Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Regulatory Risk Reduction for Advanced Reactor Technologies: FY 2017 Framework Modernization Proposals and Status

The regulatory framework governing the licensing of commercial nuclear power plants in the U.S. developed over recent decades with a strong emphasis towards assessing large light water reactor (LWR) safety. However, recent shifts in energy market needs and priorities has brought new and different types of nuclear technologies into consideration for applications that include but are not limited to electric power generation. In order to realize the benefits in efficiency, reliability and safety that advanced (non-LWR) can potentially offer, efforts are needed to modernize the existing regulatory framework to make technical licensing requirements more compatible with radically new nuclear technologies. To serve the needs of the energy market, this update should be performed on a schedule conducive to deployments projected to begin as early as 2025. Beginning in 2016, an initiative was launched to amend the U.S. nuclear power reactor licensing framework by making the technical requirements contained therein more generically compatible with non LWR technology. The Licensing Modernization Project (LMP) was established as an industry-led team of subject matter experts managed by Southern Company Services and supported through a cost sharing arrangement with the U.S. Department of Energy (DOE). Technical and programmatic coordination for the effort was also provided by the Nuclear Energy Institute (NEI), the Licensing Department of the Advanced Reactor Technologies (ART) Program located at the Idaho National Laboratory (INL), and others.

42 ENGINEERING↗

GBCGE Subsurface Database Explorer and APIs

This submission defines a DOI for the Great Basin Center for Geothermal Energy's (GBCGE) Subsurface Database Explorer web application and underlying data services, and acknowledges the INGENIOUS project as a major source of funding for data compilation and quality assurance. The GBCGE Subsurface Database Explorer is an interactive web mapping application that provides public access to the GBCGE Subsurface Database, and its collection of datasets pertinent to geothermal exploration, oil and gas exploration, critical mineral exploration, and other subsurface characterization for the Great Basin Region, western US. This is a living database, and will be continuously updated with new data and datasets as funding and motivations allow. The underlying database views that populate the web application are on an automated refresh schedule. Data sources and acknowledgements: We thank our partners with the Nevada Division of Minerals (NDOM), the Southern Methodist University (SMU), and Great Basin State Geological Surveys for their active efforts in data curation, schema design, and quality assurance. We also thank contributors among the USGS, Oregon Institute of Technology, State Divisions of Water Resources, State Divisions of Oil, Gas, and Minerals, and State Geological Surveys for open data availability and direct contributions made under the National Geothermal Data System (NGDS).

15 GEOTHERMAL ENERGY↗

Validation and Demonstration of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an integrated energy system (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. The new RAVEN plugin for grid and capacity optimization (HERON) only addresses the limits that affect the production variables and the corresponding rates of variation (explicit constraints). However, other variables are subject to constraints, and the associated limits should be accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response affects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. To obtain a more accurate approximation of the nonlinear dynamic behavior, a parametric version of the dynamic mode decomposition with control (DMDc) algorithm was developed to derive the state-space representation matrices of the IES components at different scheduling parameter. Thanks to this approach, a more accurate approximation of the system response can be obtained, the limits imposed by thermal mechanical implicit constraints can be translated into power dispatch limits, and the feedbacks to HERON power dispatcher can be provided. To assess the developed methodology, a power dispatching test case composed of three power generating and storage units (Balance of Plant, Secondary Energy Source, Thermal Energy Storage) was developed. The power output of each one of the three units was optimized to meet the imposed time-dependent load demand trajectory and to maximize the IES profitability by meeting both the explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Next Generation Nuclear Plant Intermediate Heat Exchanger Acquisition Strategy

DOE has selected the High Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production. It will have an outlet gas temperature in the range of 900°C to 950°C and a plant design service life of 60 years. The reactor design will be a graphite moderated, helium cooled, prismatic or pebble-bed reactor, and use low-enriched uranium, TRISO-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while at the same time setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. The purpose of this report is to address the acquisition strategy for the NGNP Intermediate Heat Exchanger (IHX).This component will be operated in flowing, impure helium on the primary and secondary side at temperatures up to 950°C. There are major high temperature design, materials availability, and fabrication issues that need to be addressed. The prospective materials are Alloys 617, 230, 800H and X, with Alloy 617 being the leading candidate for the use at 950°C. The material delivery schedule for these materials does not pose a problem for a 2018 start up as the vendors can quote reasonable delivery times at the moment. The product forms and amount needed must be finalized as soon as possible. An issue for the fabrication of the IHX pressure and tubular design heat exchanger is the identification of vessel fabrication vendors with the appropriate ASME certifications to perform nuclear work. The number of these firms has declined over the last 20 years and the NGNP will be competing for these services with resurgent orders for LWR’s and chemical process facility components in a world market. The first three designs listed; plate machined heat exchanger (PMHE), plate fin heat exchanger ( PFHE), and the plate stamped heat exchanger (PSHE) are compact heat exchanger designs. The tubular IHX is a standard industrial design. The foam, capillary, and ceramic IHX designs are less mature technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preemptible I/O Scheduling of Garbage Collection for Solid State Drives

Abstract Unlike hard disks, flash devices use out-of-update operations and they require a garbage collection (GC) process to reclaim invalid pages to create free blocks. This GC process is a major cause of performance degradation when running concurrently with other I/O operations as internal bandwidth is consumed to reclaim these invalid pages. The invocation of the GC process is generally governed by a low watermark on free blocks and other internal device metrics that different workloads meet at different intervals. This results in I/O performance that is highly dependent on workload characteristics. In this paper, we examine the GC process and propose a semi-preemptible GC scheme that allows GC processing to be preempted while pending I/O requests in the queue are serviced. Moreover, we further enhance flash performance by pipelining internal GC operations and merge them with pending I/O requests whenever possible. Our experimental evaluation of this semipreemptible GC scheme with realistic workloads demonstrate both improved performance and reduced performance variability. Write-dominant workloads show up to a 66.56% improvement in average response time with a 83.30% reduced variance in response time compared to the non-preemptible GC scheme. In addition, we explore opportunities of a new NAND flash device that supports suspend/resume commands for read, write and erase operations for fully preemptible GC. Our experiments with a fully preemptible GC enabled flash device show that request response time can be improved by up to 14.57% compared to semi-preemptible GC.

Flash Memory↗

ESTIMATED SIL LEVELS AND RISK COMPARISONS FOR RELIEF VALVES AS A FUNCTION OF TIME-IN-SERVICE

Risk-based inspection methods enable estimation of the probability of spring-operated relief valves failing on demand at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. The paper illustrates an approach based on application of the Frechet and Weibull distributions to SRS and Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD) proof test results. The methodology enables the estimation of ANSI/ISA-84.00.01 Safety Integrity Levels (SILs) as well as the potential change in SIL level due to modification of the maintenance schedule. Current SRS practices are reviewed and recommendations are made for extending inspection intervals. The paper compares risk-based inspection with specific SILs as maintenance intervals are adjusted. Groups of valves are identified in which maintenance times can be extended as well as different groups in which an increased safety margin may be needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Loads as a Resource: Frequency Responsive Demand

Current power grid operation predominantly relies on scheduling and regulating generation resources to supply loads and balance load changes. Due to the inherent intermittency of renewable energy, more flexible and fast ramping capacity is required to compensate for the uncertainty and variability introduced by renewable energy resources. With the advancement of information technologies, power system end-use loads are becoming more agile and can participate in provision of balancing energy and other grid services. The use of demand response can greatly reduce the required generation reserve in a clean and environmentally friendly way. In this report, a new frequency responsive load (FRL) controller was proposed based on the GFA controller, which can respond to both over and under-frequency events. A supervisory control was introduced to coordinate the autonomous response from FRLs in order to overcome the issues of excessive system response due to high penetration of FRLs. The effectiveness of the proposed FRL controller was demonstrated by large-scale simulation studies on the WECC system. Specifically, the FRLs were deployed in the WECC system at different penetration levels to analyze the performance of the proposed strategy both with and without supervisory level control. While both methods have their own advantages, the case without supervisory control could lead to system-wide instability depending on the size of the contingency and the number of FRLs deployed in the system. In addition, the voltage impacts of this controller on distribution system were also carefully investigated. Finally, a preliminary measurement and verification approach was also developed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed optimization and control for autonomous distributed energy resource power dispatch and frequency regulation considering communication failures

Distributed energy resources (DERs) can significantly enhance grid flexibility by supplying power and secondary frequency regulation (SFR) services. Yet, their large number and dispersed nature limit the effectiveness of traditional centralized power dispatch and frequency control schemes, and expose the system to single-point communication failures. This paper presents a unified distributed optimization and control framework for DER power dispatch and SFR provision. A transmission-loss-aware distributed direct current optimal power flow is first formulated to optimize DER power dispatch and reserve scheduling. On top of this, a fully distributed control scheme for DER autonomous SFR provision is developed to allocate automatic generation control signals cost-effectively while ensuring robustness to communication link disruptions. The framework is validated on IEEE 14-bus and 39-bus transmission systems with large-scale distribution feeders using transmission-distribution dynamic co-simulation, demonstrating reliable and autonomous DER power dispatch and SFR provision under diverse operating conditions and communication contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Approach to adaptive allocation of shared resources in computer systems

A request management subsystem is configured to establish service classes for clients that issue requests for a shared resource on a computer system. The subsystem also is configured to determine the state of the system with respect to bandwidth, current latency, frequency and voltage levels, among other characteristics. Further, the subsystem is configured to evaluate the requirements of each client with respect to latency sensitivity and required bandwidth, among other characteristics. Finally, the subsystem is configured to schedule access to shared resources, based on the priority class of each client, the demands of the application, and the state of the system. With this approach, the subsystem may enable all clients to perform optimally or, alternatively, may cause all clients to experience an equal reduction in performance.

Bolotin, Evgeny↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Towards Optimal and Executable Distribution Grid Restoration Planning With a Fine-Grained Power-Communication Interdependency Model

Distribution service restoration (DSR) under natural disasters is always a critical and challenging problem for utility companies. An effective solution must not ignore the power-communication interdependency as various systems are getting increasingly connected in the Smart Grid era. In this paper, we propose a two-layer distribution system model with both power and communication components. Based on this model, we formulate the restoration process as a routing problem that schedules the path and action sequence of utility crews that involves repairing damaged components, closing power switches, and enabling communication paths between the control center and remote field devices. Further, we develop a simulation-based method to quantitatively evaluate the restoration process with public reference models of large-scale power systems. The experimental results show that our method improves the total restored energy up to 57.6% and reduces the recovery time up to 63% by considering the power-communication interdependency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing Cladded Components for High Temperature Nuclear Service: Part II—Design Rules

The challenge of using existing ASME Section III, Division 5, class A metallic materials for the construction of structural components of advanced reactors with corrosive coolants could be mitigated by allowing designers to use cladding to protect the base material from corrosion. However, the existing Section III, Division 5 rules provide no guidance on the evaluation of strain accumulation and creep-fatigue damage in cladded components. The availability of design rules for cladded components that do not require long-term clad material testing could promote the application of the cladding approach to accelerate the deployment schedule of these advanced reactor systems. To avoid long-term properties for the clad materials Part I of this work proposes two approximate design analysis methods for two types of clad materials—soft clads that creep much faster and have lower yield stress than the class A base material, and hard clads that creep much slower and have higher yield stress than the class A base material. The proposed analysis methods approximate the response of a soft clad by treating it as perfectly compliant and of a hard clad by treating it as linear elastic. Based on these approximate design analysis strategies this Part II develops a complete set of design rules for class A components cladded with either soft or hard clad materials. In conclusion, Part II discusses the reasoning behind the proposed design rules and uses example finite element analyses of representative reactor components to illustrate the use of these design methods.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assuring Quality in High-Consequence Engineering

In high-consequence engineering organizations, such as Sandia, quality assurance may be heavily dependent on staff competency. Competency-dependent quality assurance models are at risk when the environment changes, as it has with increasing attrition rates, budget and schedule cuts, and competing program priorities. Risks in Sandia's competency-dependent culture can be mitigated through changes to hiring, training, and customer engagement approaches to manage people, partners, and products. Sandia's technical quality engineering organization has been able to mitigate corporate-level risks by driving changes that benefit all departments, and in doing so has assured Sandia's commitment to excellence in high-consequence engineering and national service.

42 ENGINEERING↗

Region-Specific Merchant Hydrogen Market Assessment and Techno-Economic Assessment of Electrolytic Hydrogen Generation: Cooperative Research and Development Final Report, CRADA Number CRD-18-00751

Utilities need to recover value from baseload and some renewable assets even when the electricity is curtailed. The declining cost of renewables (particularly solar), the persistently low-cost of natural gas, and the declining electricity demand, have all worked to lower the price of electricity. Furthermore, the baseload assets have a high turndown cost, which is not reflected in the low market electricity prices. One option for utilizing the curtailed electricity is hydrogen generation. One important aspect of this project will be to provide a “go/no-go” recommendation on the economic feasibility of pursuing hydrogen generation vs. other markets that could offtake curtailed electricity or nuclear steam. This project will specifically assess the opportunities for hydrogen production and use in the service territories of Southern Company Services (SCS), Exelon SBC, and Xcel Energy. Each utility partner represents a different mix of generation fleets: Exelon has significant nuclear assets, Xcel is primarily renewables (wind) with some nuclear, and SCS represents both a renewables fleet and a heavily baseload fleet, which includes significant nuclear. The Contractors will conduct the study of hydrogen market opportunities by first considering the approximate electricity demand and price profiles for the year, and power generation capacity that can be used to produce hydrogen. Therefore, a profile for hydrogen generation will also be developed to better understand the quantity and timing of hydrogen production. Once the hydrogen production schedule is estimated, hydrogen storage requirements can be determined. This effort will provide sufficient information to make a go/no-go decision on moving ahead with a detailed regional case study for hydrogen production in any of the three utility areas.

08 HYDROGEN↗

Symptomatic Outcomes in Relation to Tumor Expansion After Fractionated Stereotactic Radiation Therapy for Vestibular Schwannomas: Single-Institutional Long-Term Experience

Purpose: The effect of transient tumor expansion after conventionally fractionated stereotactic radiation therapy (SRT) on the symptomatic outcomes is not well-known. Methods and Materials: This study enrolled 201 consecutive patients who received SRT for vestibular schwannoma. A conventional fractionation schedule was applied in 194 patients (97%), and 142 (71%) received a total dose of 50 Gy. The median follow-up time was 72 months. Results: The maximum diameter was 9 mm or less in 13 patients, 10-19 mm in 79 patients, 20-29 mm in 87 patients, and 30 mm or greater in 22 patients. At presentation, tumor size of 20 mm or greater was significantly associated with loss of serviceable hearing and trigeminal neuropathy. After SRT, tumor expansion was observed in 42 patients (21%). By tumor size, tumor expansion was observed in 0%, 11.4%, 25.6%, and 50% of patients with tumors of 9 mm or less, 10-19 mm, 20-29 mm, and 30 mm or greater, respectively, in diameter. The tumor expansion was significantly associated with an increased risk of hydrocephalus requiring shunt placement (P=.004), loss of serviceable hearing (P=.0064), and worsening of facial (P<.0001) and trigeminal nerve (P<.0001) functions. Spontaneous tumor shrinkage was observed in 29 of those 42 patients, mostly within 2 years after the expansion, and the majority of the worsened symptoms except for hearing resolved once the tumor had shrunk. As a result, salvage surgical resection for symptomatic relief was required in only 5% of patients. Conclusions: Fractionated SRT could be safely applied even for medium- to large-sized ({>=}20 mm) tumors. However, greater knowledge of the risks and consequences, including transient symptomatic worsening, and the time span of expansion will be required for the follow-up of patients after SRT to avoid unnecessary surgical intervention.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Human Initiated Cascading Failures in Societal Infrastructures

In this paper, we conduct a systematic study of human-initiated cascading failures in three critical inter-dependent societal infrastructures due to behavioral adaptations in response to a crisis. We focus on three closely coupled socio-technical networks here: (i) cellular and mesh networks, (ii) transportation networks and (iii) mobile call networks. In crises, changes in individual behaviors lead to altered travel, activity and calling patterns, which influence the transport network and the loads on wireless networks. The interaction between these systems and their co-evolution poses significant technical challenges for representing and reasoning about these systems. In contrast to system dynamics models for studying these interacting infrastructures, we develop interaction-based models in which individuals and infrastructure elements are represented in detail and are placed in a common geographic coordinate system. Using the detailed representation, we study the impact of a chemical plume that has been released in a densely populated urban region. Authorities order evacuation of the affected area, and this leads to individual behavioral adaptation wherein individuals drop their scheduled activities and drive to home or pre-specified evacuation shelters as appropriate. They also revise their calling behavior to communicate and coordinate among family members. These two behavioral adaptations cause flash-congestion in the urban transport network and the wireless network. The problem is exacerbated with a few, already occurring, road closures. We analyze how extended periods of unanticipated road congestion can result in failure of infrastructures, starting with the servicing base stations in the congested area. A sensitivity analysis on the compliance rate of evacuees shows non-intuitive effect on the spatial distribution of people and on the loading of the base stations. For example, an evacuation compliance rate of 70% results in higher number of overloaded base stations than the evacuation compliance rate of 90%.

97 MATHEMATICS AND COMPUTING↗

TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY

The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology (16 second flow cone value) from 0.25 cubic feet to 4.3 cubic feet. (Ten 0.43 cubic batches were produced because full-scale equipment was not available for the Tier 1A test.); (5) Demonstrating continuous gravity filling of the ADMP mock up test form; (6) Demonstrating continuous gravity filling of 1 inch and 2 inch schedule 40 pipe; and (7) Demonstrating filling of 1 inch and 2 inch schedule 40 pipe from the bottom up by discharging through a tube inserted into the pipes. The Tier 1A mock-up test focused on the ADMP and pipes at least one inch in diameter. The ADMP which is located in center riser of Tank 18-F is a concern because the column for this long-shaft (55 ft) pump is unique and modification to the pump prior to placing it in service limited the flow path options for filling by creating a single flow path for filling and venting the ADMP support column. The large size, vertical orientation, and complicated flow path in the ADMP warrants a detailed description of this piece of ancillary equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗