifiers. Anode power requirements for the TH628 are 28 kV DC, with peak currents of 190 Amperes in long pulses. A charging power supply was obtained by reconfiguring a 2 MW beam power supply remaining from another project. A traditional ignitron crowbar was designed to rapidly discharge the 88 kJ stored energy. The anode power supply was extensively tested using a pulsed tetrode switch and resistor load. A new Fast Protect and Monitor System (FPMS) was designed to take samples of RF reflected power, anode HV, and various tube currents, with outputs to quench the HV charging supply, remove RF drive and disable the conduction bias pulse to the grid of each tube during fault events. The entire test stand is controlled with a programmable logic controller (PLC), for normal startup sequencing and timing, protection against loss of cooling, and provision for operator GUI.

Accelerator Design, Technology, and Operations↗

Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclear Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Mechanical Design and Fabrication of a New RF Power Amplifier for LANSCE

A Full-scale prototype of a new 201.25 MHz RF Final Power Amplifier (FPA) for Los Alamos Neutron Science Center (LANSCE) has been designed, fabricated, assembled and installed in the test facility. This prototype was successfully tested and met the physics and electronics design criteria. The team faced design and manufacturing challenges, having a goal to produce 2 MW peak power at 13% duty factor, at the elevation of over 2 km in Los Alamos. The mechanical design of the final power amplifier was built around a Thales TH628 Diacrode{sup R}, a state-of-art tetrode power tube. The main structure includes Input circuit, Output circuit, Grid decoupling circuit, Output coupler, Tuning pistons, and a cooling system. Many types of material were utilized to make this new RF amplifier. The fabrication processes of the key components were completed in the Prototype Fabrication Division shop at Los Alamos National Laboratory. The critical plating procedures were achieved by private industry. The FPA mass is nearly 600 kg and installed in a beam structural support stand. In this paper, we summarize the FPA design basis and fabrication, plating, and assembly process steps with necessary lifting and handling fixtures. In addition, to ensure the quality of the FPA support structure a finite element analysis with seismic design forces has also been carried out.

Accelerator Design, Technology, and Operations↗

RF Design and Operating Results for a New 201.25 MHz RF Power Amplifier for LANSCE

A prototype VHF RF Final Power Amplifier (FPA) for Los Alamos Neutron Science Center (LANSCE) has been designed, fabricated, and tested. The cavity amplifier has met the goals of generating 2.5 MW peak and 260 kW of average power, at an elevation of 2.1 km. It was designed to use a Thales TH628 Diacrode{sup R}, a state-of-art tetrode power tube that is double-ended, providing roughly twice the power of a conventional tetrode. The amplifier is designed with tunable input and output transmission line cavity circuits, a grid decoupling circuit, an adjustable output coupler, TE mode suppressors, blocking, bypassing and decoupling capacitors, and a cooling system. The tube is connected in a full wavelength output circuit, with the lower main tuner situated 3/4{lambda} from the central electron beam region in the tube and the upper slave tuner 1/4{lambda} from the same point. We summarize the design processes and features of the FPA along with significant test results. A pair of production amplifiers are planned to be power-combined and installed at the LANSCE DTL to return operation to full beam duty factor.

Accelerator Design, Technology, and Operations↗

First Results with a Surface Conversion H{sup -} Ion Source Based on Helicon Wave Mode-Driven Plasma Discharge

The currently employed converter-type negative ion source at Los Alamos Neutron Science Center (LANSCE) is based on cesium enhanced surface production of H{sup -} ion beams in a filament-driven discharge. The extracted H{sup -} beam current is limited by the achievable plasma density, which depends primarily on the electron emission current from the filaments. The emission current can be increased by increasing the filament temperature but, unfortunately, this leads not only to shorter filament lifetime but also to an increase in metal evaporation from the filament, which degrades the performance of the H{sup -} conversion surface. In order to overcome these limitations we have designed and tested a prototype of a surface conversion H{sup -} ion source, based on excitation of helicon plasma wave mode with an external antenna. The source has been operated with and without cesium injection. An H{sup -} beam current of over 12 mA has been transported through the low energy beam transport of the LANSCE ion source test stand. The results of these experiments and the effects of different source parameters on the extracted beam current are presented. The limitations of the source prototype are discussed and future improvements are proposed based on the experimental observations.

43 PARTICLE ACCELERATORS↗

Beam Position and Phase Monitor - Wire Mapping System

The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

43 PARTICLE ACCELERATORS↗

Measurement of the {sup 157}Gd(n,{gamma}) reaction with the DANCE {gamma} calorimeter array

The {sup 157}Gd(n,{gamma}) reaction was measured with the DANCE {gamma} calorimeter (consisting of 160 BaF{sub 2} scintillation detectors) at the Los Alamos Neutron Science Center. The multiplicity distributions of the {gamma} decay were used to determine the resonance spins up to E{sub n}=300 eV. The {gamma}-ray energy spectra for different multiplicities were measured for the s-wave resonances. The shapes of these spectra were compared with simulations based on the use of the DICEBOX statistical model code. Simulations showed that the scissors mode is required not only for the ground-state transitions but also for transitions between excited states.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

LANSCE wire scanning diagnostics device mechanical design

The Los Alamos Neutron Science Center (LANSCE) is one of the major experimental science facilities at the Los Alamos National Laboratory (LANL). The core of LANSCE's work lies in the operation of a powerful linear accelerator, which accelerates protons up to 84% the speed oflight. These protons are used for a variety of purposes, including materials testing, weapons research and isotopes production. To assist in guiding the proton beam, a series of over one hundred wire scanners are used to measure the beam profile at various locations along the half-mile length of the particle accelerator. A wire scanner is an electro-mechanical device that moves a set of wires through a particle beam and measures the secondary emissions from the resulting beam-wire interaction to obtain beam intensity information. When supplemented with data from a position sensor, this information is used to determine the cross-sectional profile of the beam. This measurement allows beam operators to adjust parameters such as acceleration, beam steering, and focus to ensure that the beam reaches its destination as effectively as possible. Some of the current wire scanners are nearly forty years old and are becoming obsolete. The problem with current wire scanners comes in the difficulty of maintenance and reliability. The designs of these wire scanners vary making it difficult to keep spare parts that would work on all designs. Also many of the components are custom built or out-dated technology and are no longer in production.

43 PARTICLE ACCELERATORS↗

The SNS/HFIR Web Portal System – How Can it Help Me?

Abstract. In a busy world, continuing with the status-quo, to do things the way we are already familiar, often seems to be the most efficient way to conduct our work. We look for the value-add to decide if investing in a new method is worth the effort. How shall we evaluate if we have reached this tipping point for change? For contemporary researchers, understanding the properties of the data is a good starting point. The new generation of neutron scattering instruments being built are higher resolution and produce one or more orders of magnitude larger data than the previous generation of instruments. For instance, we have grown out of being able to perform some important tasks with our laptops – the data are too big and the computations would simply take too long. These large datasets can be problematic as facility users now begin to grapple with many of the same issues faced by more established computing communities. These issues include data access, management, and movement, data format standards, distributed computing, and collaboration among others. The Neutron Science Portal has been architected, designed, and implemented to provide users with an easy-to-use interface for managing and processing data, while also keeping an eye on meeting modern cybersecurity requirements imposed on institutions. The cost of entry for users has been lowered by utilizing a web interface providing access to backend portal resources. Users can browse or search for data which they are allowed to see, data reduction applications can be run without having to load the software, sample activation calculations can be performed for SNS and HFIR beamlines, McStas simulations can be run on TeraGrid and ORNL computers, and advanced analysis applications such as those being produced by the DANSE project can be run. Behind the scenes is a “live cataloging” system which automatically catalogs and archives experiment data via the data management system, and provides proposal team members access to their experiment data. The complexity of data movement and utilizing distributed computing resources has been taken care on behalf of users. Collaboration is facilitated by providing users a read/writeable common area, shared across all experiment team members. To date, these shared areas are the fastest growing data spaces. The portal currently has over 370 registered users, almost 5TB of experiment and user data, approximately 660K files cataloged, and had almost 10,000 unique visits last year. Future directions for enhancing portal robustness include examining how to mirror data and portal services, better facilitation of collaborations via virtual organizations, enhancing disconnected service via “thick client” applications, and better inter-facility connectivity to support cross-cutting research. The portal has established itself in the SNS/HFIR user community, and the development team strives to continue to improve the quality of features and services provided in order to better serve the community.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗