Project Update for “Designing Nuclear-data Measurements that Resolve Discrepancies in Existing Data” [Slides]

AIACHNE has made key progress this past year and will contribute to the larger scientific community. We recovered input data for the current 252 Cf(sf) PFNS evaluation that was previously lost. We render a standard to the best of our ability reproducible. We critically reviewed past data as input for ML & new standard evaluation that will impact PFNS of all major actinides. We developed a unique AI/ ML code that highlights which measurement features are related to bias and are working towards open-sourcing it for the community. Features that were identified as related to bias follow physics’ intuition and bring new understanding of exp effects and might help us for other reactions and isotopes. The results highlight that EXFOR is a goldmine of features that could help us understand experiment bias (if they are easy to parse).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Status of genome function annotation in model organisms and crops

Abstract Since the entry into genome‐enabled biology several decades ago, much progress has been made in determining, describing, and disseminating the functions of genes and their products. Yet, this information is still difficult to access for many scientists and for most genomes. To provide easy access and a graphical summary of the status of genome function annotation for model organisms and bioenergy and food crop species, we created a web application ( https://genomeannotation.rheelab.org ) to visualize, search, and download genome annotation data for 28 species. The summary graphics and data tables will be updated semi‐annually, and snapshots will be archived to provide a historical record of the progress of genome function annotation efforts. Clear and simple visualization of up‐to‐date genome function annotation status, including the extent of what is unknown, will help address the grand challenge of elucidating the functions of all genes in organisms.

59 BASIC BIOLOGICAL SCIENCES↗

Monitoring, Evaluating, and Updating Your Community Solar Action Plan

The Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. This fact sheet describes some things to consider when implementing, monitoring, evaluating, and updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

MjCyc: Rediscovering the pathway-genome landscape of the first sequenced archaeon, Methanocaldococcus (Methanococcus) jannaschii

The genome of Methanocaldococcus (Methanococcus) jannaschii DSM 2661 was the first Archaeal genome to be sequenced in 1996. Subsequent sequence-based annotation cycles led to its first metabolic reconstruction in 2005. Leveraging new experimental results and function assignments, we have now re-annotated M. jannaschii, creating an updated resource with novel information and testable predictions in a pathway-genome database available at BioCyc.org. This reannotation effort has resulted in 652 function assignments with enzyme roles, accounting for a third of the total protein-coding entries for this genome. The updated resource includes 883 reactions, 540 enzymes, and 142 individual pathways. Despite notable progress in computational genomics, more than a third of the genome remains functionally uncharacterized. The publicly available MjCyc pathway-genome database holds great potential for the wider community to conduct research on the biology of methanogenic Archaea.

59 BASIC BIOLOGICAL SCIENCES↗

A Synchronization-Avoiding Distance-1 Grundy Coloring Algorithm for Power-Law Graphs

In this paper, we propose a distributed, unordered, label-correcting distance-1 Grundy (vertex) coloring algorithm, namely, Distributed Control (DC) coloring algorithm. Our algorithm eliminates the need for vertex-centric barriers and global synchronization for color refinement, relying only on atomic operations and local termination detection to update vertex color. DC proceeds optimistically, correcting the colors asynchronously as the algorithm progresses and depends on local ordering of tasks to minimize the execution of sub-optimal work. We implement our DC coloring algorithm and the well-known Jones-Plassmann algorithm and compare their performance with 4 different types of standard RMAT graphs and real-world graphs. We show that the elimination of waiting time of global and vertex-centric barriers and investing this time for local ordering leads to improved scaling for graphs with prominent power-law characteristics and densely interconnected local subgraphs.

Firoz, Jesun S.↗

Recent results from COMPASS spin program

COMPASS is a fixed target experiment at CERN’s Super-Proton-Synchrotron. Part of its physics program is dedicated to the spin structure of the nucleon, which it studies with a polarized muon beam and polarized targets. An overview of its recent results along this line is given. In particular, the first results of our 2011 longitudinally polarized proton run, a report on our progress towards the extraction of the gluon polarization, ΔG, at NLO and an update on our measurements of transverse spin and k{sub T}-dependent processes, from our 2010 transversely polarized proton data, and of hadron multiplicities.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Next Generation Melter Optioneering Study (Interim Report)

The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sault Tribe Building Efficiency Energy Audits

The Sault Ste. Marie Tribe of Chippewa Indians is working to reduce energy consumption and expense in Tribally-owned governmental buildings. The Sault Ste. Marie Tribe of Chippewa Indians will conduct energy audits of nine Tribally-owned governmental buildings in three counties in the Upper Peninsula of Michigan to provide a basis for evaluating and selecting the technical and economic viability of energy efficiency improvement options. The Sault Ste. Marie Tribe of Chippewa Indians will follow established Tribal procurement policies and procedures to secure the services of a qualified provider to conduct energy audits of nine designated buildings. The contracted provider will be required to provide a progress schedule to the Tribe prior to commencing the project and submit an updated schedule with their monthly billings. Findings and analysis reports will be required for buildings as completed, and a complete Energy Audit Summary Report will be required to be submitted with the provider?s final billing. Conducting energy audits of the nine governmental buildings will disclose building inefficiencies to prioritize and address, resulting in reduced energy consumption and expense. These savings will allow Tribal resources to be reallocated to direct services, which will benefit Tribal members and families.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

Update on Our Action Plan for Equity, Inclusion, and Diversity in Publishing at JGR: Biogeosciences

We made a commitment to better include underrepresented members of our community in the publication pipeline of JGR: Biogeosciences. This commitment consists of regular updates on our policies and practices, and concrete actions we intend to implement over the next year. So far, our progress to tackle biases and ensure equitable research in the biogeosciences has focused on improving diversity of our associate editor and reviewer pools, increasing awareness of unconscious bias in peer-review, and promoting inclusion in global collaborations. In this update, we explore manuscript submissions and manuscript decisions by gender, and we present a pilot that aims to promote ethical and equitable global collaborations in resource-poor settings. Here, we end our editorial by presenting our next set of actions that we plan on completing over the next year, which include a more thorough analysis of reviewer demographics.

99 GENERAL AND MISCELLANEOUS↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗

Experimental capabilities of the LMJ-PETAL facility

In this study, recent progress in the experimental capabilities of the LMJ-PETAL laser facility is reviewed. Updates on the indirect-drive D 2 implosion experiments and equation-of-state experiments using the LMJ laser are presented, including the commissioning of new plasma diagnostics. Several recent campaigns using the PETAL laser alone are also presented, namely the development of a platform using high-resolution and high-energy X-ray sources for radiography experiments, laser wakefield acceleration studies in the self-modulated regime, and neutron generation using a Target Normal Sheath Accelerated proton beam in a pitcher-catcher configuration.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress in the design of the future circular collider FCC-ee interaction region

In this paper we discuss the latest developments for the FCC-ee interaction region layout, which represents one of the key ingredients to establish the feasibility of the FCC-ee. The collider has to achieve extremely high luminosities over a wide range of center-of-mass energies with two or four interaction points. The complex final focus hosted in the detector region has to be carefully designed, and the impact of beam losses and of any type of synchrotron radiation generated in the interaction region, including beamstrahlung, have to be evaluated in detail with simulations. We give an overview of the progress of the whole machine-detector-interface-related studies, among which are the updated mechanical model of the interaction region, the plans for a novel R&D activity of a IR mockup which is just starting, the collimation scheme and evaluation of beam induced backgrounds in the detectors, evaluation of radiation dose in the experimental area, and MDI integration with the detector.

43 PARTICLE ACCELERATORS↗

2016 State of Wind Development in the United States by Region

Significant expansion of wind energy development will be required to achieve the scenarios outlined in the U.S. Department of Energy's (DOE)'s Wind Vision: 20% wind energy by 2030 and 35% wind energy by 2050. Wind energy currently provides nearly 5% of the nation's electricity but has the potential to provide much more. The wind industry and the DOE's Wind Energy Technologies Office are addressing technical wind energy challenges, such as reducing turbine costs and increasing energy production and reliability. The Office recognizes that public acceptance of wind energy can be challenging, depending on the proximity of proposed wind farms to local populations. Informed decision makers and communities equipped with unbiased information about the benefits and impacts of wind energy development are better prepared to navigate the sometimes contentious development process. In 2014, DOE established six Regional Resource Centers (RRCs) across the United States to communicate unbiased, credible information about wind energy to stakeholders through regional networks. The RRCs provide ready access to this information to familiarize the public with wind energy; raise awareness about potential benefits and issues; and disseminate data on siting considerations such as turbine sound and wildlife habitat protection. This document summarizes the status and drivers for U.S. wind energy development during 2016. RRC leaders provided a report of wind energy development in their regions, which was combined with findings from National Renewable Energy Laboratory (NREL) researchers to provide an account of the state of the regions, as well as updates on developments in individual states. NREL researchers and state partners added updates for all states that are not directly supported by an RRC. Accounts for each region include updates on renewable portfolio standards, the Clean Power Plan, workforce development, manufacturing and economic development, and individual state updates for installed wind capacity, ongoing policy developments, planned projects and their status, transmission progress reports, etc. This report also highlights the efforts of the RRCs to engage stakeholders in their individual regions.

17 WIND ENERGY↗

Milestone Completion Report STCO04-1 AAPS: engagements with code teams, vendors, collaborators, developers

The Advanced Architecture and Portability Specialists team (AAPS) worked with a select set of LLNL application teams to develop and/or implement a portability strategy for next-generation architectures. The team also investigated new and updated programming models and helped develop programming abstractions targeting maintainability and performance portability. Significant progress was made on both fronts in FY17, resulting in multiple applications being significantly more prepared for the nextgeneration machines than before.

97 MATHEMATICS AND COMPUTING↗

2017 State of Wind Development in the United States by Region

This document summarizes the status and drivers for U.S. wind energy development during 2017. Regional Resource Center (RRC) leaders provided a report of wind energy development in their regions, which was combined with findings from National Renewable Energy Laboratory (NREL) researchers to provide an account of the state of the regions, as well as updates on developments in individual states. NREL researchers and state partners added updates for all states that are not directly supported by an RRC. Accounts for each region include updates on renewable portfolio standards, workforce development, manufacturing and economic development, and individual state updates for installed wind capacity, ongoing policy developments, planned projects and their status, transmission progress reports, etc. This report also highlights the efforts of the RRCs to engage stakeholders in their individual regions.

17 WIND ENERGY↗

Progress on Computational Modeling of Water-Based NSTF (FY2021)

This report documents the FY21 progress and achievements made in the computational analyses of the water-based NSTF. Both system-level and high-fidelity Computational Fluid Dynamics (CFD) analyses were performed to gain a complete understanding of the complex flow and heat transfer phenomena in natural convection systems. The progress on the waterbased NSTF experimental testing is summarized in a companion report (ANL-ART-230). As a continuation of progress from previous years, in FY21 the RELAP5 model of the NSTF was first updated to include a representative heated cavity that incorporated convection and conduction means of heat transfer. Two different cavity models were developed, one that models the radiation heat exchange among all surfaces in one enclosure (Cavity Model 1), and another that employs multiple radiation enclosures with each considering the surfaces at one axial level (Cavity Model 2). This updated RELAP5 deck was benchmarked with single-phase test data to tune form loss coefficients of the elbows and tees, along with heat transfer coefficients within the cavity and off the external insulation panels. This tuned model was then found to accurately predict fluid temperatures within 2.5% and both system and riser flow rates within 6% during single-phase, steady-state simulations. For transient simulations, there is a slight over prediction of the flow rate, fluid temperatures, and heater temperatures during the heat-up period, which indicate that the transient heat loss may be underestimated. Following, the capabilities of RELAP5-3D were examined, which feature a conduction enclosure model that is not present in the current version of RELAP5-MOD3.3 used for all previous NSTF simulations. As an initial comparison of the two codes, single-phase simulations were run that used similar input decks. The results indicate that the single-phase flow predicted by the two codes was very similar, however RELAP5-3D appears to predict a higher system flow during the two-phase transient when compared to the flow rates predicted by RELAP5-MOD3.3. Furthermore, RELAP5-3D run did not capture the density wave oscillations or geysering phenomena, which are large oscillation flow instabilities observed in the experimental facility. To further the prediction capabilities for capturing two-phase instabilities, Options 55, 57, 58, 61, which are implemented by default in RELAP5-MOD3.3 but not in RELAP5-3D, were investigated. When enabling Option 61, RELAP5-3D agrees well with MOD3.3 in predicting the total system flow, while other options have negligible effect on the predicted total system flow by RELAP5-3D. However, none of these options enables RELAP5-3D to produce the same flow instabilities. For future steps, efforts are currently underway to investigate RELAP5-3D’s different behavior in predicting low-pressure two-phase instabilities. STAR-CCM+ was used to perform CFD analysis of the water-based test facility and provide simulation results for comparisons to experimental data. Efforts first focused on describing the characteristics of flow within the heated cavity. A study was performed on whether possible leakage flow between the two sides of the cavity could substantially impact and explain the results. An additional second assumption was examined which defined adiabatic side walls, so physical insulation structures were added to the models to allow conduction across this outer insulation. The results suggest that potential porosity of the insulation could be a major factor in the temperature distribution within the cavity and should be considered in any studies where it is desirable to know the cavity wall temperatures to higher accuracy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗