Equipment specifications for an electrochemical fuel reprocessing plant

Electrochemical reprocessing is a technique used to chemically separate and dissolve the components of spent nuclear fuel, in order to produce new metal fuel. There are several different variations to electrochemical reprocessing. These variations are accounted for by both the production of different types of spent nuclear fuel, as well as different states and organizations doing research in the field. For this electrochemical reprocessing plant, the spent fuel will be in the metallurgical form, a product of fast breeder reactors, which are used in many nuclear power plants. The equipment line for this process is divided into two main categories, the fuel refining equipment and the fuel fabrication equipment. The fuel refining equipment is responsible for separating out the plutonium and uranium together, while getting rid of the minor transuranic elements and fission products. The fuel fabrication equipment will then convert this plutonium and uranium mixture into readily usable metal fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solvent Recovery and Management at the Savannah River Site H-Canyon Facility

NIOWAVE, Inc. is a domestic supplier of medical and industrial isotopes from uranium and radium. The Savannah River National laboratory (SRNL) is currently providing support to NIOWAVE, which plans to deploy a superconducting electron linear accelerator (LINAC) to fission uranium for Mo-99 production without the need for a nuclear reactor or HEU. The uranium from the Mo-99 production targets will be purified using a modified PUREX (Plutonium Uranium Reduction Extraction) solvent extraction process to recover the uranium in the product stream. The uranium will then be precipitated as an oxalate which is calcined to U 3 O 8 to fabricate pellets for new Mo-99 targets. In previous support provided to NIOWAVE, the SRNL demonstrated a solvent washing process to remove degradation products from the tributyl phosphate (TBP) solvent used in the modified PUREX process under development for uranium recovery. To supplement this technology demonstration, NIOWAVE requested the SRNL to provide summary information on the solvent recovery and management activities which are used at the Savannah River Site (SRS) H-Canyon facility. An existing reference document for the reprocessing of irradiated HEU fuels at the SRS was used as the primary reference for the solvent management activities; although, other reference documents were used to provide supplementary information. The information provided includes a brief summary of the solvent degradation issues which have been observed in the H-Canyon solvent extraction cycles and resulting process safety concerns. The solvent recovery processes for the three cycles of solvent extraction used in the H-Canyon were subsequently described including the process equipment which consists of the continuous and batch solvent washers, pumps, and tanks. A final section is provided on the monitoring and analysis of solvent quality based on the previous work performed at the SRNL for NIOWAVE and past research and development activities performed to support the solvent extraction processes in both the SRS F-Canyon and H-Canyon facilities.

07 ISOTOPE AND RADIATION SOURCES↗

Neutronics Simulations of 237Np Targets to Support Safety-Basis and 238Pu Production Assessment Efforts at the High Flux Isotope Reactor

Fueled by two highly enriched uranium-bearing fuel elements surrounded by a large concentric ring of beryllium reflector, the High Flux Isotope Reactor (HFIR) provides one of the highest neutron fluxes in the world and is used to produce unique isotopes like plutonium-238. The National Aeronautics and Space Administration use radioisotope thermoelectric generators powered by 238Pu for deep-space missions. As part of the US Department of Energy s task to reestablish the domestic production of 238Pu, a technology demonstration sub-project has been initiated to establish a new 238Pu supply chain. HFIR safety-basis neutronics calculations are being performed to ensure the target irradiations have no adverse impacts on reactor performance and to calculate data required as input to follow-on thermal-structural, thermal-hydraulic and radionuclide/dose analyses. Plutonium-238 production assessments are being performed to estimate the amount of 238Pu that can be produced in HFIR s permanent beryllium reflector. It is estimated that a total of 0.96 1.12 kg 238Pu (~1.28 1.49 kg PuO2 at 85% 238Pu/Pu purity) could be produced per year in HFIR s permanent beryllium reflector irradiation facilities if they are all utilized.

depletion↗

Comparison of actinide production in traveling wave and pressurized water reactors

The geopolitical problems associated with civilian nuclear energy production arise in part from the accumulation of transuranics in spent nuclear fuel. A traveling wave reactor is a type of breed-burn reactor that could, if feasible, reduce the overall production of transuranics. In one possible configuration, a cylinder of natural or depleted uranium would be subjected to a fast neutron flux at one end. The neutrons would transmute the uranium, producing plutonium and higher actinides. Under the right conditions, the reactor could become critical, at which point a self-stabilizing fission wave would form and propagate down the length of the reactor cylinder. The neutrons from the fission wave would burn the fissile nuclides and transmute uranium ahead of the wave to produce additional fuel. Fission waves in uranium are driven largely by the production and fission of {sup 239}Pu. Simulations have shown that the fuel burnup can reach values greater than 400 MWd/kgIHM, before fission products poison the reaction. In this work we compare the production of plutonium and minor actinides produced in a fission wave to that of a UOX fueled light water reactor, both on an energy normalized basis. The nuclide concentrations in the spent traveling wave reactor fuel are computed using a one-group diffusion model and are verified using Monte Carlo simulations. In the case of the pressurized water reactor, a multi-group collision probability model is used to generate the nuclide quantities. We find that the traveling wave reactor produces about 0.187 g/MWd/kgIHM of transuranics compared to 0.413 g/MWd/kgIHM for a pressurized water reactor running fuel enriched to 4.95 % and burned to 50 MWd/kgIHM. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Passive Neutron Non-Destructive Assay for Remediation of Radiological Waste at Hanford Burial Grounds- 13189

The Hanford burial grounds contains a broad spectrum of low activity radioactive wastes, transuranic (TRU) wastes, and hazardous wastes including fission products, byproduct material (thorium and uranium), plutonium and laboratory chemicals. A passive neutron non-destructive assay technique has been developed for characterization of shielded concreted drums exhumed from the burial grounds. This method facilitates the separation of low activity radiological waste containers from TRU waste containers exhumed from the burial grounds. Two identical total neutron counting systems have been deployed, each consisting of He-3 detectors surrounded by a polyethylene moderator. The counts are processed through a statistical filter that removes outliers in order to suppress cosmic spallation events and electronic noise. Upon completion of processing, a 'GO / NO GO' signal is provided to the operator based on a threshold level equivalent to 0.5 grams of weapons grade plutonium in the container being evaluated. This approach allows instantaneous decisions to be made on how to proceed with the waste. The counting systems have been set up using initial on-site measurements (neutron emitting standards loaded into surrogate waste containers) combined with Monte Carlo modeling techniques. The benefit of this approach is to allow the systems to extend their measurement ranges, in terms of applicable matrix types and container sizes, with minimal interruption to the operations at the burial grounds. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold Testing for Characterization of Oxide Feed Impurities in Support of the ARIES Program

The Advanced Recovery and Integrated Extraction System (ARIES) Program converts surplus plutonium metal components into an oxide powder form and packages the material for final disposition. In support of the ARIES program, over a metric ton (MT) of plutonium has been removed from surplus nuclear weapons since 1998 and packaged for long-term storage in 3013 cans. The oxide production rate is anticipated to increase substantially over the next decade in support of dilute and dispose goals. Analytical chemistry data from destructive analysis of the resulting 70+ blend lots to date has been reported for contaminants in the product oxide. Changes in the Pu product specification for Pu oxide product, induced by a different pit mix, the LANL swap program and processing Alternate (non-Pit Pu) Feed Stock (AFS) metals, will affect the level and the mix of these contaminants in the upcoming years. With these changes in feed material, it will be important to provide fast and efficient measurement of elemental impurities in the oxide to be certain that the process is under control and to monitor the anticipated changes from the historical blend lot data. Non-destructive methods need to be evaluated for the characterization of the plutonium oxide product and the quantification of the impurities at the current and anticipated levels. A feasibility study has begun to investigate the applicability of new spectroscopic methods for oxide impurity characterization. To this end, here we describe the preparation of surrogate materials to support these investigations, and the results of a feasibility study investigating the use of LIBS (Laser Induced Breakdown Spectroscopy) to characterize the surrogate materials as calibration standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FURTHER ASSESSMENTS OF THE ATTRACTIVENESS OF MATERIALS IN ADVANCED NUCLEAR FUEL CYCLES FROM A SAFEGUARDS PERSPECTIVE

This paper summarizes the results of an extension to an earlier study [ ] that examined the attractiveness of materials mixtures containing special nuclear materials (SNM) associated with the PUREX, UREX+, and COEX reprocessing schemes. This study focuses on the materials associated with the UREX, COEX, THOREX, and PYROX reprocessing schemes. This study also examines what is required to render plutonium as “unattractive.” Furthermore, combining the results of this study with those from the earlier study permits a comparison of the uranium and thorium based fuel cycles on the basis of the attractiveness of the SNM associated with each fuel cycle. Both studies were performed at the request of the United States Department of Energy (DOE), and are based on the calculation of “attractiveness levels” that has been couched in terms chosen for consistency with those normally used for nuclear materials in DOE nuclear facilities [ ]. The methodology and key findings will be presented. Additionally, how these attractiveness levels relate to proliferation resistance (e.g. by increasing impediments to the diversion, theft, undeclared production of SNM for the purpose of acquiring a nuclear weapon), and how they could be used to help inform policy makers, will be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Supplemental Report on Nuclear Safeguards Considerations for the Pebble Bed Modular Reactor (PBMR)

Recent reports by Department of Energy National Laboratories have discussed safeguards considerations for the low enriched uranium (LEU) fueled Pebble Bed Modular Reactor (PBMR) and the need for bulk accountancy of the plutonium in used fuel. These reports fail to account effectively for the degree of plutonium dilution in the graphitized-carbon pebbles that is sufficient to meet the International Atomic Energy Agency's (IAEA's) 'provisional' guidelines for termination of safeguards on 'measured discards.' The thrust of this finding is not to terminate safeguards but to limit the need for specific accountancy of plutonium in stored used fuel. While the residual uranium in the used fuel may not be judged sufficiently diluted to meet the IAEA provisional guidelines for termination of safeguards, the estimated quantities of {sup 232}U and {sup 236}U in the used fuel at the target burn-up of {approx}91 GWD/MT exceed specification limits for reprocessed uranium (ASTM C787) and will require extensive blending with either natural uranium or uranium enrichment tails to dilute the {sup 236}U content to fall within specification thus making the PBMR used fuel less desirable for commercial reprocessing and reuse than that from light water reactors. Also the PBMR specific activity of reprocessed uranium isotopic mixture and its A{sub 2} values for effective dose limit if released in a dispersible form during a transportation accident are more limiting than the equivalent values for light water reactor spent fuel at 55 GWD/MT without accounting for the presence of the principal carry-over fission product ({sup 99}Tc) and any possible plutonium contamination that may be present from attempted covert reprocessing. Thus, the potentially recoverable uranium from PBMR used fuel carries reactivity penalties and radiological penalties likely greater than those for reprocessed uranium from light water reactors. These factors impact the economics of reprocessing, but a more significant consideration is that reprocessing technologies for coated particle fuels encased in graphitized-carbon have not progressed beyond laboratory-scale demonstrations although key equipment that has been tested in the past (such as graphite burners and electrolytic disintegration/dissolution devices) are not listed on either the 'Trigger List' or the 'Dual Use List' for mandatory export controls. Finally, if gross burn-up determined from fission product gamma ray inspection of a discharged pebble cannot be correlated acceptably with predicted plutonium content of the pebble, development and testing may be required on detector concepts for more directly measuring the plutonium content in a discharged pebble to ensure that its placement in the spent fuel storage tanks is for an acceptable 'measured discard' of diluted plutonium.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Demolition Strategy and Progress at Hanford's Plutonium Finishing Plant - 17161

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently demolishing the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. In November 2016, the project team, partnering with DOE-Richland Operations Office (DOE-RL) began demolition of the building. CH2M and DOE-RL will demolish PFP as a Hazardous Category II nuclear facility (HazCat II). The PFP is considered one of the most hazardous buildings on the Hanford site; employees have performed some of the most hazardous work anywhere across the DOE Environmental Management complex. Since 2008, employees have removed much of the plutonium-processing infrastructure. Four main buildings make up the majority of the PFP complex. As of November 2016, one building is undergoing demolition, another is ready for demolition and, concurrently, demolition preparations continue in the remaining two buildings. That hazard mitigation work includes removing contaminated ventilation duct work, process lines and performing asbestos abatement. To ensure safe and compliant demolition, CH2M employees researched, trained and deployed personal protective equipment never before used on the Hanford Site to complete some of the most hazardous demolition preparations. Project management commissioned the development of an air dispersion model that dictated ready-for-demolition criteria and established conservative demolition parameters. Management also sequenced project work to allow demolition to occur while demolition preparations continue a safe distance away in adjacent buildings. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pu-238 Production Progress at Idaho National Laboratory From December 2023 to November 2024

Idaho National Laboratory (INL) has continued in the effort to produce Pu-238 to support NASA deep space missions. In support of the production goal of contributing 700 g to the 1.5 kg per year constant rate production of Pu-238 heat source material in the United States by 2026. All available inner core positions of the Advanced Test Reactor (ATR) have been qualified for production for a 20% Np target, with efforts nearing completion for a 30% Np target further increasing production amounts. This includes the North East Flux Trap (NEFT), South Flux Trap (SFT), Inner A, H positions. With the completion of qualifying the inner core of ATR, work has started on the qualifying the outer core. The portion of the outer core that will produce Pu-238 includes the Large and Medium I positions. With the continued qualification work, INL is on track to contribute to the production goal by 2026.

07 - ISOTOPES AND RADIATION SOURCES↗

Modeling of distribution and speciation of plutonium in the Urex extraction system

The PUREX extraction process is used worldwide to recover uranium and plutonium from dissolved spent nuclear fuel using the tributylphosphate-nitric acid extraction system. In the recent decade, significant research progress was achieved with the aim to modify this system by addition of a salt-free agent to optimize stripping of plutonium from the tributylphosphate (TBP) extraction product (UREX). Experimental results on the extraction of Pu(IV) with and without acetohydroxamic acid in the HNO{sub 3}/TBP (30 vol %) were used for the development of a thermodynamic model of distribution and speciation of Pu(IV) in this separation process. Extraction constants for several sets of nitric acid, nitrate, and acetohydroxamic acid concentrations were used to model the obtained data. The extraction model AMUSE (Argonne Model for Universal Solvent Extraction) was employed in our calculations. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Productivity Techniques and Quality Aspects in the Criticality Safety Evaluation of Y-12 Type-B Fissile Material Packages

The inventory of certified Type-B fissile material packages consists of ten performance-based packages for offsite transportation purposes, serving transportation programs at the Y-12 National Security Complex. The containment vessels range from 5 to 19 in. in diameter and from 17 to 58 in. in height. The drum assembly external to the containment vessel ranges from 18 to 34 in. in diameter and from 26 to 71 in. in height. The weight of the packaging (drum assembly and containment vessel) ranges from 239 to 1550 lb. The older DT-nn series of Cellotex-based packages are being phased-out and replaced by a new generation of Kaolite-based ('Y-12 patented insulation') packages capable of withstanding the dynamic crush test 10 CFR 71.73(c)(2). Three replacement packages are in various stages of development; two are in use. The U.S. Department of Transportation (DOT) 6M specification package, which does not conform to the U.S. Nuclear Regulatory Commission requirements for Type-B packages, is no longer authorized for service on public roads. The ES-3100 shipping package is an example of a Kaolite-based Type-B fissile material package developed as a replacement package for the DOT 6M. With expanded utility, the ES-3100 is designed and licensed for transporting highly enriched uranium and plutonium materials on public roads. The ES-3100 provides added capability for air transport of up to 7-kg quantities of uranium material. This paper presents the productivity techniques and quality aspects in the criticality safety evaluation of Y-12 packages using the ES-3100 as an example.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PROGRESS IN REDUCING THE NUCLEAR THREAT: UNITED STATES PLUTONIUM CONSOLIDATION AND DISPOSITION

Following the end of the Cold War, the United States identified 61.5 metric tons (MT) of plutonium and larger quantities of enriched uranium that are permanently excess to use in nuclear weapons programs. The Department of Energy (DOE) also began shutting down, stabilizing, and removing inventories from production facilities that were no longer needed to support weapons programs and non-weapons activities. The storage of 'Category I' nuclear materials at Rocky Flats, Sandia National Laboratories, and several smaller sites has been terminated to reduce costs and safeguards risks. De-inventory continues at the Hanford site and the Lawrence Livermore National Laboratory. Consolidation of inventories works in concert with the permanent disposition of excess inventories, including several tonnes of plutonium that have already been disposed to waste repositories and the preparation for transfers to the planned Mixed Oxide (MOX) Fuel Fabrication Facility (for the bulk of the excess plutonium) and alternative disposition methods for material that cannot be used readily in the MOX fuel cycle. This report describes status of plutonium consolidation and disposition activities and their impacts on continuing operations, particularly at the Savannah River Site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implications of Plutonium isotopic separation on closed fuel cycles and repository design

Advances in laser enrichment may enable relatively low-cost plutonium isotopic separation. This would have large impacts on LWR closed fuel cycles and waste management. If Pu-240 is removed before recycling plutonium as mixed oxide (MOX) fuel, it would dramatically reduce the buildup of higher plutonium isotopes, Americium, and Curium. Pu-240 is a fertile material and thus can be replaced by U-238. Eliminating the higher plutonium isotopes in MOX fuel increases the Doppler feedback, simplifies reactor control, and allows infinite recycle of MOX plutonium in LWRs. Eliminating fertile Pu-240 and Pu-242 reduces the plutonium content in MOX fuel and simplifies fabrication. Reducing production of Pu-241 reduces production of Am-241 - the primary heat generator in spent nuclear fuels after several decades. Reducing heat generating Am-241 would reduce repository cost and waste toxicity. Avoiding Am- 241 avoids its decay product Np-237, a nuclide that partly controls long-term oxidizing repository performance. Most of these benefits also apply to LWR plutonium recycled into fast reactors. There are benefits for plutonium isotopic separation in fast reactor fuel cycles (particularly removal of Pu-242) but the benefits are less. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The role of chemical reactions in the Chernobyl accident

It is shown that chemical reactions played an essential role in the Chernobyl accident at all of its stages. It is important that the reactor before the explosion was at maximal xenon poisoning, and its reactivity, apparently, was not destroyed by the explosion. The reactivity release due to decay of Xe-235 on the second day after the explosion led to a reactor power of 80-110 MW. Owing to this power, the chemical reactions of reduction of uranium, plutonium, and other metals at a temperature of about 2000 Degree-Sign C occurred in the core. The yield of fission products thus sharply increased. Uranium and other metals flew down in the bottom water communications and rooms. After reduction of the uranium and its separation from the graphite, the chain reaction stopped, the temperature of the core decreased, and the activity yield stopped.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Progression of Safe and Compliant Demolition of Hanford's Plutonium Finishing Plant - 16566

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is about to begin demolition of the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is in the final stages of preparing to demolish the building by the Tri-Party Agreement Milestone date of September 30, 2016. Since 2008, employees have prepared approximately 85 percent of the building for demolition. All of the 52 pencil-shaped processing tanks and 95 percent of the 238 glove boxes have been removed. Work is progressing on dispositioning remaining glove boxes, filter boxes and ventilation ducts and chemical and drain lines. Demolition is scheduled to start in early 2016. In addition to wrapping up tasks like source term removal (or preparation for removal during pre-demolition) and decontamination, the project is also developing the strategy and process to perform physical open air demolition, including the use of 3D renderings and computer generated illustrations of building infrastructure to safely and compliantly demolish the building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrolytic Oxide Reduction of Plutonium Oxide Surrogates

Our research team has investigated electrolytic oxide reduction (EOR) as an improved metal production process versus the currently employed multiple cycle direct oxide reduction (MCDOR) process for the conversion of plutonium oxide to plutonium metal. Inherent advantages in safety, waste generation, efficiency, and operational ease make EOR an attractive alternative to traditional metal production practices. Phase I of the project consisted of the construction of a prototype electrochemical cell, and proof of concept experiments towards the reduction of SnO 2 and CeO 2 compounds. Phase II of the project was focused on the optimization of the cerium system in preparation for future plutonium EOR experiments. We observed the electrolytic reduction of cerium oxide resulting in mixed degrees of success, and discovered this was a result of parasitic side reactions and partial reduction. We employed cyclic voltammetry (CV) to identify the products of these side reactions and characterize partially reduced species. We also observed that, when metal was successfully produced by EOR, a large amount of passed charge was required. We concluded that this observation was due to several inefficiencies of the process relating to the reduction mechanism (e.g. inefficient use of cathodically produced calcium). We used our CV results to guide our optimization of the EOR of CeO 2 by refining our electrochemical method, cell geometry, and materials of construction. Finally, we developed a next generation cell, worked to establish a new molten salt electrochemical capability in the Plutonium Facility, and completed a strategy for plutonium experiments. Our electrochemical method to produce plutonium metal clearly supports the core mission of the laboratory. Furthermore, this project has allowed for the development of capabilities that will provide valuable data to programs interested in characterization and detection, as well as science of signatures. Additionally, establishing this capability in the plutonium facility will facilitate future safeguard studies that can assist with safeguard development in molten salt reprocessing flowsheets, and molten salt reactor designs.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Preparing for safe and compliant open air demolition at Hanford's plutonium finishing plant - 15100

The Plutonium Finishing Plant (PFP), located in the 200 West Area of the U.S. Department of Energy (DOE) Hanford Site, began operations in 1949 and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut-down in 1996, and material stabilization completed in 2004. DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL) is tasked with the plant's deactivation, decommissioning, decontamination and demolition, to be completed by September 30, 2016. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is exploring, evaluating and implementing efficiencies to safely and compliantly prepare the facility for demolition. Since 2008, employees have prepared approximately 75 percent of the complex for demolition. More than 90 percent of the 232 glove boxes have been removed from ventilation and more than 80 percent of pencil tank units have been dispositioned. As decontamination, deactivation and removal nears completion on the remaining glove boxes, pencil tanks and other radiological and chemical processing infrastructure, CH2M HILL and DOE-RL are making preparations to demolish PFP itself, a Hazardous Category II nuclear facility (HazCat II). Conventional techniques used to demolish buildings heavily contaminated with radiological hazards typically involve extensive hands-on work to remove Material at Risk (MAR) and decontaminate the building to low levels before conventional demolition techniques can be used to remove the building. A safe and more cost effective approach is packaging MAR located in hard to access areas of the plant and removing it during demolition. That process, combined with affixing remaining contamination to walls, floors and equipment, performing detailed air dispersion modeling before demolition and air monitoring and dust suppression during demolition, will reduce employee risk and is more efficient in demolishing a HazCat II facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗