Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Support for the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

Ma, C.↗

Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

This final report summarizes the accomplishments during the contract period. Under the contract Nepal, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during high geodetic and astrometric VLBI evolved through several major changes. This report is divided into five sections that correspond to major task areas in the contract: A) Coordination rid Scheduling, B) Field System, CN Station Support, D) Analysis and Research and Development, and E) Computer Support.

Vandenberg, N. R.↗

The Living with a Star Radiation Belt Storm Probes

The goal of NASA's Living With a Star Radiation Belt Storm Probe mission is to understand, ideally to the point of predictability, how populations of relativistic electrons and ions in space form or change in response to the variable inputs of energy from the Sun. The investigations selected for this 2-spacecraft mission scheduled for launch in early 2012 address this task by making extensive observations of the plasma waves, thermal, ring current, and relativistic particle populations, and DC electric and magnetic fields within the Earth's inner and outer radiation belts. We first describe the current mission concept within the scope of NASA's strategic plan and the Vision for Exploration, and then consider how its observations will be used to define and quantify the processes that accelerate, transport, and remove particles in the Earth's radiation belts.

Sibeck, D. G.↗

Qualification of a Hybrid Propulsion System for the Mars Ascent Vehicle

Technology for a hybrid based propulsion system is being developed to support a potential Mars Sample Return campaign. A Mars Ascent Vehicle (MAV) concept for launching samples off of Mars, and delivering them to orbit for further transport to Earth may utilize hybrid propulsion due to the predicted favorable low temperature characteristics and high performance of this option. However, the hybrid option is still undergoing technology development to demonstrate these capabilities. Once development of a capable hybrid propulsion system is proven, further work will be required. This will include environmental testing relative to the mission, and integration with the vehicle reaction control systems and payload. Qualification of such a system will be a significant effort. It will require specialized procurements for the propellants and environments involved, and further testing of the more specialized designs. This paper details an estimate of the tasks required to complete development efforts from Technical Readiness Level 5 (TRL5) through qualification. A success based program was formulated to reach the required performance metrics sufficient for a standard Preliminary Design Review (PDR). Using task level inputs from team members cost and schedule were conceived for continued progress to Critical Design Review (CDR), then through Qualification.

Prince, Andrew↗

(abstract) FASTER -- A Tool for DSN Forecasting and Scheduling

FASTER, the Forecasting And Scheduling Tool for Earth-based Resources is a suite of software tools developed at JPL to aid in the process of allocating DSN 70 and 34 meter antennas and equipment to support deep space satellites and ground based astronomy. FASTER has been designed for use by a diverse user community, including mid-level managers, data entry and analysis teams, and project scheduling personnel. The system helps to automate many of the previously labor intensive tasks and ensure proper analysis and consistency throughout all phases of the allocation process. FASTER implements an interactive environment for both forecasting and scheduling. This paper will discuss technical aspects of the FASTER system, including forecasting and scheduling algorithms, issues related to large scale use of a scheduling and forecasting system, implications to the process in which a forecasting and scheduling system is embedded, and lessons learned and implications to similar systems.

forecasting↗

Validation of Self-Scheduling Countermeasures in NASA's HERA Campaign 6

Enhancing crew capabilities for planning and scheduling activities is critical for periods of increased crew autonomy in future long-duration missions where communication delays preclude real-time ground support from Earth. Our study focuses on how to empower astronauts to manage their timelines independently from the experts in the mission control center (MCC). Our objective was to evaluate the impact of scheduling countermeasures on crew scheduling performance, workload, and usability in an analog mission environment. The study involved 16 crew members across four missions in the Limited Autonomy phase of Human Exploration Research Analog (HERA) Campaign 6. Crew members used Playbook to schedule one operational day for the entire crew. Half the participants accessed scheduling aids, and we compared their performance to a control group with no aids. Performance, workload, and usability were assessed using time on task, violation counts, NASA Task Load Index (NASA-TLX), and System Usability Scale (SUS). Participants using scheduling aids completed sessions 20% faster and committed 33% fewer violations. While these differences were not statistically significant due to the study’s operational limitations, trends indicate that scheduling aids may reduce errors and improve efficiency. These results can inform the design of scheduling tools to enhance astronauts’ autonomy in long-duration space missions, contributing to improved crew performance and reduced reliance on ground support.

space robotics↗

Validation of Self-Scheduling Countermeasures in NASA's HERA Campaign 6

Enhancing crew capabilities for planning and scheduling activities is critical for periods of increased crew autonomy in future long-duration missions where communication delays preclude real-time ground support from Earth. Our study focuses on how to empower astronauts to manage their timelines independently from the experts in the mission control center (MCC). Our objective was to evaluate the impact of scheduling countermeasures on crew scheduling performance, workload, and usability in an analog mission environment. The study involved 16 crew members across four missions in the Limited Autonomy phase of Human Exploration Research Analog (HERA) Campaign 6. Crew members used Playbook to schedule one operational day for the entire crew. Half the participants accessed scheduling aids, and we compared their performance to a control group with no aids. Performance, workload, and usability were assessed using time on task, violation counts, NASA Task Load Index (NASA-TLX), and System Usability Scale (SUS). Participants using scheduling aids completed sessions 20% faster and committed 33% fewer violations. While these differences were not statistically significant due to the study’s operational limitations, trends indicate that scheduling aids may reduce errors and improve efficiency. These results can inform the design of scheduling tools to enhance astronauts’ autonomy in long-duration space missions, contributing to improved crew performance and reduced reliance on ground support.

space robotics↗

Software sizing, cost estimation and scheduling

The Technology Implementation and Support Section at Martin Marietta Astronautics Group Denver is tasked with software development analysis, data collection, software productivity improvement and developing and applying various computerized software tools and models. The computerized tools are parametric models that reflect actuals taken from the large data base of completed software development projects. Martin Marietta's data base consists of over 300 completed projects and hundreds of cost estimating relationships (CERs) that are used in sizing, costing, scheduling and productivity improvement equations, studies, models and computerized tools.

Cheadle, William G.↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Task and work performance on Skylab missions 2, 3, and 4: Time and motion study: Experiment M151

Human task performance was evaluated under weightlessness conditions during long duration space flight in order to study the characteristics of the adaptation function. Results show that despite pronounced variability in training schedules and in initial reaction to the Skylab environment, in-flight task performance was relatively equivalent among Skylab crews, and behavioral performance continued to improve from beginning to end of all missions.

Kubis, J. F.↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John↗

Program Predicts Time Courses of Human/Computer Interactions

CPM X is a computer program that predicts sequences of, and amounts of time taken by, routine actions performed by a skilled person performing a task. Unlike programs that simulate the interaction of the person with the task environment, CPM X predicts the time course of events as consequences of encoded constraints on human behavior. The constraints determine which cognitive and environmental processes can occur simultaneously and which have sequential dependencies. The input to CPM X comprises (1) a description of a task and strategy in a hierarchical description language and (2) a description of architectural constraints in the form of rules governing interactions of fundamental cognitive, perceptual, and motor operations. The output of CPM X is a Program Evaluation Review Technique (PERT) chart that presents a schedule of predicted cognitive, motor, and perceptual operators interacting with a task environment. The CPM X program allows direct, a priori prediction of skilled user performance on complex human-machine systems, providing a way to assess critical interfaces before they are deployed in mission contexts.

Vera, Alonso↗

Defining and representing events in a satellite scheduling system - The IEPS (Interactive Experimenter Planning System) approach

A methodology is described for defining and representing satellite events from the IEPS perspective. The task of doing this is divided into four categories and includes defining and representing resource windows, event parameters, event scheduling strategies, and event constraints. The description of each of these categories includes examples from the IEPS ERBS-TDRSS Contact Planning System. This is a system which is being used by the Earth Radiation Budget Satellite (ERBS) schedulers to request TDRSS contact times from the NCC. The system is written in the C programming language and uses a custom built inference engine (TIE1) to do constraint checking and a custom built strategies interpreter to derive the plan. The planning system runs on the IBM-PC/AT or on any similar hardware which has a C development environment and 640K of memory.

Mclean, David R.↗

User Acceptability of Physiological and Other Measures of Hazardous States of Awareness

Two studies explored user acceptance of devices that measure hazardous states of awareness. In the first study, critical incident data were collected in two workshops from 11 operators working as air traffic controllers or commercial pilots. These critical incident data were used to develop a survey of the acceptability of awareness measures. In the second study, the survey was administered to 100 people also working as air traffic controllers or commercial pilots. Results show that operators are open to the inclusion of technology to measure HSAs even if that technology is somewhat invasive as long as feedback about the HSAs is considered to be useful and helpful. Nonetheless, a major concern is the legal complications associated with being recorded, particularly for older and more experienced operators. Air traffic controllers emphasized the importance of sharing technology information with supervisors in order to receive backup or assistance under conditions of task overload, whereas pilots emphasized the influence of work schedules on problems with awareness. Recommendations are offered concerning the implementation of devices to measure hazardous states of awareness.

Dickinson, Terry L.↗

Sensor Data Distribution With Robustness and Reliability: Toward Distributed Components Model

In planetary surface exploration mission, sensor data distribution is required in many aspects, for example, in navigation, scheduling, planning, monitoring, diagnostics, and automation of the field tasks. The challenge is to distribute such data in the robust and reliable way so that we can minimize the errors caused by miscalculations, and misjudgments that based on the error data input in the mission. The ad-hoc wireless network on planetary surface is not constantly connected because of the nature of the rough terrain and lack of permanent establishments on the surface. There are some disconnected moments that the computation nodes will re-associate with different repeaters or access points until connections are reestablished. Such a nature requires our sensor data distribution software robust and reliable with ability to tolerant disconnected moments. This paper presents a distributed components model as a framework to accomplish such tasks. The software is written in Java and utilized the available Java Message Services schema and the Boss implementation. The results of field experimentations show that the model is very effective in completing the tasks.

Alena, Richard L.↗

Q-IRIS: The Evolution of the IRIS Task-Based Runtime to Enable Classical-Quantum Workflows

Extreme heterogeneity in emerging HPC systems are starting to include quantum accelerators, motivating runtimes that can coordinate between classical and quantum workloads. We present a proof-of-concept hybrid execution framework integrating the IRIS asynchronous task-based runtime with the XACC quantum programming framework via the Quantum Intermediate Representation Execution Engine (QIR-EE). IRIS orchestrates multiple programs written in the quantum intermediate representation (QIR) across heterogeneous backends (including multiple quantum simulators), enabling concurrent execution of classical and quantum tasks. Although not a performance study, we report measurable outcomes through the successful asynchronous scheduling and execution of multiple quantum workloads. To illustrate practical runtime implications, we decompose a four-qubit circuit into smaller subcircuits through a process known as quantum circuit cutting, reducing per-task quantum simulation load and demonstrating how task granularity can improve simulator throughput and reduce queueing behavior -- effects directly relevant to early quantum hardware environments. We conclude by outlining key challenges for scaling hybrid runtimes, including coordinated scheduling, classical-quantum interaction management, and support for diverse backend resources in heterogeneous systems.

Miniskar, Narasinga Rao [ORNL] (ORCID:000000018259↗