Search NASA⌕ Search

SEARCH · Search NASA

Results for “Potential evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Los Alamos National Laboratory Wetland Assessment for the Replacement Water Lines from Technical Area 48 to Technical Area 55 Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) near a wetland at Technical Area (TA) 48 and under a wetland at TA-55. The project proposes to install two 12-inch water lines along an alignment from TA-48 to Pecos Road on the east side of TA-55 (Figure 1). The proposed water lines will replace aging cast iron pipes that provide water for fire suppression to buildings within TA-55, and potable water to other areas in the Pajarito Corridor. NNSA has prepared this wetland assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Wetland and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Wetland Management (EO 1977). A wetland is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base wetland as “the 100-year wetland, that is, a wetland with a 1.0 percent chance of flooding in any given year (CFR 2003).” This wetland assessment evaluates potential impacts to wetland values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

FY2021 Rotating Bed Reactor for Iodine Removal from ETF Feed to Support DFLAW Start-Up

In FY20, Washington River Protection Solutions, LLC (WRPS) began a program of work to evaluate potential technologies for removal of iodine from the ETF feed. Work at the Pacific Northwest National Laboratory (PNNL) focused on ion exchange media and conventional column based deployment while Atkins and VSL focused on ion exchange media in a Rotating Bed Reactor (RBR) system. In the RBR system, the ion exchange media is loaded into a packed bed, which is rotated in the liquid to be treated. The work described in this report builds on the results from FY20 work, in particular, with regard to improving iodate removal, extending the data set to support process modeling, further comparison of RBR versus column performance, and RBR scale-up testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cryo-GCMS Outgassing Screening: Thermal Filler Materials

A study was conducted to investigate the outgassing characteristics of four thermal filler materials. The purpose of this screening was to identify any outgassing products that might be considered reactive, specifically compounds that could result in corrosion in the systems where these materials are used. A range of compounds was observed in the sample headspaces, though most do not stand out as being known reactive species of concern. However, several halogenated compounds and sulfurous compounds- classes compounds known to facilitate corrosion reactions under certain conditions- were observed in low concentrations. The TFLEX 760 exhibited the highest total outgassing, while the GR130 had the lowest. Therm-a-Gap75 and the Si thermal grease exhibited very similar outgassing profiles. It is difficult to predict the extent to which any given compound observed in an analysis of this type might pose a risk in an actual system; factors such as temperature, system geometry, concentration, and gas conductance all play a role in the kinetics governing chemical reactions. It is recommended that the results of these analyses are shared with pertinent materials SMEs familiar with the system(s) in question to evaluate potential risks.

36 MATERIALS SCIENCE↗

Flow Forecasting on New England’s Great River Hydro (Abstract)

Great River Hydro (GRH) operates 13 generating stations and 3 storage-only reservoirs along the Upper Connecticut River, draining 6,266 square miles. Managing the reservoirs requires coordination over a couple days. So far seasonal flow-forecast and medium range probabilistic flow forecast during high flow conditions are leading to satisfactory management. Great River Hydro is seeking technical assistance to evaluate potential improvements in inflow forecasting and scheduling accuracy, particularly during short- to medium- duration periods (1-10 days). Improved accuracy is anticipated to enhance the efficiency with which GRH utilizes water, improving GRH’s ability to hit the best priced hours throughout the system and enhancing revenues as a result.

13 HYDRO ENERGY↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 8 to Technical Area 22 Natural Gas Line Replacement Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction that crosses through upper Pajarito Canyon and upper Starmer Canyon from Technical Area (TA) 8 to TA-22 at Los Alamos National Laboratory (LANL). The project proposes to install a new 12 inch natural gas line to replace the existing 70+ year old natural gas line. Replacement will prevent loss of service to several LANL TAs and Bandelier National Monument. The project activities within the 100- year floodplains include 1) new natural gas line installation to replace and existing aging gas line, 2) relocating a section of fence and 3) three construction equipment and materials storage areas. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Incorporating Wind Turbine Choice in High-Resolution Geospatial Supply Curve and Capacity Expansion Models

To achieve national decarbonization goals, U.S. annual deployment of wind energy will need to increase by at least fivefold compared to the recent past. Modeling and analysis frameworks can help inform where and how wind energy deployment might occur and thereby help enable the achievement of decarbonization goals. However, most prior wind energy modeling and analysis studies rely on generalized representations of wind energy technologies. Since wind energy technology advancements are expected to increase the competitiveness of wind energy, it is important to incorporate more detailed representations of turbine technology into wind energy modeling. Here we present a new method that incorporates wind turbine choice into the technology representation of land-based wind energy in long-term planning models. Our method integrates three previously published modeling and analysis capabilities: 1) bottom-up cost modeling to estimate future technology costs, 2) geospatial modeling to represent siting decisions, and 3) power sector modeling to evaluate potential deployment. We refer to this approach as a "customized turbine choice" methodology because it creates a composite turbine scenario by choosing from multiple wind turbine technologies—using site-specific optimized turbine layout and selecting the least-cost technology at each location. We demonstrate the capabilities of this new modeling pipeline by examining how the selection of four different wind turbine configurations might evolve from 2021 through 2040. Our results show that using our customized turbine choice methodology could lead to higher estimates for wind future deployment, which indicates that more simplified modeling might underestimate the role that wind energy could play in meeting decarbonization goals. Future research is needed to further explore the implications of turbine choice and to better inform technology researchers, original equipment manufacturers, and other wind industry stakeholders about the market potential of different wind turbine technologies.

17 WIND ENERGY↗

Organic Evaporation, Oxidation, and Hydrolysis Testing in Support of Hanford Sample-and-Send

The Hanford site has approximately 56 million gallons of radioactive mixed waste stored in 156 unretrieved underground storage tanks. The Hanford Waste Treatment and Immobilization Plant (WTP) is being built to treat and immobilize the tank waste. The baseline method for immobilization of Low Activity Waste (LAW) through the WTP is vitrification, but additional immobilization capacity is needed to supplement the initial LAW melters. An alternative cementitious waste form is being investigated for that future immobilization method. However, one impediment to a cementitious waste form is the presence of Land Disposal Restricted (LDR) organic chemicals in tank waste, which are regulated on a concentration-based standard in the final waste form. Hence, if the quantity of organics in LAW is high enough, they must be destroyed or removed to make a waste form compatible with disposal in a mixed low level waste landfill. This work evaluates potential avenues for treatment of LDR organics to eliminate the impediment and permit possible use of a cementitious waste form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Temperature Tensile Testing of Molybdenum Before and After Exposure in Flowing He at 600°C to 1000°C

ORNL supported NorthStar Medical Radioisotope’s accelerator-based concept to produce the medical isotope molybdenum-99 (Mo-99). The Mo targets are expected to experience in the accelerator temperature ranging from 200°C to 1000°C, and previous studies have demonstrated the embrittlement of Mo targets at room temperature when exposed to impure He at 800 to 1000°C. The goal of this project was to evaluate potential embrittlement at temperature ranging from 600°C to 1000°C for three Mo materials exposed at the same temperatures for 100h in high purity He (O 2 < 5ppm (µl/l)) with a flow rate of ~1m/s. Enriched Mo-100 (aMo) and conventional pressed and sintered Mo (UHP) disks were provided by NorthStar while low carbon arc cast rolled Mo, fabricated at ORNL, was used for comparison. The as fabricated rolled Mo exhibited superior tensile strength due to the alloy very fine grain size with limited ductility except at 1000°C with the elongation at rupture reaching 30%. The UHP Mo disks showed the lowest strength but highest ductility at 20-1000°C with significant strain hardening during tensile testing. The ductility of the aMo material was quite low at all temperatures due to a high density of voids at grain boundaries. Significant embrittlement of the aMo material was observed after exposure at 600°C to 1000°C, most likely because of oxygen diffusion and segregation at grain boundaries. No embrittlement was observed for the UHP Mo material, with excellent elongation at rupture for some of the specimens oxidized in He and tested at 600-1000°C. Significant variation in ductility from one UHP Mo specimen to another was, however, measured, both in the as fabricated and He-oxidized conditions. The rolled Mo was not affected by oxidation in He at 800°C, but a decrease in strength and increase in ductility was observed at 1000°C, likely due to the material recrystallization.

36 MATERIALS SCIENCE↗

Organic Evaporation, Oxidation, and Hydrolysis Testing in Support of Hanford Sample-and-Send

The Hanford site has approximately 54 to 56 million gallons of radioactive mixed waste stored in 156 unretrieved underground storage tanks. The Hanford Waste Treatment and Immobilization Plant (WTP) is being built to treat and immobilize the tank waste. The baseline method for immobilization of Low Activity Waste (LAW) through the WTP is vitrification, but additional immobilization capacity is needed to supplement the initial LAW melters. An alternative cementitious waste form is being investigated for that future immobilization method. However, one impediment to a cementitious waste form is the presence of Land Disposal Restricted (LDR) organic chemicals in tank waste, which are regulated on a concentration based standard in the final waste form. Hence, if the quantity of organics in LAW is high enough, they must be destroyed or removed to make a waste form compatible with disposal in a mixed low level waste landfill. This work evaluates potential avenues for treatment of LDR organics to eliminate the impediment and permit possible use of a cementitious waste form. Vacuum evaporation testing to remove LDR organics consisted of preparing a non-radioactive LAW simulant, spiking that simulant with organic chemicals, and evaporating the mixture via differential distillation. The apparatus was a laboratory-scale vacuum evaporator operated at 60 ±5 torr absolute (vacuum evaporation). The LAW simulant represented the liquid expected to be retrieved from the Hanford tank farms at approximately 4.0 M [Na+] total sodium ion concentration. The concentration of the organic chemicals added was significantly higher than typically found in the tank waste samples since the higher levels were necessary to assist in analytical measurement and tracking of the spiked species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

First Phase Consensus Roadmap for Development of Condition-Based Cable Reliability Assurance

The objective of this work was to develop a first phase consensus roadmap for condition-based qualification (CBQ) of electrical cables. With CBQ, qualification of Class 1E electrical cables moves from a time-based approach to a condition-based approach, which is anticipated to be safer in terms of reliability and conservatism, and more cost effective in the long run. However, due to barriers, the CBQ approach has not yet been adopted by U.S. nuclear power plants (NPPs). Based upon a review of current work evaluating CBQ, the limitation of available condition monitoring technology seems to be the largest barrier. The importance of condition monitoring, or more specifically selecting appropriate condition indicators, during CBQ cannot be understated. However, selecting appropriate condition indicators is challenged by techniques that are destructive and only evaluate cable degradation locally. Further, arguably, no one identified condition indicator fully establishes cable condition. Thus, additional work is necessary to evaluate potential condition indicators towards CBQ. In addition to the requirements of IEC/IEEE Std. 60780-323, ideal condition indicators should include a) both destructive and non-destructive approaches, b) both local and global measurements, c) real-time (i.e., online) monitoring that trends with degradation, d) enable correlation with qualified levels of degradation, and e) be established within a repository of condition indicators with applicable materials and/or components and their acceptance criteria. Additional work is needed in development of technology and methodology prior to adoption of CBQ, especially for extending qualified life of installed components. Education and early experience by the industry and regulators will be required for this change in approach as an alternative to re-analysis. A series of workshops that bring together stakeholders to identify and address gaps will be needed. The longstanding cooperative working group of cable researchers from the U.S. Department of Energy, the Electric Power Research Institute, and the Nuclear Regulatory Commission forms a valuable starting point for development of a consensus roadmap to condition-based qualification approach as a viable options for qualification of cable systems in U.S. light water reactors.

42 ENGINEERING↗

Hanford Site Ecological Monitoring Report for Calendar Year 2017

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing the U.S. Department of Energy’s (DOE) activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act and Comprehensive Environmental Response, Compensation, and Liability Act. DOE/EIS-0222-FU, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement, (CLUP) evaluates potential environmental impacts associated with implementing a comprehensive land use plan for the Hanford Site over the next 50 years. The vision for the DOE-RL-managed portion of the Hanford Site focuses not only on the cleanup of nuclear facilities and waste sites but on the protection of groundwater, the Columbia River, and the restoration of the land for access and use. To reach these goals DOE-RL is working closely with partners, such as the U. S. Fish and Wildlife Service (FWS) and National Park Service, to enable use of the Hanford land consistent with the CLUP. As DOE-RL moves toward accomplishing this vision, monitoring the ecological resources present to determine whether there is a need for conservation and/or protection of any resources will be critical for making informed decisions for responsible site stewardship.

54 ENVIRONMENTAL SCIENCES↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Impacts of Model Building Energy Codes

The Department of Energy (DOE) Building Energy Codes Program (BECP) periodically evaluates national and state-level impacts associated with energy codes in residential and commercial buildings. Pacific Northwest National Laboratory (PNNL), funded by DOE, conducted an assessment of the prospective impacts of national model building energy codes from 2010 through 2040. A previous PNNL study evaluated the impact of the Building Energy Codes Program. A 2016 study looked more broadly at overall code impacts and this report describes the methodology used for the assessment and presents the impacts in terms of energy savings, consumer cost savings, and reduced emissions at the state level and at aggregated levels. In 2021, DOE conducted an interim and limited update to its 2016 study to evaluate potential building code updates using the 2016 methodology. That interim update includes estimated savings resulting from updates to the model energy codes, including the ANSI/ASHRAE/IES Standard 90.1-2016 (ASHRAE 90.1-2016) and 2019 editions, as well as the 2018 and 2021 International Energy Conservation Code (IECC). In 2023, DOE developed a fully updated report that includes code updates (ASHRAE 90.1-2019 and 2021 IECC), as well as additional enhancements and updates, including updated energy prices, annual floorspace additions, state code adoption dates, and emission factors, among others. This current version is another fully updated report that includes code updates (ASHRAE 90.1-2022 and 2024 IECC), as well as additional enhancements and updates, including updated energy prices, state code adoption dates, emission factors, and renewable energy contribution among others. Energy codes follow a three-phase cycle that starts with the development of a new model code, proceeds with the adoption of the new code by states and local jurisdictions, and finishes when the new code is implemented and builders, architects, and engineers are required to comply with the new provisions. The development of new model code editions creates the potential for increased energy savings. After a new model code is adopted, potential savings are realized in the field when new buildings (or additions and alterations) are constructed to comply with the new code. The contributions of all three phases are crucial to the overall impact of codes and are considered in this assessment. Figure ES.1 schematically describes the analysis framework. Energy savings are expressed in terms of energy use intensity (EUI) in the figure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Port Gamble S'Klallam Tribe Strategic Energy Plan

The Port Gamble S'Klallam Tribe's Strategic Energy Plan (SEP) details the outcomes and efforts of a 1.5-year Energy Technology Innovation Partnership Program (ETIPP) project. This collaboration involved the Port Gamble S'Klallam Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory. Project partners supported the Tribe in identifying key energy research focus areas and the Tribe's energy vision. As the technical lead on the project, PNNL led a series of research initiatives to evaluate potential pathways for the Tribe to achieve its energy goals, subsequently providing associated recommendations. The SEP offers a comprehensive analysis encompassing several critical aspects including: -The Tribe's current energy landscape -Availability of renewable resources -Potential microgrid designs, developed by Säzän Group -Critical infrastructure analysis -Electric vehicle integration -An energy workforce development framework, led by Spark Northwest The analysis results come with recommended next steps, categorized by implementation timeframe (short-term, medium-term, long-term) and priority.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Damage in Medium Voltage Cable Using Machine Learning

Developments in cable test instrumentation coupled with artificial intelligence and machine learning (ML) to aid in interpretation of cable test signals supports the feasibility for automated analysis of reflectometry tests for low voltage power cables. This work seeks to leverage prior ML work and success for low voltage cables to evaluate potential application to medium voltage (2kV to 10kV) installations. The Accelerated and Real-Time Environmental Nodal Assessment (ARENA) Cable Motor Test Bed at Pacific Northwest National Laboratory (PNNL) was used to test a medium voltage cable with several types of damage including thermal aging and low resistance conductor-to-shield faults. The cable was tested using an inductive clamshell coupler to protect the test instruments from the energized cable voltages that would damage the test instruments if coupled directly to the energized conductor.

42 ENGINEERING↗

Pyramid Lake Renewable Energy Project

The Pyramid Lake Paiute Tribe is a federally recognized Tribe residing on the Pyramid Lake Reservation in western Nevada. The funding for this project was used to identify blind geothermal systems disconnected from geothermal sacred sites and develop a Tribal energy corporation for evaluating potential economic development for profit.

15 GEOTHERMAL ENERGY↗