Search NASA⌕ Search

SEARCH · Search NASA

Results for “Uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

How does uncertainty of soil organic carbon stock affect the calculation of carbon budgets and soil carbon credits for croplands in the U.S. Midwest?

Cropland carbon budget depicts the amount of carbon flowing in and out of agroecosystems and the changes in carbon stocks of soil and living biomass during the same period. Soil carbon credit is the additional change in soil carbon stock under certain farming practices compared with the business-as-usual practices. Accurately calculating cropland carbon budget and soil carbon credit is critical to assessing climate change mitigation potential in agroecosystems. The calculation of cropland carbon budget and soil carbon credit is sensitive to local soil and climatic conditions, especially initial soil organic carbon (SOC) stock, which is determined by both SOC concentration (SOC%) and bulk density (Bulk_Density). SOC stock data are either from soil sampling or gridded public survey data. In agroecosystem models, SOC stock data are a key model input for quantifying cropland carbon budget and soil carbon credit. However, various types and degrees of uncertainties exist in SOC stock datasets, which propagate to the quantification of SOC stock change. In particular, a large discrepancy is found in two widely used SOC stock datasets — Rapid Carbon Assessment dataset (RaCA) and Gridded Soil Survey Geographic Database (gSSURGO) — in the U.S. Midwest, with a relative difference (quantified using Normalized Root Mean Square Error, NRMSE) of 48.0% for 0–30 cm SOC stock between the two datasets. It remains largely unclear how uncertainty in SOC stocks affects the calculation of cropland carbon budget and soil carbon credit. To address this question, we used a well-validated process-based agroecosystem model, ecosys, to assess the impacts of SOC stock uncertainty on carbon budget and soil carbon credit calculation in the U.S. Midwestern corn-soybean rotation systems. Our results reveal the following findings: (1) A sizable discrepancy exists in simulated cropland carbon budget between using gSSURGO and using RaCA for their SOC% and Bulk_Density as model inputs, with a Pearson correlation coefficient (r) of only 0.4 for simulated change of SOC stock (ΔSOC) using these two different soil datasets. (2) Simulated cropland carbon budget components were more sensitive to initial SOC% than to Bulk_Density. For example, the upper and lower quartiles of multi-year averaged ΔSOC were –29.8 and 4.8 gC/m 2 /year for the selected counties respectively, with an uncertainty of 13.7 and 0.7 gC/m 2 /year induced by uncertainties in initial SOC% and Bulk_Density, respectively. (3) Both simulated ΔSOC and its uncertainty were negatively correlated with initial SOC%, whereas ΔSOC was negatively correlated with air temperature, and ΔSOC uncertainty was positively correlated with air temperature. (4) The uncertainty of calculated soil carbon credits was much smaller compared with the uncertainty of calculated absolute carbon budgets assuming the same SOC stock uncertainty level in the inputs. Specifically, in our assessment comparing planting cover crops vs no cover crop, the uncertainty of calculated soil carbon credits induced by initial SOC% uncertainty was less than 4% (relative to the quantified value of the soil carbon credits) for 90% of the cases. Our analysis highlights that high accuracy measurement of SOC% as inputs is needed for the calculation of cropland carbon budgets; however, soil carbon credit quantification is much less sensitive to the initial SOC% inputs, and the current publicly available soil datasets (e.g., gSSURGO) are largely suitable for the calculation of soil

54 ENVIRONMENTAL SCIENCES↗

Uncertainty analysis of steady-state measurements with a hot-filament type calorimetric emissometer

Calorimetric emissometers measure total hemispherical emissivity by measuring the heat transferred from a heated sample to its surroundings under a vacuum. The accuracy of emissometers standardized by the ASTM C835-06 are well understood. This work uses the Guide to the Evaluation of Uncertainty in Measurement (GUM) for the propagation uncertainties for an ASTM compliant emissometer. The GUM method was able to develop a measurement model and expressions to determine the uncertainty for other emissometers of this type. Data on ‘as-received’ Hastelloy X was used to develop a detailed uncertainty analysis of the emissivity measurement. Data on ‘as-received’ SS 347 and sandblasted A387 Gr. 91 and previous data by the group on A508/A533B were used to determine uncertainty over the ranges 0.16 to 0.81. For all samples, relative uncertainties in emissivities varied from 0.77% to 2.5% when using a fluxgate magnetometer sensor (FMS) to measure the DC heating current. Data on Hastelloy X using a Hall-effect sensor for DC current and low alloy steel showed the DC current and voltage across the test section to be dominate sources of uncertainty. When these sources were reduced, the specimen temperature and the surface area of the test sections were main sources of uncertainty in the emissivity, especially at higher temperatures. As thermal expansion of the surface was considered in the calculations, correlation between specimen temperature and surface area was examined. It was found to be a small contribution to emissivity's uncertainty despite the differences in linear CTE and its uncertainty for the materials analyzed in this study. For low temperatures, the chamber temperature can be a significant source of uncertainty if not sufficiently cooled. The GUM was also briefly compared to uncertainty from the 2nd and 3rd expansions of the Taylor series. We found that the results were the same when rounding to two significant figures.

42 ENGINEERING↗

Nuclear data uncertainty propagation applied to the versatile test reactor conceptual design

We report the Versatile Test Reactor (VTR) currently under development is a 300 MWth sodium-cooled fast reactor (SFR) fueled with ternary metal alloy fuel, which aims to accelerate the testing of advanced nuclear fuels, materials, instrumentation, and sensors in high flux environments that are necessary to license the next generation of advanced reactor concepts. To support the VTR design process, uncertainties associated with the nuclear data has been propagated through the reactor core neutronics calculation to global parameters of interest, such as the core multiplication factor, kinetic parameters, and various reactivity feedback coefficients, following the sensitivity based uncertainty propagation approach. By folding the sensitivity coefficients, separately computed by the generalized perturbation theory code PERSENT and Monte Carlo code Serpent 2, with the variance-covariance matrices from COMMARA-2.0, we obtain the reaction-wise, isotope-wise, and overall uncertainties for each response of interest due to nuclear data uncertainty. With Serpent 2, the statistical error of the uncertainty is obtained by propagating the statistical error of the sensitivity coefficients through the same process using a newly developed uncertainty propagation method. From both codes, the overall top uncertainty contributors are found to be the cross section of Fe-56 elastic scattering, Na-23 elastic scattering, and U 238 inelastic scattering. The large contributions of the Fe-56 elastic scattering cross sections to global parameters are due to its relatively large relative uncertainty of 5–10% in nuclear data and the large volume of Fe-containing reflector assemblies in the fairly compact VTR core design. Both codes agreed well for the overall uncertainty estimates of all responses of interest, except the delayed neutron fraction, prompt neutron generation time, and the coolant density feedback coefficient, where Serpent 2 yielded a much larger value than PERSENT due to the large statistical error of sensitivity coefficients. The calculated uncertainties are also compared to those associated with other SFR cores. Another outcome of this study is a variance-covariance matrix of reactivity coefficients, which can be used in the subsequent uncertainty propagation to the system level to investigate the impact of identified uncertainties on system responses in the safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Role of uncertainties in protecting ecological resources during remediation and restoration

Cleanup of contaminated waste sites is a National priority to protect human health and the environment, while restoring land to productive uses. While there are uncertainties with under standing risk to individuals from exposure, the aim of this study was to focus on uncertainties and complexities for ecological systems, complicated by hundreds of species occupying any remediation site which participate in multiple-interacting food webs. The ability to better predict the effectiveness of remediation in fostering future ecosystems might facilitate remedy selection and improve strategic environmental management. This investigation examined (1) uncertainties in ecosystem processes, (2) uncertainties in exposure from contamination before remediation, and (3) uncertainties during remediation. Two Department of Energy sites Hanford Site and Savannah River Site were used as case studies to illustrate how the uncertainties affect eco-receptors. Several types of ecological, physical, and human dimension uncertainties are defined. Ecological uncertainties include temporal, spatial, individual, developmental, and exogenous types. Physical uncertainties are weather-related, watershed variations, slope/aspect, soil/sediment structure and form, unforeseen events, and temporal patterns. Human dimension uncertainties include current land use, future land use, extractive and non-extractive recreation. The effects of remedial strategies varied between the two sites because Hanford is a primarily arid shrub-steppe ecotype, while Savannah River is a wet forest ecotype. Defining the associated ecological sensitivities and uncertainties and providing examples might help policy-makers, managers, planners, and contractors to be aware of issues to consider throughout planning, remediation, and restoration. Adding ecological uncertainty analysis to risk evaluations and remediation planning is analogous to using safety factors in human health risk assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Yes, No, Maybe So: Human Factors Considerations for Fostering Calibrated Trust in Foundation Models Under Uncertainty

High-stakes analytical environments require analysts to evaluate evidence and generate conclusions to inform critical decisions often under conditions of uncertainty. Probabilistic decision-making based on incomplete or inaccurate information can reduce productivity, compromise national interests, and endanger public safety. Researchers are developing expert systems built on foundation models (FMs) to support analysts’ decision-making processes by enabling human-artificial intelligence (AI) teaming, in part through the quantification and expression of uncertainty information. As FMs continue to mature, it is imperative to correspondingly consider analysts’ needs for appropriately interpreting and using uncertainty information. However, prior research indicates that it remains unclear how analysts engage with FM-generated uncertainty information and the extent to which these interactions influence trust in, and reliance on, expert systems. We plan to review the state of the science and conduct an exploratory, qualitative study to (a) understand how properly communicated uncertainty can foster calibrated trust and appropriate reliance and (b) identify approaches for effectively conveying FM-generated uncertainty information during analytical workflows. We will administer semi-structured interviews with analysts from a specific high-stakes analytical environment to collect their current experiences with job-related uncertainty and their impressions when viewing FM-generated uncertainty information. During the interview protocol, participants will be presented with several different FM outputs and invited to discuss their thoughts and beliefs about the uncertainty information displayed. Participants may provide insights into how trust and reliance may be influenced by uncertainty. The results of this study will help us to better understand how analysts currently interpret and use uncertainty information. Our findings may inform human factors recommendations for effectively conveying uncertainty information to foster calibrated trust in, and appropriate reliance on, expert systems. Interaction designers and FM developers can use this knowledge to enhance human-AI teaming and ensure the responsible deployment of FM-based expert systems in analytical workflows.

97 MATHEMATICS AND COMPUTING↗

Quantifying Effects of Departure and Flight Time Uncertainty on Urban Air Mobility Operations

Demand capacity balancing is a key mechanism for maintaining safe and efficient Urban Air Mobility (UAM) operations. However, uncertainties such as departure delays and flight time variation may reduce the effectiveness of algorithms used for balancing and detrimentally impact the safety and efficiency of UAM operations. In this paper, the effects of these uncertainties on UAM operations are quantified by modeling a distribution of departure and flight time errors. A route network in the Dallas/Fort Worth metropolitan area was used to simulate traffic demand with and without uncertainty. Simulations were conducted with three main models of uncertainty – first uncertainty in departure time delay resulting in late takeoffs, second with uncertainty in flight times in addition to departure delays, and finally, uncertainty in departure times that cause either late or early takeoffs. Each of these simulations were performed using varied standard deviations to fully understand the effects of uncertainties. Results from these simulations were compared to a baseline simulation using the same parameters, but without any uncertainty. The results suggest that both safety and efficiency are significantly impacted by uncertainty even with relatively low uncertainty introduced. These results work towards quantifying the effects of uncertainty in flight scheduling for UAM. They will also aid in the further development of the demand capacity balancing algorithms for UAM operations and associated air traffic management.

Urban Air Mobility↗

Quantifying the Effects of Departure and Flight Time Uncertainty on Urban Air Mobility Operations

Demand capacity balancing is a key mechanism for maintaining safe and efficient Urban Air Mobility (UAM) operations. However, uncertainties such as departure delays and flight time variation may reduce the effectiveness of algorithms used for balancing and detrimentally impact the safety and efficiency of UAM operations. In this paper, the effects of these uncertainties on UAM operations are quantified by modeling a distribution of departure and flight time errors. A route network in the Dallas/Fort Worth metropolitan area was used to simulate traffic demand with and without uncertainty. Simulations were conducted with three main models of uncertainty – first uncertainty in departure time delay resulting in late takeoffs, second with uncertainty in flight times in addition to departure delays, and finally, uncertainty in departure times that cause either late or early takeoffs. Each of these simulations were performed using varied standard deviations to fully understand the effects of uncertainties. Results from these simulations were compared to a baseline simulation using the same parameters, but without any uncertainty. The results suggest that both safety and efficiency are significantly impacted by uncertainty even with relatively low uncertainty introduced. These results work towards quantifying the effects of uncertainty in flight scheduling for UAM. They will also aid in the further development of the demand capacity balancing algorithms for UAM operations and associated air traffic management.

Urban Air Mobility↗

Gap Size Uncertainty Quantification in Advanced Gas Reactor TRISO Fuel Irradiation Experiments

The Advanced Gas Reactor (AGR)-3/4 experiment is the combination of the third and fourth tests conducted within the tristructural isotropic fuel development and qualification research program. The AGR-3/4 test consists of twelve independent capsules containing a fuel stack in the center surrounded by three graphite cylinders and shrouded by a stainless steel shell. This capsule design enables temperature control of both the fuel and the graphite rings by varying the neon/helium gas mixture flowing through the four resulting gaps. Knowledge of fuel and graphite temperatures is crucial for establishing the functional relationship between fission product release and irradiation thermal conditions. These temperatures are predicted for each capsule using the commercial finite-element heat transfer code ABAQUS. Uncertainty quantification reveals that the gap size uncertainties are among the dominant factors contributing to predicted temperature uncertainty due to high input sensitivity and uncertainty. Gap size uncertainty originates from the fact that all gap sizes vary with time due to dimensional changes of the fuel compacts and three graphite rings caused by extended exposure to high temperatures and fast neutron irradiation. Gap sizes are estimated using as-fabricated dimensional measurements at the start of irradiation and post irradiation examination dimensional measurements at the end of irradiation. Uncertainties in these measurements provide a basis for quantifying gap size uncertainty. However, lack of gap size measurements during irradiation and lack of knowledge about the dimension change rates lead to gap size modeling assumptions, which could increase gap size uncertainty. In addition, the dimensional measurements are performed at room temperature, and must be corrected to account for thermal expansion of the materials at high irradiation temperatures. Uncertainty in the thermal expansion coefficients for the graphite materials used in the AGR-3/4 capsules also increases gap size uncertainty. This study focuses on analysis of modeling assumptions and uncertainty sources to evaluate their impacts on the gap size uncertainty.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Uncertainty Due to Correlated Mass, Volume, and Density When Mass and Density are Measured

The mass, density, and volume of a part are not quantities that vary independently; they are correlated. The correlations must be accounted for in uncertainty analysis. Favorite et al. derived an equation for the uncertainty in k{sub eff} that assumed that part masses and volumes were measured with some uncertainty. Perko et al. verified the equation. The equation was used in the last revision of the Jezebel reevaluation, which is presently under revision. Densities are however measured directly, not derived as a measured mass divided by a measured density. In this paper, an equation is derived in two ways for the uncertainty in k{sub eff} (or any response) that assumes that part masses and densities are measured with some uncertainty. The equation for a response uncertainty due to correlated mass, density, and volume uncertainties is slightly different when the density uncertainty is known instead of the volume uncertainty. However, if the mass uncertainty is small in comparison, the effect on the response uncertainty may be quite small. A more general equation that accounts for correlations among mass, density, and linear dimensions, with possible uncertainties in all of these inputs, will be developed. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Benefits of dealing with uncertainty in greenhouse gas inventories: introduction

The assessment of greenhouse gases emitted to and removed from the atmosphere is high on the international political and scientific agendas. Growing international concern and cooperation regarding the climate change problem have increased the need for policy-oriented solutions to the issue of uncertainty in, and related to, inventories of greenhouse gas (GHG) emissions. The approaches to addressing uncertainty discussed in this Special Issue reflect attempts to improve national inventories, not only for their own sake but also from a wider, systems analytical perspective-a perspective that seeks to strengthen the usefulness of national inventories under a compliance and/or global monitoring and reporting framework. These approaches demonstrate the benefits of including inventory uncertainty in policy analyses. The authors of the contributed papers show that considering uncertainty helps avoid situations that can, for example, create a false sense of certainty or lead to invalid views of subsystems. This may eventually prevent related errors from showing up in analyses. However, considering uncertainty does not come for free. Proper treatment of uncertainty is costly and demanding because it forces us to make the step from 'simple to complex' and only then to discuss potential simplifications. Finally, comprehensive treatment of uncertainty does not offer policymakers quick and easy solutions. The authors of the papers in this Special Issue do, however, agree that uncertainty analysis must be a key component of national GHG inventory analysis. Uncertainty analysis helps to provide a greater understanding and better science helps us to reduce and deal with uncertainty. By recognizing the importance of identifying and quantifying uncertainties, great strides can be made in ongoing discussions regarding GHG inventories and accounting for climate change. The 17 papers in this Special Issue deal with many aspects of analyzing and dealing with uncertainty in emissions estimates.

54 ENVIRONMENTAL SCIENCES↗

Fragmentary provisions for uncertainty disclosure and consideration in EA legislation, regulations and guidelines and the need for improvement

The consideration and disclosure of uncertainties is fundamental to a credible EA process, but little is known about the nature and type of requirements and guidance available to proponents, practitioners and decision makers about how to deal with uncertainties. This paper examines the provisions for considering and disclosing uncertainties in EA. Methods are based on a comparative review of uncertainty provisions in EA legislation, regulations and guidance documents under Canadian federal, provincial and territorial jurisdictions. Results show 10 types of provisions applied at different stages of the EA process with considerable jurisdictional variability and incoherence. The most common provision was that decision makers can request that project proponents provide more information, followed by the preparation of contingency plans, and that practitioners document their assumptions about data reliability. Most of these provisions were found in guidelines, versus legislation or regulations; and most addressed impact management, with very few provisions for addressing uncertainty during EA review and decision making. Current practices of uncertainty (non)disclosure and (non)consideration in EA can be explained, in part, by the superficial nature and limited extent of the requirements and guidance made available to EA practitioners, proponents, and decision makers. The existing requirements placed on proponents and practitioners to disclose and consider uncertainties are necessary, but insufficient. Stronger, more coherent and transparent requirements for those tasked with EA review and decision making to consider uncertainty information when disclosed, and the development of practical guidance on how to do so, are needed. - Highlights: •Uncertainty disclosure requirements in EA are examined. •Practitioners are often suggested to disclose uncertainties in their EAs. •Most provisions for uncertainty disclosure in EA are non-mandatory, guidelines. •There are few provisions for decision makers to consider uncertainty when disclosed. •Stronger, more coherent and transparent requirements are needed.

54 ENVIRONMENTAL SCIENCES↗

Processing Aleatory and Epistemic Uncertainties in Experimental Data From Sparse Replicate Tests of Stochastic Systems for Real-Space Model Validation

This paper presents a practical methodology for propagating and processing uncertainties associated with random measurement and estimation errors (that vary from test-to-test) and systematic measurement and estimation errors (uncertain but similar from test-to-test) in inputs and outputs of replicate tests to characterize response variability of stochastically varying test units. Also treated are test condition control variability from test-to-test and sampling uncertainty due to limited numbers of replicate tests. These aleatory variabilities and epistemic uncertainties result in uncertainty on computed statistics of output response quantities. The methodology was developed in the context of processing experimental data for “real-space” (RS) model validation comparisons against model-predicted statistics and uncertainty thereof. The methodology is flexible and sufficient for many types of experimental and data uncertainty, offering the most extensive data uncertainty quantification (UQ) treatment of any model validation method the authors are aware of. It handles both interval and probabilistic uncertainty descriptions and can be performed with relatively little computational cost through use of simple and effective dimension- and order-adaptive polynomial response surfaces in a Monte Carlo (MC) uncertainty propagation approach. A key feature of the progressively upgraded response surfaces is that they enable estimation of propagation error contributed by the surrogate model. Sensitivity analysis of the relative contributions of the various uncertainty sources to the total uncertainty of statistical estimates is also presented. Finally, the methodologies are demonstrated on real experimental validation data involving all the mentioned sources and types of error and uncertainty in five replicate tests of pressure vessels heated and pressurized to failure. Simple spreadsheet procedures are used for all processing operations.

97 MATHEMATICS AND COMPUTING↗

MAMA Software Features: Errors, Uncertainty, and Standards

This document reviews the sources of uncertainty, standards, and the UQ development plan for the MAMA software. Our intention is to allow users to generate quantification data with uncertainty based on the contributing back end sources. We do not intend to add in front end uncertainty into the software itself, due to the numerous different instruments that could be used, and the enormous variation in factors that would add to that uncertainty among different users, samples, and sample prep routines. We could not possibly or reasonably address them all. We will however, add in the uncertainty component from the image scale bar, which must be provided by the user as an input to the software, and could be used to incorporate any front end uncertainty. (Note: the detailing of these front end uncertainties is beyond the scope of this software effort.) The verification testing we have done generates uncertainties that are fundamentally pixel based. Given the uncertainty in the scale bar, we can then propagate the uncertainty and convert to uncertainty in all calculated results in microns (or whatever unit the scale bar is in.) Users can then add any additional instrumentation and sample prep uncertainty to the resulting output as appropriate for the data calculation and analysis being performed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Impacts of Process and Prediction Uncertainties on Projected Hanford Waste Glass Amount

Analyses were performed to evaluate the impacts of using the advanced glass models, constraints (Vienna et al. 2016), and uncertainty descriptions on projected Hanford glass mass. The maximum allowable WOL was estimated for waste compositions while simultaneously satisfying all applicable glass property and composition constraints with sufficient confidence. Different components of prediction and composition/process uncertainties were systematically included in the calculations to evaluate their impacts on glass mass. The analyses estimated the production of 23,360 MT of IHLW glass when no uncertainties were taken into accound. Accounting for prediction and composition/process uncertainties resulted in 5.01 relative percent increase in estimated glass mass 24,531 MT. Roughly equal impacts were found for prediction uncertainties (2.58 RPD) and composition/process uncertainties (2.43 RPD). ILAW mass was predicted to be 282,350 MT without uncertainty and with weaste loading “line” rules in place. Accounting for prediction and composition/process uncertainties resulted in only 0.08 relative percent increase in estimated glass mass of 282,562 MTG. Without application of line rules the glass mass decreases by 10.6 relative percent (252,490 MT) for the case with no uncertainties. Addition of prediction uncertainties increases glass mass by 1.32 relative percent and the addition of composition/process uncertainties increase glass mass by an additional 7.73 relative percent (9.06 relative percent increase combined). The glass mass estimate without line rules (275,359 MT) was 2.55 relative percent lower than that with the line rules (282,562 MT), after accounting for all applicable uncertainties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Process and Prediction Uncertainties on Projected Hanford Waste Glass Amount

Analyses were performed to evaluate the impacts of using the advanced glass models, constraints (Vienna et al. 2016), and uncertainty descriptions on projected Hanford glass mass. The maximum allowable waste oxide loading (WOL) was estimated for waste compositions while simultaneously satisfying all applicable glass property and composition constraints with sufficient confidence. Different components of prediction and composition/process uncertainties were systematically included in the calculations to evaluate their impacts on glass mass. The analyses estimated the production of 23,360 MT of immobilized high-level waste (IHLW) glass when no uncertainties were taken into account. Accounting for prediction and composition/process uncertainties resulted in 5.01 relative percent increase in estimated glass mass of 24,531 MT. Roughly equal impacts were found for prediction uncertainties (2.58 RPD) and composition/process uncertainties (2.43 RPD). The immobilized low-activity waste (ILAW) mass was predicted to be 282,350 MT without uncertainty and with waste loading “line” rules in place. Accounting for prediction and composition/process uncertainties resulted in only 0.08 relative percent increase in estimated glass mass of 282,562 MT. Without application of line rules the glass mass decreases by 10.6 relative percent (252,490 MT) for the case with no uncertainties. Addition of prediction uncertainties increases glass mass by 1.32 relative percent and the addition of composition/process uncertainties increase glass mass by an additional 7.73 relative percent (9.06 relative percent increase combined). The glass mass estimate without line rules (275,359 MT) was 2.55 relative percent lower than that with the line rules (282,562 MT), after accounting for all applicable uncertainties

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Process and Prediction Uncertainties on Projected Hanford Waste Glass Amount

Analyses were performed to evaluate the impacts of using the advanced glass models, constraints, and uncertainty descriptions on projected Hanford glass mass. The maximum allowable waste oxide loading (WOL) was estimated for waste compositions while simultaneously satisfying all applicable glass property and composition constraints with sufficient confidence. Different components of prediction and composition/process uncertainties were systematically included in the calculations to evaluate their impacts on glass mass. The analyses estimated the production of 23,360 MT of immobilized high-level waste (IHLW) glass when no uncertainties were taken into account. Accounting for prediction and composition/process uncertainties resulted in 5.01 relative percent increase in estimated glass mass of 24,531 MT. Roughly equal impacts were found for prediction uncertainties (2.58 RPD) and composition/process uncertainties (2.43 RPD). The immobilized low-activity waste (ILAW) mass was predicted to be 282,350 MT without uncertainty and with waste loading “line” rules in place. Accounting for prediction and composition/process uncertainties resulted in only 0.08 relative percent increase in estimated glass mass of 282,562 MT. Without application of line rules the glass mass decreases by 10.6 relative percent (252,490 MT) for the case with no uncertainties. Addition of prediction uncertainties increases glass mass by 1.32 relative percent and the addition of composition/process uncertainties increase glass mass by an additional 7.73 relative percent (9.06 relative percent increase combined). The glass mass estimate without line rules (275,359 MT) was 2.55 relative percent lower than that with the line rules (282,562 MT), after accounting for all applicable uncertainties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Process and Prediction Uncertainties on Projected Hanford Waste Glass Amount

Analyses were performed to evaluate the impacts of using the advanced glass models, constraints, and uncertainty descriptions on projected Hanford glass mass. The maximum allowable WOL was estimated for waste compositions while simultaneously satisfying all applicable glass property and composition constraints with sufficient confidence. Different components of prediction and composition/process uncertainties were systematically included in the calculations to evaluate their impacts on glass mass. The analyses estimated the production of 23,360 MT of IHLW glass when no uncertainties were taken into account. Accounting for prediction and composition/process uncertainties resulted in 5.01 relative percent increase in estimated glass mass 24,531 MT. Roughly equal impacts were found for prediction uncertainties (2.58 RPD) and composition/process uncertainties (2.43 RPD). ILAW mass was predicted to be 282,350 MT without uncertainty and with waste loading “line” rules in place. Accounting for prediction and composition/process uncertainties resulted in only 0.08 relative percent increase in estimated glass mass of 282,562 MTG. Without application of line rules the glass mass decreases by 10.6 relative percent (252,490 MT) for the case with no uncertainties. Addition of prediction uncertainties increases glass mass by 1.32 relative percent and the addition of composition/process uncertainties increase glass mass by an additional 7.73 relative percent (9.06 relative percent increase combined). The glass mass estimate without line rules (275,359 MT) was 2.55 relative percent lower than that with the line rules (282,562 MT), after accounting for all applicable uncertainties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Aerosol Forcing Uncertainty

Understanding sources of uncertainty in aerosol direct radiative forcing (DRF), the difference in a given radiative flux component with and without aerosol, is essential to quantifying changes in Earth's radiation budget. We examine the uncertainty in DRF due to measurement uncertainty in the quantities on which it depends: aerosol optical depth, single scattering albedo, asymmetry parameter, solar geometry, and surface albedo. Direct radiative forcing at the top of the atmosphere and at the surface as well as sensitivities, the changes in DRF in response to unit changes in individual aerosol or surface properties, are calculated at three locations representing distinct aerosol types and radiative environments. The uncertainty in DRF associated with a given property is computed as the product of the sensitivity and typical measurement uncertainty in the respective aerosol or surface property. Sensitivity and uncertainty values permit estimation of total uncertainty in calculated DRF and identification of properties that most limit accuracy in estimating forcing. Total uncertainties in modeled local diurnally averaged forcing range from 0.2 to 1.3 W m-2 (42 to 20%) depending on location (from tropical to polar sites), solar zenith angle, surface reflectance, aerosol type, and aerosol optical depth. The largest contributor to total uncertainty in DRF is usually single scattering albedo; however decreasing measurement uncertainties for any property would increase accuracy in DRF. Comparison of two radiative transfer models suggests the contribution of modeling error is small compared to the total uncertainty although comparable to uncertainty arising from some individual properties.

54 ENVIRONMENTAL SCIENCES↗