Search NASA⌕ Search

SEARCH · Search NASA

Results for “STS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Mission safety evaluation report for STS-48, postflight edition

Space Shuttle Discovery was launched into a 57 deg inclination orbit from the Kennedy Space Center (KSC) Launch Complex 39A at 7:11 p.m. EDT on 12 Sep. 1991. STS-48 was the second mission since return-to-flight to have KSC as the planned end-of-mission landing site, and the first mission to have a planned night landing at KSC. However, due to weather conditions at KSC, Discovery flew one extra orbit and landed at Edwards AFB, Calif. at 3:38 a.m. EDT on 18 Sep. 1991. Operation of all systems was generally satisfactory during the 5 day mission. On flight day 3, the Upper Atmospheric Research Satellite (UARS) was deployed from Discovery's payload bay 350 statute miles above Earth. This orbiting observatory will study mankind's effects on the planet's atmosphere and its shielding ozone layer. STS-48 safety risk factors are addressed that represent a change from previous flights, factors from previous flights that had an impact on this flight, and factors that are unique to this flight.

Clatterbuck, Guy E.↗

Mission safety evaluation report for STS-38, postflight edition

After several months delay due to Liquid Hydrogen (LH2) leaks in the External Tank (ET) 17 in LH2 umbilical disconnect, Atlantis was launched at 6:48 p.m. Eastern Standard Time on 15 Nov. 1990. Atlantis was cleared for launch after the replacement of the ET 17 in umbilical disconnect and a successful tanking test on 24 Oct. 1990. No technical concerns were encountered during the countdown. The end of the STS-38 mission was extended by one day because of high crosswinds at the primary landing site, Edwards Air Force Base (EAFB), Calif. On the next day, 20 Nov. 1990, the winds were too high for a safe landing at EAFB, and a decision was made to select the Shuttle Landing Facility (SLF) at the Kennedy Space Center (KSC) at the primary landing site. The deorbit burn was performed on orbit 79 of the STS-38 mission. Reentry and descent were effected with no problems. Postlanding inspection of Atlantis' exterior found little evidence of damage. There has been a concern about returning an Orbiter to KSC, because the last mission to do so experienced tire failure. Atlantis' tires and brakes were in excellent condition with no indication of excessive wear.

Hill, William C.↗

Mission safety evaluation report for STS-37, postflight edition

STS-37/Atlantis was launched on April 5, 1991 from Kennedy Space Center launch complex 39B at 9:23 a.m. Eastern Standard Time (EST). Launch was delayed 4 minutes 45 seconds because of safety concerns about the low cloud ceiling and the wind direction in the potential blast area. Based on the limited number and type of inflight anomalies encountered, the Space Shuttle operated satisfactorily throughout the STS-37 mission. A contingency EVA was performed by the crew on Flight Day (FD) 3 to free a sticky Gamma Ray Observatory (GRO) high gain antenna, after which the GRO primary payload was successfully deployed by the Orbiter's Remote Manipulator System. The GRO, which weighed just over 35,000 lbs, was the heaviest NASA science satellite ever deployed by the Space Shuttle into low Earth orbit. The scheduled entry/landing on FD 6 was waved off for one day due to high wind conditions at Edwards Air Force Base. Atlantis landed on FD 7, 11 April 1991 on Edwards AFB lakebed runway 33 at 9:55 a.m. Eastern Daylight Time.

Hill, William C.↗

Payload and General Support Computer (PGSC) Detailed Test Objective (DTO) number 795 postflight report: STS-41

Since 1983, the Space Transportation System (STS) had routinely flown the GRiD 1139 (80286) laptop computer as a portable onboard computing resource. In the spring of 1988, the GRiD 1530, an 80386 based machine, was chosen to replace the GRiD 1139. Human factors ground evaluations and detailed test objectives (DTO) examined the usability of the available display types under different lighting conditions and various angle deviations. All proved unsuitable due to either flight qualification of usability problems. In 1990, an Electroluminescent (EL) display for the GRiD 1530 became flight qualified and another DTO was undertaken to examine this display on-orbit. Under conditions of indirect sunlight and low ambient light, the readability of the text and graphics was only limited by the observer's distance from the display. Although a problem of direct sunlight viewing still existed, there were no problems with large angular deviations nor dark adaptation. No further evaluations were deemed necessary. The GRiD 1530 with the EL display was accepted by the STS program as the new standard for the PGSC.

Adolf, Jurine A.↗

Debris/ice/TPS assessment and photographic analysis for Shuttle Mission STS-42

A Debris/Ice/TPS (Thermal Protection System) assessment and photographic analysis was conducted for Shuttle Mission STS-42. Debris inspection of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the External Tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flighr anomalies. The debris/ice/TPS conditions are documented along with photographic analysis of Mission STS-42, and their overall effect on the Space Shuttle Program.

Katnik, Gregory N.↗

Debris/Ice/TPS Assessment and Integrated Photographic Analysis for Shuttle Mission STS-49

A debris/ice/Thermal Protection System (TPS) assessment and integrated photographic analysis was conducted for Shuttle Mission STS-49. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the External Tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. Debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-49, and the resulting effect on the Space Shuttle Program are discussed.

Katnik, Gregory N.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-50

Thermal Protection System (TPS) assessment and integrated photographic analysis was conducted for Shuttle Mission STS-50. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the external tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. The debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-50, and the resulting effect on the Space Shuttle Program are documented.

Higginbotham, Scott A.↗

STS Derivative Cargo Vehicles for the 1990's decade and beyond

Shuttle-derived vehicle options are described in the context of supporting earth-LEO space transportation for the lunar and Mars missions. An evolutionary model is delineated which can provide heavy-lift capabilities for these missions with a system based on STS booster elements. The Shuttle-C unmanned launch system and the Mars heavy-lift launch vehicles (HLLV) are examined as reference vehicles with launch configurations illustrated for lunar and Martian transportation scenarios. The Shuttle-C prelunar vehicle can be modified for lunar transportation as the Shuttle-C Block I which can then be extended to a two-stage HLLV by adding a third stage in the form of a Mars transfer vehicle. The development of a liquid-rocket booster is proposed to replace the STS solid booster for added mission flexibility. The use of shuttle-derived vehicles is concluded to be an effective means for supporting the lunar and Mars initiatives while minimizing near-term costs.

Shelton, Billy W.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-46

A Debris/Ice/TPS assessment and integrated photographic analysis was conducted for Shuttle Mission STS-46. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the External Tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. This report documents the debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-46, and the resulting effect on the Space Shuttle Program.

Katnik, Gregory N.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle mission STS-47

A debris/ice/TPS assessment and integrated photographic analysis was conducted for Shuttle Mission STS-47. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the External Tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. This report documents the debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-47, and the resulting effect on the Space Shuttle Program.

Katnik, Gregory N.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-52

A debris/ice/Thermal Protection System (TPS) assessment and integrated photographic analysis was conducted for Shuttle Mission STS-47. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the external tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. This report documents the debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-52, and the resulting effect on the Space Shuttle Program.

Katnik, Gregory N.↗

Preliminary OARE absolute acceleration measurements on STS-50

On-orbit Orbital Acceleration Research Experiment (OARE) data on STS-50 was examined in detail during a 2-day time period. Absolute acceleration levels were derived at the OARE location, the orbiter center-of-gravity, and at the STS-50 spacelab Crystal Growth Facility. The tri-axial OARE raw acceleration measurements (i.e., telemetered data) during the interval were filtered using a sliding trimmed mean filter in order to remove large acceleration spikes (e.g., thrusters) and reduce the noise. Twelve OARE measured biases in each acceleration channel during the 2-day interval were analyzed and applied to the filtered data. Similarly, the in situ measured x-axis scale factors in the sensor's most sensitive range were also analyzed and applied to the data. Due to equipment problem(s) on this flight, both y- and z- axis sensitive range scale factors were determined in a separate process (using the OARE maneuver data) and subsequently applied to the data. All known significant low-frequency corrections at the OARE location (i.e., both vertical and horizontal gravity-gradient, and rotational effects) were removed from the filtered data in order to produce the acceleration components at the orbiter's center-of-gravity, which are the aerodynamic signals along each body axes. Results indicate that there is a force of unknown origin being applied to the Orbiter in addition to the aerodynamic forces. The OARE instrument and all known gravitational and electromagnetic forces were reexamined, but none produce the observed effect. Thus, it is tentatively concluded that the Orbiter is creating the environment observed.

Blanchard, Robert C.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-54

A Debris/Ice/TPS assessment and integrated photographic analysis was conducted for Shuttle Mission STS-54. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/frost conditions on the External Tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. This report documents the debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-54, and the resulting effect on the Space Shuttle Program.

Katnik, Gregory N.↗

Debris/ice/TPS assessment and integrated photographic analysis of Shuttle Mission STS-53

A Debris/Ice/TPS assessment and integrated photographic analysis was conducted for Shuttle Mission STS-53. Debris inspections of the flight elements and launch pad were performed before and after launch. Ice/Frost conditions on the External Tank were assessed by the use of computer programs, nomographs, and infrared scanner data during cryogenic loading of the vehicle followed by on-pad visual inspection. High speed photography was analyzed after launch to identify ice/debris sources and evaluate potential vehicle damage and/or in-flight anomalies. This report documents the debris/ice/TPS conditions and integrated photographic analysis of Shuttle Mission STS-53, and the resulting effect on the Space Shuttle Program.

Katnik, Gregory N.↗

STS-43 Space Shuttle mission report

The STS-43 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-second flight of the Space Shuttle Program and the ninth flight of the Orbiter Vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-47 (LWT-40); three Space Shuttle main engines (SSME's) (serial numbers 2024, 2012, and 2028 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-045. The primary objective of the STS-43 mission was to successfully deploy the Tracking and Data Relay Satellite-E/Inertial Upper Stage (TDRS-E/IUS) satellite and to perform all operations necessary to support the requirements of the Shuttle Solar Backscatter Ultraviolet (SSBUV) payload and the Space Station Heat Pipe Advanced Radiator Element (SHARE-2).

Fricke, Robert W.↗

STS-40 Space Shuttle mission report

The STS-40 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-first flight of the Space Shuttle and the eleventh flight of the Orbiter Vehicle Columbia (OV-102). In addition to the Columbia vehicle, the flight vehicle consisted of an External Tank (ET) designated as ET-41 (LWT-34), three Space Shuttle main engines (SSME's) (serial numbers 2015, 2022, and 2027 in positions 1, 2, and 3, respectively), and two Solid Rocket Boosters (SRB's) designated as BI-044. The primary objective of the STS-40 flight was to successfully perform the planned operations of the Spacelab Life Sciences-1 (SLS-1) payload. The secondary objectives of this flight were to perform the operations required by the Getaway Special (GAS) payloads and the Middeck O-Gravity Dynamics Experiment (MODE) payload.

Fricke, Robert W.↗

STS-47 Space Shuttle mission report

The STS-47 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the fiftieth Space Shuttle Program flight and the second flight of the Orbiter Vehicle Endeavour (OV-105). In addition to the Endeavour vehicle, the flight vehicle consisted of the following: an ET which was designated ET-45 (LWT-38); three SSME's which were serial numbers 2026, 2022, and 2029 and were located in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-053. The lightweight/redesigned RSRM that was installed in the left SRB was designated 360L026A, and the RSRM that was installed in the right SRB was 360W026B. The primary objective of the STS-47 flight was to successfully perform the planned operations of the Spacelab-J (SL-J) payload (containing 43 experiments--of which 34 were provided by the Japanese National Space Development Agency (NASDA)). The secondary objectives of this flight were to perform the operations of the Israeli Space Agency Investigation About Hornets (ISAIAH) payload, the Solid Surface Combustion Experiment (SSCE), the Shuttle Amateur Radio Experiment-2 (SAREX-2), and the Get-Away Special (GAS) payloads. The Ultraviolet Plume Instrument (UVPI) was flown as a payload of opportunity.

Fricke, Robert W., Jr.↗

STS-44 Space Shuttle mission report

The STS-44 Space Shuttle Program Mission Report is a summary of the vehicle subsystem operations during the forty-fourth flight of the Space Shuttle Program and the tenth flight of the Orbiter vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-53 (LWT-46); three Space Shuttle main engines (SSME's) (serial numbers 2015, 2030, and 2029 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-047. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L019A for the left SRB and 360W019B for the right SRB. The primary objective of the STS-44 mission was to successfully deploy the Department of Defense (DOD) Defense Support Program (DSP) satellite/inertial upper stage (IUS) into a 195 nmi. earth orbit at an inclination of 28.45 deg. Secondary objectives of this flight were to perform all operations necessary to support the requirements of the following: Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System Calibration Test (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment-3 (RME-3), Visual Function Tester-1 (VFT-1), and the Interim Operational Contamination Monitor (IOCM) secondary payloads/experiments.

Fricke, Robert W.↗