Search NASA⌕ Search

SEARCH · Search NASA

Results for “UTILITY INTERCONNECTIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Hypothetical Solar Cyberattack Scenarios and Impacts

This report offers approachable, plausible scenarios of cyberattacks affecting photovoltaic assets and interconnected infrastructure. It may be used by State Energy Officials and Public Utility Commission Staff to educate themselves on the potential consequences of these scenarios and the practical, high-level actions that may be implemented now to mitigate future impacts. It highlights plausible consequences of inadequate cyber provisions for PV systems and offers potential state actions to alleviate the identified risks.

14 SOLAR ENERGY↗

IceNet for FireBox - A Berkeley Warehouse-Scale Computer

Berkeley’s FireBox is a next-generation warehouse-scale computer (WSC) that utilizes the energy-efficiency and bandwidth density of integrated silicon-photonic interconnects to enable a new high-bandwidth and low-latency network fabric connecting thousands of compute nodes to petabytes of DRAM and Flash storage. The high bandwidth, low latency and high connectivity of FireBox’s WSC network fabric (IceNet) will enable dramatic improvements in the overall system energy efficiency enabling fine-grain power control on system resources (processors, links and memory/storage components). IceNet is a special 3-stage photonic Clos network architected to achieve ultra-low-latency connectivity between processor nodes and memory, drastically cutting down on the energy wasted in resource idling (processors and memory stalled due to pending network requests). This is achieved by integration of the first and last switch stages into processor/memory hub clients and by heavy over-provisioning of the high-radix middle switches (FlareSwitches). A key hardware component developed in this program is an active laser power management photonic integrated circuits called LightSpark. It interacts with the FlareSwitch and provides laser power to a subset of occupied switch ports, increasing the utilization of laser light in the photonic network by an order of magnitude. In addition to guiding the laser power where it is needed, the laser-power management module enables both wavelength and laser redundancy, significantly increasing the robustness of the system. The goal of the IceNet fabric is to enable communication between 1000s of processor nodes and PBs of memory/storage with <100ns latency, <10pJ/b wall-plug energy cost at multiple Pb/s of available connectivity bandwidth. These metrics represent two-orders of magnitude improvement with respect to the status of current data-center technology.

42 ENGINEERING↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

Final Scientific/Technical Report for Building Transmission Capacity in the Western Interconnection to Support a Low Carbon Future

The Building Transmission Capacity grant activities focused on educating both policy makers (primarily at Public Utility Commissions) and utilities across the West. Western Grid Group (WGG), the grant recipient, chose three methods to reach these audiences - direct outreach, a website that contains information on policies and strategies to integrate more variable generation resources, and a report - The Best of the West, Policies and Practices to Support Transition to a Lower-Carbon Electric Sector in the Western Interconnection and that highlights what is working in the West. While all avenues for education are effective the Best of the West report is the first west-wide assessment of its kind. The report details incremental changes that are working to integrate variable generation but it also expounds on what fundamental or transformative changes are needed to get to the 20% wind penetration and beyond.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Perspective on Protection Challenges with High Penetration of IBRs

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report / presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, this report looks broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the report summarizes on gathered data and internal experiences.

14 SOLAR ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space station architecture, module, berthing hub, shell assembly, berthing mechanism and utility connection channel

The geometric form of a space station is presented that includes a description of a plurality of modules and berthing hubs, joined by interconnections which are sideways connectable. The modules and hubs are fastened together in a triangular configuration in three dimensions. The interconnections include a pair of opposed, axially aligned, flanged ports and a clamp latch formed from a plurality of sections hinged along their length and extending circumferentially around the flanged ports. A hermetic seal is formed between the ports. A utilities connection channel extends between the ports. The channel has a shell with utilities connectors movable between an extended position to mating connectors in the modules and a withdrawn position. Assembly sequence and common module shell structure is detailed.

Cohen, M. M.↗

Tracking the Sun 10: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

Berkeley Lab’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected, residential and non-residential systems solar photovoltaic (PV) systems in the United States. The present report, the tenth edition in the series, focuses on systems installed through year-end 2016, with preliminary data for the first half of 2017. The report provides an overview of both long-term and more-recent trends, highlighting key drivers for installed price declines over different time horizons. The report also extensively characterizes the widespread variability in system pricing, comparing installed prices across states, market segments, installers, and various system and technology characteristics. The trends described in this report derive from project-level data collected by state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data for this report were compiled and cleaned for more than 1.1 million individual PV systems, though the analysis in the report is based on a subset of that sample, consisting of roughly 630,000 systems with available installed price data. The full underlying dataset of project-level data (excluding any confidential information) is available in a public data file, for use by other researchers and analysts.

14 SOLAR ENERGY↗

Final Technical Report for Automated Manufacturing of Innovative CPV/PV Modules

Cogenra’s Dense Cell Interconnect system was designed to use traditional front-contact cells and string them together into high efficiency and high reliability “supercells”. This novel stringer allows one to take advantage of the ~100 GW/year of existing cell production capacity and create a solar product for the customer that will produce more power and last longer than traditional PV products. The goal for this program was for Cogenra Solar to design and develop a first-of-kind automated solar manufacturing line that produces strings of overlapping cells or “supercells” based on Cogenra’s Dense Cell Interconnect (DCI) technology for their Low Concentration Photovoltaic (LCPV) systems. This will enable the commercialization of DCI technology to improve the efficiency, reliability and economics for their Low Concentration Photovoltaic systems. In this program, Cogenra Solar very successfully designed, developed, built, installed, and started up the ground-breaking manufacturing tools required to assemble supercells. Cogenra then successfully demonstrated operation of the integrated line at high yield and throughput far exceeding expectations. The development of a supercell production line represents a critical step toward a high volume and low cost Low Concentration Photovoltaic Module with Dense Cell Interconnect technology and has enabled the evaluation of the technology for reliability and yield. Unfortunately, performance and cost headwinds on Low Concentration Photovoltaics systems including lack of diffuse capture (10-15% hit) and more expensive tracker requirements resulted in a move away from LCPV technology. Fortunately, the versatility of Dense Cell Interconnect technology allows for application to flat plate module technology as well and Cogenra has worked with the DOE to utilize the learning from this grant to commercialize DCI technology for the solar market through the on-going grant: Catalyzing PV Manufacturing in the US With Cogenra Solar’s Next-Generation Dense Cell Interconnect PV Module Manufacturing Technology. This program is now very successfully building off of this work and commercializing the technology to enable increased solar adoption.

14 SOLAR ENERGY↗

Texas Solar Collaboration DOE Rooftop Solar Challenge City of Houston Project Summary

The City of Houston is committed to achieving a sustainable solar infrastructure. In 2008, Houston was named a United States Department of Energy (DOE) Solar America City. As a Solar America City, Houston teamed with the Houston Advanced Research Center (HARC), Sandia National Laboratory (Sandia), industry, and academia, to implement the Solar Houston Initiative and prepare the Solar Houston Plan. The Solar Houston initiative was focused on identifying and overcoming barriers associated with establishing a solar infrastructure that is incorporated into the City of Houston’s overall energy plan. A broad group of Houston area stakeholders, facilitated by HARC, came together to develop a comprehensive solar plan that went beyond technology to address barriers and establish demonstrations, public outreach, education programs and other activities. The plan included proposed scopes of work in four program areas: policies, solar integration, public outreach, and education. Through the support of the DOE SunShot Rooftop Solar Challenge (RSC) grant to the Texas Collaboration (San Antonio, Austin, and Hosuton), Houston has been able to implement several of the recommendations of the Solar Houston Plan. Specific recommendations that this project was able to support include; Working with the other Texas Solar America Cities (San Antonio and Austin), to harmonize permitting and inspection processes to simplify for installers and lower soft costs of installation; Participating in state level solar policy groups such as the Texas Renewable Energy Industries Association (TRIEA); Continued coordination with the local transmission and distribution utility (CenterPoint) and retail electric providers (REP); Identification of opportunities to improve permitting and interconnection; Providing training on PV systems to City inspectors; Educating the public by continuing outreach, training, and workshops, particularly using the the Green Building Resources Center; Evaluating methods of addressing financial barriers to residential solar; Maintaining www.solarhoustontx.org; and Continuing meetings with stakeholders to get ongoing feedback from the solar community on their needs. The following sections provide a brief summary of the activities completed under each of the nine tasks specifically related to the RSC grant. Reports and other backup information are included in the appendices.

14 SOLAR ENERGY↗

Utilities Perspective on Protection Challenges with High IBR Penetration

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, we are looking broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the presentation summarizes on gathered data and internal experiences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Perspective on Protection Challenges with High IBR Penetration [Slides]

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, this report looks broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the report summarizes on gathered data and internal experiences.

14 SOLAR ENERGY↗

Reaching new solar heights: integrating high penetrations of PV into the power system

Installed capacity of solar photovoltaics (PV) continues to grow rapidly in the US. High penetrations and can create operational and reliability challenges. PV integration shares some attributes and mitigation strategies with wind, and differs in some key ways that will be discussed. This study investigates PV integration challenges and examines mitigation issues for utilities planning for high penetrations of PV, with a focus on the Western Interconnection of the US. System balancing becomes more difficult due to a duck‐shaped net load curve. Flexibility in the remaining generators, load, and the PV itself, is critical in balancing the system. Reliability impacts from PV have been studied less and addressed less than system balancing issues, but become more important at high penetrations. Understanding essential reliability services from PV, weak grid issues with PV, and distributed PV impacts on bulk power system reliability is critical for planning of high penetrations of PV.

Lew, Debra↗

Standard Inverter Interface and Compliance Framework

Electric Power Research Institute, Inc. (EPRI) and Sandia National Laboratories (SNL) collaborated to develop and demonstrate a standard communication interface for solar inverters as well as a compliance framework to verify proper product operation via that interface. This activity filled a key void in the needs of California in relation to revisions to California’s Electric Tariff Rule 21 interconnection guidelines. Rule 21 is a CPUC-approved tariff based on IEEE 1547 technical requirements that describes the interconnection, operating, and metering requirements for generation facilities to be connected to a utility’s distribution system, over which the CPUC has jurisdiction. These guidelines, as presently being developed, anticipate a requirement for future inverters to have a standard communication interface and to be testable to verify their proper operation prior to deployment.

14 SOLAR ENERGY↗

Distribution System Secondary Circuit Parameter Estimation for Model Calibration

To analyze and coordinate the operation of distribution systems with rapidly increasing amounts of PV, more accurate distribution system models are required, especially for the distribution system secondary (low-voltage) circuits down to the point of common coupling for distributed PV. There is a growing need for automated procedures to calibrate the distribution system secondary circuit models that are typically either not modeled at all or are modeled with a lower level of detail than the better modeled medium-voltage systems. This report presents an accurate, flexible, and computationally efficient method to use measurement data to estimate secondary circuit series impedance parameters in existing utility feeder models. The parameter estimation method assumes well-modeled primary circuit models, known secondary circuit topologies, and AMI active power, and reactive power measurements at all the loads in the secondary circuit. The method also requires AMI voltage measurement at most of the loads in the secondary circuit but can handle loads that do not have voltage measurements. No existing secondary circuit model information is needed, except for topology. The method is based on the well-known linearized voltage drop approximation and linear regression. The performance of the method is demonstrated on a three-phase test circuit with ten different secondary circuit topologies and on the Georgia Tech campus distribution system with AMI data. The developed method can be utilized to improve existing utility feeder models for more accurate analysis and operation with ubiquitous distributed PV interconnected on the low-voltage circuits.

24 POWER TRANSMISSION AND DISTRIBUTION↗