Search NASA⌕ Search

SEARCH · Search NASA

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

After the hurricane: Validating a resilience assessment methodology

With increasing utility grid outages in the United States, there is growing interest in assessing risk and developing mitigation strategies to reduce the impact of grid outages. Working with the U.S. Air Force, the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a replicable energy resilience assessment methodology and investment decision tool to: (1) identify and score hazards and vulnerabilities at the site level; (2) analyze risks to energy infrastructure; and (3) identify and prioritize energy resilience investments. This work improves on existing resilience assessment methodologies and tools by combining a bottom-up, all-hazards assessment methodology with top-down geographic information system mapping capabilities to provide an innovative, dynamic tool for identifying and prioritizing actionable solutions. This process combines probabilistic forecasting with an iterative approach for continuously updating and reassessing risks to address temporal dynamism. Relationships among systems are modeled and visualized to estimate the effectiveness of resilience actions across multiple interdependent systems and inform financial priorities through cost-difficulty-impact trade-offs. The approach is validated in a case study at Tyndall Air Force Base (AFB) in Florida, which experienced a Category 5 hurricane in 2018. The risks and mitigation strategies identified pre-hurricane are compared with post-hurricane, realized impacts. The assessment effectively identifies risks and actions to increase site energy resilience, but the methodology can be enhanced though greater consideration of the interdependencies between the energy system and related systems like transportation, communication, and food/water systems, which impact the recovery of the energy system and the base.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exploring Wildfire & Energy data toward State Prioritization Index (WESPI)

Energy infrastructure can both induce and suffer risks from wildfires ranging from direct damage to energy assets such as substations and power lines to Public Safety Power Shutoffs. Recent wildfire events underscore the need for data-driven approaches that help states and utilities proactively plan for wildfire risk. Existing national tools such as Federal Emergency Management Agency (FEMA)’s National Risk Index (NRI) are valuable for community hazard planning. However, they are less suited for energy infrastructure, as they emphasize population and building exposure rather than system vulnerabilities. In this paper, we explore relationships between energy and wildfire data and present a Wildfire-Energy State Prioritization Index (WESPI). Our methodology combines data from the US Forest Service’s Fire Simulation (FSIM) dataset with energy resilience metrics, historical fire incidents, and geospatial data on transmission lines and fire stations. Correlation analyses suggest that FSIM burn probability is more strongly associated with power outage metrics (ρ = 0.32) than NRI wildfire frequency, and counties with a greater density of fire stations experience more frequent, but less intense wildfires. We further leverage data for burn probability, transmission line density, and fire station density to develop a Wildfire-Energy State Prioritization Index (WESPI) to highlight counties where wildfire hazard, infrastructure exposure, and limited suppression capacity converge. The index provides a consistent, scalable framework for state energy offices and utilities to screen counties for vegetation management, optimization of outage management system deployment, and to inform wildfire mitigation plans.

Critical infrastructure↗

Optimizing Service Restoration in Distribution Systems With Uncertain Repair Time and Demand

This paper proposes a novel method to co-optimize the distribution system operation and repair crew routing for outage restoration after extreme weather events. A two-stage stochastic mixed integer linear program is developed. The first stage is to dispatch the repair crews to the damaged components. The second stage is distribution system restoration using distributed generators, and reconfiguration. We consider demand uncertainty in terms of a truncated normal forecast error distribution, and model the uncertainty of the repair time using a lognormal distribution. A new decomposition approach, combined with the progressive hedging algorithm, is developed for solving large-scale outage management problems in an effective and timely manner. Furthermore, the proposed method is validated on modified IEEE 34- and 8500-bus distribution test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2015 Summary Report on Industrial and Regulatory Engagement Activities

The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a Utility Working Group (UWG), composed of utility representatives that participate in formal meetings and bi-monthly phone calls to provide input on nuclear plant needs and priorities for II&C technologies. Two working groups were initiated during FY 2015 to provide a means for UWG members to focus on particular technologies of interest. The Outage Improvement Working Group consists of eight utilities that participate in periodic conference calls and have access to a share-point web page for acccess to project materials developed in the Advanced Outage Control Center pilot project. In the area of computer-based procedures and automated work packages, the II&C Pathway has worked with the Nuclear Information Technology Strategic Leadership (NITSL) to set up a monthly conference call with interested utility members to discuss various aspects of mobile worker technologies. Twenty one technical and project reports were delivered to the UWG during FY 2015, reflecting the work of the II&C Pathway pilot projects during the year. Distribution of these reports is one of the primary means of transferring to the nuclear industry the knowledge and experience gained during the development of advanced II&C technologies in support of LWR sustainability. Site visits to discuss pilot project activities and future plans were made to Arizona Public Service, Exelon, Duke Energy, Pacific Gas & Electric, SCANA, Southern Nuclear, South Texas Project, STARS Alliance, Tennessee Valley Authority, and Xcel. Discussions were also held on the pathway goals and activities with major industry support organizations during FY 2102, including the Institute of Nuclear Power Operations (INPO), the Nuclear Information Technology Strategic Leadership (NITSL), the Nuclear Energy Institute (NEI), and the Electric Power Research Institute. The Advanced II&C Pathway work was presented at five major industry conferences and Informal discussions were held with key NRC managers at industry conferences. In addition, discussions were held with NRC senior managers on digital regulatory issues through participation on the NEI Digital I&C Working Group. Meetings were held with major industry suppliers and consultants, to explore opportunities for collaboration and to provide a means of pilot project technology transfer. In the international area, discussions were held with Electricite’ de France (EdF) concerning possible collaboration in the area NPP configuration control using intelligent wireless devices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of Fuel Choice for Backup Generators

The costs of a power outage to a business can be substantial, so there is a growing interest in generators for reliable backup power. Businesses are either considering installing backup generators or redundant backup systems for added resilience against grid outages. This report discusses the costs and benefits of backup generator configurations, and compares the relative merits of grid-connected backup systems that enable financial benefits when the grid is functioning, versus backup-only systems that only generate energy for critical services when the primary grid is down. This report discusses how to assign value to the reliability of each system and the revenue streams related to backup generators.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Technology Innovation Partnership Project Strategic Energy Plan for Washington County, Maine

This Strategic Energy Plan (SEP) for Washington County, Maine was developed through the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to address local challenges related to electricity reliability, affordability, and safety. Grounded in a "relational infrastructure" approach, the plan recognizes that improved energy outcomes depend not only on physical grid investments but also on strengthened coordination and trust between utilities and communities. Using utility-provided reliability data, public datasets, and community input, the plan identifies key risks, including vegetation-related outages, high energy burden, and vulnerability among elderly and medically dependent populations. The SEP establishes three priority areas: hazard mitigation for energy infrastructure, outage safety and emergency readiness, and energy assistance and thermal safety. It outlines community-driven actions designed to complement utility-led system improvements, including targeted outreach, municipal coordination, and expanded access to energy programs. The plan also situates local conditions within broader state policy, market dynamics, and funding opportunities. Intended as a living document, this SEP provides a scalable framework for collaborative action to improve resilience, safety, and affordability in rural energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A business case for nuclear plant control room modernization - 352

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing nuclear power plants (NPPs). The business case is based on advanced digital instrumentation and control (I and C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. Labor savings can be harvested in terms of reduced overtime and redistribution of work. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases. The technologies employed in CRM include large overview displays, task-based operator displays, computer-based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others. The CRM business case is founded on the following categories of cost savings: - Integrated Computer-Based Procedures for Operators; - Reduction in Corrective Action Program Work Due to Operator Error; - Reduction in Outage Critical Path Time; - Operation of Local Control Panels; - Reduction in Control Room Support; - Reduction in Plant Events Resulting in Generation Loss; - Paperless Control Room Processes. In addition to cost savings, these technologies also offer improvements to indirect ways that have impact on key performance indicators of the plant. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Towards a Neutronic and Thermal-Hydraulic Safety Analysis of PWR Fuel Bow with SIMULATE5 and COBRA-TF

In the 1990's, collective fuel assembly bow was observed in the Ringhals PWRs in Sweden. Back then fuel vendors reinforced the fuel assemblies' dashpot, decreased hold-down spring forces, increased guide tube wall thickness, and introduced guide tube materials with higher creep resistance in order to improve dimensional stability. Nevertheless, twenty years later in 2010, the same kind of collective bow with S and C shape patterns started to appear in most of Germany's PWRs. At this time the SIMULATE5 (S5) core simulator with its delta-gap bow model (DGA) which was originally developed for safety analysis at Ringhals, could be used as an off-the-shelf solution to assess the impact of bow on Fq and FH. However, these two quantities are of secondary importance in German PWRs in normal operation because the most restricting licensing criteria set limits on DNBRmin values. For this purpose, a method was developed to extract S5 pin powers from DGA calculations and automatically generate COBRA-TF input files (CTF) to analyze DNBR values in the cores. In the following two sections, it is shown how the S5 model for DGA calculations has been verified with independent MCNP6 calculations in order to check its predictions on pin power changes for delta gaps up to 1 cm in size and how the existing licensed DNBR calculation methodology has been updated to bowed fuel assembly situations with the help of CTF. Finally, the applicability of the Doroschuk CHF correlation, which is the licensing standard in most German PWRs, is discussed. For the fuel bow patterns considered, it is assumed that only the gap between fuel assemblies change and that the pitch between fuel rods inside the assemblies remains largely unchanged. This approximation can be justified by the visual inspections conducted at the plants during the outages. Every calculation of the pin-power impact of delta-gaps in the core under operating conditions is only as good as the knowledge of the bow pattern. Measurements of fuel assembly bow at cold conditions have been made for some German PWRs for all the fuel assemblies in the core during plant outages. Together with methods developed by the fuel assembly vendors, a best-estimate bow pattern during operation could be reconstructed. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Unsteady State Gas Transport Model in Matrix Laboratory (MATLAB) for PWR Gas Management

Reactor Coolant System (RCS) hydrogen gas management can be a challenge at Pressurized Water Reactors (PWRs) during shutdown, startup, and steady state operation. Poor hydrogen control can result in higher general corrosion rates for RCS components and increases in critical path time for shutdown or startup. Also, performance indicator penalties may be accrued by entry into Electric Power Research Institute (EPRI) Action Level conditions or by accrual of Chemistry Effectiveness Index (CEI) penalties established by the Institute of Nuclear Power Operations (INPO). Furthermore, poor hydrogen control may increase industrial safety risk due to the creation of an explosive environment. Part of the hydrogen management difficulty arises from the interaction of several phenomena that require complex simulations to fully understand. While hydrogen gas transport models have been developed, the application of these models is limited by the computational intensity required to accurately model the dynamism inherent in plant shutdown or startup. Subsequently, a gas transport model is developed in a suitable computational program to meet these needs and provide input to an optimized RCS hydrogen management strategy for all operational modes. The gas transport model is used to model RCS hydrogen behavior for an example PWR during an End of Cycle (EOC) Forced Outage (FO) startup, a refueling outage (RFO) shutdown, and during nominal steady state operation. The computational software selected is Matrix Laboratory (MATLAB{sup R})

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Incorporating realistic conservatism into criticality alarm placement and emergency response: a regulatory perspective - 14425

Review of historical process plant criticality accidents shows that their consequences vary widely and are extremely difficult to predict accurately. Because of the wide variability and inherent uncertainty in estimating consequences, criticality detector placement analysis and consequence estimation for emergency response typically utilize very conservative assumptions with regard to the total fissions, time-dependent fission rate, and intervening shielding. For detector placement, a 'minimum accident of concern' is typically defined, whereas emergency consequence evaluations typically define a maximum fission source term. These require different mindsets because what is conservative for one type of analysis may be non-conservative for the other. While some conservatism is commonly practiced in both cases, excessive conservatism can result in a net increase in risk, such as resulting from inadvertent alarm activations, that can be costly to operations and counterproductive to safety. Conversely, reliance on very detailed calculational models to reduce conservatism could increase the number and complexity of controls, such as shielding for dose mitigation. Deterministic regulatory criteria have also been applied for determining where criticality detectors are to be deployed and what areas must be evacuated in the event of an accident. This paper explores several issues associated with criticality alarm placement and emergency response from a regulatory perspective. This paper will discuss insights gained from historical fuel facility accidents and significant events regarding the inherent risk of criticality, the most likely locations for criticality to occur, and the most probable characteristics of a critical excursion. This will include discussion of the previously disputed relevance of the United States Nuclear Regulatory Commission's (USNRC's) longstanding model for a critical excursion. While USNRC regulations deterministically require dual alarm coverage in all areas having greater than a 'critical mass' of fissionable material, a process is provided to grant exemptions when a risk-informed argument is technically justified. Similar risk-informed considerations have been used to justify compensatory measures allowing limited operation during periods of alarm system outage due to component failure or maintenance. This paper will explore the application of risk information and performance history to address requirements for criticality alarm system coverage, granting exemptions from deterministic criteria, allowing compensatory measures during system outages, determining evacuation areas and routes, and assessing the significance associated with alarm system issues. Finally, the impact of shielding on the USNRC's regulatory risk basis and approved subcritical margin will be reviewed. (authors)

42 ENGINEERING↗

Imputation of urban environmental sensor data using gated attention bidirectional long short-term memory (GA-BiLSTM): methods, performance, and implications

Urban environmental monitoring networks frequently encounter significant data gaps due to sensor malfunctions, environmental disturbances, and communication failures. Reliable approaches to address these gaps are essential for ensuring the continuity and quality of environmental data streams. In this study, we developed a gated attention bidirectional long short-term memory (GA-BiLSTM) model to impute missing data in a dense urban monitoring network. Using observations from the CROCUS network in Chicago, we evaluated GA-BiLSTM against widely used approaches (XGBoost and K-nearest neighbors) under scenarios of both short-term intermittent gaps and prolonged outages. GA-BiLSTM consistently outperformed comparative methods, particularly during extended outages of up to ten days, demonstrating its ability to capture spatiotemporal dependencies across sensor nodes. Beyond performance metrics, feature importance and spatial network analyses highlighted the unexpected but critical predictive role of peripheral rural nodes, underlining their strategic value for maintaining robust urban monitoring systems. These results emphasize that advanced imputation methods can substantially improve the reliability of environmental monitoring networks and support more resilient data infrastructures for urban sustainability.

Data imputation↗

Optimizing power system restoration with damaged communications

Utility procedures for power system blackstart and restoration typically assume that energization decisions can be reliably communicated across the grid. In reality, the communications and control network would likely also be affected in power outages, such as those caused by extreme weather events or cyber-attacks. This paper studies the effect of damage to the power system communications and control infrastructure on restoration operations following a blackout. We model the communications infrastructure as a graph, overlaying the power grid, and imposing the requirement that every energized element in the power grid be observable from a control center. We expand on a specialized branch-and-bound algorithm from the literature to optimize the restoration process and devise an initialization heuristic and a rounding heuristic to improve solution speed. We perform numerical experiments on synthetic systems for Illinois and Texas with outages based on a solar flare or hurricane. We compare the results of our specialized branch-and-bound algorithm to the results from (i) the initialization heuristic alone, (ii) a variation of this heuristic that we use as a baseline, and (iii) the restoration optimization for the power system without communications constraints. Here, we find that damage to the communications infrastructure significantly increases the time required to re-energize the grid. Moreover, by simultaneously optimizing communications repairs and grid energization decisions, we are able to re-energize the grid significantly faster than if communications repairs and energization decisions were made independently or with partial coordination, motivating improvements to current industry practice.

97 MATHEMATICS AND COMPUTING↗

Insights into Methodologies and Operational Details of Resource Adequacy Assessment: A Case Study with Application to a Broader Flexibility Framework

Assessing and maintaining resource adequacy (RA) is a core pillar of power systems. However, recent changes in the physical makeup of these systems and the conditions under which these systems must operate have yielded a renewed interest in the methods, metrics, and assumptions that underpin RA assessments. In this paper, we systematically explore a wide range of RA modeling dimensions, including: the objective function and level of operational detail in the underlying model formulation; the quantity (look-ahead) and quality (accuracy) of data that is available for making operational decisions within those models; and the physical configuration of solar photovoltaics (PV) with battery storage hybrid resources. We apply a set of probabilistic RA tools and production cost modeling tools to a realistic test system based loosely on a future Electric Reliability Council of Texas power system dominated by solar PV resources. Under the assumptions of our system and models, we find that multi-stage probabilistic assessments may provide a more robust evaluation of RA by capturing a wider range of operational and system interactions, but this comes at a computational cost of 1-2 orders of magnitude longer run time depending on the specific configuration. In addition, the information on thermal generator availability impacts RA performance by an order of magnitude more than solar resource forecasts, which is driven by the comparatively larger magnitude of thermal outages than solar forecast errors within our test system. Lastly, the flexibility provided by hybrid and other resources can help reduce system load-shedding event frequencies and enable the system to be more robust to inaccurate forecast information, and alternative hybrid inverter sizes can impact RA levels by 1-2 orders of magnitude. Our results point to the importance of a broader flexibility framework to describe the interaction between (1) flexibility "supply" from both physical resource capabilities and operational constraints considered in the modeling, and (2) flexibility "demand" from forecast errors, thermal generator outages, and other sources of uncertainty, as well as their RA impacts. Results are likely sensitive to the system buildout explored; future work could consider additional system configurations and conditions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Adaptive cold-load pickup considerations in 2-stage microgrid unit commitment for enhancing microgrid resilience

In an extended main grid outage spanning multiple days, load shedding serves as a critical mechanism for islanded microgrids to maintain essential power and energy reserves that are indispensable for fulfilling reliability and resiliency mandates. However, using load shedding for such purposes leads to increasing occurrence of cold load pickup (CLPU) events. Here, this study presents an innovative adaptive CLPU model that introduces a method for determining and incorporating parameters related to CLPU power and energy requirements into a two-stage microgrid unit commitment (MGUC) algorithm. In contrast to the traditional fixed-CLPU-curve approach, this model calculates CLPU duration, power, and energy demands by considering outage durations and ambient temperature variations within the MGUC process. By integrating the adaptive CLPU model into the MGUC problem formulation, it allows for the optimal allocation of energy resources throughout the entire scheduling horizon to fulfill the CLPU requirements when scheduling multiple CLPU events. The performance of the enhanced MGUC algorithm considering CLPU needs is assessed using actual load and photovoltaic (PV) data. Simulation results demonstrate significant improvements in dispatch optimality evaluated by the amount of load served, customer comfort, energy storage operation, and adherence to energy schedules. These enhancements collectively contribute to reliable and resilient microgrid operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leak detection in a subcritical boiler

Thermal power plants experience cycling duty leading to the fatigue of the boiler and heat exchanger tubes. As a result, tube failures occur frequently in coal fired fleets leading to forced outages. Furthermore, because the tube leaks have been the major source of unwanted shutdowns and the number of outages is increasing, present work focuses on the detection and isolation of the leak in a subcritical boiler based upon the process data from a commercial coalfired power plant. The mass balance equation around the steam drum was analyzed using timeseries data collected from a 300 MW power plant. The ratio of the feed water mass flow rate to the steam mass flow rate was defined as a key parameter for detecting leaks. The difference in slope between the feedwater and steam mass flow rate during the normal and faulty operations was established as the upper control limit for real time monitoring. To reduce false alarm rates that arise when raw signal is directly compared against the threshold due to common process fluctuations, an optimal filter was derived for smoothing. It was found that the optimal filter reacted much more quickly to process changes than an exponential moving average filter, around 8 h earlier on average. Occurrence of relatively high false alarm rates even in the filtered responses was related to the cycling of the boiler from the base load condition. Variable threshold was established to keep false alarm rates to the minimum while maintaining the leak detection rate. Finally, the leak was located at the economizer and this could readily be isolated by investigating the magnitude of the mass flow rates ratio and the temperature at the economizer outlet.

42 ENGINEERING↗

Cool rooms for indoor heat resilience: Evaluating affordable cooling strategies in heat-stressed California homes

Extreme heat conditions pose significant indoor survivability challenges for resource-constrained communities, which often lack access to cooling, have poorly insulated homes, and face compounding socioeconomic vulnerabilities. Moreover, concurrent power outages worsen health risks and heat-related illnesses. It is therefore crucial to develop innovative and affordable cooling approaches to protect vulnerable populations. This study assesses the efficacy of “cool rooms”– a designated space within a home equipped with passive and low-power active cooling measures to maintain safe indoor temperatures during extreme heat events and power disruptions. Using a physics-based building energy modeling approach, we evaluate the efficacy of various retrofit packages in maintaining thermal safety within the cool room under recent extreme heat conditions. The results indicate that passive measures can reduce 64% of hours with unmet standard effective temperatures, while the combination of passive and low-power active measures with built-in batteries further cuts this to 86%. Nevertheless, these strategies remain insufficient to maintain indoor thermal safety during extended outages. In contrast, integrating a solar-powered mini-split heat pump, whose technical potential was evaluated in this study, reduces indoor air temperatures below the 28 °C overheating threshold and significantly improves indoor habitability. The localized cool room strategy also offers potential for grid resilience by reducing peak electricity demand by up to 70% compared to whole house cooling during heat waves. The findings can inform the development of actionable heat mitigation plans and retrofit policies for residential communities with relatively low adoption of air conditioning such as warm marine climates.

Cool room↗

Cyclic moisture reactivation of calcium sorbents for long duration thermochemical energy storage

The transition to a flexible and reliable energy infrastructure, using electro-thermal energy generation technologies such as geothermal, concentrated solar power, and nuclear, usually demands simultaneous advancement of thermal energy storage (TES) to support on-demand electricity generation and industrial applications while mitigating the inherent intermittency of renewable energy sources and power outages from direct energy generation. Among TES technologies, thermochemical energy storage (TCES) based on calcium looping emerges as a compelling high-power energy storage candidate due to its high reaction enthalpy, compatibility with elevated operating temperatures, and abundance of low-cost materials. However, the long-term durability of calcium-based sorbents for TCES is hindered by surface sintering and particle aggregation, leading to performance degradation over repeated thermal cycles. This study explores a moisture hydration-based strategy to regenerate a degraded calcium sorbent and mitigate performance degradation for long duration TCES. The addition of moisture transforms calcium oxide into calcium hydroxide and produces intercalation water layers, associated with a regenerated surface area and reduced calcium oxide crystallite size. Both these effects are beneficial in restoring the sorbents' reactivity for carbonization. Additionally, an optimized hydration-assisted reactivation protocol balances the recovered energy storage capacity with heating penalty required for moisture removal from hydrated samples, resulting in an enhanced energy storage capacity up to 176% compared to benchmark sorbents that undergo cycling without reactivation after 60 cycles. In conclusion, these results highlight the potential of hydration-assisted reactivation to enhance the long-term performance of TCES, providing an effective pathway to advancing electro-thermal storage technologies.

36 MATERIALS SCIENCE↗