Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.

START, transportation, GIS, V&V↗

Power System Recovery Coordinated with (Non-)Black-Start Generators

Power restoration is an urgent task after a black-out, and recovery efficiency is critical when quantifying system resilience. Multiple elements should be considered to restore the power system quickly and safely. This paper proposes a recovery model to solve a direct-current optimal power flow (DCOPF) based on mixed-integer linear programming (MILP). Since most of the generators cannot start independently, the interaction between black-start (BS) and non-black-start (NBS) generators must be modeled appropriately. The energization status of the NBS is coordinated with the recovery status of transmission lines, and both of them are modeled as binary variables. Also, only after an NBS unit receives the cranking power through connected transmission lines, will it be allowed to participate in the following system dispatch. The amount of cranking power is estimated as a fixed proportion to the maximum generation capacity. The proposed model is validated on several test systems, as well as a 1393-bus representation system of the Puerto Rican electric power grid. Test results demonstrate how the recovery of NBS units and damaged transmission lines can be optimized, resulting in an efficient and well-coordinated recovery procedure.

Zhao, Meng↗

Development of a Low Cost 10kW Tubular SOFC Power System

The DOE program funded from 2003 through early 2013 has brought the Acumentrics SOFC program from an early stage R&D program to an entry level commercial product offering. The development work started as one of the main core teams under the DOE Solid State Energy Conversion Alliance (SECA) program administered by the National Energy Technology Laboratory (NETL) of the DOE. During the first phase of the program, lasting approximately 3-4 years, a 5kW machine was designed, manufactured and tested against the specification developed by NETL. This unit was also shipped to NETL for independent verification testing which validated all of the results achieved while in the laboratory at Acumentrics. The Acumentrics unit passed all criteria established from operational stability, efficiency, and cost projections. Passing of the SECA Phase I test allowed the program to move into Phase II of the program. During this phase, the overall objective was to further refine the unit meeting a higher level of performance stability as well as further cost reductions. During the first year of this new phase, the NETL SECA program was refocused towards larger size units and operation on coal gasification due to the severe rise in natural gas prices and refocus on the US supply of indigenous coal. At this point, the program was shifted to the U.S. DOE’s Energy Efficiency and Renewable Energy (EERE) division located in Golden, Colorado. With this shift, the focus remained on smaller power units operational on gaseous fuels for a variety of applications including micro combined heat and power (mCHP). To achieve this goal, further enhancements in power, life expectancy and reductions in cost were necessary. The past 5 years have achieved these goals with machines that can now achieve over 40% electrical efficiency and field units that have now operated for close to a year and a half with minimal maintenance. The following report details not only the first phase while under the SECA program and the key achievements but also the results while under EERE’s leadership and the transition to an early commercial product offering.

10 SYNTHETIC FUELS↗

Lessons Learned from a Laser Injury Event - Limitations of Skill-Of-The-Craft

A technician at INL received 2nd degree burns to the middle and ring fingers of his left hand while performing a preventive maintenance (PM) procedure on a Class 4 industrial laser on August 30, 2011. The task required placement of a “target” in the beam path to verify mirror alignment. The technician, believing the laser was in a safe mode, reached into the beam pathway to place the target, saw a flash and immediately withdrew his hand. Three INL technicians were assigned to perform a 2000 hour run time PM on a laser. A pre-job briefing was held August 29, 2011 by the acting foreman and the technicians started the PM. They had completed 25 steps in Section I of the work order by the end of the day. The laser systems were placed under LO/TO and the internal optics were cleaned and/or replaced. The LO/TO was released and the next morning, August 30, 2011, the technicians prepared to take a diagnostic shot inside the internal optics. The laser was powered up at the HMI, and the person in charge (PIC) selected the “Mirror Alignment” program from the human machine interface (HMI) screen, enabled the pendent and pressed the “Cycle Start” button. The technicians believed the laser was in “simmer” mode at this point and that no beam was being generated out of the resonator. A beam was being generated in the “Mirror Alignment” program when the “Cycle Start” button was pressed. They decided to check the #4 aperture target and see if they were aligned at that location. One of the technicians reach to place the target at the end of the Z box and a “Flash” occurred. The technician immediately retracted his hand with the target. The PIC turned off the high voltage (HV) at the pendent. The foreman and supervisor were informed of the incident and the injured technician was escorted to an onsite medical facility. The nurse evaluated the injury and sent the technician to a physician for further evaluation. A physician examined the technician’s hand. The technician’s left middle and ring fingers received 2nd degree burns to both finger tips. A prescription burn ointment and bandage was applied. The employee was returned to work with no restrictions.

99 GENERAL AND MISCELLANEOUS↗

Nuclear waste reduction: Exploring new pathways one step at a time

In my home country of Venezuela, nuclear energy is not a topic that attracts much attention. The government briefly oversaw some nuclear energy programs during the 1950s, but currently there are no active nuclear power facilities in the country. In fact, the Venezuelan government signed and ratified the treaty of the prohibition of nuclear weapons in 2021, which states that Venezuela has never owned, possessed or controlled nuclear weapons or programs of any kind. When I moved to the United States, however, nuclear energy became an extremely relevant topic. In the 1940s, the U.S. government established and oversaw the Manhattan Project to build atomic bombs for use in World War II. After the war, the government encouraged scientists to use this information on nuclear reactions to develop nuclear energy for peaceful civilian purposes instead.1 During these early days of nuclear research, there were no formal regulatory standards for nuclear waste management. Policies usually were self-regulated and often created based on existing policies of disposal for non-nuclear waste.2 As a result, there were instances of nuclear waste leaching into the environment and affecting local communities. So, much research has been conducted since then to characterize and store nuclear waste safely and securely.3 I first became interested in nuclear energy during my undergraduate studies when I worked on a project involving ligand synthesis to help extract actinides from nuclear waste. I then studied electrochemistry in molten salt systems for nuclear energy applications during my Ph.D. As I approached graduation, I started looking into national laboratories that have programs involving nuclear energy and waste management. At Idaho National Laboratory (INL), the focus is more on applied processes and how nuclear energy can be innovated to realize next-generation reactor design and technologies. This focus led me to apply for a Seaborg distinguished postdoctoral position at INL, for which I was chosen based on my proposal of a way to improve nuclear waste recycling. To understand my proposal, we must familiarize ourselves with the makeup of nuclear waste. After uranium dioxide is used as nuclear fuel in a reactor, the fuel matrix is then characterized by various fission products, including rare earth elements, alkali and alkaline earths, and actinides. Some of these fission products can potentially be recovered through pyroprocessing, 4 which involves the electrochemical dissolution of the used nuclear fuel in a molten chloride salt mixture at high temperatures. Though some of the fission products can be easily recovered—for example, uranium is reduced onto an inert cathode by applied potentials—numerous other fission products such as rare earth elements are difficult to recover due to their multivalent oxidation states and side reactions.5 To improve the recovery efficiency of rare earth elements specifically, I proposed investigating the fundamental interactions between rare earth elements in the molten chloride salt and their metallic form (Figure 1). The kinetic pathways and the chemical reactions of these elements, which will be elucidated through spectro-electrochemistry at high temperatures, will give insights on how the recovery efficiency can be improved. Although my research focuses on fundamental science, it will benefit the applied process by generating new scientific knowledge and closing the gap for efficient recycling of the waste: one step at a time.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Source Term Reduction for Advanced and Small Modular Boiling Water Reactors

The United States Department of Energy (US DOE) is currently supporting the development of various advanced and small modular reactor (SMR) designs. Several of these designs have commenced license application with the US Nuclear Regulatory Commission (US NRC). These reactors have improved safety features that may significantly reduce radiological source terms in the event of design and beyond-design basis accidents. Specifically, some reactors feature a smaller containment volume relative to the available fission product depositional surface area, which supports increased fission product retention in the containment vessel. Pressurized water reactors (PWR) and boiling water reactors (BWR) with this feature include the integral pressurized water reactor (iPWR) and the BWRX-300 design by General Electric. A prior research program supported by the US DOE quantified the source term reduction associated with light water iPWRs and developed iPWR-specific theoretical models for fission product deposition rates. This program included a sequence of research projects that started with a feasibility study, development of theoretical models that predict higher deposition rates, and finally, development of empirical data for verification and validation of the theoretical models. The current project, which is a feasibility study, is the first step in a similar program to quantify the source term reduction associated with small and advanced light water BWRs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Proceedings of RIKEN BNL Research Center Workshop: Theory and Modeling for the Beam Energy Scan: From Exploration to Discovery (Volume 121)

The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory has concluded phase I of its Beam Energy Scan (BES) program. The goal of the RHIC BES program is to explore the phase diagram of strongly interacting matter at high baryonic densities and search for the QCD critical point by performing systematic scans at lower beam energies. Results from the RHIC BES I program are intriguing. There indeed seem to be several signals suggesting a softening of the equation of state, which may result from a first-order transition, as well as possible indications of a critical point. In light of these intriguing results, several accelerator and detector upgrades have been planned to conduct the phase II of the RHIC BES during the period 2017-2020. The goal of the RHIC BES II is discovery of the QCD critical point by performing high luminosity scans within the interesting beam energy range revealed through explorations at RHIC BES I. Past experience has proven that even qualitative understanding of the physics encoded within the RHIC experimental data requires substantial theoretical input based on QCD calculations as well as detailed, quantitative modeling of the medium created at the RHIC. However, the coordinated theoretical and modeling efforts necessary for comprehensive understanding of the RHIC BES data is presently lacking. The purpose of this workshop was to gather a small group of expert theorists, phenomenologists and experimentalists to identify the necessary theoretical and modeling developments required for RHIC BES, to delineate a clear path towards extracting concrete physics utilizing the RHIC BES data, and to kick-start collaborations among theorists, phenomenologists and experimentalists to ensure that the necessary theoretical and modeling developments can be achieved before the start of the RHIC BES II experimental program.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

There is Nothing Here for You: Passive Institutional Controls and Preemptive Resource Exploitation - 16197

The Department of Energy (DOE) Carlsbad Field Office (CBFO) is required by Title 40 CFR Part 191.14(c) and Title 40 CFR Part 194.43 to develop a Passive Institutional Controls (PICs) program to prevent the likelihood for future human intrusion into the Waste Isolation Pilot Plant (WIPP). The purpose of this paper is to explore how the exploitation of resources under nuclear waste repositories as a part of PICs could reduce the risk of future human intrusion. The WIPP, located in the northern Permian Basin near Carlsbad, New Mexico, is a geologic repository for the permanent isolation of defense-related transuranic waste. In 1995, a series of geophysical surveys by the New Mexico Bureau of Mines and Mineral Resources estimated the total hydrocarbon reserves underneath the WIPP, which included a 16-section area plus a one mile buffer. Since that time the Delaware Basin well database has been maintained to closely monitor hydrocarbon extraction activities. The database was used in compiling relevant oil and gas extraction data retrieved from The New Mexico Oil Conservation Division. The volume of hydrocarbons extracted from 1995 to the present suggests that if current extraction growth trends continue (as historic market and production data indicate they will), all known crude oil reserves under the WIPP, obtainable through current extraction technology, will be depleted within approximately 10 years, i.e., by 2026. This is well before the anticipated WIPP closure and start of the Active Institutional Controls (AICs) program called for in 40 CFR Part 194.41(b). In addition, gas resources, although more difficult to forecast, are not expected to last beyond 2137. Title 40 CFR 194.33 states, 'Inadvertent and intermittent intrusion by drilling for resources... is the most severe human intrusion scenario'. This human intrusion scenario is the feature, event, and process (FEP) that performance assessment (PA) has identified as having the most significant impact on radionuclide releases during the 10,000 year regulatory period for the WIPP. Title 40 CFR 194.43 requires a PICs program which contains '... [records] in the international archives that would likely be consulted by individuals in search of unexploited resources'. Due to political, social, and economic motivators for resource exploration and exploitation, the potential future absence of hydrocarbon resources under the WIPP is important in deterring possible human intrusion. To minimize the risk of future human intrusion, it may be necessary to consider actively removing as many of the exploitable hydrocarbon resources under and around a nuclear waste repository as is practicable before the end of the period of AICs (i.e., 100 years after closure of the repository). Additionally, communicating the absence of hydrocarbon resources under a nuclear repository should take a prominent role in any PICs program. Due to its high-cost nature, exploratory drilling of any kind currently involves cost/benefit analysis. If in the future the economic realities of resource exploration remain similar to today, and future oil companies know the resources for a particular area have already been heavily exploited, hypothetically, they would become less motivated to drill in that area. They would instead opt to explore an area with better prospects. It is important then that the remaining hydrocarbon reserves be clearly stated and prominently displayed. In essence we should communicate the message, loud and clear, 'There is nothing here for you'. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Portable Acceleration Solutions for LArTPC Simulation Using Wire-Cell Toolkit

The Liquid Argon Time Projection Chamber (LArTPC) technology plays an essential role in many current and future neutrino experiments. Accurate and fast simulation is critical to developing efficient analysis algorithms and precise physics model projections. The speed of simulation becomes more important as Deep Learning algorithms are getting more widely used in LArTPC analysis and their training requires a large simulated dataset. Heterogeneous computing is an efficient way to delegate computationally intensive tasks to specialized hardware. However, as the landscape of compute accelerators quickly evolves, it becomes increasingly difficult to manually adapt the code to the latest hardware or software environments. A solution which is portable to multiple hardware architectures without substantially compromising performance would thus be very beneficial, especially for long-term projects such as the LArTPC simulations. In search of a portable, scalable and maintainable software solution for LArTPC simulations, we have started to explore high-level portable programming frameworks that support several hardware backends. In this paper, we present our experience porting the LArTPC simulation code in the Wire-Cell Toolkit to NVIDIA GPUs, first with the CUDA programming model and then with a portable library called Kokkos. Preliminary performance results on NVIDIA V100 GPUs and multi-core CPUs are presented, followed by a discussion of the factors affiecting the performance and plans for future improvements.

Yu, Haiwang↗

Ultra Slow Muon Project at J-PARC, MUSE

The muon science facility (MUSE), along with the neutron, hadron, and neutrino facilities, is one of the experimental areas of the J-PARC project, which was approved for construction at the Tokai JAEA site. The MUSE facility is located in the Materials and Life Science Facility (MLF), which is a building integrated to include both neutron and muon science programs. Construction of the MLF building was started in the beginning of 2004, and first muon beam is expected in the autumn of 2008.As a next step, we are planning to install, a Super Omega muon channel with a large acceptance of 400 msr, to extract the world strongest pulsed surface muon beam. Its goal is to extract 4x10{sup 8} surface muons/s for the generation of the intense ultra slow muons, utilizing laser resonant ionization of Mu by applying an intense pulsed VUV laser system. As maximum 1x10{sup 6} ultra slow muons/s will be expected, which will allow for the extension of {mu}SR into the field of thin film and surface science.

74 ATOMIC AND MOLECULAR PHYSICS↗

Toward a Fully Kinetic Theory of Turbulence in Magnetized Plasmas

This paper outlines the present status of the kinetic theory of turbulence in magnetized plasmas as being developed by the present author. The systematic program to formulate the theory of turbulence starting from the Vlasov-Klimontovich formalism began with the works by pioneers of modern plasma physics in the 1960s and 1970s. However, early efforts adopted the heuristic semi-classical method instead of the statistical mechanical formulation, which is necessary for a quantitative analysis. Recently, the present author picked up where the early pioneers left, and began to reformulate the kinetic turbulence theory of turbulence in magnetized plasmas from statistical mechanical formalism. This paper is a brief outline of the progress to date.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Quantum Nature and Mass of the Neutrino. FY20 Annual Laboratory Continuation Progress Report

Over the last 100 years we have learned a much about the neutrino, but there remain interesting questions about this weakly interacting particle. In particular, at LLNL we are developing experiments to measure the mass and the quantum nature of the neutrino. The 2015 long range plan recommended tonne-scale neutrinoless double beta decay experiments as the top new project priority and this experiment will target the quantum nature of the neutrino. The LLNL team is motivated and focused on developing the best technology for this experiment which is a liquid xenon time project chamber called nEXO. On a longer time scale, LLNL is also developing technology to measure the neutrino mass with tritium decay experiments. Work on nEXO at LLNL started in 2015 with an LDRD and program development funds to develop the nEXO concept, publish sensitivity predictions, explore alternatives and risks, and to build a credible project team and this effort is on going. In addition, we received research funding from DOE-SC NP and LLNL manages pre-conceptual R&D for the nEXO collaboration a portion of which is executed at LLNL. The Project 8 effort is solely funded by LLNL LDRD, and ends this year. A second LDRD effort is focused on repurposing cyclotron radiation emission spectroscopy for eV-scale X-ray detection. This second effort, while separated from Project 8, still has scientific and technical commonalities with Project 8. The funding for this X-ray detection effort will continue for one more year. LLNL has a long history of building large projects, science projects and time projection chambers, but nEXO is in fact the first project of this scale that LLNL is prepared to lead for DOE-SC NP.We have the tools, skills, people and motivation to make nEXO a reality. The current program development dollars are used to prepare the nEXO concept for down select and CD1. These internal LLNL dollars pay for a number of things including project staff to organize the nEXO collaboration for the various reviews that lie ahead, to develop the draft plans and structure to manage the project as well as setting up an external advisory committee. The current LDRD is exploring alternatives that effect the risk profile as well as possible performance improvements. The DOE-SC NP base funding is targeted at simulation and analysis of the nEXO concept in preparation for the down select and refinement of the understanding of the detector as well as scientific effort on the large xenon test stand (LXTS) that will burn down one of the largest risks to the nEXO project. Lastly, LLNL is leading the pre-conceptual R&D effort and managing the funds for the nEXO collaboration. The results of this effort are reported elsewhere, but the scope of this executed at LLNL will be reported here and is primarily the engineering and construction of the LXTS experiment. The primary technical contribution of LLNL to the Project 8 concept is the formation and study of atomic tritium. Atomic tritium is necessary for Project 8 to reach the ultimate sensitivity. LLNL has considerable experience with tritium and is well suited for this crucial work. Although the focus of this work is strictly fundamental science, there has already been one significant spinoff to develop a new means to measure radio xenon in the air

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Quantum Nature of the Neutrino

Over the last 100 years we have learned much about the neutrino, but there remain interesting questions about this weakly interacting particle. In particular, at LLNL we are developing an experiment to measure the quantum nature of the neutrino. The 2015 long range plan recom mended tonne-scale neutrinoless double beta decay experiments as the top new project priority and this experiment will target the quantum nature of the neutrino. The LLNL team is motivated and focused on developing the best technology for this experiment which is a liquid xenon time projection chamber called nEXO. Work on nEXO at LLNL started in 2015 with an LDRD and program development funds to de velop the nEXO concept, publish sensitivity predictions, explore alternatives and risks, and to build a credible project team and this effort is on going. In addition, we received research funding from DOE-SC NP and LLNL manages pre-conceptual R&D for the nEXO collaboration a portion of which is executed at LLNL. LLNL has a long history of building large projects, science projects and time projection chambers, but nEXO is in fact the first project of this scale that LLNL is prepared to lead for DOE-SC NP. We have the tools, skills, people and motivation to make nEXO a reality. The current program devel opment dollars are used to prepare the nEXO concept for down select and CD1. These internal LLNL dollars pay for a number of things including project staff to organize the nEXO collaboration for the various reviews, to develop the draft plans and structure to manage the project as well as setting up external advisory committees. The DOE-SC NP base funding is targeted at simulation and analysis of the nEXO concept in preparation for the down select and refinement of the under standing of the detector as well as scientific effort on the large xenon test stand (LXTS) that will burn down one of the largest risks to the nEXO project. Lastly, LLNL is leading the pre-conceptual R&D effort and managing the funds for the nEXO collaboration. LLNL continues to build the best scientific team for nEXO and this year that includes adding Ethan Bernard to lead the efforts on the LXTS. We will also soon add a new postoc, Samuel Hedges, in the fall to the LLNL nEXO team. The effort this year was influenced by the portfolio review, and there were a number of scientific activities led by LLNL to prepare for this review. In addition, we again took a lead role on the new sensitivity paper as well as publishing a paper based analyzing the effects of skin xenon in nEXO. LLNL leads the software and analysis for the project and we continued work in this area as well. High voltage remains a significant risk for the project and we continue to make progress on the LXTS that will mitigate this risk. Lastly we remain active in looking at how to scale the technology to larger scales, and expect to produce a paper on this topic in the near future.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SRNL LDRD ANNUAL REPORT 2008

The Laboratory Director is pleased to have the opportunity to present the 2008 Laboratory Directed Research and Development (LDRD) annual report. This is my first opportunity to do so, and only the second such report that has been issued. As will be obvious, SRNL has built upon the excellent start that was made with the LDRD program last year, and researchers have broken new ground in some important areas. In reviewing the output of this program this year, it is clear that the researchers implemented their ideas with creativity, skill and enthusiasm. It is gratifying to see this level of participation, because the LDRD program remains a key part of meeting SRNL's and DOE's strategic goals, and helps lay a solid scientific foundation for SRNL as the premier applied science laboratory. I also believe that the LDRD program's results this year have demonstrated SRNL's value as the EM Corporate Laboratory, having advanced knowledge in a spectrum of areas, including reduction of the technical risks of cleanup, separations science, packaging and transportation of nuclear materials, and many others. The research in support of Energy Security and National and Homeland Security has been no less notable. SRNL' s researchers have shown again that the nascent LDRD program is a sound investment for DOE that will pay off handsomely for the nation as time goes on.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status of a Single-Aperture 11 T Nb3Sn Demonstrator Dipole for LHC Upgrades

The planned upgrade of the LHC collimation system includes two additional collimators to be installed in the dispersion suppressor areas of points 2, 3 and 7. The necessary longitudinal space for the collimators could be provided by replacing some 8.33 T NbTi LHC main dipoles with 11 T dipoles based on Nb3Sn superconductor and compatible with the LHC lattice and main systems. To demonstrate t his possibility Fermilab and CERN have started in 2011 a joint R&D program with the goal of building b y 2014 a 5.5-m long twin-aperture dipole prototype suitable for installation in the LHC. The first step of this program is the development of a 2-m long single-aperture demonstration dipole with the nominal field of 11 T at the LHC nominal current of ~11. 85 kA and 60 mm bore with ~20% margin. This paper describes the design, construction and test results of the single-aperture Nb3Sn demonstrator model for the LHC collimation system upgrade.

43 PARTICLE ACCELERATORS↗

Managing TRU waste processing and storage issues/challenges - 15487

Operational events at the Waste Isolation Pilot Plant (WIPP) facility resulted in suspension of disposal operations and waste shipments to WIPP creating significant challenges for the Department of Energy (DOE) complex. The Oak Ridge Transuranic (TRU) Waste Program which was poised to re-start shipping after a 2.5 year suspension of the Carlsbad Field Office (CBFO) certification activities which resulted in on-site accumulation of the highest activity contact handled (CH) TRU waste containers. As a result, Transuranic Waste Processing Center (TWPC) is nearing its physical storage capacity for CH waste and has already reached storage capacity limits for remote handled (RH) TRU waste. The TWPC storage capacity for RH-TRU waste is very limited and dependent on real time shipping support to continue RH waste processing activities in the facilities Hot Cell. Additionally, changes in dispersion modeling (i.e., dry deposition factor changes) used in the TWPC Documented Safety Analysis (DSA) present Material at Risk (MAR) management challenges to effectively manage off-site dose consequences. These facts necessitated the identification of alternative waste storage options for both CH and RH waste to continue waste processing operations at TWPC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Design, Fabrication, and Test Program for NREL's Wave-Powered Desalination System: Preprint

Starting in 2018, the U.S. Department of Energy's Water Power Technologies Office (WPTO), initiated the development of a prize competition as a foundational investment of Powering the Blue Economy, The prize encouraged the development of small, modular, cost-competitive wave-powered desalination systems. The National Renewable Energy Laboratory (NREL) was tasked with managing the prize, known as the Waves to Water Prize (W2W), and providing technical input based on prior desalination research performed at the lab. NREL partnered with the Coastal Studies Institute (CSI) and Jennette's Pier in North Carolina for their expertise in deploying research articles at the Jennette's Pier research facility. The prize consisted of five stages that included high-level concept proposals, numerical modelling, site- specific design, subsystem prototyping, and a final ocean demonstration. Due to the logistical risks of installing numerous prototypes in the ocean at the same time, NREL was tasked with designing and building a test article to de- risk the final event. The test article design needed to represent the technologies expected in the final stage of the prize. This meant that the design was expected to follow the same rules as the competitors, providing CSI with an opportunity to practice installations and develop a final logistics plan prior to the final event. After concluding the W2W event in April 2022, the NREL test article was redeployed in August 2022 to better understand the challenges of anchoring wave energy converters (WECs) in shallow water conditions with breaking waves. For the Spanish version of this report, see NREL/CP-5700-88482 (https://www.nrel.gov/docs/fy24osti/88482.pdf).

deployment↗