Search NASA⌕ Search

SEARCH · Search NASA

Results for “Prelaunch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Calibration of a satellite infrared radiometer

The calibration procedure is described for a two-channel imaging radiometer on board the Heat Capacity Mapping Mission, a single sensor satellite in a near polar orbit. The Heat Capacity Mapping Radiometer measures radiation temperature and reflectivity with an instantaneous FOV of 600 m and a noise equivalent temperature of 0.4 K at 280 K in the thermal IR channel. Unexplained changes in the system during satellite launch were treated through comparison with surface/atmosphere data to force agreement. This necessitated an offset from the prelaunch calibration by 5.5 K. Later comparisons showed no difference. Possible explanations are presented.

Barnes, W. L.↗

Shuttle mission simulator

The simulator was designed to provide real time simulation capability for all phases of the Shuttle Transportation System orbital missions including prelaunch, ascent, onorbit operations, deorbit, entry, approach/landing, and rollout. Full mission continuity is provided in transition between these mission phases. Dual fixed and motion base crew stations, instructor/operator stations, and computer systems allow parallel, simultaneous crew training with either complex capable of being individually integrated with the mission control center. This integrated training capability allows flight control personnel training in the air/ground interface areas of tracking, telemetry (vehicle systems monitoring), uplink command control, and communications. With the exception of the simulated Data Processing System, which utilizes actual flight computers and associated flight software, all orbiter onboard systems are functionally simulated with extensive simulated malfunction capabilities. Additionally, crew out-the-window visual scenes, and aural cues are rigorously simulated.

Olasky, C.↗

Wet countdown demonstration and flight readiness firing

The prelaunch tests for the Space Transportation System 1 flight are briefly described. Testing is divided into two major sections: the wet countdown demonstration test/flight readiness firing, which includes a 20 second test firing of the orbiter's three main engines, and a mission verification test, which is centered on flight and landing operations. The functions of the countdown sequence are listed and end of mission and mission abort exercises are described.

Source record↗

NASA to launch second business communications satellite

The two stage Delta 3910 launch vehicle was chosen to place the second small business satellite (SBS-B) into a transfer orbit with an apogee of 36,619 kilometers and a perigee of 167 km, at an inclination of 27.7 degrees to Earth's equator. The firing and separation sequence and the inertial guidance system are described as well as the payload assist module. Facilities and services for tracking and control by NASA, COMSAT, Intelsat, and SBS are outlined and prelaunch operations are summarized.

Source record↗

Solar Mesosphere Explorer

Five experiments and the instruments packages designed for use in studying reactions between sunlight, ozone, and other chemicals in the atmosphere as well as for determining how ozone concentrations are transported in the mesosphere are described. The spin-stabilized satellite carrying the experiments consists of an observatory module and a spacecraft bus. Powered by a solar array which charges the nickel-cadmium batteries, the satellite is to be inserted into a sun synchronous orbit by a two stage Delta 2310 launch vehicle. The mission objectives, spacecraft configurations, and various subsystems are described as well as the ground support and prelaunch operations.

Source record↗

Atmospheric environment for space shuttle (STS-1) launch

Atmospheric conditions near space shuttle STS-1 launch time on April, 12, 1981, at Kennedy Space Center, Florida, are reported. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is presented. Also presented are the wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area. Final meteorological data tapes for STS-1 vehicle ascent, and SRB descent have been constructed which consist of wind and thermodynamic parameters versus altitude.

Johnson, D. L.↗

Preliminary cryogenic performance of the Shuttle Infrared Telescope Facility

The Shuttle Infrared Telescope Facility (SIRTF) is a cryogenically cooled telescope in the one-meter aperture class designed for sensing in the infrared from 2-200 microns. This facility is designed to be flown many times on the Space Shuttle with varying instrument complements. All components of the SIRTF within the field of view of the optics are cryogenically cooled. The primary coolant is supercritical helium which is stored in an external tank and routed through the telescope - cooling the instruments first, then the optical components and finally the baffles. For detector cooling below 6K small reservoirs of superfluid helium (He II) are provided. The SIRTF cryogenic system is designed to automatically control the tank pressure and telescope flow rates during prelaunch operations and flight as well as meet the Space Shuttle environmental and safety requirements. Temperatures maintained in the telescope are a function of instrument operation, design, energy dissipation, and telescope pointing angle. By control of the cryogen flow rate any selected instrument temperature can be maintained within fixed limits, and the critical secondary mirror can be maintained below 10K throughout a 14-day mission. Instrument thermal design is a critical factor in the maintenance of proper temperature differences in the experiment package. Design of a cryogenic telescope for space use presents many problems which do not exist in earth based systems. The limited opportunity for servicing, the restricted coolant supply, and the remote instrumentation and control all provide new considerations for the instrument and system designers.

Gier, H. L.↗

ATS-5 12 year in orbit evaluation

The results of the ATS 5 End-of-Life (EOL) tests are presented. Whenever possible, the test data were compared with prelaunch and inflight data. Pertinent memos and other informal documents containing these data are included as appendixes. The EOL tests include communication subsystems tests, power sybsystem tests, and gravity gradient television camera system tests.

Kissel, F. J.↗

Third Intelsat 5 satellite scheduled for launch

The launch sequence of the Intelsat 5-C satellite is announced. A brief description of the satellite and the Atlas Centaur launch vehicle is given. Prelaunch operations are included.

Source record↗

High precision attitude determination for Magsat

A two phase approach to attitude determination software development is introduced. The prelaunch planning and software activities connected with the development and testing of the baseline system for processing nominal attitude data for MAGSAT are described and postlaunch analysis and modifications are outlined. Attitude data processing began 5 months after launch so that postlaunch anomalies could be accounted for. Another advantage of the two phase approach is that costs are reduced because the system is not burdened with software dealing with all possible contingencies. A definitive, continuous, time history of the three axis attitude of the spacecraft was generated to a precision of 20 arc sec (one standard deviation), in each axis. Sensor alignment determinations were done continuously because of the deletrious effects of changing alignments on attitude precision.

Abshire, G.↗

Atmospheric environment for Space Shuttle (STS-2) launch

Selected atmospheric conditions observed near Space Shuttle STS-2 launch time on November 12, 1981, or Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given in this report. Wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area are also presented. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-2 vehicle ascent and SRB descent have been constructed. The STS-2 ascent meteorological data tape was constructed.

Johnson, D. L.↗

Geometric error characterization and error budgets

Procedures used in characterizing geometric error sources for a spaceborne imaging system are described using the LANDSAT D thematic mapper ground segment processing as the prototype. Software was tested through simulation and is undergoing tests with the operational hardware as part of the prelaunch system evaluation. Geometric accuracy specifications, geometric correction, and control point processing are discussed. Cross track and along track errors are tabulated for the thematic mapper, the spacecraft, and ground processing to show the temporal registration error budget in pixel (42.5 microrad) 90%.

Beyer, E.↗

INTELSAT V-E(F-5)

Prelaunch mission plans for the INTELSAT V-5 (F-5) commercial communications satellites are summarized. Voice circuits, television channels, and a Maritime Communications Services package for the Maritime Satellite Organization (INMARSAT) to provide ship/shore/ship communications are described.

Source record↗

Atmospheric constraint statistics for the Space Shuttle mission planning

The procedures used to establish statistics of atmospheric constraints of interest to the Space Shuttle mission planning are presented. The statistics considered are for the frequency of occurrence, runs, and time conditional probabilities of several atmospheric constrants for each of the Space Shuttle mission phases. The mission phases considered are (1) prelaunch, (2) launch, (3) return to launch site, (4) abort once around landing, and (5) end of mission landing.

Smith, O. E.↗

Development and integration of the infrared telescope for Spacelab

A description is given of the design features of the Small Helium-Cooled Infrared Telescope (IRT) being developed for the 1983 Spacelab 2 mission and the problems encountered during the development of its (1) superfluid helium system requirements, (2) interfaces with Spacelab, and (3) Kennedy Space Center prelaunch operations requirements and restrictions. The IRT comprises cryogenic, IR optical, mechanical, and electronics subsystems. Attention is given the preflight management of superfluid helium by a vacuum maintenance assembly (VMA), which will operate almost continuously until launch and then be deactivated to fly as unavoidable ballast. The objective of IRT design and development is the meeting of IR science and engineering objectives with a relatively low-cost system.

Urban, E. W.↗

Simulation for STS flight crew training

Training activities for flights of the Space Shuttle Orbiter are performed in the most complicated flight simulation facility yet assembled. The Shuttle Mission Simulator (SMS) provides training for the entire mission from prelaunch to postlanding. An extensive pilot-cues environment is provided in which visual, aural, and motion cues are presented. The planning and execution of training on the simulator must take into account the complexity of the Shuttle systems, the complexity of the procedures and crew interface on the Shuttle, and the complexity of the mission, itself. The major points of this training program are highlighted.

Hughes, F. E.↗

Thermodynamic energy balance equations for Space Shuttle Orbiter gas compartment during ascent and re-entry

Thermodynamic energy balance equations are derived and applied to midsection Orbiter-payload atmospheric thermal math models (TMMs) to predict Orbiter component, element, compartment, internal insolation and structure temperatures in support of NASA/JSC mission planning, postflight thermal analysis and payload thermal integration planning. The equations are extended and applied to the forward section, midsection, and aft section of the TMMs for five Orbiter mission phases: prelaunch on pad with purge, lift-off to ascent, re-entry to touchdown, post landing without purge, and post-landing with purge. Predicted results from the 390 node/DFI atmospheric TMM are in good agreement with STS-1 flight measurement data.

Ting, P. C.↗