Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗

NASA’s Unsteady Pressure-Sensitive Paint Phase I Development Overview

Since 2019, a group out of NASA Ames Research Center(ARC)has been focused on implementing systematic updates to make unsteady pressure-sensitive paint (uPSP) a more viable capability for production wind tunnel testing. Focusing on the general categories of data acquisition, data transfer, data processing, and data visualization, the uPSP Development Team has made several improvements to increase data quality and innovate a more workable system that would provide valuable surface pressure data to customers. As a result of the COVID-19 pandemic and several initial demonstration tests prior to the formal start of the development effort, the decision was made to focus on launch vehicles as the test article. To-date this development has focused on implementation in the ARC Unitary Plan Wind Tunnel 11-by11-footTransonic Wind Tunnel due to the large optical access of the test section and that the NASA Advanced Supercomputer is located at ARC. This paper summarizes the project origins and the results of four years of development effort, which will all culminate in a final demonstration test in the first half of2024.

unsteady pressure-sensitive paint↗

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Computational Modeling to Limit the Impact Displays and Indicator Lights Have on Habitable Volume Operational Lighting Constraints

NASA has demonstrated an interest in improving astronaut health and performance through the installment of a new lighting countermeasure on the International Space Station. The Solid State Lighting Assembly (SSLA) system is designed to positively influence astronaut health by providing a daily change to light spectrum to improve circadian entrainment. Unfortunately, existing NASA standards and requirements define ambient light level requirements for crew sleep and other tasks, yet the number of light-emitting diode (LED) indicators and displays within a habitable volume is currently uncontrolled. Because each of these light sources has its own unique spectral properties, the additive lighting environment ends up becoming something different from what was planned or researched. Restricting the use of displays and indicators is not a solution because these systems provide beneficial feedback to the crew. The research team for this grant used computer-based computational modeling and real-world lighting mockups to document the impact that light sources other than the ambient lighting system contribute to the ambient spectral lighting environment. In particular, the team was focused on understanding the impacts of long-term tasks located in front of avionics or computer displays. The team also wanted to understand options for mitigating the changes to the ambient light spectrum in the interest of maintaining the performance of a lighting countermeasure. The project utilized a variety of physical and computer-based simulations to determine direct relationships between system implementation and light spectrum. Using real-world data, computer models were built in the commercially available optics analysis software Zemax Optics Studio(c). The team also built a mockup test facility that had the same volume and configuration as one of the Zemax models. The team collected over 1200 spectral irradiance measurements, each representing a different configuration of the mockup. Analysis of the data showed a measurable impact on ambient light spectrum. This data showed that obvious design techniques exist that can be used to bind the ambient light spectrum closer to the planned spectral operating environment for the observer's eye point. The following observations should be considered when designing an operational environment that is dominated by computer displays. When more light is directed into the field of view of the observer, the greater the impact it will make on various human factors issues that depend on spectral shape and intensity. Because viewing angle has a large part to play in the amount of light flux on the crewmember's retina, beam shape, combined with light source location is an important factor for determining percent probable incident flux on the observer from any combination of light sources. Computer graphics design and display lumen output are major factors influencing the amount of spectrally intense light projected into the environment and in the viewer's direction. Use of adjustable white point display software was useful only if the predominant background color was white and if it matched the ambient light system's color. Display graphics that used a predominantly black background had the least influence on unplanned spectral energy projected into the environment. Percent reflectance makes a difference in total energy reflected back into an environment, and within certain architectural geometries, reflectance can be used to control the amount of a light spectrum that is allowed to perpetuate in the environment. Data showed that room volume and distance from significant light sources influence the total spectrum in a room. Smaller environments had a homogenizing effect on total light spectrum, whereas light from multiple sources in larger environments was less mixed. The findings indicated above should be considered when making recommendations for practice or standards for architectural systems. The ambient lighting system, surface reflectance, and display and indicator implementation all factor into the users' spectral environment. A variety of low-cost solutions exist to mitigate the impact of light from non-architectural lighting systems, and much potential for system automation and integration of display systems with the ambient environment. This team believes that proper planning can be used to avoid integration problems and also believes that human-in-the-loop evaluations, real-world test and measurement, and computer modeling can be used to determine how changes to a process, display graphics, and architecture will help maintain the planned spectral operating lighting environment.

Clark, T. A.↗

Automated Target Planning for FUSE Using the SOVA Algorithm

The SOVA algorithm was originally developed under the Resilient Systems and Operations Project of the Engineering for Complex Systems Program from NASA s Aerospace Technology Enterprise as a conceptual framework to support real-time autonomous system mission and contingency management. The algorithm and its software implementation were formulated for generic application to autonomous flight vehicle systems, and its efficacy was demonstrated by simulation within the problem domain of Unmanned Aerial Vehicle autonomous flight management. The approach itself is based upon the precept that autonomous decision making for a very complex system can be made tractable by distillation of the system state to a manageable set of strategic objectives (e.g. maintain power margin, maintain mission timeline, and et cetera), which if attended to, will result in a favorable outcome. From any given starting point, the attainability of the end-states resulting from a set of candidate decisions is assessed by propagating a system model forward in time while qualitatively mapping simulated states into margins on strategic objectives using fuzzy inference systems. The expected return value of each candidate decision is evaluated as the product of the assigned value of the end-state with the assessed attainability of the end-state. The candidate decision yielding the highest expected return value is selected for implementation; thus, the approach provides a software framework for intelligent autonomous risk management. The name adopted for the technique incorporates its essential elements: Strategic Objective Valuation and Attainability (SOVA). Maximum value of the approach is realized for systems where human intervention is unavailable in the timeframe within which critical control decisions must be made. The Far Ultraviolet Spectroscopic Explorer (FUSE) satellite, launched in 1999, has been collecting science data for eight years.[1] At its beginning of life, FUSE had six gyros in two IRUs and four reaction wheels. Over time through various failures, the satellite has been left with one reaction wheel on the vehicle skew axis and two gyros. To remain operational, a control scheme has been implemented using the magnetic torque rods and the remaining momentum wheel.[2] As a consequence, there are attitude regions where there is insufficient torque authority to overcome environmental disturbances (e.g. gravity gradient torques). The situation is further complicated by the fact that these attitude regions shift inertially with time as the spacecraft moves through earth s magnetic field during the course of its orbit. Under these conditions, the burden of planning targets and target-to-target slew maneuvers has increased significantly since the beginning of the mission.[3] Individual targets must be selected so that the magnetic field remains roughly aligned with the skew wheel axis to provide enough control authority to the other two orthogonal axes. If the field moves too far away from the skew axis, the lack of control authority allows environmental torques to pull the satellite away from the target and can potentially cause it to tumble. Slew maneuver planning must factor the stability of targets at the beginning and end, and the torque authority at all points along the slew. Due to the time varying magnetic field geometry relative to any two inertial targets, small modifications in slew maneuver timing can make large differences in the achievability of a maneuver.

Heatwole, Scott↗

Software Engineering Research/Developer Collaborations (C104)

The goal of this collaboration was to produce Flight Software Branch (FSB) process standards for software inspections which could be used across three new missions within the FSB. The standard was developed by Dr. Forrest Shull (Fraunhofer Center for Experimental Software Engineering, Maryland) using the Perspective-Based Inspection approach, (PBI research has been funded by SARP) , then tested on a pilot Branch project. Because the short time scale of the collaboration ruled out a quantitative evaluation, it would be decided whether the standard was suitable for roll-out to other Branch projects based on a qualitative measure: whether the standard received high ratings from Branch personnel as to usability and overall satisfaction. The project used for piloting the Perspective-Based Inspection approach was a multi-mission framework designed for reuse. This was a good choice because key representatives from the three new missions would be involved in the inspections. The perspective-based approach was applied to produce inspection procedures tailored for the specific quality needs of the branch. The technical information to do so was largely drawn through a series of interviews with Branch personnel. The framework team used the procedures to review requirements. The inspections were useful for indicating that a restructuring of the requirements document was needed, which led to changes in the development project plan. The standard was sent out to other Branch personnel for review. Branch personnel were very positive. However, important changes were identified because the perspective of Attitude Control System (ACS) developers had not been adequately represented, a result of the specific personnel interviewed. The net result is that with some further work to incorporate the ACS perspective, and in synchrony with the roll out of independent Branch standards, the PBI approach will be implemented in the FSB. Also, the project intends to continue its collaboration with the technology provider (Dr. Forrest Shull) past the end of the grant, to allow a more rigorous quantitative evaluation.

Shell, Elaine↗

Mariner Mars 1971 project. Volume 3: Mission operations system implementation and standard mission flight operations

The Mariner Mars 1971 mission which was another step in the continuing program of planetary exploration in search of evidence of exobiological activity, information on the origin and evolution of the solar system, and basic science data related to the study of planetary physics, geology, planetology, and cosmology is reported. The mission plan was designed for two spacecraft, each performing a separate but complementary mission. However, a single mission plan was actually used for Mariner 9 because of failure of the launch vehicle for the first spacecraft. The implementation is described, of the Mission Operations System, including organization, training, and data processing development and operations, and Mariner 9 spacecraft cruise and orbital operations through completion of the standard mission from launch to solar occultation in April 1972 are discussed.

Source record↗

Instructions for Plastic Encapsulated Microcircuit(PEM) Selection, Screening and Qualification.

The use of Plastic Encapsulated Microcircuits (PEMs) is permitted on NASA Goddard Space Flight Center (GSFC) spaceflight applications, provided each use is thoroughly evaluated for thermal, mechanical, and radiation implications of the specific application and found to meet mission requirements. PEMs shall be selected for their functional advantage and availability, not for cost saving; the steps necessary to ensure reliability usually negate any initial apparent cost advantage. A PEM shall not be substituted for a form, fit and functional equivalent, high reliability, hermetic device in spaceflight applications. Due to the rapid change in wafer-level designs typical of commercial parts and the unknown traceability between packaging lots and wafer lots, lot specific testing is required for PEMs, unless specifically excepted by the Mission Assurance Requirements (MAR) for the project. Lot specific qualification, screening, radiation hardness assurance analysis and/or testing, shall be consistent with the required reliability level as defined in the MAR. Developers proposing to use PEMs shall address the following items in their Performance Assurance Implementation Plan: source selection (manufacturers and distributors), storage conditions for all stages of use, packing, shipping and handling, electrostatic discharge (ESD), screening and qualification testing, derating, radiation hardness assurance, test house selection and control, data collection and retention.

King, Terry↗

Investing American Recovery and Reinvestment Act Funds to Advance Capability, Reliability, and Performance in NASA Wind Tunnels

The National Aeronautics and Space Administration's (NASA) Aeronautics Test Program (ATP) is implementing five significant ground-based test facility projects across the nation with funding provided by the American Recovery and Reinvestment Act (ARRA). The projects were selected as the best candidates within the constraints of the ARRA and the strategic plan of ATP. They are a combination of much-needed large scale maintenance, reliability, and system upgrades plus creating new test beds for upcoming research programs. The projects are: 1.) Re-activation of a large compressor to provide a second source for compressed air and vacuum to the Unitary Plan Wind Tunnel at the Ames Research Center (ARC) 2.) Addition of high-altitude ice crystal generation at the Glenn Research Center Propulsion Systems Laboratory Test Cell 3, 3.) New refrigeration system and tunnel heat exchanger for the Icing Research Tunnel at the Glenn Research Center, 4.) Technical viability improvements for the National Transonic Facility at the Langley Research Center, and 5.) Modifications to conduct Environmentally Responsible Aviation and Rotorcraft research at the 14 x 22 Subsonic Tunnel at Langley Research Center. The selection rationale, problem statement, and technical solution summary for each project is given here. The benefits and challenges of the ARRA funded projects are discussed. Indirectly, this opportunity provides the advantages of developing experience in NASA's workforce in large projects and maintaining corporate knowledge in that very unique capability. It is envisioned that improved facilities will attract a larger user base and capabilities that are needed for current and future research efforts will offer revenue growth and future operations stability. Several of the chosen projects will maximize wind tunnel reliability and maintainability by using newer, proven technologies in place of older and obsolete equipment and processes. The projects will meet NASA's goal of integrating more efficient, environmentally safer, and less energy consuming hardware and processes into existing tunnel systems. These include Environmental Protection Agency-approved refrigerants, energy efficient motors, and faster, flexible tunnel data systems.

Sydnor, Goerge H.↗

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

DellaCorte, Christopher↗

A prototype expert system in OPS5 for data error detection

A prototype expert system has been developed in the OPS5 language to perform error checking on data which spacecraft builders/users supply to the NASA Goddard Space Flight Center for processing on the Communications Link Analysis and Simulation System (CLASS) computer. This prototype expert system, called Trajectory Preprocessing System (TRAPS), contains 49 rules. In its operational phase, TRAPS will run in the Oak Ridge Production Language (ORPL) on the CLASS computer. ORPL, an implementation of OPS5 in MULTIFORTH on a desktop computer, is now being ported to SS-FORTH on the CLASS computer. This paper discusses the expert system problem domain, development approch, tools, results, and future plans stemming from the TRAPS project.

Rash, James↗

A Spatial Analysis and Modeling System (SAMS) for environment management

This is a proposal to develop a uniform global environmental data gathering and distribution system to support the calibration and validation of remotely sensed data. SAMS is based on an enhanced version of FEMA's Integrated Emergency Management Information Systems and the Department of Defense's Air land Battlefield Environment Software Systems. This system consists of state-of-the-art graphics and visualization techniques, simulation models, database management and expert systems for conducting environmental and disaster preparedness studies. This software package will be integrated into various Landsat and UNEP-GRID stations which are planned to become direct readout stations during the EOS (Earth Observing System) timeframe. This system would be implemented as a pilot program to support the Tropical Rainfall Measuring Mission (TRMM). This will be a joint NASA-FEMA-University-Industry project.

Stetina, Fran↗

Reducing costs of managing and accessing navigation and ancillary data by relying on the extensive capabilities of NASA's spice system

The SPICE system of navigation and ancillary data possesses a number of traits that make its use in modern space missions of all types highly cost efficient. The core of the system is a software library providing API interfaces for storing and retrieving such data as trajectories, orientations, time conversions, and instrument geometry parameters. Applications used at any stage of a mission life cycle can call SPICE APIs to access this data and compute geometric quantities required for observation planning, engineering assessment and science data analysis. SPICE is implemented in three different languages, supported on 20+ computer environments, and distributed with complete source code and documentation. It includes capabilities that are extensively tested by everyday use in many active projects and are applicable to all types of space missions - flyby, orbiters, observatories, landers and rovers. While a customer's initial SPICE adaptation for the first mission or experiment requires a modest effort, this initial effort pays off because adaptation for subsequent missions/experiments is just a small fraction of the initial investment, with the majority of tools based on SPICE requiring no or very minor changes.

ancillary data↗

CEOS Contributions to Informing Energy Management and Policy Decision Making Using Space-Based Earth Observations

Earth observations are playing an increasingly significant role in informing decision making in the energy sector. In renewable energy applications, space-based observations now routinely augment sparse ground-based observations used as input for renewable energy resource assessment applications. As one of the nine Group on Earth Observations (GEO) societal benefit areas, the enhancement of management and policy decision making in the energy sector is receiving attention in activities conducted by the Committee on Earth Observation Satellites (CEOS). CEOS has become the "space arm" for the implementation of the Global Earth Observation System of Systems (GEOSS) vision. It is directly supporting the space-based, near-term tasks articulated in the GEO three-year work plan. This paper describes a coordinated program of demonstration projects conducted by CEOS member agencies and partners to utilize Earth observations to enhance energy management end-user decision support systems. I discuss the importance of engagement with stakeholders and understanding their decision support needs in successfully increasing the uptake of Earth observation products for societal benefit. Several case studies are presented, demonstrating the importance of providing data sets in formats and units familiar and immediately usable by decision makers. These projects show the utility of Earth observations to enhance renewable energy resource assessment in the developing world, forecast space-weather impacts on the power grid, and improve energy efficiency in the built environment.

Eckman, Richard S.↗

JPL Technology Readiness Assessment Guideline

New capabilities in spaceflight missions are enabled by new technologies. Transitioning new technology to spaceflight elements is difficult and introduces risk, but finding the right balance between benefit and risk leads to scientific advancements and novel space missions. A clear understanding of the risks of new technology can create an environment where innovation is nurtured rather than avoided. The Technology Readiness Level (TRL) was developed as a metric for the maturity of new technology, but, in the past, assessing the TRL was often done informally and inconsistently. This frequently led to discrepancies between the TRL as perceived by the technologist and that perceived by a project. JPL has developed a guideline for their projects to provide a basis for a consistent Technology Readiness Assessment (TRA). Highlights of this guideline are presented here. It is anticipated that the implementation of this guideline will enable the hand-off from technologists to project engineers leading to greater acceptance of technologies by flight projects. On completion of a satisfactory TRA, an agreement can be made between the parties on the maturation plan required for successful infusion of the technology into a flight mission.

Frerking, Margaret A.↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗