Search NASA⌕ Search

SEARCH · Search NASA

Results for “Viable system model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

311 records · Page 18

Resource Recovery and Environmental Protection in Wyoming’s Greater Green River Basin Using Selective Nanostructured Membranes (Final Report)

Produced water (PW) represents a sizable waste stream that is co-generated with oil and natural gas production. In 2021 Wyoming ranked 8th and 9th, respectively in domestic oil and natural gas production. In 2017 Wyoming ranked as the 4th highest generator of PW in the U.S, accounting for 7% of the total volume generated. In the context of being the 3rd most arid state in the U.S., the value of water reuse becomes obvious. PW reuse, and resource recovery, in any form requires some level of treatment to remove particulates, residual (free, dispersed) hydrocarbons, organics, and salts. The level of treatment depends on the requirements of the reuse, or resource recovery, application. PW management systems in Wyoming employ in order of volume of PW managed the following management strategies: reinjection for enhanced oil recovery, surface discharge, deep well injection, evaporation ponds (impoundments), and commercial management/treatment. Complicating treatment efforts are the relatively high concentrations of organics (natural and synthetic), dispersed/free hydrocarbons, benzene-toluene-ethylbenzene, and xylenes (BTEX) compounds, biologicals, salts, and minerals. Hydrocarbons (dispersed/dissolved crude oils) and BTEX compounds, as well as synthetic organics, present economic and environmental concerns. The former represents lost revenue, while the latter results in negative environmental impacts like emissions from surface impoundments. The overall objective of this proposal was to synthesize superhydrophilic/oleophobic and superhydrophobic/oleophilic membranes for selectively concentrating and then separating BTEX compounds and oil and grease (O&G) from PW originating from the Greater Green River Basin (GGRB) in Wyoming. Three specific research aims were pursued to accomplish this overall objective. This final report details the development of the superhydrophobic and superhydrophilic membranes, as well as the design of the membrane module prototypes specifically. The technoeconomic assessment is separately reported in another document. 1. Aim #1 – Material optimization and performance evaluation of superhydrophilic/oleophobic and superhydrophobic/oleophilic membranes made by electrospinning/spraying. 2. Aim #2 – Design and construction of cross-flow membrane modules for selectively concentrating and then separating BTEX/oil from GGRB produced water. 3. Aim #3 – Techno-economic assessment of BTEX/oil recovery, and clean water production, using superhydrophilic/oleophobic and superhydrophobic/oleophilic membrane separation for GGRB PW. Superhydrophobic membranes were synthesized by electrospinning poly(vinylidene fluoride-co-hexafluoropropylene) (PVDF-HFP) nanofibers onto polyester (PET) substrates and electrospraying nano-carbon black/PVDF-HFP onto the nanofibrous layer. These membranes were characterized by high (>8000 liters per square meter per hour per bar (LMH/bar)) permeance values for pure hydrocarbon phases and a high hydrocarbon selectivity (>96%) when treating GGRB PW. All results were obtained when operating the membrane in a crossflow configuration representative of actual field operating conditions. Solvent/oil properties, specifically viscosity and total surface energy/tension, affected permeance across the membrane, which resulted in light mineral oil (394 LMH/bar) and o-xylene (1834 LMH/bar) being characterized by lower permeance values in the pure phase tests. Mixed phase fluxes between 40 to 80 LMH were obtained for the PW when operating the membrane at a feed pressure of 0.3 bar. Flux decreased as the mixed phase concentration in the feed decreased pointing to the importance of maximizing the collision efficiency between the emulsion and the membrane surface and maximizing the emulsion concentration in the feed and the turbulence within the feed channel. These tests demonstrated that the superhydrophobic membranes developed here are a viable hydrocarbon recovery method for GGRB PWs and should be pursued for testing in pilot-scale trials. Superhydrophilic membranes were successfully synthesized via electrospinning/spraying using polyacrylonitrile (PAN) nanofibers as a base nanofibrous matrix. Integration of polyaniline (PANI) into the nanofibrous matrix produced a superior membrane, for water filtration applications, relative to PAN alone and reduced graphene oxide (RGO) when integrated into the nanofibrous matrix. This conclusion was based on the PANI-PAN resistance to flux loss (fouling) when treating model solvent/oil solutions representative of GGRB PWs and field collected PW from the GGRB. The synthesized PAN membranes outperformed a commercially available PAN membrane designed for oil/water separation. This finding indicates that the surface chemical and physical characteristics of the electrospun membranes presents improved properties for filtration of challenging waters like GGRB PWs. The electrospun membranes therefore show promise overall as a substitute for conventionally polymerized membranes in PW treatment applications. The PANI-PAN membrane specifically presents superior performance characteristics for concentration O&G prior to treatment by the hydrocarbon recovery membrane and producing high-quality filtrate for reuse and/or additional treatment (desalination).

02 PETROLEUM↗

Investigation of Flux Spreading in a Light-Trapping, Planar-Cavity Receiver for Enclosed Solar Particle Heating

Concentrating solar thermal power (CSP) technology development has recently focused on increasing the operating temperatures to accommodate high efficiency power cycles and thermochemical processes. Inert solid particles as heat transfer media enable solar receivers to operate above 700 degrees Celsius resulting in increased system thermal efficiency compared to the conventional molten salt based CSP system. An open-cavity falling-particle solar receiver that can efficiently heat particles by direct heating from concentrated solar radiation faces challenges with large particle losses from wind and unable to support thermochemical reactions. A light-trapping, planar cavity reiver (LTPCR) where particles are indirectly heated can significantly minimize the particle losses during the operation, support thermochemical reactions, and offer scalability potential. The LTPCR features an array of vertical planar receiver/absorber panels arranged within a cavity configuration. Concentrated solar radiation from heliostats is focused onto the receiver walls, where heat is indirectly transferred to solid particles flowing inside the receiver channels. Heat transfer occurs through direct contact between the receiver panel walls and particles, and can be enhanced by fluidizing particles with air. This fluidization increases particle-wall contact and extends particle residence time, maximizing heat transfer efficiency. The unique vertical planar receiver structure originated from a near-blackbody tubular light absorber, effectively distributing the incoming solar beam spread across the panel walls and trapping light. This flux spreading effect, driven by cosine projection, converts high incident solar flux into a lower, more uniform heat flux on the panel walls. This redistribution enhances heat transfer efficiency between particle-wall or reaction gases-wall, while preventing localized overheating of the receiver panel. Indirect planar cavity solar receivers completely separate solid particles from the ambient environment that can greatly reduce the thermal losses in heated particles resulting in high efficiency at high temperatures above 700 degrees Celsius. This design ensures no particle losses to the environment during the operation while open-cavity designs can experience significant particle losses from wind. An experimental investigation was conducted to observe flux spreading on the receiver panel wall. A lab-scale prototype planar receiver, fabricated using Haynes 230 alloy, was tested under direct concentrated solar radiation using the high-flux solar furnace (HFSF) facility at NREL. The experiment was performed under normal peak radiative heat fluxes ranging from 800 to 1900 kW/m2. A temperature distribution on the panel wall was measured using a thermal imaging camera (FLIR A 6600). To prevent overheating at the receiver front tip, prism-shaped heat shields (Zircar UNIFROM C1) were placed in front of the receiver, and their influence on flux spreading was also studied. Absorbed flux distribution on the panel wall was modeled using SolTrace. The total solar power and flux distributions delivered from HFSF were determined based on the heliostat mirror optical properties, direct normal irradiance (DNI) on the on-sun testing days, peak flux measurement during the on-sun testing, and shutter/attenuator settings Due to the large incident angles of the solar beam on the panel wall, the angular optical properties of Haynes 230 alloy and Zircar heat shields were incorporated into the model. This flux distribution model was then integrated into a computational fluid dynamics (CFD) simulation to predict the receiver panel wall temperature, which was compared with the experimental measurements. Both prediction and measurements identified a temperature hotspot at the backside of the panel, indicating that the incident solar beam can fully reach to the rear of the receiver. The heat shields positioned at the front of the receiver effectively reduced the excessive temperature rise at the receiver front tip. Overall, the temperature was well distributed over the panel wall, with a minor hotspot at the back of the receiver. The model slightly overpredicted the temperature, possibly due to discrepancies in optical properties of the panel and an underprediction of thermal loss in the receiver. The advancement of the particle LTPCR offers a viable alternative to open-cavity receivers by addressing particle loss issues. Additionally, it presents a pathway for enabling solar thermochemical processes, extending CSP technology beyond power generation to fuel and chemical production.

14 SOLAR ENERGY↗

Emissions mitigation technology for advanced water-lean solvent-based CO 2 capture processes

This technical final report submitted to DOE/NETL presents all the research activities performed during the entirety of DE-FE0031660 project-Emissions Mitigation Technology for Advanced Water-Lean Solvent-Based CO 2 Capture Processes which spans from October 2018 through March 2022. RTI International has been conducting studies from fundamental and operational aspects to reduce the overall amine emissions from the advanced Water-Lean Solvent (WLS) systems, specifically RTI’s Non-Aqueous Solvent (NAS). This technical final report will highlight the key findings from project which align closely to the project objectives which are: Identify the contribution of vapor loss, entrainment, and aerosols to the overall emissions of water-lean systems; Determine the significance of CO 2 capture system operating parameters to the amine emissions; Develop an emissions model based on critical operating parameters; Evaluate the effectiveness of emissions mitigation devices to reduce the amine emissions to <1 ppm under flue coal-fired flue gas; and, Determine the contribution of the ECTs to the overall CO 2 capture cost. The following are the key findings based on numerous tests using both lab-scale setups and parametric testing performed at RTI’s Bench-scale Gas Absorption System (BsGAS). During the BP1, the aerosol generation system and monitoring equipment were installed at BsGAS to produce and determine the aerosol characteristics during the NAS CO 2 capture process. The aerosol produced by this setup produced aerosols with the peak diameter and concentration of 50 micron and 1.2E10 7 cm -3 , respectively. These particle sizes and concentrations are matched to those observed in the actual coal-fired power plant flue gases and expected to be found at the absorber inlet of the CO 2 capture system. Over 1,300 hours of parametric testing have been conducted to evaluate the impact of the aerosols and operating conditions during the CO 2 capture with NAS on the overall amine emissions in the treated flue gas. At the worse condition tested, the presence of the aerosols in the flue gas could increase the overall emissions by 10X compared to the baseline emissions from NAS’s vapor pressure. CO 2 capture rate was found to be a main factor impacting the overall emissions as well as aerosol size and concentrations in the absorber off-gas. The higher CO 2 capture rate, the higher amine emissions in the treated gas. The temperature difference between the temperature bulge seen in the absorber and the water wash temperature also impacts the particle growth where the larger the temperature difference, the more amine emissions from aerosols in the treated gas. The majority of the aerosols did not grow substantially in the system, and the particle concentrations remained nearly constant between the absorber inlet and wash outlet. Only a small portion of the particles were found to grow significantly. The high efficiency demister with mesh size of 5-10 micron can be installed to remove a portion of the aerosols from the gas stream leaving the water wash. Overall, these results from parametric testing have established the emission baseline and validate our assumption on the need of emission control technologies (ECT) in order to minimize the emissions from the baseline NAS CO 2 capture process. Over 2,000 of BsGAS operating hours was used to investigate a handful of process improvements which led to a selection of the vital few changes that effectively control the amine emissions. These process improvements are lime-coated-filters for absorber gas inlet, advanced demister at the top of the absorber, a second water wash with amine recovery unit were designed, installed, and tested at BsGAS at the end of BP1. The result showed that the NAS CO 2 capture process with these additional emission control devices could lower the amine emission in the treated gas to about 1 ppm using a simulated coal-fire flue gas stream. The main contributor in lowering the amine emission came from the second water wash with amine recovery unit where the amine concentration in the scrubbing water was kept below 2 wt% through a continuous amine removal via an adsorbent bed, resulting in a low amine vapor pressure. The adsorbent bed was regenerated via a direct steam regeneration and the recover amine was returned to the absorber to minimize wastewater and makeup amine. A flue gas generation system was designed and installed during the first half of BP2 to support the emission testing using a real coal-derived flue gas. The system is capable of generating both coal- and natural gas- derived flue gases with the composition of the gaseous species highly resemble to that of the power plant flue gases. The particulates detected in the coal-derived flue gas showed the mean diameter of 1 micron. The CO 2 capture operating was then proceed using the real coal-derived flue gas where the amine emission was controlled to be about 0-3 ppm for the total run time of about 200 hours. Similar testing was conducted with natural gas-derived flue gas and the result showed a highly amine emission of 30 ppm under the total run time of 200 hours. The Principal Component Analysis (PCA) and the Partial Least Squares Projection to Latent Structures (PLS) techniques were applied to the parametric testing data to derive a multivariate statistical model. The model was validated and trained with half of the data collected, and the predictive ability of the model was evaluated using the remaining half of the data. The resulting empirical model was capable of predicting the overall emissions from the NAS process without the ECTs with ±15% accuracy (average absolute deviation, AAD) in BP1. As more emission data were obtained under the real coal-flue gas in the BP2, the model incorporated these new set of data to reflect the final process configuration, operating parameters, and amine emission. This results in the updated empirical model predicting the amine emission from the NAS CO 2 capture process with 84% goodness-of-fit (R 2 ), 85% predictability (Q 2 ), and 15% AAD. The study evaluates the use of RTI’s Non-Aqueous Solvent technology for 90% CO 2 capture from a net 650 MWe pulverized coal power plant, downstream of the flue-gas desulfurization unit. The captured CO 2 has a purity of > 95% CO 2 , and is dried, compressed to 15.3 MPa (2,215 psia), ready for sequestration. The analysis uses Case B12B from the DOE Baseline study on Bituminous Coal, Revision 4 where the Cansolv CO 2 capture plant is replaced by the RTI CO 2 Capture plant. The CO 2 capture plant has been sized to capture >90% CO 2 from flue gas derived from a net 650 MWe supercritical pulverized coal power plant. The CO 2 capture plant is equipped with emission control technologies that limits the amine emissions to < 1 ppm. Two different cases were evaluated for the technoeconomic study. The key difference between the two cases is the regenerator pressure. In Case 1, the regenerator operates at 0.195 MPa (28.3 psia), whereas in Case 2, the regenerator pressure is 0.44 MPa (64 psia) thus removing the need for the first stage of compression of the eight-stage compression train. Results from the TEA are compared against the DOE reference cases for SCPC plant with and without CO 2 Capture (Case B12A and Case B12B of the DOE Baseline study, respectively). Case 2 with CO 2 regeneration at higher pressure results in the lower cost of CO 2 capture. The total capital cost of the capture process has been estimated using 2018 dollars in Aspen Process Economic Analyzer and was estimated to be $579 MM. The capture plant operation leads to a total parasitic power loss rate of 96 MWe, resulting in a decrease in pulverized coal power plant efficiency of 7.8% points. The resulting cost of electric power increases from 64.4 mills/kWh, for no capture, to 97.5 mills/kWh, with 90% capture, an increase of 51% in the COE. The cost of capturing 90% CO 2 was estimated to be $38.2/tonne-CO 2 , and meets the DOE target of $40/t-CO 2 . Emission control technologies (ECT) investigated in this project includes a second water wash with use of activated carbon beds for removal of amine from the wash water prior to recirculation in the water wash. These ECT allow operation of the CO 2 capture plant with < 1 ppm amine emissions with the treated flue gas and contributes to $2.4/t-CO 2 captured. Amine emissions derived from thermal and oxidative degradations were investigated under this project along with the emissions derived from aerosols for the NAS system. The thermally degraded of the lean NAS showed less than 4% decreased of the original total amine content in the NAS at 150 °C while the result obtained at 120 °C showed no drop in total amine content, suggesting that thermal degradation of the NAS is minimal. These results also suggested that the thermally degraded species are not likely formed and contributed to the emissions due to the low regeneration temperature of the NAS at 90-105 °C. The oxidative degradation, on the other hand, could become problematic as some of these oxidative degraded species were observed during the NAS-5 testing at National Carbon Capture Center (NCCC) and SINTEF in our previous project. The rapid screening of selected inhibitors suggested that oxidative degradation of NAS can be suppressed using thiol containing compounds in amounts of at least 1 mol%. The detailed mechanistic degradation pathway was conceived for a specific amine used in NAS formulation during BP2. he reduction of the nitrosamines caused by the NO x present in the flue gas was also examined. The study suggested that the thermo-chemical treatment of the NAS solvent would be a more effective and economically viable compared to removing NO x at the DCC.

01 COAL, LIGNITE, AND PEAT↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗