Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Preliminary QCGAT program test results

NASA Lewis Research Center is conducting a program to demonstrate that large commercial engine technology can be applied to general aviation engines to reduce noise, emissions and fuel consumption and to develop new technology where required. The overall engine program, design, and technology incorporated into the QCGAT engines are described. In addition, preliminary engine test results are presented and compared to the technical requirements the engines were designed to meet.

Koenig, R. W.↗

The Integration and Test Program of the James Webb Space Telescope

With the delivery of its flight scientific instruments and the completion of all telescope optics both scheduled to occur later this year, the James Webb Space Telescope (JWST) will enter into a challenging integration and test (I&T) program. Highlights of that program include cryo-vacuum tests of the Integrated Science Instrument Module (ISIM) at Goddard Space Flight Center, ambient integration of the ISIM and the Optical Telescope Element (OTE) at Goddard, and an end-to-end cryo-vacuum test of the OTE + ISIM system at Johnson Space Center. We review the overall flow of the I&T program, highlighting the key activities and the critical verifications to be performed at each step.

Randy, Kimble↗

(abstract) JPL Cryocooler Development and Test Program Overview

Many near-term and future space-instrument programs within NASA and the Ballistic Missile Defense Organization (BMDO) depend on the successful development of long-life, low-vibration space cryocoolers. The most demanding near-term programs include a number of science instruments selected for NASA's Earth Observing System (Eos) program, and a number of space reconnaissance instruments associated with the BMDO's Brilliant Eyes program; both of these programs require delivery of similar types of flight coolers in the next few years. To help ensure the success of these cooler commitments, JPL has implemented an extensive cryocooler program in support of the NASA/JPL AIRS project, the Air Force Phillips Laboratory (AFPL), and the Air Force Space and Missiles Systems Division (SMC). This program is directed at assisting industry in developing advanced cryocoolers that successfully address the broad array of complex performance requirements needed for NASA and BMDO long-life space instruments. The JPL cryocooler program includes extensive characterization and life testing of industry-developed cryocoolers, development and flight testing of advanced sorption cooler systems for detector cooling to 10 K , development of mechanical cryocooler enhancement technologies, and flight tests of advanced low-vibration Stirling-cooler systems.

development design testing↗

Heritage to Flight; The Test Program that Brought an Inflation System Back to Life for the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID)

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Design Challenges Encountered in a Propulsion-Controlled Aircraft Flight Test Program

The NASA Dryden Flight Research Center conducted flight tests of a propulsion-controlled aircraft system on an F-15 airplane. This system was designed to explore the feasibility of providing safe emergency landing capability using only the engines to provide flight control in the event of a catastrophic loss of conventional flight controls. Control laws were designed to control the flightpath and bank angle using only commands to the throttles. Although the program was highly successful, this paper highlights some of the challenges associated with using engine thrust as a control effector. These challenges include slow engine response time, poorly modeled nonlinear engine dynamics, unmodeled inlet-airframe interactions, and difficulties with ground effect and gust rejection. Flight and simulation data illustrate these difficulties.

Maine, Trindel↗

Design challenges encountered in the F-15 PCA flight test program

The NASA Dryden Flight Research Center conducted flight tests of a propulsion-controlled aircraft system on an F-15 airplane. This system was designed to explore the feasibility of providing safe emergency landing capability using only the engines to provide flight control in the event of a catastrophic loss of conventional flight controls. Control laws were designed to control the flight path and bank angle using only commands to the throttles. While the program was highly successful, this paper concentrates on the challenges encountered using engine thrust as the only control effector. Compared to conventional flight control surfaces, the engines are slow, nonlinear, and have limited control effectiveness. This increases the vulnerability of the system to outside disturbances and changes in aerodynamic conditions. As a result, the PCA system had problems with gust rejection. Cross coupling of the longitudinal and lateral axis also occured, primarily as a result of control saturation. The normally negligible effects of inlet airframe interactions became significant with the engines as the control effector. Flight and simulation data are used to illustrate these difficulties.

Maine, Trindel A.↗

Overview of the Ares I Scale Model Acoustic Test Program

Launch environments, such as lift-off acoustic (LOA) and ignition overpressure (IOP), are important design factors for any vehicle and are dependent upon the design of both the vehicle and the ground systems. LOA environments are used directly in the development of vehicle vibro-acoustic environments and IOP is used in the loads assessment. The NASA Constellation Program had several risks to the development of the Ares I vehicle linked to LOA. The risks included cost, schedule and technical impacts for component qualification due to high predicted vibro-acoustic environments. One solution is to mitigate the environment at the component level. However, where the environment is too severe for component survivability, reduction of the environment itself is required. The Ares I Scale Model Acoustic Test (ASMAT) program was implemented to verify the Ares I LOA and IOP environments for the vehicle and ground systems including the Mobile Launcher (ML) and tower. An additional objective was to determine the acoustic reduction for the LOA environment with an above deck water sound suppression system. ASMAT was a development test performed at the Marshall Space Flight Center (MSFC) East Test Area (ETA) Test Stand 116 (TS 116). The ASMAT program is described in this presentation.

Counter, Douglas D.↗

Free-piston stirling engine endurance test program

The Free-Piston Stirling Engine (FPSE) has the potential to be a long-lived, highly reliable, power conversion device attractive for many product applications such as space, residential, or remote-site power. The purpose of endurance testing the FPSE is to demonstrate its potential for long life. The endurance program was directed at obtaining 1000 operational hours under various test conditions: low power, full stroke, duty cycle, and stop/start. Critical performance parameters were measured to note any change and/or trend. Inspections were conducted to measure and compare critical seal/bearing clearance. The engine performed well throughout the program, completing the 1000 hours. Hardware inspection, including the critical clearances, showed no significant change in hardware or clearance dimensions. The performance parameters did not exhibit any increasing or decreasing trends. The test program confirms the potential for long-life FPSE applications. Additional testing is planned to increase the test hours to 10,000.

Dochat, G.↗

Orion Heat Shield Manufacturing Producibility Improvements for the EM-1 Flight Test Program

This paper describes how the Orion program is incorporating improvements in the heat shield design and manufacturing processes reducing programmatic risk and ensuring crew safety in support of NASA’s Exploration Missions. The Orion program successfully completed the EFT-1 flight test in 2014 and is currently developing the EM-1 spacecraft to meet the test objectives of an orbital mission to the moon and return to earth in 2019. Lessons learned from the EFT-1 manufacturing and flight test experience are being incorporated into a wide variety of vehicle systems and manufacturing processes to reduce risk to the Orion missions and flight crew. A critical contributor to crew safety is the heat shield that protects the crew capsule during re-entry through the earth’s atmosphere for return from deep space. The first flight test vehicle, EFT-1, was manufactured and tested in the Neil Armstrong Operations and Checkout (O&C) facility at KSC to demonstrate early risk reduction including the functionality of the Thermal Protection Systems (TPS) for capsule safe return to earth. The approach for the EFT-1 heat shield utilized a low risk approach using Apollo heritage design and manufacturing processes using an Avcoat TPS ablator with a honeycomb substrate to provide a one piece heat shield to meet the mission re-entry heating environments. The manufacturing processes used honeycomb cell injection guns which were redeveloped from the Apollo Lunar Program processes to build the EFT-1 heat shield. The completed heat shield was transported across the country by aircraft to the O&C at KSC for installation onto the capsule. The EFT-1 heat shield successfully performed its mission and experienced ~80% of the re-entry velocity (50% heating rate) for a lunar return for an Exploration Mission. The second flight test vehicle is the EM-1 mission which will have additional flight systems installed to fly to the moon and return. Heat shield design and producibility improvements have been incorporated in the EM-1 vehicle to meet deep space mission and programmatic requirements. The design continues to use the Avcoat material, but in a “block” configuration to enable improvements in the application processes as well as additional improvements in the carrier structure design and manufacturing operations. Incorporating flight test results and producibility improvements from EFT-1 for the heat shield system design and processes have improved the thermal protection capability, improved the producibility, and cost for EM-1 flight test.

Producibility↗

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

An accelerated stress testing program for determining the reliability sensitivity of silicon solar cells to encapsulation and metallization systems

The use of accelerated testing methods in a program to determine the reliability attributes of terrestrial silicon solar cells is discussed. Different failure modes are to be expected when cells with and without encapsulation are subjected to accelerated testing and separate test schedules for each are described. Unencapsulated test cells having slight variations in metallization are used to illustrate how accelerated testing can highlight different diffusion related failure mechanisms. The usefulness of accelerated testing when applied to encapsulated cells is illustrated by results showing that moisture related degradation may be many times worse with some forms of encapsulation than with no encapsulation at all.

Lathrop, J. W.↗

Alternatives Analysis for the Resumption of Transient Testing Program

An alternatives analysis was performed for resumption of transient testing. The analysis considered eleven alternatives – including both US international facilities. A screening process was used to identify two viable alternatives from the original eleven. In addition, the alternatives analysis includes a no action alternative as required by the National Environmental Policy Act (NEPA). The alternatives considered in this analysis included: 1. Restart the Transient Reactor Test Facility (TREAT), 2. Modify the Annular Core Research Reactor (ACRR) which includes construction of a new hot cell and installation of a new hodoscope, and 3. No Action.

42 ENGINEERING↗