Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

ISS Expedition 1 Crew Interviews: William M. Shepherd

Live footage of a preflight interview with Commander Bill Shepherd is seen. The interview addresses many different questions including why Shepherd became interested in the space program, the events that led to his interest, the transition from the navy to his selection in the astronaut program. Other interesting information that this one-on-one interview discusses are the main goals of the first Expedition Crew, their scheduled docking with the International Space Station (ISS), making the ISS ready for human inhabitance, and all the specifics that will make his living arrangements difficult. Shepherd mentions his responsibilities during the much-anticipated two-day flight to the ISS, as well as the scheduled space-walk. Shepherd also discusses the crew's first tasks upon entrance including other scheduled tasks for the first week, docking from cargo ships, and spacecraft delivering equipment or performing Extra Vehicular Activities (EVA). He explains his interpretation of the meaning of mission success, and the implications of having human beings in space.

Source record↗

Space Station Power System Advanced Development

The objectives of the Space Station Advanced Development Program are related to the development of a set of design options and/or new capabilities to support Space Station development and operation, taking into account also a quantification of the performance and risk of key state-of-the-art technologies, and a reduction of the cost and schedule risk in Space Station development. Attention is given to the photovoltaic power system, a solar dynamic system, and aspects of power management and distribution. A major issue will be the selection of the power generation system. In view of the advantages of the solar dynamic system, it is attempted to resolve issues associated with this system.

Forestieri, A. F.↗

Application of statistical distribution theory to launch-on-time for space construction logistic support

The ability to launch-on-time and to send payloads into space has progressed dramatically since the days of the earliest missile and space programs. Causes for delay during launch, i.e., unplanned 'holds', are attributable to several sources: weather, range activities, vehicle conditions, human performance, etc. Recent developments in space program, particularly the need for highly reliable logistic support of space construction and the subsequent planned operation of space stations, large unmanned space structures, lunar and Mars bases, and the necessity of providing 'guaranteed' commercial launches have placed increased emphasis on understanding and mastering every aspect of launch vehicle operations. The Center of Space Construction has acquired historical launch vehicle data and is applying these data to the analysis of space launch vehicle logistic support of space construction. This analysis will include development of a better understanding of launch-on-time capability and simulation of required support systems for vehicle assembly and launch which are necessary to support national space program construction schedules. In this paper, the author presents actual launch data on unscheduled 'hold' distributions of various launch vehicles. The data have been supplied by industrial associate companies of the Center for Space Construction. The paper seeks to determine suitable probability models which describe these historical data and that can be used for several purposes such as: inputs to broader simulations of launch vehicle logistic space construction support processes and the determination of which launch operations sources cause the majority of the unscheduled 'holds', and hence to suggest changes which might improve launch-on-time. In particular, the paper investigates the ability of a compound distribution probability model to fit actual data, versus alternative models, and recommends the most productive avenues for future statistical work.

Morgenthaler, George W.↗

Nexus: Planning Tomorrow, Today

To prepare for future human space flight programs, the Mission Operations Laboratory (MOL) at the Marshall Space Flight Center (MSFC) has been investigating new planning and scheduling paradigms. To support and prove this investigation, MOL technologists have developed a working prototype of a scheduling system to support the new paradigms. The new planning and scheduling system is called Nexus and has a web site at http://nexus.nasa.gov/. Nexus is based on a comprehensive modeling schema to capture all scheduling requirements typical to human space missions, an incremental scheduling engine tailored to the modeling schema, and remote access (including Personal Data Assistant (PDA) access) to the scheduling system. This paper describes the proposed paradigm shift and the enabling software. It also describes a typical Nexus demonstration which emphasizes how it works, how it enables the paradigm shift, and possible applications. Demonstrations include access to the full functionally of Nexus from a personal computer and access to limited functionally via a PDA. An appendix includes a description and screen shots of the demonstrations.

Jaap, John↗

DSN Resource Scheduling

TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

Wang, Yeou-Fang↗

STS 41-D Solar Array Flight Experiment

The Solar Array Flight Experiment (SAFE) developed under the direction of the Marshall Space Flight Center, scheduled for launch on STS 41-D, will demonstrate a lightweight solar array technology which offers a factor of 3 improvement in weight and a factor of 10 improvement in specific volume over solar array systems currently in use in the space program. The experiment, which will include multiple deployment and retraction demonstration, verification of electrical and thermal performance, and verification of structural dynamic math models is 15 feet by 105 feet in size and, if completely covered with solar cells, would produce approximately 12.5 kW of electrical power. The unit has now been developed, tested, and is at Kennedy Space Center (KSC) being prepared for launch.

Turner, G. F.↗

The Infrared Space Observatory (ISO)

ISO, scheduled to launch in 1995, will carry into orbit the most sophisticated infrared observatory of the decade. Overviews of the mission, instrument payload and scientific program are given, along with a comparison of the strengths of ISO and SOFIA.

Helou, George↗

Report of the 90-day study on human exploration of the Moon and Mars

The basic mission sequence to achieve the President's goal is clear: begin with Space Station Freedom in the 1990's, return to the Moon to stay early in the Next century, and then journey to Mars. Five reference approaches are modeled building on past programs and recent studies to reflect wide-ranging strategies that incorporate varied program objectives, schedules, technologies, and resource availabilities. The reference approaches are (1) balance and speed; (2) the earliest possible landing on Mars; (3) reduce logistics from Earth; (4) schedule adapted to Space Station Freedom; and (5) reduced scales. The study and programmatic assessment have shown that the Human Exploration Initiative is indeed a feasible approach to achieving the President's goals. Several reasonable alternatives exist, but a long-range commitment and significant resources will be required. However, the value of the program and the benefits to the Nation are immeasurable.

Aaron Cohen↗

High Efficiency Plastic Scintillator Detector with Wave-Length Shifting Fiber Readout for the GLAST Large Area Telescope

This paper describes the design and performance studies of the scintillator tile detectors for the Anti-Coincidence Detector (ACD) of the Large Area Telescope (LAT) on the Gamma ray Large Area Space Telescope (GLAST), scheduled for launch in early 2008. The scintillator tile detectors utilize wavelength shifting fibers and have dual photomultiplier tube (PMT) readout. The design requires highly efficient and uniform detection of singly charged relativistic particles over the tile area and must meet all requirements for a launch, as well as operation in a space environment. We present here the design of three basic types of tiles used in the ACD, ranging in size from approx.450 sq cm to approx.2500 sq cm, all 1 cm thick, with different shapes, and with photoelectron yield of approx. 20 photoelectrons per minimum ionizing particle (mip) at normal tile incidence, uniform over the tile area. Some tiles require flexible clear fiber cables up to 1.5 m long to deliver scintillator light to remotely located PMT.

Moiseev, A. A.↗

Telescope Innovations Improve Speed, Accuracy of Eye Surgery

One of the main components of NASA's vision for the future of space exploration will actually have a keen eye for the past. The James Webb Space Telescope (JWST), scheduled to launch in 2018, will have spectacular sight, after it reaches orbit, one of its main goals is to observe the first galaxies that formed in the early universe. "JWST offers new capabilities in the infrared well beyond what we can see from current telescopes, either on the ground or in space. It will let us explore the early universe, extrasolar planets, and really, all branches of astrophysics," says Lee Feinberg, optical telescope element manager for the JWST at Goddard Space Flight Center. Building such a keen space telescope is an astronomic task. Because JWST will gaze over such incredible distances, it requires very large mirrors. In fact, the primary mirror will be more than two stories in diameter and consists of 18 separate segments. Each segment must be perfectly smooth, flat, and scratch-free in order to deliver a view 13 billion light years away. Construction of the 18 mirror segments involved measuring, grinding, polishing, and testing - and more measuring, grinding, polishing, and testing - and more measuring, grinding, polishing, and testing (you get the idea). One of the most time consuming steps of the mirror development process, the grinding phase, can take years.

Source record↗

The Voyager Neptune travel guide

The Voyager mission to the giant outer planets of our solar system is described. Scientific highlights include interplanetary cruise, Jupiter, Saturn, Uranus, and their vast satellite and ring systems. Detailed plans are provided for the August 1989 Neptune encounter and subsequent interstellar journey to reach the heliopause. As background, the elements of an unmanned space mission are explained, with emphasis on the capabilities of the spacecraft and the scientific sensors. Other topics include the Voyager Grand Tour trajectory design, deep-space navigation, and gravity-assist concepts. The Neptune flyby is animated through the use of computer-generated, flip-page movie frames that appear in the corners of the publication. Useful historical information is also presented, including facts associated with the Voyager mission. Finally, short summaries are provided to describe the major objectives and schedules for several space missions planned for the remainder of the 20th century.

Kohlhase, Charles↗

The NASA Human Space Flight Supply Chain, Current and Future

The current NASA Human Space Flight transportation system, the Space Shuttle, is scheduled for final flight in 2010. The Exploration initiative will create a new capability with a combination of existing systems and new flight and ground elements. To fully understand and act on the implications of such change it is necessary to understand what, how, when and where such changes occur and more importantly, how all these interact. This paper presents Human Space Flight, with an emphasis on KSC Launch and Landing, as a Supply Chain of both information and materials. A supply chain methodology for understanding the flow of information and materials is presented. Further, modeling and simulation projects funded by the Exploration initiative to understand the NASA Exploration Supply Chain are explained. Key concepts and their purpose, including the Enterprise, Locations, Physical and Organizational Functional Units, Products, and Resources, are explained. It is shown that the art, science and perspective of Supply Chain Management is not only applicable to such a government & contractor operation, it is also an invaluable approach for understanding, focusing improvement and growth. It is shown that such commercial practice applies to Human Space Flight and is invaluable towards one day creating routine, affordable access to and from space.

supply chain managemen↗

Application of space-time neural networks to detect tether skiprope phenomenon in space operations

The feasibility of operating tethered payloads in earth orbit will be studied during a space shuttle flight scheduled for 1992. Tethered systems may exhibit a circular transverse oscillation or skiprope phenomenon due to interaction between the earth's magnetic field and current pulsing through the tether. Effective damping of this skiprope motion depends on rapid and accurate detection of its magnitude and phase. Satellite attitude motion has characteristic oscillations as well as many other perturbations and therefore the relationship between skiprope parameters and attitude time history is very complex and nonlinear. A space-time neural network (STNN) for filtering satellite rate gyro data is proposed for rapid detection and prediction of skiprope magnitude and phase. A validated orbital operations simulator and STNN software will be used for training and testing of this skiprope detection system. The advantages of STNNs are discussed and STNN configurations and preliminary results are presented.

Lea, Robert N.↗

Sailing Towards an Expressive Scheduling Language for Europa Clipper

The mission planners for NASA's Europa Clipper deep-space mission use automated scheduling software to generate activity plans and command sequences for multiple instruments and subsystems before sending the sequences for execution on board. Both science and engineering planners must translate their intents into expressions of mission constraints, goals, and preferences that the scheduling engine understands. This paper describes the ongoing development of a dedicated domain-specific java-embedded language that can efficiently and accurately capture such concerns for the Europa Clipper mission, along with a user-interface companion for the language.

Schaffer, Steve↗

Integrating O/S models during conceptual design, part 3

Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.

Ebeling, Charles E.↗