Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Reasoning about real-time systems with temporal interval logic constraints on multi-state automata

Models of real-time systems using a single paradigm often turn out to be inadequate, whether the paradigm is based on states, rules, event sequences, or logic. A model-based approach to reasoning about real-time systems is presented in which a temporal interval logic called TIL is employed to define constraints on a new type of high level automata. The combination, called hierarchical multi-state (HMS) machines, can be used to model formally a real-time system, a dynamic set of requirements, the environment, heuristic knowledge about planning-related problem solving, and the computational states of the reasoning mechanism. In this framework, mathematical techniques were developed for: (1) proving the correctness of a representation; (2) planning of concurrent tasks to achieve goals; and (3) scheduling of plans to satisfy complex temporal constraints. HMS machines allow reasoning about a real-time system from a model of how truth arises instead of merely depending of what is true in a system.

Gabrielian, Armen↗

Integrated resource scheduling in a distributed scheduling environment

The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

Zoch, David↗

Supporting research and technology for automotive Stirling engine development

The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

Tomazic, W. A.↗

Citizen Explorer: An Earth Observer With New Small Satellite Technology - 1

Citizen Explorer-I (CX-I), designed and built by students at Colorado Space Grant Consortium in Boulder to provide global ozone monitoring, employs a unique mission architecture and several innovative technologies during its mission. The mission design allows K-12 schools around the world to be involved as ground stations available to receive science data and telemetry from CX-I. Another important technology allows the spacecraft to be less reliant on ground operators. Spacecraft Command Language (SCL) allows mission designers to set constraints on the satellite operations. The satellite then automatically adheres to the constraints when the satellite is out of contact with Mission Operations. In addition to SCL, a low level of artificial intelligence will be supplied to the spacecraft through the use of the Automated Scheduling and Planning ENvironment (ASPEN). ASPEN is used to maintain a spacecraft schedule in order to achieve the objectives a mission operator would normally have to complete. Within the communications system of CX-I, internet of CX-I, internet protocols are the main method for communicating with the satellite. As internet protocols have not been widely used in satellite communication, CX-I provides an opportunity to study the effectiveness of using internet protocols over radio links. The Attitude Determination and Control System (ADCS) on CX-I uses a gravity gradient boom as a means of orienting the satellite's science instruments toward nadir. The boom design is unique because it is constructed of tape measure material. These new technologies' effectiveness will be tested for use on future small satellite projects within the space satellite industry.

Allen, Zachary↗

Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

Constraint Satisfaction Problems CSP constraint pr↗

A Stochastic Scheduler for Integrated Arrival, Departure and Surface Operations in Los Angeles

In terminal airspace, integrating arrivals, departures, and surface operations with competing resources provides the potential of improving operational efficiency by removing barriers between different operations. This work develops a centralized stochastic scheduler for operations in a terminal area including airborne and surface operations using Non-dominated sorting genetic algorithm and Monte Carlo simulations. The scheduler handles completing resources between different flows, such as runway allocations, runway crossing, departure fixes, and other interaction way points between arrivals and departures. Meanwhile, the scheduler also takes time-varied uncertainties into account when optimizing schedules. The scheduler is run sequentially to identify the best and robust schedule for the next planning window. Resulting schedules decide the routes, speed or delays, and runway assignments with separation constraints at mergingdiverging waypoints in the air and crossing and separations on runways. The Los Angels terminal area was used as an example. The implementation of this stochastic scheduler for integrated arrival, departure and surface operations is completed. And several preliminary runs are finished for over 1,200 flights in LAX in a typical day. Sensitivity studies on various planning window sizes are presented, which shows that trade-off exits between planning window size and achievable minimum delay. Preliminary results on runway usage are also presented in this abstract. Because arrivals on the outer runways have to be followed by crossings on the inner runways, algorithmic runway allocation prefers inner runways for arrivals and outer runways for departures. More results will be presented in the final paper. And current terminal arrival and departure procedures based on first-come-first-serve procedure will also be set up and used as a baseline for comparison.

integrated scheduler↗

The Psyche Planning Software Subsystem: Creating a Robust Toolset for a Discovery-class Mission

Psyche is a Discovery-class mission to the small metal-rich asteroid (16) Psyche, and is slated to launch in 2022. Psyche, like many missions, requires low-cost activity planning and sequence generation that serves as the backbone to overall uplink design. Such tools must be maintainable over long periods of operations, and powerful enough to solve complex issues that deep-space one-off missions encounter. In this paper we introduce cost-effective solutions that leverage inner- and open-source principles to meet a variety of common and novel use cases.The uplink process that was designed to meet these challenges is presented, as well as the data-flow through the high-level architecture of the planning software subsystem. The user-facing planning tools are described, particularly the Science Opportunity Analyzer, the Plan Editor, Psyche’s planning automation in the Blackbird framework, and Psyche Simulation Reports. All these applications are either new or have been substantially revamped to meet Psyche’s concept of operations. In particular, ensuring the entire toolchain can correctly process epoch-relative activities is discussed. Underlying the main applications are a common set of dependencies developed and maintained by a new cross-mission association of planning developers. In this way, Psyche can inherit well-tested functionality which saves effort and ensures its developers can focus on solving domain challenges. Quality control of the applications and libraries is ensured with a code-review and unit-test based novel ‘CM lite’ process. Collaboration with international industry and academia using the open-source modules is already occurring.The planning and scheduling software is designed to maximize operator awareness of the integrated plan at every step of the process and use common interfaces and file formats to easily transfer information. Design choices plus the team’s test-driven development process enables more expansive capabilities compared to the decentralized planning and sequence generation functions typical of Discovery-class orbiters without significant development cost increases. Benefits and drawbacks of Psyche’s approach are discussed, including comparison to other missions and tools where appropriate.

Ramanathan, Keshav↗

Geographic Information Systems and Web Page Development

The Facilities Engineering and Architectural Branch is responsible for the design and maintenance of buildings, laboratories, and civil structures. In order to improve efficiency and quality, the FEAB has dedicated itself to establishing a data infrastructure based on Geographic Information Systems, GIS. The value of GIS was explained in an article dating back to 1980 entitled "Need for a Multipurpose Cadastre" which stated, "There is a critical need for a better land-information system in the United States to improve land-conveyance procedures, furnish a basis for equitable taxation, and provide much-needed information for resource management and environmental planning." Scientists and engineers both point to GIS as the solution. What is GIS? According to most text books, Geographic Information Systems is a class of software that stores, manages, and analyzes mapable features on, above, or below the surface of the earth. GIS software is basically database management software to the management of spatial data and information. Simply put, Geographic Information Systems manage, analyze, chart, graph, and map spatial information. GIS can be broken down into two main categories, urban GIS and natural resource GIS. Further still, natural resource GIS can be broken down into six sub-categories, agriculture, forestry, wildlife, catchment management, archaeology, and geology/mining. Agriculture GIS has several applications, such as agricultural capability analysis, land conservation, market analysis, or whole farming planning. Forestry GIs can be used for timber assessment and management, harvest scheduling and planning, environmental impact assessment, and pest management. GIS when used in wildlife applications enables the user to assess and manage habitats, identify and track endangered and rare species, and monitor impact assessment.

Reynolds, Justin↗

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

Controlling Distributed Planning

A system of software implements an extended version of an approach, denoted shared activity coordination (SHAC), to the interleaving of planning and the exchange of plan information among organizations devoted to different missions that normally communicate infrequently except that they need to collaborate on joint activities and/or the use of shared resources. SHAC enables the planning and scheduling systems of the organizations to coordinate by resolving conflicts while optimizing local planning solutions. The present software provides a framework for modeling and executing communication protocols for SHAC. Shared activities are represented in each interacting planning system to establish consensus on joint activities or to inform the other systems of consumption of a common resource or a change in a shared state. The representations of shared activities are extended to include information on (1) the role(s) of each participant, (2) permissions (defined as specifications of which participant controls what aspects of shared activities and scheduling thereof), and (3) constraints on the parameters of shared activities. Also defined in the software are protocols for changing roles, permissions, and constraints during the course of coordination and execution.

Clement, Bradley↗

The Ames-Lockheed orbiter processing scheduling system

A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

Zweben, Monte↗

Integrating Space Communication Network Capabilities via Web Portal Technologies

We have developed a service portal prototype as part of an investigation into the feasibility of using Java portlet technology as a means of providing integrated access to NASA communications network services. Portal servers provide an attractive platform for this role due to the various built-in collaboration applications they can provide, combined with the possibility to develop custom inter-operating portlets to extent their functionality while preserving common presentation and behavior. This paper describes various options for integration of network services related to planning and scheduling, and results based on use of a popular open-source portal framework. Plans are underway to develop an operational SCaN Service Portal, building on the experiences reported here.

web services↗

Benchmarking Planning Applications on the Qualcomm Snapdragon

We benchmark several space planning/scheduling applications on the Qualcomm Snapdragon 855 Handheld Development Kit (HDK), a high performance embedded processor used in many mobile phones.We are flying 2 Snapdragon HDKs onboard the International Space Station (ISS) where they are hosted by the the Spaceborne Computer-2 by Hewlett Packard Enterprise linked by USB and 12V power delivery. We run computational benchmarks using three planner/ schedulers that are used for several space missions: Multi- Mission Executive (MEXEC), Compressed Large-scale Activity Scheduling and Planning (CLASP), and M2020 Ground Scheduler (Surrogate). We compare the Snapdragon performance to a performance baseline on Linux workstations. In addition, we are currently working on benchmarking the same applications on other space flight processors, such as the LEON4 Processor on the Sabertooth card, the LEON3 Processor on the Sphinx card, and the RAD750 processor.

Chien, Steve↗

Hypertext-based design of a user interface for scheduling

Operations Mission Planner (OMP) is an ongoing research project at JPL that utilizes AI techniques to create an intelligent, automated planning and scheduling system. The information space reflects the complexity and diversity of tasks necessary in most real-world scheduling problems. Thus the problem of the user interface is to present as much information as possible at a given moment and allow the user to quickly navigate through the various types of displays. This paper describes a design which applies the hypertext model to solve these user interface problems. The general paradigm is to provide maps and search queries to allow the user to quickly find an interesting conflict or problem, and then allow the user to navigate through the displays in a hypertext fashion.

Woerner, Irene W.↗

Dynamic Scheduling Under Uncertainty

Often, autonomous agents that operate in real-world environments must be able to schedule and execute actions to accomplish mission goals while being robust to uncertainty and disturbances that arise during operations. This tutorial will focus on classes of models and algorithms that have been used to enable effective, robust strategies for dynamically dispatching plans in real time. The tutorial will begin with a survey of past and current research in modeling uncertainty in planning and scheduling, as well as research in different classes of approaches to dynamic scheduling. We then focus on a general class of approaches based on executing temporal plans using graphical models of events and their temporal ordering. These approaches allow for ensuring temporal flexibility in scheduling, as well as for developing strategies for executing partially controllable plans.

Morris, Robert↗