Search NASA⌕ Search

SEARCH · Search NASA

Results for “Requirements engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Development of NASA's Sample Cartridge Assembly: Summary of GEDS Design, Development Testing, and Thermal Analyses

NASA's Sample Cartridge Assembly (SCA) project is responsible for designing and validating a payload that contains materials research samples in a sealed environment. The SCA will be heated in the European Space Agency's (ESA) Low Gradient Furnace (LGF) that is housed inside the Material Science Research Rack (MSRR) located on the International Space Station (ISS). The first Principle Investigator (PI) to utilize the SCA will focus on Gravitational Effects on Distortion in Sintering (GEDS) research. This paper will give a summary of the design and development test effort for the GEDS SCA and will discuss the role of thermal analysis in developing test profiles to meet the science and engineering requirements. Lessons learned will be reviewed and salient design features that may differ for each PI will be discussed.

O'Connor, Brian↗

New Efforts to Update NASA's Global Reference Atmospheric Models (GRAM)

NASA is at the forefront of planetary exploration. The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the atmosphere for many NASA projects is the Global Reference Atmospheric Model (GRAM) developed by the NASA Marshall Space Flight Center (MSFC). Over the past decade GRAM upgrades and maintenance have depended on inconsistent and waning project-specific support. Recently, the NASA Science Mission Directorate agreed to provide funding support in Fiscal Year 2018 and 2019 to upgrade the GRAMs. This poster summarizes the objectives, tasks and milestones of this effort.

Justh, Hilary↗

New Efforts to Update NASA's Global Reference Atmospheric Models (GRAM)

NASA is at the forefront of planetary exploration. The inability to test planetary space-craft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the atmosphere for many NASA projects is the Global Reference Atmospheric Model (GRAM) developed by the NASA Marshall Space Flight Center (MSFC). Over the past decade GRAM upgrades and maintenance have depended on inconsistent and waning project-specific support. Recently, the NASA Science Mission Directorate (SMD) has agreed to provide funding support in Fiscal Year 2018 and 2019 to upgrade the GRAMs.

Justh, H. L.↗

New Efforts to Update NASA's Global Reference Atmospheric Models (GRAM)

NASA is at the forefront of planetary exploration. The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the atmosphere for many NASA projects is the Global Reference Atmospheric Model (GRAM) developed by the NASA Marshall Space Flight Center (MSFC). Over the past decade GRAM upgrades and maintenance have depended on inconsistent and waning project-specific support. Recently, the NASA Science Mission Directorate agreed to provide funding support in Fiscal Year 2018 and 2019 to upgrade the GRAMs. This poster summarizes the objectives, tasks and milestones of this effort.

Dwyer Cianciolo, Alicia↗

Radiation Transport and Shielding Challenges at NASA Marshall Space Flight Center

Several unique radiation transport and shielding challenges for various spacecraft and ground test facilities have recently been explored at NASA Marshall Space Flight Center (MSFC). Many radiation transport methods and code packages have been utilized during this effort, and some additional analytical tools have been developed to support this work. This includes the development of a nuclear thermal propulsion stage, in which radiation damage to hardware, radiation heating, and crew dose must be assessed for a large spacecraft. Radiation shielding for such a stage must be optimized to minimize weight, and additional dose consequences are expected from cosmic sources. Development of a nuclear engine requires ground test facilities, which themselves require significant development effort that includes deep-penetration shielding analysis for facility design and site selection. Additional radiation transport analysis has been performed in support of a notional lander mission to Europa, the icy moon of Jupiter. The radiation burden to spacecraft has been analyzed, and charged particle radiation transport methods have been utilized to apply correct doses to material samples in ground test facilities.

Caffrey, Jarvis A.↗

Continuously Improving Parametric Modeling with Historical Data on the ICESat-2 Mission

This paper delves into the details of the Joint Confidence Level (JCL) process performed for the Ice, Cloud, and Land Elevation Satellite (ICESat)-2 mission and how past performance was incorporated into subsequent JCL models to enable the project to continuously analyze potential slips to their launch readiness date (LRD). One year prior to the mission Preliminary Review (mPDR), the JCL model development process began. The first model was well received at the mPDR, held on October 10, 2012, and the input received by the Standing Review Board was incorporated into the model for the official data drop for key decision point (KDP)-C. The 70% JCL results of the October 2012 mPDR model forecast an LRD of February 2017 and associated cost of $830M. This result in 2012 immediately highlighted potential challenges with the project-planned LRD of July 2016. The year following the mPDR, the project had sustained a oneyear slip in the LRD due to problematic systems engineering requirement issues which impacted all project subsystems. This slip moved the project planned LRD from July 2016 to July 2017, an additional 5 months beyond the 2012 model’s 70% JCL result for the LRD of February 2017. As the project was quickly approaching the mission Critical Design Review (mCDR), the need for reliable JCL results increased significantly. The project held discussions on the JCL modeling process and focused on the input uncertainty distributions. Specifically, to identify the uncertainty distributions that the 2012 mPDR model would have needed to produce a 70% LRD result of July 2017. This led the project to compare multiple uncertainty distributions, and ultimately spurred the project to utilize uncertainty distributions that incorporated project past performance and historical data to forecast potential LRD slips. The revised results, created in 2014 and utilizing the new uncertainty distributions, showed that with 70% confidence, the ICESat-2 mission would launch in August 2018 with a cost of $1,044M. Today, ICESat-2 is scheduled to launch on September 15, 2018 with a project management (PM) agreement value of $1,056M. This illustrates how a JCL model can be continuously improved to produce valuable results for a project, even in cases of LRD delays. The primary reason for the ICESat-2 LRD delay is due to a laser failure on the primary instrument. Laser failure was one of the highest risk and uncertainty drivers within the JCL model. The project placed the most risk in this area of the model, and the model further identified the laser as the top risk driver and contributor to the LRD result. This further illustrates how a JCL can be used to predict and quantify possible issues on new technology missions.

Krygiel, Joseph↗

Mars Global Reference Atmospheric Model (Mars-GRAM) Upgrades

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the Martian atmosphere is the Mars Global Reference Atmospheric Model (Mars-GRAM) developed and maintained by the NASA Marshall Space Flight Center (MSFC). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the planetary GRAMs in Fiscal Year 2018 and 2019. This poster summarizes the upgrades that have been made to Mars-GRAM, the release status of Mars-GRAM, the new GRAMs that are under development, and future Mars-GRAM upgrade plans.

Justh, H. L.↗

Status of Outer Planet Global Reference Atmospheric Model (GRAM) Upgrades

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the atmosphere is the Global Reference Atmospheric Model (GRAM) developed and maintained by the NASA Marshall Space Flight Center (MSFC). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the GRAMs.

Justh, H. L.↗

Run Time Assurance as an Alternate Concept to Contemporary Development Assurance Processes

NASA and the FAA sought industry research to identify and evaluate alternate concepts for assuring safety of airborne systems. This report documents a research effort focused on the evaluation of Run Time Assurance (RTA) as applied to a novel, airborne system architecture. The RTA pattern is applied to a case study focused on a notional integrated flight and propulsion control system for a DEP VTOL aircraft. During flight, while the high-automation algorithms are operating, the RTA system will monitor the aircraft state for any impending violation of safety requirements. When necessary, it will switch to the low-automation software to prevent such violations. Assurance practices for both baseline industry activities and the RTA approach were captured and compared to illustrate the required engineering design considerations, and possible advantages and disadvantages of each approach as part of this case study.

Eric M. Peterson↗

Nanomechanical Characterization of Additive Manufactured GRCop-42 Alloy Developed by Directed Energy Deposition Methods

Propulsion applications such as combustion chambers and nozzles for liquid rocket engines require the use of unique materials with superior mechanical and thermal properties. GRCop-42(Cu-4 wt.% Cr-2 wt.% Nb) is one such candidate material developed by NASA and is now being manufactured using additive manufacturing (AM) techniques. AM offers a unique processing environment different from traditional metal fabrication processes. This study characterized the mechanical and structural properties of as-deposited and heat-treated GRCop-42manufactured with Blown Powder Directed Energy Deposition (BPD)based on preliminary testing. The materials were characterized using several techniques including surface profiling by laser microscopy, mechanical stiffness by instrumented indentation, crystal structure, residual stress measurements using XRD and residual XRD, and chemical composition and microstructural evaluation using SEM with EBSD. The results of the study are compared using the BPD techniques for samples in the as-deposited and heat-treated conditions.

GRCop-42↗

The Lunar Flashlight CubeSat Instrument: A Compact SWIR Laser Reflectometer to Quantify and Map Water Ice on the Surface of the Moon

The Lunar Flashlight (LF) mission will send a CubeSat to lunar orbit via NASA’s Space Launch System (SLS) test flight. The LF spacecraft will carry a novel instrument to quantify and map water ice harbored in the permanently shadowed craters of the lunar South Pole. The LF instrument, an active multi-band reflectometer which employs four high power diode lasers in the 1-2 μm infrared band, will measure the reflectance of the lunar surface near water ice absorption peaks. We present the detailed instrument design and system engineering required to deploy this instrument within very demanding CubeSat resource allocations.

Shelton, Jacob↗

CARBO - The Carbon Observatory Instrument Suite - The Next Generation of Earth Observing Instruments for Global Monitoring of Carbon Gases

The Carbon Observatory Instrument Suite, or CARBO, consists of four carbon observing instruments sharing a common instrument bus, yet targeted for a particular wavelength band each with a unique science observation. They are: a) Instrument 1, wavelength centered at 756 nm for oxygen and solar-induced chlorophyll fluorescence (SIF) observations, b) Instrument 2, centered at 1629 nm, for carbon dioxide (CO2) and methane (CH4) observation, c) Instrument 3, centered at 2062 nm for carbon dioxide and d) Instrument 4, centered at 2328 for carbon monoxide (CO) and methane. From low-Earth orbit, these instruments have a field-of-view of 10 to 15 degrees, and a spatial resolution of 2 km square. These instruments have a spectral resolving power ranging from ten to twenty thousand, and can monitor columnaverage dry air mole fraction of carbon dioxide (XCO2) at 1.5 ppm, and methane (XCH4) at 7 ppb. These new instruments will advance the use of immersion grating technology in spectrometer instruments in order to reduce the size of the instrument, while improving performance. These compact, capable instruments are envisioned to be compatible with small satellites, yet modular to be configured to address the particular science questions at hand. Here we report on the current status of the instrument design and fabrication, focusing primarily on Instruments 1 and 2. We will describe the key science and engineering requirements and the instrument performance error budget. We will discuss the optical design with particular emphasis on the immersion grating, and the advantages this new technology affords compared to previous instruments. We will also discuss the status of the focal plane array and the detector electronics and housing. Finally, we report on a new approach – developed during this instrument design process - which enables simultaneous measurement of both orthogonal polarization states (S and P) over the field-of-view and optical bandpass. We believe this polarization sensing capability will enable science observations which were previously limited by instrumental and observational degeneracies. In particular: improved sensitivity to all species, better sensitivity to surface polarization effects, better constraints on aerosol scattering parameters, and superior discrimination of the vertical distribution of gases and aerosols.

Bernas, Michael↗

Venus Global Reference Atmospheric Model (GRAM) Upgrades

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of Venus’ atmosphere is the Venus Global Reference Atmospheric Model (Venus-GRAM).The Venus-GRAM upgrades are being developed by NASA Marshall Space Flight Center and NASA Langley Research Center.

atmospheric models↗

Validation on the Europa Clipper Mission in the Formulation Phase

The Europa Clipper mission will perform a detailed investigation of Europa’s environment and habitability by placing a spacecraft into a looping orbit around Jupiter and performing repeated close Europa flybys. The Europa Clipper Project Verification and Validation (V&V) team is responsible for verifying that the Project System is compliant with the science and engineering requirements levied on it and validating that it is capable of meeting the mission objectives. Europa Clipper has developed a V&V framework to ensure that mission capabilities are realized at a reasonable confidence level prior to launch. The V&V team will coordinate the validation activities defined by this framework throughout the project lifecycle as the spacecraft evolves from design to implementation and operations. Validation of space missions is typically grouped into three categories: 1) requirements validation, 2) model validation, and 3) system validation. System validation, along with verification activities, are often the primary focus of V&V programs and these efforts peak in the implementation phase. However, the increasing reliance of exploration missions on models and simulations, and the complexity of the Europa Clipper mission, have dictated attention to requirements and model validation in the formulation phase. This paper discusses the development of the Europa Clipper V&V framework with emphasis on the validation of models and simulations, and of requirements. Approaches include the adaptation of institutional guidelines, such as those in the NASA-STD-7009 document, to create a Project Model V&V Plan and the use of tools such as DOORS NG to plan model validation and derive requirement quality metrics.

Srivastava, Priyanka↗

Orbiting Artificial Star for High-Resolution Coronal Imaging from the Ground

This paper establishes the scientific motivation of the Orbiting Artificial Star for High-resolution Coronal Imaging from the Ground (ORCAS-Helio), and presents the Preliminary Science Traceability Matrix (STM), defining the scientific objectives, the expected significance, and the impact of the mission. Furthermore, the paper describes the payload, mission configuration, and spacecraft architecture and shows it could meet its scientific and engineering requirements. By doing so, a viable mission configuration for the ORCAS-Helio mission is established.

Eliad Peretz↗

Recommendations for Developing Space Suit Integrated Food Systems and Delivering Nutrition Before, During, and After Lunar EVA

The concept of providing hydration and nutrition during extravehicular activity (EVA) is nearly as old as the space program itself. Astronauts currently have access to 32 ounces of water through a disposable in-suit drink bag (DIDB) while they are confined to their space suit. During the Apollo program, methods for providing food/nutrition to crewmembers in space suits were included as contingency solutions (1) but were eventually abandoned. The main reasons that provision of in-suit nutrition beyond water was discontinued after Apollo were the complicated engineering requirements, the additional mass and volume that was required for the applicable food formulations, hardware needed for a suit-specialized food system, and because the perceived need for in-suit nutrition during EVAs was not sufficient during the Space Shuttle and the International Space Station (ISS) eras. A custom-made 165-kcal fruit bar was fitted into the EVA suit during the Space Shuttle program, but crewmembers rarely consumed it during the EVA and rather chose to consume it before or after suited activities (2). Since 2011, between 4 and 13 EVAs have been conducted from the ISS each year, with durations ranging from 1:32 to 8:17 hours (https://www.nasa.gov/mission_pages/station/spacewalks ). It has been acceptable for the crewmembers to schedule food intake around these relatively infrequent suited activities. Because upcoming Artemis missions will include nominal 8-hour lunar exploration EVAs that are expected to increase in frequency to several (4 to 5) sorties per week (3), the desire for an in-suit nutrition system has increased. In preparation for these missions, requirements to provide in-suit nutrition has been outlined in the most recent NASA Human Spaceflight Standards documents (4). Establishing general recommendations for in-suit nutrition systems precedes the selection of a lunar EVA pressure suit system. The current document is intended to define the rationale for nutrition to support EVA (whether in-suit or from the pantry in the habitat), document the requirements, constraints, and crewmember preferences, and recommend necessary next steps for developing an in-suit EVA nutrition system. Assessments presented in this report include a review of commercial off-the-shelf (COTS) food products as potential in-suit formulations, a comparison of conceptual designs for delivering nutrition to a crewmember while confined to a space suit, an evaluation of space suit volume constraints for the placement of in-suit nutrition systems, and feedback from astronauts regarding preferences for nutrition support during EVA. Based on these assessments, recommendations were formulated that can be used to help develop a method to deliver nutrition safely and acceptably to a crewmember while they are confined to a space suit for an EVA duration of up to 8 hours, and a total time in the suit of up to 12 hours.

space suit↗

Upgrades to the Mars Global Reference Atmospheric Model (Mars-GRAM)

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering reference models of planetary atmospheres are the Global Reference Atmospheric Models (GRAMs). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the GRAMs since Fiscal Year 2018. The GRAM upgrades are being developed by NASA Marshall Space Flight Center and NASA Langley Research Center. This poster provides details regarding recent MarsGRAM upgrades.

atmospheric models↗

ECI Final Report: Closing of Critical Technology Gaps for Rotating Detonation Rocket Engines

NASA has successfully fired several configurations of a dual regenerative 10K lbf class Rotating Detonation Rocket Engines using cryogenic liquid methane, liquid hydrogen, and RP-1 as fuel and liquid or gaseous oxygen as the oxidizer. In addition, 3 hot fire test phases were conducted to evaluate parametrically varying combustor geometries using a subscale 500-1K lbf class thruster RDRE. Several studies were successfully completed to evaluate the impacts of contraction ratio, annulus L’, heat transfer through calorimetry, and varying injector designs. Laser powder bed fusion GRCop-42, GRX-810, and C-103 alloys were used for the outer bodies, inner bodies, nozzles, and injector variations. The development of RDRE technology is only now possible with additive manufacturing techniques and these specialized alloys. Critical design parameters, design rules of thumb, and operability limitations have been identified. Major lessons learned in the development of critical components have also been documented. All critical technology gaps have been demonstrated at one scale or another and closed. A major finding of this work is that the combustion efficiency of the RDRE is far superior to that of the traditional liquid rocket engine requiring an order of magnitude lower chamber volume and residence time to react. Because of this, the design trade space opens up significantly. More compact chamber geometries are now possible with potential mass savings and significant length savings possible to flight geometries. In addition, the ceiling for the technology, in terms of Isp, has not yet been reached. It is likely that an additional ~10% better Isp over equivalent state-of-the-art combustion devices may be achieved over the next decade should the technology continue to be developed. This technology has been shown to be viable for near term infusion (2-5 years) into space missions and enable cost effective space access for US industry. This final report documents all major findings from this early career initiative (ECI) project and lays out what is needed post ECI.

Thomas Teasley↗