Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John↗

Program Predicts Time Courses of Human/Computer Interactions

CPM X is a computer program that predicts sequences of, and amounts of time taken by, routine actions performed by a skilled person performing a task. Unlike programs that simulate the interaction of the person with the task environment, CPM X predicts the time course of events as consequences of encoded constraints on human behavior. The constraints determine which cognitive and environmental processes can occur simultaneously and which have sequential dependencies. The input to CPM X comprises (1) a description of a task and strategy in a hierarchical description language and (2) a description of architectural constraints in the form of rules governing interactions of fundamental cognitive, perceptual, and motor operations. The output of CPM X is a Program Evaluation Review Technique (PERT) chart that presents a schedule of predicted cognitive, motor, and perceptual operators interacting with a task environment. The CPM X program allows direct, a priori prediction of skilled user performance on complex human-machine systems, providing a way to assess critical interfaces before they are deployed in mission contexts.

Vera, Alonso↗

Defining and representing events in a satellite scheduling system - The IEPS (Interactive Experimenter Planning System) approach

A methodology is described for defining and representing satellite events from the IEPS perspective. The task of doing this is divided into four categories and includes defining and representing resource windows, event parameters, event scheduling strategies, and event constraints. The description of each of these categories includes examples from the IEPS ERBS-TDRSS Contact Planning System. This is a system which is being used by the Earth Radiation Budget Satellite (ERBS) schedulers to request TDRSS contact times from the NCC. The system is written in the C programming language and uses a custom built inference engine (TIE1) to do constraint checking and a custom built strategies interpreter to derive the plan. The planning system runs on the IBM-PC/AT or on any similar hardware which has a C development environment and 640K of memory.

Mclean, David R.↗

User Acceptability of Physiological and Other Measures of Hazardous States of Awareness

Two studies explored user acceptance of devices that measure hazardous states of awareness. In the first study, critical incident data were collected in two workshops from 11 operators working as air traffic controllers or commercial pilots. These critical incident data were used to develop a survey of the acceptability of awareness measures. In the second study, the survey was administered to 100 people also working as air traffic controllers or commercial pilots. Results show that operators are open to the inclusion of technology to measure HSAs even if that technology is somewhat invasive as long as feedback about the HSAs is considered to be useful and helpful. Nonetheless, a major concern is the legal complications associated with being recorded, particularly for older and more experienced operators. Air traffic controllers emphasized the importance of sharing technology information with supervisors in order to receive backup or assistance under conditions of task overload, whereas pilots emphasized the influence of work schedules on problems with awareness. Recommendations are offered concerning the implementation of devices to measure hazardous states of awareness.

Dickinson, Terry L.↗

Sensor Data Distribution With Robustness and Reliability: Toward Distributed Components Model

In planetary surface exploration mission, sensor data distribution is required in many aspects, for example, in navigation, scheduling, planning, monitoring, diagnostics, and automation of the field tasks. The challenge is to distribute such data in the robust and reliable way so that we can minimize the errors caused by miscalculations, and misjudgments that based on the error data input in the mission. The ad-hoc wireless network on planetary surface is not constantly connected because of the nature of the rough terrain and lack of permanent establishments on the surface. There are some disconnected moments that the computation nodes will re-associate with different repeaters or access points until connections are reestablished. Such a nature requires our sensor data distribution software robust and reliable with ability to tolerant disconnected moments. This paper presents a distributed components model as a framework to accomplish such tasks. The software is written in Java and utilized the available Java Message Services schema and the Boss implementation. The results of field experimentations show that the model is very effective in completing the tasks.

Alena, Richard L.↗

An intelligent value-driven scheduling system for Space Station Freedom with special emphasis on the electric power system

The Electric Power Control System (EPCS) created by Decision-Science Applications, Inc. (DSA) for the Lewis Research Center is discussed. This system makes decisions on what to schedule and when to schedule it, including making choices among various options or ways of performing a task. The system is goal-directed and seeks to shape resource usage in an optimal manner using a value-driven approach. Discussed here are considerations governing what makes a good schedule, how to design a value function to find the best schedule, and how to design the algorithm that finds the schedule that maximizes this value function. Results are shown which demonstrate the usefulness of the techniques employed.

Krupp, Joseph C.↗

Crew Factors in Flight Operations: A Survey of Fatigue Factors in Corporate/Executive A Viation Operations - 8

Corporate flight crews face unique challenges including unscheduled flights, quickly changing schedules, extended duty days, long waits, time zone changes, and peripheral tasks. Most corporate operations are regulated by Part 91 FARs which set no flight or duty time limits. The objective of this study was to identify operationally significant factors that may influence fatigue, alertness, and performance in corporate operations. In collaboration with the National Business Aircraft Association and the Flight Safety Foundation, NASA developed and distributed a retrospective survey comprising 107 questions addressing demographics, home sleep habits, flight experience, duty schedules, fatigue during operations, and work environment. Corporate crewmembers returned 1,488 surveys. Respondents averaged 45.2 years of age, had 14.9 years of corporate flying experience, and 9,750 total flight hours. The majority (89%) rated themselves as 'good' or 'very good' sleepers at home. Most (82%) indicated they are subject to call for duty and described an average duty day of 9.9 h. About two-thirds reported having a daily duty time limit and over half (57%) reported a daily flight time limit. Nearly three-quarters (71%) acknowledged having 'nodded off' during a flight. Only 21% reported that their flight departments offer training on fatigue issues. Almost three-quarters (74%) described fatigue as a 'moderate' or 'serious' concern, and a majority (61%) characterized it as a common occurrence. Most (85%) identified fatigue as a 'moderate' or 'serious' safety issue.

Rosekind, Mark R.↗

Advisory Algorithm for Scheduling Open Sectors, Operating Positions, and Workstations

Air traffic controller supervisors configure available sector, operating position, and work-station resources to safely and efficiently control air traffic in a region of airspace. In this paper, an algorithm for assisting supervisors with this task is described and demonstrated on two sample problem instances. The algorithm produces configuration schedule advisories that minimize a cost. The cost is a weighted sum of two competing costs: one penalizing mismatches between configurations and predicted air traffic demand and another penalizing the effort associated with changing configurations. The problem considered by the algorithm is a shortest path problem that is solved with a dynamic programming value iteration algorithm. The cost function contains numerous parameters. Default values for most of these are suggested based on descriptions of air traffic control procedures and subject-matter expert feedback. The parameter determining the relative importance of the two competing costs is tuned by comparing historical configurations with corresponding algorithm advisories. Two sample problem instances for which appropriate configuration advisories are obvious were designed to illustrate characteristics of the algorithm. Results demonstrate how the algorithm suggests advisories that appropriately utilize changes in airspace configurations and changes in the number of operating positions allocated to each open sector. The results also demonstrate how the advisories suggest appropriate times for configuration changes.

Bloem, Michael↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

Source record↗

The Development of a Method of Producing Etch Resistant Wax Patterns on Solar Cells

The first quarter of a one-year program to investigate the production of patterned etch resistant wax coatings on solar cell substrates by printing is reported. Master molds for printing plates were produced for the plates. The resist wax is being studied to determine its relevant physical properties. A printing device is currently in design, and material costs are being compiled as first step in a cost analysis task. All phases of the project are proceeding according to schedule. No specific phases are yet completed.

Pastirik, E.↗

Advanced Platform Systems Technology study. Volume 4: Technology advancement program plan

An overview study of the major technology definition tasks and subtasks along with their interfaces and interrelationships is presented. Although not specifically indicated in the diagram, iterations were required at many steps to finalize the results. The development of the integrated technology advancement plan was initiated by using the results of the previous two tasks, i.e., the trade studies and the preliminary cost and schedule estimates for the selected technologies. Descriptions for the development of each viable technology advancement was drawn from the trade studies. Additionally, a logic flow diagram depicting the steps in developing each technology element was developed along with descriptions for each of the major elements. Next, major elements of the logic flow diagrams were time phased, and that allowed the definition of a technology development schedule that was consistent with the space station program schedule when possible. Schedules show the major milestone including tests required as described in the logic flow diagrams.

Source record↗

Expert mission planning and replanning scheduling system for NASA KSC payload operations

EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

Pierce, Roger↗

An Overview of the NIRA Status

The NASA Glenn Research Center (GRC) has been tasked by NASA JSC's ISS Payloads Office to perform the NIRA (Non-Isolated Rack Assessment) microgravity prediction analysis task for the International Space Station. Previously, the NIRA analysis task had been performed by Boeing/Houston. Boeing's last NIRA analysis was released in 1999 and was denoted as "NIRA 99." GRC is currently close to completing our first full-NIRA analysis (encompassing the frequency range from 0 to 50 Hz) to be released as "NIRA 2003." This presentation will focus on describing the NIRA analysis, the transition of this analysis task from Boeing to GRC, and the current status and schedule for release of the NIRA 2003 results. Additionally, the results obtained from a mini-NIRA analysis requested by ESA and completed by GRC in the Spring of 2003 will be shown. This mini-analysis focused solely on predicting the microgravity environment at the COF-EPF (Columbus Orbiting Facility - External Payload Facility).

Hughes, William↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

MPST Software: grl_pef_check

This innovation is a tool used to verify and validate spacecraft sequences at the predicted events file (PEF) level for the GRAIL (Gravity Recovery and Interior Laboratory, see http://www.nasa. gov/mission_pages/grail/main/index. html) mission as part of the Multi-Mission Planning and Sequencing Team (MPST) operations process to reduce the possibility for errors. This tool is used to catch any sequence related errors or issues immediately after the seqgen modeling to streamline downstream processes. This script verifies and validates the seqgen modeling for the GRAIL MPST process. A PEF is provided as input, and dozens of checks are performed on it to verify and validate the command products including command content, command ordering, flight-rule violations, modeling boundary consistency, resource limits, and ground commanding consistency. By performing as many checks as early in the process as possible, grl_pef_check streamlines the MPST task of generating GRAIL command and modeled products on an aggressive schedule. By enumerating each check being performed, and clearly stating the criteria and assumptions made at each step, grl_pef_check can be used as a manual checklist as well as an automated tool. This helper script was written with a focus on enabling the user with the information they need in order to evaluate a sequence quickly and efficiently, while still keeping them informed and active in the overall sequencing process. grl_pef_check verifies and validates the modeling and sequence content prior to investing any more effort into the build. There are dozens of various items in the modeling run that need to be checked, which is a time-consuming and errorprone task. Currently, no software exists that provides this functionality. Compared to a manual process, this script reduces human error and saves considerable man-hours by automating and streamlining the mission planning and sequencing task for the GRAIL mission.

Call, Jared A.↗