Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Adaptive Mission Assurance (AMA) – A Conceptual Guide for NASA Missions

NASA is well acquainted with and skilled in conducting Risk Class A Safety and Mission Assurance (SMA). Class A missions are characterized as having highly specific performance with an ultra-low risk tolerance for risk and mission failure. But space is rapidly changing, and the space enterprise is challenged to pursue faster more agile mission developments with fewer resources and directed schedules. To meet this demand mission development teams face accepting more risk and trading performance within strict cost and schedule constraints. In responding to this challenge, The Aerospace Corporation has evolved the Adaptive Mission Assurance (AMA) approach. The benefit of an “adaptive” approach is most realized for smaller Research and Development (R&D), or Science and Technology (S&T) demonstration missions constrained by significantly smaller budgets and directed schedules. The challenge for these “risk tolerant, constraints-driven” missions is how to identify the most valuable mission assurance tasks that will fit within strict budgetary and schedule constraints for “gracefully” accepting risk that still achieves an agreeable expectation of mission success. AMA can respond to this challenge with little to no impact to team staffing or existing workload. This conceptual guide introduces AMA as a potential implementation for NASA Risk Class D and Sub-Class D missions.

Douglas A. Harris↗

Virtual FPGA management and optimization system

A macro scheduler includes a resource tracking module configured to update a database enumerating a plurality of macro components of a set of field programmable gate array (FPGA) devices, a communication interface configured to receive from a first client device a first design definition indicating one or more specified macro components for a design, resource allocation logic configured to allocate a first set of macro components for the design by allocating one of the plurality of macro components for each of the one or more specified macro components indicated in the first design definition, and configuration logic configured to implement the design in the set of FPGA devices by configuring the first set of allocated macro components according to the first design definition.

97 MATHEMATICS AND COMPUTING↗

Steps Toward Optimal Competitive Scheduling

This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum of users preferences, when the preference values are private information of the users. We bypass this problem by making the assumptions that one can assign money to customers. This assumption is reasonable; a committee is usually in charge of deciding the priority of each mission competing for access to the DSN within a time period while scheduling. Instead, we can assume that the committee assigns a budget to each mission.This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum ofsers preferences, when the preference values are private information of the users. We bypass this problem by making the assumptions that one can assign money to customers. This assumption is reasonable; a committee is usually in charge of deciding the priority of each mission competing for access to the DSN within a time period while scheduling. Instead, we can assume that the committee assigns a budget to each mission.

Frank, Jeremy↗

Spike: Artificial intelligence scheduling for Hubble space telescope

Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

Johnston, Mark↗

Method for resource control in parallel environments using program organization and run-time support

A system and method for dynamic scheduling and allocation of resources to parallel applications during the course of their execution. By establishing well-defined interactions between an executing job and the parallel system, the system and method support dynamic reconfiguration of processor partitions, dynamic distribution and redistribution of data, communication among cooperating applications, and various other monitoring actions. The interactions occur only at specific points in the execution of the program where the aforementioned operations can be performed efficiently.

Ekanadham, Kattamuri↗

Method for resource control in parallel environments using program organization and run-time support

A system and method for dynamic scheduling and allocation of resources to parallel applications during the course of their execution. By establishing well-defined interactions between an executing job and the parallel system, the system and method support dynamic reconfiguration of processor partitions, dynamic distribution and redistribution of data, communication among cooperating applications, and various other monitoring actions. The interactions occur only at specific points in the execution of the program where the aforementioned operations can be performed efficiently.

Ekanadham, Kattamuri↗

The MFIVE Space Station Crew Activity Scheduler and Stowage Logistics Clerk

An interactive computer scheduling tool, the MFIVE Space Station Crew Activity Scheduler and Stowage Logistics Clerk, is described. The MFIVE employs the intelligent perturbation method, which was developed to schedule complex time and resource constrained problems. This algorithm was used to minimize the completion time of sample scheduling problems and solutions were derived which averaged within 7 percent of optimum where standard solution techniques gave solutions 23 percent longer than optimum.

Kurtzman, Clifford R.↗

Generating and evaluating alternate schedules

The demand for and availability of Space Network resources are subject to short-term fluctuations and long-term changes. Generation of acceptable schedules under changing demand and resource availability will require the use of different scheduling policies. This paper identifies several such scheduling policies. It defines metrics for evaluating schedules using the criteria directly related to these scheduling policies. Then it applies the metrics to compare several schedules generated for a scenario representative of 1998 SN demand and resources. Finally, the paper describes a method for using these metrics to evaluate schedules based on multiple criteria.

Reddy, Surender D.↗

Profile of Resource Adequacy in the MISO Region

MISO is facing a number of generation resource challenges, ranging from large amounts of retirements, behind schedule retrofit projects, and internal resources committed to exporting power to PJM's capacity market. This report identifies potential issues with generator retirements and retrofits, as well as potential transmission issues, including the impact of imports and exports in a short-term outlook for resource adequacy in the MISO region, including specific concerns with the generation capacity expected to be available in the MISO North and Central regions from 2014 to 2016, as well as additional risks from proposed environmental regulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A System for Planning Ahead

A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

Source record↗

Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

Jaap, John↗

Incremental Scheduling Engines for Human Exploration of the Cosmos

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

Jaap, John↗

Priority-BF: A Task Manager for Priority-Based Scheduling

The increasing demand for computational resources, particularly in High-Performance Computing environments, necessitates to rethink how we handle job scheduling strategies. This work addresses the challenge of managing concurrent jobs with differing priorities on overloaded parallel systems, where strict QoS constraints are often difficult for users to define. Our solution relies on a qualitative description of priorities and pulls from two key approaches: the Easy-BF algorithm and the Conservative Backfilling algorithms. This solution improves the response time for high-priority jobs by 50% without affecting the overall system utilization. We show its applicability in several critical scenarios such as High-Performance Computing (HPC) resource management and in-situ computing.

Gainaru, Ana [ORNL]↗

Computing Bounds on Resource Levels for Flexible Plans

A new algorithm efficiently computes the tightest exact bound on the levels of resources induced by a flexible activity plan (see figure). Tightness of bounds is extremely important for computations involved in planning because tight bounds can save potentially exponential amounts of search (through early backtracking and detection of solutions), relative to looser bounds. The bound computed by the new algorithm, denoted the resource-level envelope, constitutes the measure of maximum and minimum consumption of resources at any time for all fixed-time schedules in the flexible plan. At each time, the envelope guarantees that there are two fixed-time instantiations one that produces the minimum level and one that produces the maximum level. Therefore, the resource-level envelope is the tightest possible resource-level bound for a flexible plan because any tighter bound would exclude the contribution of at least one fixed-time schedule. If the resource- level envelope can be computed efficiently, one could substitute looser bounds that are currently used in the inner cores of constraint-posting scheduling algorithms, with the potential for great improvements in performance. What is needed to reduce the cost of computation is an algorithm, the measure of complexity of which is no greater than a low-degree polynomial in N (where N is the number of activities). The new algorithm satisfies this need. In this algorithm, the computation of resource-level envelopes is based on a novel combination of (1) the theory of shortest paths in the temporal-constraint network for the flexible plan and (2) the theory of maximum flows for a flow network derived from the temporal and resource constraints. The measure of asymptotic complexity of the algorithm is O(N O(maxflow(N)), where O(x) denotes an amount of computing time or a number of arithmetic operations proportional to a number of the order of x and O(maxflow(N)) is the measure of complexity (and thus of cost) of a maximumflow algorithm applied to an auxiliary flow network of 2N nodes. The algorithm is believed to be efficient in practice; experimental analysis shows the practical cost of maxflow to be as low as O(N1.5). The algorithm could be enhanced following at least two approaches. In the first approach, incremental subalgorithms for the computation of the envelope could be developed. By use of temporal scanning of the events in the temporal network, it may be possible to significantly reduce the size of the networks on which it is necessary to run the maximum-flow subalgorithm, thereby significantly reducing the time required for envelope calculation. In the second approach, the practical effectiveness of resource envelopes in the inner loops of search algorithms could be tested for multi-capacity resource scheduling. This testing would include inner-loop backtracking and termination tests and variable and value-ordering heuristics that exploit the properties of resource envelopes more directly.

Muscvettola, Nicola↗

Abstract-Reasoning Software for Coordinating Multiple Agents

A computer program for scheduling the activities of multiple agents that share limited resources has been incorporated into the Automated Scheduling and Planning Environment (ASPEN) software system, aspects of which have been reported in several previous NASA Tech Briefs articles. In the original intended application, the agents would be multiple spacecraft and/or robotic vehicles engaged in scientific exploration of distant planets. The program could also be used on Earth in such diverse settings as production lines and military maneuvers. This program includes a planning/scheduling subprogram of the iterative repair type that reasons about the activities of multiple agents at abstract levels in order to greatly improve the scheduling of their use of shared resources. The program summarizes the information about the constraints on, and resource requirements of, abstract activities on the basis of the constraints and requirements that pertain to their potential refinements (decomposition into less-abstract and ultimately to primitive activities). The advantage of reasoning about summary information is that time needed to find consistent schedules is exponentially smaller than the time that would be needed for reasoning about the same tasks at the primitive level.

Clement, Bradley↗

Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

Richards, Stephen F.↗

US 2023/0182605 A1 Network constraint energy management system for electric vehicle depot charging and scheduling

Network constraint energy management system for electric vehicle (EV) depot charging and scheduling. In an embodiment, a power schedule is received from an economic dispatch application for a charging depot comprising EV charging station(s) and distributed energy resource(s). The power schedule may be simulated on a distribution network model of the charging depot, according to load flow analysis, to determine whether any grid-code violations occur. In response to the detection of violation(s), a constraint may be generated for each violating node, and the economic dispatch application may be re-executed with the constraint(s) to produce a new power schedule, until no violations are detected. When not all load demand can be satisfied by the power schedule, a charging schedule may be adjusted to ensure that critical energy requirements are satisfied. The final power and charging schedules may be used to schedule and control power generation and charging in the charging depot.

Hafiz, Faeza↗

Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

Richards, Stephen F.↗