Search NASA⌕ Search

SEARCH · Search NASA

Results for “RF SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Contact resistance and overlapping capacitance in flexible sub-micron long oxide thin-film transistors for above 100 MHz operation

In recent years new forms of electronic devices such as electronic papers, flexible displays, epidermal sensors, and smart textiles have become reality. Thin-film transistors (TFTs) are the basic blocks of the circuits used in such devices and need to operate above 100 MHz to efficiently treat signals in RF systems and address pixels in high resolution displays. Beyond the choice of the semiconductor, i.e., silicon, graphene, organics, or amorphous oxides, the junctionless nature of TFTs and its geometry imply some limitations which become evident and important in devices with scaled channel length. Furthermore, the mechanical instability of flexible substrates limits the feature size of flexible TFTs. Contact resistance and overlapping capacitance are two parasitic effects which limit the transit frequency of transistors. They are often considered independent, while a deeper analysis of TFTs geometry imposes to handle them together; in fact, they both depend on the overlapping length (L{sub OV}) between source/drain and the gate contacts. Here, we conduct a quantitative analysis based on a large number of flexible ultra-scaled IGZO TFTs. Devices with three different values of overlap length and channel length down to 0.5 μm are fabricated to experimentally investigate the scaling behavior of the transit frequency. Contact resistance and overlapping capacitance depend in opposite ways on L{sub OV}. These findings establish routes for the optimization of the dimension of source/drain contact pads and suggest design guidelines to achieve megahertz operation in flexible IGZO TFTs and circuits.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Resonance effects of longitudinal HOMS in Project X linac

Results of analysis of losses due to excitation of longitudinal high order modes (HOMs) in the accelerating RF system of the CW proton linac of the Project X facility are presented. The necessity of HOM dampers in the superconducting (SC) cavities of the linac is discussed. Project X is a multi-MW proton source which is under development at Fermilab. The facility is based on a 3 GeV CW linac. The main fraction of H{sup -} beam from the linac is split into three parts for Mu2e experiment, kaon experiments, and another which is not yet decided. The layout of the linac is shown in Figure 1. It includes three sections based on 325 MHz single-spoke cavities, and a low-energy and a high-energy sections of 650 MHz elliptical cavities with geometrical beta of 0.61 and 0.9, respectively. The linac provides a beam with an average current of 1 mA and time structure (shown in Figure 2) devised to satisfy specific requirements of the experiments. Each bunch contains 9 {center_dot} 10{sup 7} H{sup -} ions. The bunch sequence frequency for the Mu2e experiment is 162.5 MHz with a total pulse duration of 100 ns and pulse repetition rate of 1 MHz. The bunch sequence frequency for Kaon and other experiments is 27.08 MHz. Figure 3 shows the idealized beam current spectrum, which contains harmonics of multiplies of 27.08 MHz and harmonics of multiplies of 1 MHz. The 5-cell 650 MHz cavities for Project X are currently under development. A critical design decision is to define the necessity of HOM dampers for these types of cavities.

43 PARTICLE ACCELERATORS↗

RHIC Polarized proton operation

The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

08 HYDROGEN↗

Combined Optical and Radio–Frequency Perspectives on the Time Evolution of Lightning Measured by the FORTE Satellite

We use a cluster feature data set for the Fast On-orbit Recording of Transient Events (FORTE) satellite that combines detections from its pixelated Lightning Locating System (LLS), photodiode detector (PDD) and Radio-Frequency (RF) instrumentation to generate statistics describing the frequency and timing of lightning events detected by each instrument during lightning flashes. Coincident observations from the same vantage point allow us to directly compare flash details that can be resolved by the wide Field of View (FOV) instruments relative to the pixelated LLS—whose design is based on NASA's Lightning Imaging Sensor. We find that both the PDD and RF system typically generate more detections than the lightning imager (mean: 1.5 PDD events per LLS group, 2 RF events per LLS group) from pulses that are either not sufficiently bright in the optical band (in the case of RF) or that lack the optical energy density (in the case of the PDD) required to trigger one of the pixels on the LLS imaging array. This includes additional activity before the first LLS group or after the final LLS group. These FORTE results demonstrate that certain lightning processes would be better resolved by wide-FOV optical and RF instruments than lightning imagers. Current/future space-based missions that use/plan to use similar instruments will improve our understanding of flash evolution by resolving details missed by lightning imagers.

47 OTHER INSTRUMENTATION↗

Postflight Evaluation of Atlas-Centaur AC-6 (Launched August 11, 1965)

The sixth Atlas Centaur vehicle (AC-6) was successfully launched from the Eastern T e s t Range, Complex 36B, on August 11, 1965, at 0931:04.430 EST. A 2084-pound dynamic model of the Surveyor payload was placed in a simulated lunar transfer trajectory. Vehicle systems operated satisfactorily and all the flight objectives were accomplished. Lift-off within 4 seconds of the window opening demonstrated the launch-on-time capability of the vehicle were accurately compensated for by the Centaur guidance system. the Surveyor model into a near-perfect lunar transfer trajectory would have resulted in an impact of the moon without a midcourse correction. To hit the precise target area on the lunar surface, the required correction would have been 4.25 meters per second, which is well within the spacecraft capability. Normal thrust and impulse levels were obtained with both the A t l a s and Centaur propulsion systems. However, a sizeable thrust overshoot on startup of the Centaur engines has not been resolved. A propellant-utilization system used for the first time on the Centaur, accurately controlled the fuel and oxidant consumption. The turnaround and retrothrust maneuver were performed without incident. Relatively high longitudinal modal excitations and lateral payload excitations were obtained at lift-off; these high perturbations are believed t o be related t o the launcher holddown arms. Nominal temperatures were recorded for both the external vehicle skin and the payload compartment; however, abnormally low temperatures were measured in the forward equipment area, which may have resulted from leakage of cold helium purge gas. All vehicle electrical systems performed satisfactorily; the only difficulty with the RF systems was obtained with the C-band transponder. of the vehicle instrumentation yielded valid data. The AC-6 vehicle was constructed with several new lightweight designs including the forward bulkhead, thrust barrel, interstage adapter and tank skin thickness reduction from 0.016 t o 0.014 inch. No deficiencies were observed in any of these new structural elements.

Source record↗

LHC Abort Gap Monitoring and Cleaning

Unbunched beam is a potentially serious issue in the LHC as it may quench the superconductingmagnets during a beam abort. Unbunched particles, either not captured by the RF system at injection or leaking out of the RF bucket, will be removed by using the existing damper kickers to excite resonantly the particles in the abort gap. Following beam simulations, a strategy for cleaning the abort gap at different energieswas proposed. The plans for the commissioning of the beam abort gap cleaning are described and first results from the beam commissioning are presented.

43 PARTICLE ACCELERATORS↗

LHC Abort Gap Cleaning with the Transverse Damper

In the Large Hadron Collider –LHC, particles not captured by the RF system at injection or leaking out of the RF bucket may quench the superconducting magnets during beam abort. The problem, common to other superconducting machines, is particularly serious for the LHC due to the very large stored energy in the beam. For the LHC a way of removing the unbunched beam has been studied and it uses the existing damper kickers to excite resonantly the particles travelling along the abort gap. In this paper we describe the results of simulations performed with MAD-X for various LHC optics configurations, including the estimated multipolar errors.

Gianfelice-Wendt, E.↗

The Development of the Electrically Controlled High Power RF Switch and Its Application to Active RF Pulse Compression Systems

In the past decades, there has been increasing interest in pulsed high power RF sources for building high-gradient high-energy particle accelerators. Passive RF pulse compression systems have been used in many applications to match the available RF sources to the loads requiring higher RF power but a shorter pulse. Theoretically, an active RF pulse compression system has the advantage of higher efficiency and compactness over the passive system. However, the key component for such a system an element capable of switching hundreds of megawatts of RF power in a short time compared to the compressed pulse width is still an open problem. In this dissertation, we present a switch module composed of an active window based on the bulk effects in semiconductor, a circular waveguide three-port network and a movable short plane, with the capability to adjust the S-parameters before and after switching. The RF properties of the switch module were analyzed. We give the scaling laws of the multiple-element switch systems, which allow the expansion of the system to a higher power level. We present a novel overmoded design for the circular waveguide three-port network and the associated circular-to-rectangular mode-converter. We also detail the design and synthesis process of this novel mode-converter. We demonstrate an electrically controlled ultra-fast high power X-band RF active window built with PIN diodes on high resistivity silicon. The window is capable of handling multi-megawatt RF power and can switch in 2-300ns with a 1000A current driver. A low power active pulse compression experiment was carried out with the switch module and a 375ns resonant delay line, obtaining 8 times compression gain with a compression ratio of 20.

43 PARTICLE ACCELERATORS↗

CT-guided Bipolar and Multipolar Radiofrequency Ablation (RF Ablation) of Renal Cell Carcinoma: Specific Technical Aspects and Clinical Results

Purpose. This study was designed to evaluate the clinical efficacy of CT-guided bipolar and multipolar radiofrequency ablation (RF ablation) of renal cell carcinoma (RCC) and to analyze specific technical aspects between both technologies. Methods. We included 22 consecutive patients (3 women; age 74.2 {+-} 8.6 years) after 28 CT-guided bipolar or multipolar RF ablations of 28 RCCs (diameter 2.5 {+-} 0.8 cm). Procedures were performed with a commercially available RF system (Celon AG Olympus, Berlin, Germany). Technical aspects of RF ablation procedures (ablation mode [bipolar or multipolar], number of applicators and ablation cycles, overall ablation time and deployed energy, and technical success rate) were analyzed. Clinical results (local recurrence-free survival and local tumor control rate, renal function [glomerular filtration rate (GFR)]) and complication rates were evaluated. Results. Bipolar RF ablation was performed in 12 procedures and multipolar RF ablation in 16 procedures (2 applicators in 14 procedures and 3 applicators in 2 procedures). One ablation cycle was performed in 15 procedures and two ablation cycles in 13 procedures. Overall ablation time and deployed energy were 35.0 {+-} 13.6 min and 43.7 {+-} 17.9 kJ. Technical success rate was 100 %. Major and minor complication rates were 4 and 14 %. At an imaging follow-up of 15.2 {+-} 8.8 months, local recurrence-free survival was 14.4 {+-} 8.8 months and local tumor control rate was 93 %. GFR did not deteriorate after RF ablation (50.8 {+-} 16.6 ml/min/1.73 m{sup 2} before RF ablation vs. 47.2 {+-} 11.9 ml/min/1.73 m{sup 2} after RF ablation; not significant). Conclusions. CT-guided bipolar and multipolar RF ablation of RCC has a high rate of clinical success and low complication rates. At short-term follow-up, clinical efficacy is high without deterioration of the renal function.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

MLS: Airplane system modeling

Analysis, modeling, and simulations were conducted as part of a multiyear investigation of the more important airplane-system-related items of the microwave landing system (MLS). Particular emphasis was placed upon the airplane RF system, including the antenna radiation distribution, the cabling options from the antenna to the receiver, and the overall impact of the airborne system gains and losses upon the direct-path signal structure. In addition, effort was expended toward determining the impact of the MLS upon the airplane flight management system and developing the initial stages of a fast-time MLS automatic control system simulation model. Results ot these studies are presented.

Thompson, A. D.↗

The LCLS-II LLRF System

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW superconducting (SCRF) linac. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded Q L of ~ 4x10 7 . The RF system will have 3.8 kW solid state amplifiers driving single cavities. To ensure optimum field stability a single-source single-cavity control system has been chosen. It consists of a precision four-channel cavity receiver and RF stations (Forward, Reflected and Drive signals). In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) is being modeled and cavity microphonic testing has started. This paper describes the LLRF system under consideration, including recent modeling and cavity tests.

43 PARTICLE ACCELERATORS↗

Superconducting Radio-frequency Cavity Fault Classification Using Machine Learning at Jefferson Laboratory

We report on the development of machine learning models for classifying C100 superconducting radiofrequency (SRF) cavity faults in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Of the 418 SRF cavities in CEBAF, 96 are designed with a digital low-level RF system configured such that a cavity fault triggers recordings of RF signals for each of eight cavities in the cryomodule. Subject matter experts analyze the collected time-series data and identify which of the eight cavities faulted first and classify the type of fault. This information is used to find trends and strategically deploy mitigations to problematic cryomodules. However, manually labeling the data is laborious and time-consuming. By leveraging machine learning, near real-time - rather than postmortem - identification of the offending cavity and classification of the fault type has been implemented. We discuss the performance of the machine learning models during a recent physics run. We also discuss efforts for further insights into fault types through unsupervised learning techniques and present preliminary work on cavity and fault prediction using data collected prior to a failure event.

Tennant, C. D.↗

LLRF System Analysis for the Fermilab PIP-II Superconducting LINAC

PIP-II is a superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of cavities with five different acceleration \(β\). The LLRF system for the linac has to provide field and resonance control for a total of 125 RF cavities. Various components of the LLRF system have been tested with and without beam at the PIP-II test stands. The LLRF system design is derived from the LCLS-II project with its self-excited loop architecture used in the majority of the cryo-modules. The PIP-II beam loading at 2 mA is much higher than the LCLS-II linac. The control system architecture is analyzed and evaluated for the operational limits of feedback gains and their ability to meet the project regulation requirements for cavity field amplitude and phase regulation.

Varghese, P. [Fermilab] (ORCID:0009000925131983)↗

Development of long pulse RF heating and current drive for H-mode scenarios with metallic walls in WEST

The longstanding expertise of the Tore Supra team in long pulse heating and current drive with radiofrequency (RF) systems will now be exploited in the WEST device (tungsten-W Environment in Steady-state Tokamak) [1]. WEST will allow an integrated long pulse tokamak programme for testing W-divertor components at ITER-relevant heat flux (10-20 MW/m{sup 2}), while treating crucial aspects for ITER-operation, such as avoidance of W-accumulation in long discharges, monitoring and control of heat fluxes on the metallic plasma facing components (PFCs) and coupling of RF waves in H-mode plasmas. Scenario modelling using the METIS-code shows that ITER-relevant heat fluxes are compatible with the sustainment of long pulse H-mode discharges, at high power (up to 15 MW / 30 s at I{sub P} = 0.8 MA) or high fluence (up to 10 MW / 1000 s at I{sub P} = 0.6 MA) [2], all based on RF heating and current drive using Ion Cyclotron Resonance Heating (ICRH) and Lower Hybrid Current Drive (LHCD). This paper gives a description of the ICRH and LHCD systems in WEST, together with the modelling of the power deposition of the RF waves in the WEST-scenarios.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Implementing New Methods of Laser Marking of Items in the Nuclear Material Control and Accountability System at SSC RF-IPPE: An Automated Laser Marking System

For over ten years SSC RF-IPPE, together with the US DOE National Laboratories, has been working on implementing automated control and accountability methods for nuclear materials and other items. Initial efforts to use adhesive bar codes or ones printed (painted) onto metal revealed that these methods were inconvenient and lacked durability under operational conditions. For NM disk applications in critical stands, there is the additional requirement that labels not affect the neutron characteristics of the critical assembly. This is particularly true for the many stainless-steel clad disks containing highly enriched uranium (HEU) and plutonium that are used at SSC RF-IPPE for modeling nuclear power reactors. In search of an alternate method for labeling these disks, we tested several technological options, including laser marking and two-dimensional codes. As a result, the method of laser coloring was chosen in combination with Data Matrix ECC200 symbology. To implement laser marking procedures for the HEU disks and meet all the nuclear material (NM) handling standards and rules, IPPE staff, with U.S. technical and financial support, implemented an automated laser marking system; there are also specially developed procedures for NM movements during laser marking. For the laser marking station, a Zenith 10F system by Telesis Technologies (10 watt Ytterbium Fiber Laser and Merlin software) is used. The presentation includes a flowchart for the automated system and a list of specially developed procedures with comments. Among other things, approaches are discussed for human-factor considerations. To date, markings have been applied to numerous steel-clad HEU disks, and the work continues. In the future this method is expected to be applied to other MC&A items.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Studies of microwave scattering and canopy architecture for boreal forests

Our primary objectives during the last year have been to develop a helicopter-borne radar system for measuring microwave backscatter from vegetation and to use this system to study the characteristics of backscatter from the boreal forest. Our research is aimed at refining the current microwave models and using these improvements for more accurate interpretation of SAR data. SAR data are very useful for monitoring the boreal forest region because of the microwave signal's ability to penetrate clouds and to see at night. Meeting these objectives involves several stages of development. The first stage is the design and implementation of a frequency-modulated continuous-wave (FM-CW) radar system with the capability of measuring backscatter at three frequencies and four polarizations at each frequency. These requirements necessitate a twelve-channel radar system. Using three frequencies is advantageous because it allows us to look at different parts of the canopy. For instance, the lower frequency signal penetrates deeper into the canopy and allows us to see the ground while the high frequency signal is scattered more by the leaves and needles and typically does not penetrate to the floor of the forest. We designed the radar starting with the antenna system. We then developed the intermediate frequency (IF) and radio frequency (RF) sections of the radar. Also, the need to collect data from twelve channels during each flight line presented a complex data acquisition problem that we solved by using a high-speed data acquisition board. After construction, the radar was tested at the lab. We performed extensive testing of the IF and RF systems of the radar during this time. Once we were satisfied with the operation of the radar it was shipped to Canada for use in the second intensive field campaign (IFC-2) from July 16 - August 8, 1994. During IFC-2, we collected backscatter data over the experimental sites in the southern study area (SSA). Additionally, we used a ground-based step-frequency radar to measure the reflection coefficient of the forest floor at the old jack pine (OJP) and young jack pine (YJP) sites. The ground-based radar data have been processed and a frew examples are included in this report. we are currently processing the helicopter-borne radar data.

Lockhart, G. Lance↗

Beam Based RF Voltage Measurements and Longitudinal Beam Tomography at the Fermilab Booster

Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two decades. Therefore, understanding the Booster in great detail is important as we continue to improve its performance. For example, it is important to know accurately the available RF power in the Booster by carrying out beam-based measurements in order to specify the needed upgrades to the Booster RF system. Since the Booster magnetic field is changing continuously measuring/calibrating the RF voltage is not a trivial task. Here, we present a beam based method for the RF voltage measurements. Data analysis is carried out using computer programs developed in Python and MATLAB. The method presented here is applicable to any RCS which do not have flat-bottom and flat-top in the acceleration magnetic ramps. We have also carried out longitudinal beam tomography at injection and extraction energies with the data used for RF voltage measurements. Beam based RF voltage measurements and beam tomography were never done before for the Fermilab Booster. The results from these investigations will be very useful in future intensity upgrades.

43 PARTICLE ACCELERATORS↗

Performance of the LLRF System for the Fermilab PIP-II Injector Test

PIP-II IT is a test facility for the PIP-II project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The 8-cavity half-wave-resonator (HWR) cryomodule operating at 162.5 MHz is followed by the 8-cavity single-spoke resonator(SSR1) cryomodule operating at 325 MHz. The LLRF systems for both cryomodules are based on a common SOC FPGA-based hardware platform. The resonance control systems for the two cryomodules are quite different, the first being a pneumatic system based on helium pressure and the latter a piezo/stepper motor type control. The data acquisition and control system can support both CW and Pulsed mode operations. Beam loading compensation is available which can be used for both manual/automatic control in the LLRF system. The user interfaces include EPICS, Labview, and ACNET. Testing of the RF system has progressed to the point of being ready for a 2 mA beam to be accelerated to 25 MeV. The design and performance of the field control and resonance control system operation with beam are presented in this paper.

43 PARTICLE ACCELERATORS↗