Search NASA⌕ Search

SEARCH · Search NASA

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Pilot Workload is Associated with Long Duty Days and Multiple Flight Legs

Pilot workload is a real concern throughout aviation, especially in short-haul operations due to short flights and multiple flight legs. Our goal was to examine the workload experienced by pilots during normal operations in a short-haul airline. Thirty pilots flew a roster consisting of a cycle of five days of mid-day start time duty hours with many flight legs (baseline block) followed by four days off, five early start time duty hours followed by three days off, five mid-day time starts with many legs followed by three days off and then five early start time followed by one day off. The pilots provided evaluations of workload by scoring the six subscales of NASA-TLX (i.e., Mental Demand, Performance, Physical Demand, Effort, Temporal Demand, and Frustration) on their duty days during each flight and once during rest days. The analyses included the raw TLX scores for each demand, the mean raw TLX, and the overall weighted TLX mean for duty days and rest days. We found that mental demand was significantly lower for each duty schedule and rest relative to baseline (early start 1st block p = 0.016, late duty p = 0.017, early start 2nd block p < 0.001, rest p < 0.001). Temporal demand was significantly lower than baseline on early duty 1st block (p = 0.02), early start 2nd block (p < 0.001), and rest (p < 0.001). Effort was significantly lower than baseline only during early start 1st block (p = 0.014) and early start 2nd block (p < 0.001). Frustration was significantly lower during early start 2nd block relative to baseline (p = 0. 039). Physical demand and performance were higher relative to baseline during rest days (p < 0.001). Mean raw TLX showed significantly lower workload for early start 1st block (p = 0.011) and early start 2nd block (p < 0.001). The overall weighted TLX showed significantly lower workload for early start 1st block (p = 0.004), early start 2nd block (p < 0.001) and rest (p < 0.001). We found that pilots experienced higher workload on longer duty days with multiple flight legs. Pilots experienced lower mental demand, temporal demand, and effort on short duty days even though when their duty started earlier in the day. During days off pilots experienced higher physical demand and higher performance.

short-haul↗

Backup control airstart performance on a digital electronic engine control-equipped F100-engine

The air start capability of a backup control (BUC) was tested for a digital electronic engine control (DEEC) equipped F100 engine, which was installed in an F-15 aircraft. Two air start schedules were tested. Using the group 1 start schedule, based on a 40 sec timer, an air speed of 300 knots was required to ensure successful 40 and 25% BUC mode spooldown airstarts. If core rotor speed (N2) was less than 40% a stall would occur when the start bleed closed, 40 sec after initiation of the air start. All jet fuel starter (JFS) assisted air starts were successful with the group 1 start schedule. For the group 2 schedule, the time between pressurization and start bleed closure ranged between 50 sec and 72 sec. Idle rps was lower than the desired 65% for air starts at higher altitudes and lower air speeds.

Johnson, J. B.↗

Engine Operating Conditions that Cause Thermal-Fatigue Cracks in Turbojet-Engine Buckets

Five engine tests were conducted to definitely establish the failure mechanism of leading-edge cracking and to determine which conditions of engine operation cause the failures. Five groups of S-616 and M-252 buckets from master lots were run consecutively in the same J47-25 engine. The tests included a steady-state run at full-power conditions, rapid cycling between idle and rated speed, and three different start-stop tests. The first start-stop test consisted of cycles of start and stop with 5 minutes of idle speed before each stop; the second included cycles of start and stop but with 15 minutes of rated speed before each stop; the third consisted of cycles of gradual starts and normal stops with 5 minutes at idle speed before each stop. The test results demonstrated that the primary cause of leading-edge cracking was thermal fatigue produced by repeated engine starts. The leading edge of the bucket experiences plastic flow in compression during starts and consequently is subjected to a tensile stress when the remainder of the bucket becomes heated and expands. Crack initiation was accelerated when rated-speed operation was added to each normal start-stop cycle. This acceleration of crack formation was attributed to localized creep damage and perhaps to embrittlement resulting from overaging. It was demonstrated that leading-edge cracking can be prevented simply by starting the engine gradually.

Johnston, James R.↗

Loop Heat Pipe Startup Behaviors

A loop heat pipe must start successfully before it can commence its service. The start-up transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe start-up behaviors. Topics include the four start-up scenarios, the initial fluid distribution between the evaporator and reservoir that determines the start-up scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power start-up, and methods to enhance the start-up success. Also addressed are the thermodynamic constraint between the evaporator and reservoir in the loop heat pipe operation, the superheat requirement for nucleate boiling, pressure spike and pressure surge during the start-up transient, and repeated cycles of loop start-up andshutdown under certain conditions.

Loop Heat Pipes↗

Effect of Propellant and Catalyst Bed Temperatures on Thrust Buildup in Several Hydrogen Peroxide Reaction Control Rockets

An investigation was undertaken to determine the effect of chamber and propellant feed temperatures on the starting characteristics of hydrogen peroxide thrust chambers. Start delay times for two types of thrust chamber designs in the 1- to 24-pound-thrust range were obtained over a range of chamber and propellant feed temperatures from 30 to 100 F. Start delay times obtained during the first minute of catalyst bed life and again after 6 minutes of total accumulated running time are presented as a function of chamber and propellant feed temperatures. The initial cold-start delay time of the hydrogen peroxide thrust chambers investigated was approximately 0.150 second to attain 90 percent of steady-state chamber pressure at chamber and propellant feed temperatures of 70 F and above. Both thrust chamber designs could be started at chamber and propellant feed temperatures as low as 30 F; start delay times did, however, generally increase at low temperatures. When the chamber was at an elevated temperature from a preceding firing, the start delay time was reduced to approximately 0.050 second, indicating a marked effect of chamber temperature at constant propellant feed temperatures. Accumulated run time affected the starting characteristics only when both the chamber and propellant feed temperatures were at reduced levels.

Wanhainen, John P.↗

Phenology of Photosynthesis in Winter‐Dormant Temperate and Boreal Forests: Long‐Term Observations From Flux Towers and Quantitative Evaluation of Phenology Models

Abstract We examined the seasonality of photosynthesis in 46 evergreen needleleaf (evergreen needleleaf forests (ENF)) and deciduous broadleaf (deciduous broadleaf forests (DBF)) forests across North America and Eurasia. We quantified the onset and end (Start GPP and End GPP ) of photosynthesis in spring and autumn based on the response of net ecosystem exchange of CO 2 to sunlight. To test the hypothesis that snowmelt is required for photosynthesis to begin, these were compared with end of snowmelt derived from soil temperature. ENF forests achieved 10% of summer photosynthetic capacity ∼3 weeks before end of snowmelt, while DBF forests achieved that capacity ∼4 weeks afterward. DBF forests increased photosynthetic capacity in spring faster (1.95% d −1 ) than ENF (1.10% d −1 ), and their active season length (End GPP –Start GPP ) was ∼50 days shorter. We hypothesized that warming has influenced timing of the photosynthesis season. We found minimal evidence for long‐term change in Start GPP , End GPP , or air temperature, but their interannual anomalies were significantly correlated. Warmer weather was associated with earlier Start GPP (1.3–2.5 days °C −1 ) or later End GPP (1.5–1.8 days °C −1 , depending on forest type and month). Finally, we tested whether existing phenological models could predict Start GPP and End GPP . For ENF forests, air temperature‐ and daylength‐based models provided best predictions for Start GPP , while a chilling‐degree‐day model was best for End GPP . The root mean square errors (RMSE) between predicted and observed Start GPP and End GPP were 11.7 and 11.3 days, respectively. For DBF forests, temperature‐ and daylength‐based models yielded the best results (RMSE 6.3 and 10.5 days).

Environmental Sciences & Ecology↗

High voltage pulse ignition of mercury discharge hollow cathodes

A high voltage pulse generated by a capacitor discharge into a step-up transformer has been demonstrated capable of consistently igniting hollow cathode mercury discharges at propellant flows and heater power levels much below those required by conventional cathode starting. Results are presented for 3.2-mm diameter enclosed and open keeper cathodes. Starting characteristics are shown to depend on keeper voltage, mercury flow rate, heater power, keeper orifice size, emissive materials, and electrode to which the pulse is applied. This starting technique has been used to start a cathode over 10,000 times without any degradation of starting capability. The starting reliability, propellant and power savings offered by the high voltage pulse start should favorably impact performance of electron bombardment thrusters in missions requiring many on-off duty cycles.

Wintucky, E. G.↗

Advanced transportation system studies technical area 3: Alternate propulsion system concepts. SSME upper stage use

The main objective was to determine viable methods for starting the Space Shuttle Main Engine (SSME) in an altitude environment and restarting it in an orbit environment with minimum changes in utilization of the engine system or hardware. The study concluded that the use of the SSME in an upper stage is feasible with minimal changes to the engine systems. The altitude start case requires only a change in the valve sequencing during start and reorificing of the ASI lines. Inlet pressures can be moderately low at 40 psia for the LOX and 32 psia for the H2. The orbital restart case adds the need to recirculate propellant and thermal control paint (to keep the turbomachinery inlets cold to minimize the tank pressures needed), and the need to heat two small components (to maintain acceptable mixture ratios during the early part of the start). These actions allow start anytime after approximately 120 minutes. Earlier starts (approximately one hour) are also possible but would require additional component heating for mixture ratio control during the early portion of the start sequence.

Strangeland, Eric↗

A Hierarchical Relationship Between the Fluence Spectra and CME Kinematics in Large Solar Energetic Particle Events: A Radio Perspective

We report on further evidence that solar energetic particles are organized by the kinematic properties of coronal mass ejections (CMEs). In particular, we focus on the starting frequency of type II bursts, which is related to the distance from the Sun where the radio emission starts. We find that the three groups of solar energetic particle (SEP) events known to have distinct values of CME initial acceleration, also have distinct average starting frequencies of the associated type II bursts. SEP events with ground level enhancement (GLE) have the highest starting frequency (107 MHz), while those associated with filament eruption (FE) in quiescent regions have the lowest starting frequency (22 MHz); regular SEP events have intermediate starting frequency (81 MHz). Taking the onset time of type II bursts as the time of shock formation, we determine the shock formation heights measured from the Sun center. We find that the shocks form on average closest to the Sun (1.51 Rs) in GLE events, farthest from the Sun in FE SEP events (5.38 Rs), and at intermediate distances in regular SEP events (1.72 Rs). Finally, we present the results of a case study of a CME with high initial acceleration (approx.3 km s-2) and a type II radio burst with high starting frequency (approx. 200 MHz) but associated with a minor SEP event. We find that the relation between the fluence spectral index and CME initial acceleration continues to hold even for this minor SEP event.

Gopalswamy, N.↗

A Hierarchical Relationship Between the Fluence Spectra and CME Kinematics in Large Solar Energetic Particle Events: A Radio Perspective

We report on further evidence that solar energetic particles are organized by the kinematic properties of coronal mass ejections (CMEs). In particular, we focus on the starting frequency of type II bursts, which is related to the distance from the Sun where the radio emission starts. We find that the three groups of solar energetic particle (SEP) events known to have distinct values of CME initial acceleration, also have distinct average starting frequencies of the associated type II bursts. SEP events with ground level enhancement (GLE) have the highest starting frequency (107 MHz), while those associated with filament eruption (FE) in quiescent regions have the lowest starting frequency (22 MHz); regular SEP events have intermediate starting frequency (81 MHz). Taking the onset time of type II bursts as the time of shock formation, we determine the shock formation heights measured from the Sun center. We find that the shocks form on average closest to the Sun (1.51 Rs) in GLE events, farthest from the Sun in FE SEP events (5.38 Rs), and at intermediate distances in regular SEP events (1.72 Rs). Finally, we present the results of a case study of a CME with high initial acceleration (approx. 3 km s-2) and a type II radio burst with high starting frequency (~200 MHz) but associated with a minor SEP event. We find that the relation between the fluence spectral index and CME initial acceleration continues to hold even for this minor SEP event.

Gopalswamy, N.↗

Experimental study of ECH pre-ionization on J-TEXT

An experimental study on electron cyclotron heating (ECH) pre-ionization has been conducted on J-TEXT in support of the joint experiment research for ITER plasma initiation. In this experiment, ECH power was injected to the vessel before the application of loop voltage ionize the neutral gas and form the initial plasma or so-called pre-plasma. The impact of several significant factors, such as magnetic field configuration, pre-fill gas pressure, ECH toroidal injection angle and ECH power on the evolution of pre-plasma are systematically studied, aiming to identify shared features, clarify their potential relationship and optimize the discharge parameters to generate a rather high pre-plasma density. By separating ECH power from the inductive start-up, the effect of pre-plasma on tokamak start-up can be observed. A dynamic magnetic configuration facilitates the transition of pre-plasma to tokamak plasma. To assess the influence of pre-plasma density on tokamak start-up, two kinds of magnetic field configurations are examined. While the effect of different pre-plasma densities on tokamak start-up is negligible, a significant difference is observed between pure ohmic start-up and start-up with pre-ionization. The studies presented here show evolutionary trends and threshold values needed to optimize ECH pre-ionization and also a feasible way to improve pre-plasma density and a configuration to stabilize pre-plasma for transition. Eventually, these results may contribute to multi-machine research and physics analysis that can assist ITER with its optimal preparation for first plasma operation.

ECH↗

Tuning austenite stability through prior microstructure control in a low-alloy Q&P steel

Quenching and partitioning (Q&P) processing is a widely accepted heat treatment methodology for creating high strength steels consisting of ferrite, martensite, and austenite, while maintaining relatively low manufacturing costs. Though the research on effects of prior microstructure is limited, an understanding of the heat treatment response of different starting microstructures is critical to processing and creating steels with complex microstructures that contain retained austenite and may afford opportunities to further optimize properties. This study investigates the influence of starting microstructure (ferrite/pearlite versus martensite) and prior levels of cold work (38 verses 58 %) on the microstructural development and mechanical properties of a 0.2 C-2.0 Mn-1.5 Si (wt.%) steel exposed to Q&P processing. Samples with a starting martensitic microstructure resulted in higher retained austenite fractions and a more homogeneous microstructure after Q&P processing compared to a starting microstructure of ferrite-pearlite. Starting martensitic microstructures also displayed higher work hardening rates and higher uniform elongations. Larger cold reductions saw accelerated dissolution kinetics and austenite formation during intercritical annealing, resulting in more similar final microstructures from the ferrite-pearlite and martensitic starting microstructures. Finally, the results presented here indicate that varying prior processing can be a route to manipulate and control austenite stability in a Q&P processed steel.

36 MATERIALS SCIENCE↗

Kicking the can down the road: understanding the effects of delaying the deployment of stratospheric aerosol injection

Abstract Climate change is a prevalent threat, and it is unlikely that current mitigation efforts will be enough to avoid unwanted impacts. One potential option to reduce climate change impacts is the use of stratospheric aerosol injection (SAI). Even if SAI is ultimately deployed, it might be initiated only after some temperature target is exceeded. The consequences of such a delay are assessed herein. This study compares two cases, with the same target global mean temperature of ∼1.5° C above preindustrial, but start dates of 2035 or a ‘delayed’ start in 2045. We make use of simulations in the Community Earth System Model version 2 with the Whole Atmosphere Coupled Chemistry Model version 6 (CESM2-WACCM6), using SAI under the SSP2-4.5 emissions pathway. We find that delaying the start of deployment (relative to the target temperature) necessitates lower net radiative forcing (−30%) and thus larger sulfur dioxide injection rates (+20%), even after surface temperatures converge, to compensate for the extra energy absorbed by the Earth system. Southern hemisphere ozone is higher from 2035 to 2050 in the delayed start scenario, but converges to the same value later in the century. However, many of the surface climate differences between the 2035 and 2045 start simulations appear to be small during the 10–25 years following the delayed SAI start, although longer simulations would be needed to assess any longer-term impacts in this model. In addition, irreversibilities and tipping points that might be triggered during the period of increased warming may not be adequately represented in the model but could change this conclusion in the real world.

Brody, Ezra (ORCID:000900030008681X)↗

Centaur propellant acquisition system study

A study was performed to determine the desirability of replacing the hydrogen peroxide settling system on the Centaur D-1S with a capillary acquisition system. A comprehensive screening was performed to select the most promising capillary device fluid acquisition, thermal conditioning, and fabrication techniques. Refillable start baskets and bypass feed start tanks were selected for detailed design. Critical analysis areas were settling and refilling, start sequence development with an initially dry boost pump, and cooling the fluid delivered to the boost pump in order to provide necessary net position suction head (NPSH). Design drawings were prepared for the start basket and start tank concepts for both LO2 and LH2 tanks. System comparisons indicated that the start baskets using wicking for thermal conditioning, and thermal subcooling for boost pump NPSH, are the most desirable systems for future development.

Blatt, M. H.↗

Centaur propellant acquisition system

The desirability of replacing the hydrogen peroxide settling system of the Centaur D-1S with a capillary acquisition system was evaluated. A comprehensive screening was performed to select the most promising capillary device fluid acquisition, thermal conditioning, and fabrication techniques. Refillable start baskets and bypass feed start tanks were selected for detailed design. Critical analysis areas were settling and refilling, start sequence development with an initially dry boost pump, and cooling the fluid delivered to the boost pump to provide the necessary net positive suction head (NPSH). Design drawings were prepared for start basket and start tank concepts for both the liquid oxygen and liquid hydrogen tanks. System comparisons indicated that the start baskets using wicking flow for thermal conditioning, and thermal subcooling for providing boost pump NPSH, are the most desirable systems for future Centaur acquisition system development.

Blatt, M. H.↗

High resolution time interval counter

In recent years, we have developed two types of high resolution, multi-channel time interval counters. In the NIST two-way time transfer MODEM application, the counter is designed for operating primarily in the interrupt-driven mode, with 3 start channels and 3 stop channels. The intended start and stop signals are 1 PPS, although other frequencies can also be applied to start and stop the count. The time interval counters used in the NIST Frequency Measurement and Analysis System are implemented with 7 start channels and 7 stop channels. Four of the 7 start channels are devoted to the frequencies of 1 MHz, 5 MHz or 10 MHz, while triggering signals to all other start and stop channels can range from 1 PPS to 100 kHz. Time interval interpolation plays a key role in achieving the high resolution time interval measurements for both counters. With a 10 MHz time base, both counters demonstrate a single-shot resolution of better than 40 ps, and a stability of better than 5 x 10(exp -12) (sigma(sub chi)(tau)) after self test of 1000 seconds). The maximum rate of time interval measurements (with no dead time) is 1.0 kHz for the counter used in the MODEM application and is 2.0 kHz for the counter used in the Frequency Measurement and Analysis System. The counters are implemented as plug-in units for an AT-compatible personal computer. This configuration provides an efficient way of using a computer not only to control and operate the counters, but also to store and process measured data.

Zhang, Victor S.↗

Computational Support for Technology- Investment Decisions

Strategic Assessment of Risk and Technology (START) is a user-friendly computer program that assists human managers in making decisions regarding research-and-development investment portfolios in the presence of uncertainties and of non-technological constraints that include budgetary and time limits, restrictions related to infrastructure, and programmatic and institutional priorities. START facilitates quantitative analysis of technologies, capabilities, missions, scenarios and programs, and thereby enables the selection and scheduling of value-optimal development efforts. START incorporates features that, variously, perform or support a unique combination of functions, most of which are not systematically performed or supported by prior decision- support software. These functions include the following: Optimal portfolio selection using an expected-utility-based assessment of capabilities and technologies; Temporal investment recommendations; Distinctions between enhancing and enabling capabilities; Analysis of partial funding for enhancing capabilities; and Sensitivity and uncertainty analysis. START can run on almost any computing hardware, within Linux and related operating systems that include Mac OS X versions 10.3 and later, and can run in Windows under the Cygwin environment. START can be distributed in binary code form. START calls, as external libraries, several open-source software packages. Output is in Excel (.xls) file format.

Adumitroaie, Virgil↗

Improved Timing Scheme for Spaceborne Precipitation Radar

An improved timing scheme has been conceived for operation of a scanning satellite-borne rain-measuring radar system. The scheme allows a real-time-generated solution, which is required for auto targeting. The current timing scheme used in radar satellites involves pre-computing a solution that allows the instrument to catch all transmitted pulses without transmitting and receiving at the same time. Satellite altitude requires many pulses in flight at any time, and the timing solution to prevent transmit and receive operations from colliding is usually found iteratively. The proposed satellite has a large number of scanning beams each with a different range to target and few pulses per beam. Furthermore, the satellite will be self-targeting, so the selection of which beams are used will change from sweep to sweep. The proposed timing solution guarantees no echo collisions, can be generated using simple FPGA-based hardware in real time, and can be mathematically shown to deliver the maximum number of pulses per second, given the timing constraints. The timing solution is computed every sweep, and consists of three phases: (1) a build-up phase, (2) a feedback phase, and (3) a build-down phase. Before the build-up phase can begin, the beams to be transmitted are sorted in numerical order. The numerical order of the beams is also the order from shortest range to longest range. Sorting the list guarantees no pulse collisions. The build-up phase begins by transmitting the first pulse from the first beam on the list. Transmission of this pulse starts a delay counter, which stores the beam number and the time delay to the beginning of the receive window for that beam. The timing generator waits just long enough to complete the transmit pulse plus one receive window, then sends out the second pulse. The second pulse starts a second delay counter, which stores its beam number and time delay. This process continues until an output from the first timer indicates there is less than one transmit pulse width until the start of the next receive event. This blocks future transmit pulses in the build-up phase. The feedback phase begins with the first timer paying off and starting the first receive window. When the first receive window is complete, the timing generator transmits the next beam from the list. When the second timer pays off, the second receive event is started. Following the second receive event, the timing generator will transmit the next beam on the list and start an additional timer. The timers work in a circular buffer fashion so there only need to be enough to cover the maximum number of echoes in flight.

Berkun, Andrew↗