Search NASA⌕ Search

SEARCH · Search NASA

Results for “Practitioner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The treatment of landscape in a Swedish EIA process

Landscape is partly a social matter and has long been one of many aspects investigated in environmental impact work in road and railway planning. The focus on landscape has recently strengthened as Sweden is on its way to ratifying the European Landscape Convention (ELC). It is timely to examine how landscape is handled in environmental impact statement (EIS) preparation in everyday practice, a process involving many actors. This study examines the environmental impact assessment process for a large road project, More Efficient North-South Communications in Greater Stockholm, in terms of the behaviour of three actors, the developer, practitioner, and reviewer. In many respects, the results were rather far removed from several ELC intentions. The deficiencies primarily concerned public participation, comprehensive overview, competence, and stakeholder coordination. These deficiencies originated both inside and outside the environmental impact assessment process of the studied road-building project and cannot be attributed any single stakeholder.

54 ENVIRONMENTAL SCIENCES↗

The U.S. Forest Service's analysis of cumulative effects to wildlife: A study of legal standards, current practice, and ongoing challenges on a National Forest

Cumulative effects analysis (CEA) allows natural resource managers to understand the status of resources in historical context, learn from past management actions, and adapt future activities accordingly. U.S. federal agencies are required to complete CEA as part of environmental impact assessment under the National Environmental Policy Act (NEPA). Past research on CEA as part of NEPA has identified significant deficiencies in CEA practice, suggested methodologies for handling difficult aspects of CEA, and analyzed the rise in litigation over CEA in U.S. courts. This article provides a review of the literature and legal standards related to CEA as it is done under NEPA and then examines current practice on a U.S. National Forest, utilizing qualitative methods in order to provide a detailed understanding of current approaches to CEA. Research objectives were to understand current practice, investigate ongoing challenges, and identify impediments to improvement. Methods included a systematic review of a set of NEPA documents and semi-structured interviews with practitioners, scientists, and members of the public. Findings indicate that the primary challenges associated with CEA include: issues of both geographic and temporal scale of analysis, confusion over the purpose of the requirement, the lack of monitoring data, and problems coordinating and disseminating data. Improved monitoring strategies and programmatic analyses could support improved CEA practice.

54 ENVIRONMENTAL SCIENCES↗

Health impact assessment: A comparison of 45 local, national, and international guidelines

This article provides a comparison of health impact assessment (HIA) guidelines from around the world and for multiple geographic scales. We identify commonalities and differences within HIA guides to discuss the plausibility of consensus guidelines and to inform guideline development. The practice of HIA has grown over the last two decades with a concurrent growth of HIA guides. This study expands on earlier review work and includes guides published since 2007 (Mindell, Boltong and Forde, 2008). From April 2010 to October 2011, 45 HIA guides were identified through an internet search and review of previous research. Common characteristics, key features, and the HIA process were analyzed. The 45 documents recommended similar but not identical processes for conducting HIAs. These analyses suggest that guidelines for HIAs are similar in many areas of the world and that new HIA practitioners can use these findings to inform their approach. Further discussion is needed to determine if the approaches established in these guidelines are followed and if one set of common guidelines could be written for use in numerous countries and regions. - Highlights: Black-Right-Pointing-Pointer We analyze 45 health impact assessment (HIA) guidelines worldwide. Black-Right-Pointing-Pointer We examine similarities and unique attributes of each guideline. Black-Right-Pointing-Pointer We discuss the advantages and disadvantages of developing consensus guidelines. Black-Right-Pointing-Pointer Identifying additional guidelines aides in future HIA work and evaluation.

54 ENVIRONMENTAL SCIENCES↗

Walking the sustainability assessment talk - Progressing the practice of environmental impact assessment (EIA)

Internationally there is a growing demand for environmental impact assessment (EIA) to move away from its traditional focus towards delivering more sustainable outcomes. South Africa is an example of a country where the EIA system seems to have embraced the concept of sustainability. In this paper we test the existing objectives for EIA in South Africa against sustainability principles and then critique the effectiveness of EIA practice in delivering these objectives. The outcome of the research suggests that notwithstanding a strong and explicit sustainability mandate through policy and legislation, the effectiveness of EIA practice falls far short of what is mandated. This shows that further legislative reform is not required to improve effectiveness but rather a focus on changing the behaviour of individual professionals. We conclude by inviting further debate on what exactly practitioners can do to give effect to sustainability in EIA practice.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The significance of structural power in Strategic Environmental Assessment

This article presents a study of how power dynamics enables and constrains the influence of actors upon decision-making and Strategic Environmental Assessment (SEA). Based on structuration theory, a model for studying power dynamics in strategic decision-making processes is developed. The model is used to map and analyse key decision arenas in the decision process of aluminium production in Greenland. The analysis shows that communication lines are an important resource through which actors exercise power and influence decision-making on the location of the aluminium production. The SEA process involved not only reproduction of formal communication and decision competence but also production of alternative informal communication structures in which the SEA had capability to influence. It is concluded, that actors influence strategic decision making, and attention needs to be on not only the formal interactions between SEA process and strategic decision-making process but also on informal interaction and communication between actors as the informal structures, which can be crucial to the outcome of the decision-making process. This article is meant as a supplement to the understanding of power dynamics influence in IA processes and as a contribution to the IA research field with a method to analyse power dynamics in strategic decision-making processes. The article also brings reflections of strengths and weaknesses of using the structuration theory as an approach to power analysis. - Highlights: Black-Right-Pointing-Pointer Informal interaction influenced process despite the presence of formalised rules. Black-Right-Pointing-Pointer Interdependence of actors influenced SEA effectiveness. Black-Right-Pointing-Pointer SEA practitioners successfully exercised power to influence decision-making. Black-Right-Pointing-Pointer Power dynamics are properties of actors' interactions in decision-making. Black-Right-Pointing-Pointer Power structures can be enabling and not solely limiting.

54 ENVIRONMENTAL SCIENCES↗

Spheres of public conversation: Experiences in strategic environmental assessment

This paper draws on earlier research, a national review of Scottish SEA practice and a survey of practitioners and stakeholders engaged in SEA and spatial planning in one Scottish city-region, to explore claims being made in the academic literature for Strategic Environmental Assessment (SEA) as a tool for deliberative plan-making. We consider whether there is evidence that Scottish SEA practice is helping create more inclusive plan-making processes in light of recent legislative changes, thereby fulfilling one of the expectations of Scottish Government. The macro analysis found that although there are opportunities for stakeholders to engage in the Scottish SEA process the level in practice is extremely low, a finding which mirrors experience in England and elsewhere. The more detailed micro analysis reveals a more nuanced picture within the spatial planning system, however, suggesting the existence of two distinct spheres of public conversations, one characterised by active dialogue about the environmental effects of alternative strategies amongst public sector stakeholders and the other involving non-governmental stakeholders and community groups in a much more limited way. The paper concludes with a discussion of possible explanations for this outcome, concerning asymmetric incentive structures and the application of power, and a consideration of the implications in relation to the competing discourses of SEA. -- Highlights: • We examine the extent to which Scottish SEA is helping promote inclusive plan-making. • Low levels of stakeholder engagement generally in Scottish SEA. • Stronger SEA dialogue amongst public agencies than with the wider community. • Importance of incentive structures and power capture in framing SEA public conversations.

54 ENVIRONMENTAL SCIENCES↗

Ecological compensation: From general guidance and expertise to specific proposals for road developments

The main scientific bibliography addressing the rationale behind ecological compensation is reviewed in order to examine general guidelines. This contains interesting general guidance on how to implement compensation, and provides the basis for future developments in compensation practice. On this basis, we propose a further step in compensation practice, advancing compensation proposals or rules for specific kinds of projects and contexts, focusing on road projects in the Spanish Environmental Impact Assessment (EIA). Three main residual impacts of roads are identified which usually remain uncompensated for: the loss of natural and semi-natural land use, the increase in emissions resulting from any new road, and the fragmentation, severance or barrier effect on the landscape and its wildlife. To counteract these, four proposals, or “rules”, are advanced: conservation of natural and semi-natural land use area, conservation of dominant plant species physiognomy, compensation for emissions, and the rule of positive defragmentation. -- Highlights: • Ecological compensation theory does not specify guidelines for types of projects. • EIA practitioners lack valuable specific guidance on how to implement compensation. • Specific guidance for road project ecological compensation is proposed. • Compensation proposals should have in mind present-day compensation practice level. • Specific ways to compensate for habitat loss, emissions, and fragmentation are shown.

54 ENVIRONMENTAL SCIENCES↗

The paradox of strategic environmental assessment

Strategic Environmental Assessment (SEA) is a tool that can facilitate sustainable development and improve decision-making by introducing environmental concern early in planning processes. However, various international studies conclude that current planning practice is not taking full advantage of the tool, and we therefore define the paradox of SEA as the methodological ambiguity of non-strategic SEA. This article explores causality through at three-step case study on aggregates extraction planning in Denmark, which consists of a document analysis; a questionnaire survey and follow-up communication with key planners. Though the environmental reports on one hand largely lack strategic considerations, practitioners express an inherent will for strategy and reveal that their SEAs in fact have been an integrated part of the planning process. Institutional context is found to be the most significant barrier for a strategy and this suggests that non-strategic planning setups can prove more important than non-strategic planning in SEA practice. Planners may try to execute strategy within the confinements of SEA-restricted planning contexts; however, such efforts can be overlooked if evaluated by a narrow criterion for strategy formation. Consequently, the paradox may also spark from challenged documentation. These findings contribute to the common understanding of SEA quality; however, further research is needed on how to communicate and influence the strategic options which arguably remain inside non-strategic planning realities. - Highlights: • International studies conclude that SEAs are not strategic. = The paradox of SEA. • Even on the highest managerial level, some contexts do not leave room for strategy. • Non-strategic SEA can derive from challenged documentation. • Descriptive and emergent strategy formation can, in practice, be deemed non-strategic.

54 ENVIRONMENTAL SCIENCES↗

Theory versus practice in Strategic Environmental Assessment (SEA)

Could the theory of Strategic Environmental Assessment (SEA) be ahead of its time and decoupled from its practice? This paper evolved in search for this leading research question. Over the years the discourse on SEA experienced a gradual shift from the technocratic and rationalist thinking that supported its origin to more strategic approaches and integrated concepts, suggested since the mid 1990's. In this paper we share the results of our analysis of international thinking and practical experience with SEA. Results reveal that SEA practice changes very slowly when compared to advanced thinking supporting the noted shift. Current SEA practice shows to be still predominantly rooted in the logic of projects' environmental impact assessment (EIA). It is strongly bound to legal and regulatory requirements, and the motivation for its application persists being the delivery of environmental (or final) reports to meet legal obligations. Even though advanced SEA theoretical thinking claim its potential to help decisions to look forward, change mind-sets and the rationale of decision-making to meet sustainability challenges and enhance societal values, we note a weak relationship between the theoretical development of SEA and its practice. Why is this happening? Which factors explain this apparent inertia, resistance to change, in the SEA practice? Results appear to demonstrate the influence of assumptions, understandings, concepts, and beliefs in the use of SEA, which in turn suggest the political sensitivity of the instrument. - Highlights: • Theoretical thinking in SEA is ahead of its time. • SEA international practice reveals inertia to move out of project’ EIA comfort zone. • World current SEA practice show similar understandings of 30 years ago. • 100 world reports and survey of practitioners supported world review. • SEA great challenge is to change paradigms into new scientific complexity theories.

54 ENVIRONMENTAL SCIENCES↗

Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

54 ENVIRONMENTAL SCIENCES↗

Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools. - Highlights: • We assessed the effectiveness of Environmental Management Plans (EMPs) for major developments, focusing on delivery of mitigation and monitoring. • EIA and Environmental Management Systems (EMS) post-consent are weakly linked. • The use of EMPs varies significantly in practise, partly due to the range of terminology used. • Linkages are hampered by poor communication and follow-up • More detailed guidance on how EMPs can successfully link with EMS is required.

54 ENVIRONMENTAL SCIENCES↗

Consideration of climate change on environmental impact assessment in Spain

Most of the projects subject to environmental impact assessment (EIA) are closely related to climate change, as they contribute to or are affected by it. The growing certainty about climate change and its impacts makes its consideration an essential part of the EIA process, as well as in strategic environmental assessment (SEA). This paper examines how climate change (CC) has been taken into account in EIA in Spain through the analysis of 1713 environmental records of decision (RODs) of projects submitted for EIA. In 2013 Spain approved one of the most advanced laws in terms of CC consideration in environmental assessment, although it had not yet accumulated extensive practice on the issue. This contrasts with the situation of countries like Canada or the USA, which have a significant body of experience without specific legal requirements. Only 14% of the RODs analysed included references to CC, and in more than half of the cases it was a mere citation. Thermal power plants, which are subject to specific GHG regulations, show the highest consideration, while transport infrastructures, which are important contributors to CC, show a very low consideration. Almost all the references are related to their contribution to CC, while consideration of the effects of CC is minimal. The increasingly common incorporation of CC into SEA, should not imply its exclusion from EIA, because both processes have different aims and uses. Including the obligation to consider CC in the EIA regulations is highly desirable, but probably not enough without other measures, such as practical guidance, training and motivational programmes for practitioners and evaluators. But even these actions cannot ensure effective and adequate assessments of CC. Probably more resources should be spent on creating greater awareness in all the agents involved in EIA. - Highlights: • We analyse how the climate change is considered in EIA in Spain. • Few projects seriously assess climate change. • Transport infrastructure projects barely consider climate change. • Assessing climate change in SEA should not imply that it is excluded from EIA.

54 ENVIRONMENTAL SCIENCES↗

Cumulative effects in strategic environmental assessment: The influence of plan boundaries

Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

54 ENVIRONMENTAL SCIENCES↗

A knowledge brokerage approach for assessing the impacts of the setting up young farmers policy measure in Greece

This study explores Knowledge Brokerage (KB) aspects of an ex-post Impact Assessment (IA) for the Rural Development Programme (RDP) measure of setting up young farmers, under the Common Agricultural Policy (CAP), at the regional level in Northern Greece. The measure supports the entry of young farmers in agriculture by moving land from older to younger farmers. The aim of the study was to test a set of KB tools for improving the interaction between researchers and policy makers. Our analysis mainly focused on a suite of IA Support Modules to guide practitioners, and on a technical tool kit, a web-based contextualisation platform, to support the IA of the specific test case. Offering a structured approach towards IA, both the Support Modules and LIAISE-KIT allow framing the context, organisation, scheduling and method selection in the light of KB objectives. The evaluation of how IA Support Modules influence the Science Policy Interface (SPI), in the case of the ex-post assessment, demonstrated the high relevance of KB activities for facilitating the interaction between researchers and regional policy makers. The assessment bridges the gap between knowledge producers developing scientific output to be applied in a specific context, and knowledge users, who want clear messages regarding the policy challenges they face. Other conclusions include the need for specific guidelines and training for knowledge users, especially with regard to the use of tools. According to our findings, a consequent application of KB activities is a crucial pre-condition for successfully implementing IAs in future RDP measures.

54 ENVIRONMENTAL SCIENCES↗

Conceptualizing strategic environmental assessment: Principles, approaches and research directions

Increasing emphasis has been placed in recent years on transitioning strategic environmental assessment (SEA) away from its environmental impact assessment (EIA) roots. Scholars have argued the need to conceptualize SEA as a process designed to facilitate strategic thinking, thus enabling transitions toward sustainability. The practice of SEA, however, remains deeply rooted in the EIA tradition and scholars and practitioners often appear divided on the nature and purpose of SEA. This paper revisits the strategic principles of SEA and conceptualizes SEA as a multi-faceted and multi-dimensional assessment process. It is suggested that SEA can be conceptualized as series of approaches operating along a spectrum from less to more strategic – from impact assessment-based to strategy-based – with each approach to SEA differentiated by the specific objectives of SEA application and the extent to which strategic principles are reflected in its design and implementation. Advancing the effectiveness of SEA requires a continued research agenda focused on improving the traditional SEA approach, as a tool to assess the impacts of policies, plans and programs (PPPs). Realizing the full potential of SEA, however, requires a new research agenda — one focused on the development and testing of a deliberative governance approach to SEA that can facilitate strategic innovations in PPP formulation and drive transitions in short-term policy and initiatives based on longer-term thinking. - Highlights: • SEA facilitates strategic thinking, enabling transitions toward sustainability. • SEA is conceptualized as a spectrum of approaches, from IA-based to strategy-based. • Each approach variably emphasizes strategic principles in its design and practice. • There is no one conceptualization of SEA that is best, SEA is fit for PPP purpose. • Research is needed to advance SEA to facilitate strategic PPP transformations.

54 ENVIRONMENTAL SCIENCES↗

System dynamic simulation: A new method in social impact assessment (SIA)

Many complex social questions are difficult to address adequately with conventional methods and techniques, due to the complicated dynamics, and hard to quantify social processes. Despite these difficulties researchers and practitioners have attempted to use conventional methods not only in evaluative modes but also in predictive modes to inform decision making. The effectiveness of SIAs would be increased if they were used to support the project design processes. This requires deliberate use of lessons from retrospective assessments to inform predictive assessments. Social simulations may be a useful tool for developing a predictive SIA method. There have been limited attempts to develop computer simulations that allow social impacts to be explored and understood before implementing development projects. In light of this argument, this paper aims to introduce system dynamic (SD) simulation as a new predictive SIA method in large development projects. We propose the potential value of the SD approach to simulate social impacts of development projects. We use data from the SIA of Gareh-Bygone floodwater spreading project to illustrate the potential of SD simulation in SIA. It was concluded that in comparison to traditional SIA methods SD simulation can integrate quantitative and qualitative inputs from different sources and methods and provides a more effective and dynamic assessment of social impacts for development projects. We recommend future research to investigate the full potential of SD in SIA in comparing different situations and scenarios.

54 ENVIRONMENTAL SCIENCES↗

Health impact assessment in Latin American countries: Current practice and prospects

Background: With the objective to avoid and mitigate potential adverse health impacts of projects, programmes and policies, health impact assessment (HIA) offers an opportunity for disease prevention and health promotion. Although HIA has gained importance over the past two decades, it is unclear whether and to what extent HIA practice has been established and institutionalised in Latin America. To address this issue, the current practice and prospects of HIA in Latin America was assessed in the peer-reviewed literature and existing guidelines. Methodology: The peer-reviewed literature was systematically searched using five electronic databases until February 2016. Studies were included on a set of pre-defined criteria. The search was carried out in English, French, Portuguese and Spanish. Additionally, a search for HIA guidelines used in Latin American countries and territories was performed by means of a Google search and on websites of government departments and institutions that may promote HIA. Results: The search yielded 167 hits in the peer-reviewed literature of which 17 articles met inclusion criteria. Only four peer-reviewed articles described prospective HIAs and four featured a discussion of the HIA approach. The remaining nine articles presented health impact evaluations. Most studies were published only recently, after 2012 (88%). Seven HIA guideline documents were identified, two of which were country-specific (i.e. Brazil and Mexico) and the remaining five addressed HIA at the regional level. Conclusions: This study confirmed the paucity of literature pertaining to HIA implementation, as well as HIA guidelines in Latin America. Mexico, Brazil and Cuba have the longest track record in scientific literature and guidelines on HIA. In order to better understand current barriers and limitations to practice and institutionalisation of HIA in Latin American countries, a broad discussion among policy makers, academic institutions and HIA practitioners is warranted nationally and regionally. - Highlights: •We conducted a systematic review pertaining to HIA and a search for guidelines on HIA in use in Latin America. •We identified 17 peer-reviewed articles, four of which were prospective HIAs. •Seven HIA guideline documents were identified, with two country-specific pieces. •There is a paucity of HIA articles in the peer-reviewed literature and guidelines in Latin America, but the situation is improving.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Confronting barriers and recognizing opportunities: Developing effective community-based environmental monitoring programs to meet the needs of Aboriginal communities

Aboriginal communities can be negatively affected by resource development, but often they do not have a full opportunity to participate in project review and the resulting monitoring and mitigation activities. Cumulative impacts of resource development are also typically neglected in monitoring protocols that focus on a limited number of environmental values, rather than adopting a long-term, holistic view of development over time and space. Community-based environmental monitoring (CBEM) is emerging as a way to meaningfully include local Aboriginal citizens in the decision-making process as well as the assessment of the long-term impacts of the development of natural resources. We explored opportunities and barriers for developing CBEM programs that meet the needs of small and rural Aboriginal communities that are faced with the rapid and wide-spread development of natural resources. We conducted interviews with a local Aboriginal community, and natural resource management practitioners who could provide perspectives on the application of CBEM to resource management in north-central British Columbia, Canada. Results demonstrate that CBEM offers a locally adapted and culturally appropriate approach to facilitate the participation of Aboriginal communities in natural resource decision making and management. The interpretation of the specific role and purpose of CBEM differed among participants, depending on their objectives for and concerns about natural resource development. However, all parties were consistent in viewing CBEM as an effective method for engaging in dialogue, cooperation, and tracking environmental change. The development or improvement of CBEM programs should consider the efficacy of monitoring protocols, social cohesion and relationships, ability to inform decision-making, and effectiveness of CBEM for the members of the community. - Highlights: • We explored how to develop effective CBEM with a focus on Aboriginal communities. • We identified opportunities and barriers for developing CBEM programs. • CBEM can facilitate Aboriginal community participation in natural resource management.

54 ENVIRONMENTAL SCIENCES↗