Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Formation of electron bunches with tailored current profiles using multi-frequency linacs

Tailoring an electron bunch with specific current profile can provide substantial enhancement of the transformer ratio in beam-driven acceleration methods. We present a method relying on the use of a linac with accelerating sections operating at different frequencies followed by a magnetic bunch compressor. The experimental verfification of the technique in a two-frequency linac is presented. The compatibility of the proposed technique with the formation and acceleration of a drive and witness bunches is numerically demonstrated.

43 PARTICLE ACCELERATORS↗

Tracking of Acceleration with HNJ Method

After reviewing the principle of operation of acceleration with the method of Harmonic Number Jump (HNJ) in a Fixed-Field Alternating-Gradient (FFAG) accelerator for protons and heavy ions, we report in this talk the results of computer simulations performed to assess the capability and the limits of the method in a variety of practical situations. Though the study is not yet completed, and there still remain other cases to be investigated, nonetheless the tracking results so far obtained are very encouraging, and confirm the validity of the method.

43 PARTICLE ACCELERATORS↗

Tracking of Acceleration with HNJ Method

After reviewing the principle of operation of acceleration with the method of Harmonic Number Jump (HNJ) in a Fixed-Field Alternating Gradient (FFAG) accelerator for protons and heavy ions, we report in this talk the results of computer simulations performed to assess the capability and the limits of the method in a variety of practical situations. Though the study is not yet completed, and there still remain other cases to be investigated, nonetheless the tracking results so far obtained are very encouraging, and confirm the validity of the method.

43 PARTICLE ACCELERATORS↗

TRACKING OF ACCELERATION WITH HNJ METHOD.

After reviewing the principle of operation of acceleration with the method of Harmonic Number Jump (HNJ) in a Fixed-Field Alternating-Gradient (FFAG) accelerator for protons and heavy ions, we report in this talk the results of computer simulations performed to assess the capability and the limits of the method in a variety of practical situations. Though the study is not yet completed, and there still remain other cases to be investigated, nonetheless the tracking results so far obtained are very encouraging, and confirm the validity of the method.

43 PARTICLE ACCELERATORS↗

The operation of the LHC accelerator complex (2/2)

These lectures will give an overview of what happens when the LHC is in running mode. They are aimed at students working on the LHC experiments, but all those who are curious about what happens behind the scenes of the LHC are welcomed. You will learn all you always wanted to know about the LHC, and never had the courage to ask! The only pre-requisite is a basic, college-level, knowledge of EM and of the principles that allow to steer charged beams. Topics covered will include, among others: - the description of the injector chain, from the generation of the protons, to the delivery of bunches to the LHC. - the discussion of the steps required to accelerate the beams in the LHC, to bring them into collision, and to control the luminosity at the interaction points. - the description of the monitoring tools available to the LHC operators, and an explanation of the various plots and panels that can be found on the LHC web pages

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Accelerator/Experiment Operations - FY 2014

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2014. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2014 MINOS and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

43 PARTICLE ACCELERATORS↗

AXI4MLIR: User-Driven Automatic Host Code Generation for Custom AXI-Based Accelerators

Tensor algebra operations represent an important class of algorithms used across many applications, including machine learning, scientific computing, and data analytics. As a result, the efficient generation of custom accelerators for tensor operations has received increased attention. Previous efforts have produced automated tools enabling users to prototype and explore optimized accelerators. However, little effort has been focused on the host-accelerator interaction in these tools. Efficient use of hardware accelerators requires knowledge about the accelerator's capabilities (operations, data formats, and opcode support), the host CPU microarchitecture (e.g., memory hierarchy), the host-accelerator interface, and the application's features (which code regions should be mapped onto an accelerator). Manually rewriting the original applications to facilitate improved custom accelerator mapping is an error-prone and time-consuming endeavor. To cope with this, we propose AXI4MLIR, a new framework to automatically generate and optimize the communication between the host CPU and arbitrary accelerators that implement linear algebra algorithms. AXI4MLIR extends the MLIR compiler framework to automatically generate efficient host-accelerator driver code for accelerators with AXI-based interfaces. Our compiler extensions enable automatic driver code generation while carefully considering the host's memory hierarchy and target accelerator features. To demonstrate the flexibility and utility of AXI4MLIR, we test it with diverse use cases that include different types of accelerators, tiling scenarios, and dataflow schemes. We compare our experimental results to manual implementations of host-accelerator driver code and find that our approach can reduce CPU cache references by 56% and deliver up to a 1.65x speedup.

Bohm Agostini, Nicolas↗

Strategy for Modernizing a 40-Year-Old Accelerator Control System

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and software that uses obsolete frameworks. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The project team is evaluating three design concepts, and the future deployment of artificial intelligence capabilities for accelerator operations is an important consideration. An overview of the ACORN Project will be presented, including R&D used for evaluating the conceptual designs in the context of requirements for future accelerator operations.

43 PARTICLE ACCELERATORS↗

Conception and Operation of a New Treatment Center for Radioactive Waste from High Energy Accelerators - 18293

CERN has operated high-energy accelerators for more than 60 years of research in fundamental physics. The side-product of this activity is the generation of low- and intermediate-level radioactive waste, most of which is in solid form and free of surface contamination. Today, one operational year produces about 400 tons of radioactive waste which need to be disposed of towards the final repositories of the two CERN Host States, France and Switzerland. A new facility for the collection, interim storage, characterization and treatment of radioactive waste became operational at CERN in 2015. This facility was specifically conceived for an accelerator complex with a wide range of challenging waste items, which are often unique in their irradiation history as well as in their physical, chemical and radiological characteristics. The disposal rate was ramped up in 2016 with a unique treatment process tailored for metallic low-level waste. In 2017, two parallel processes were successfully tested for the elimination of radioactive cables and for the recycling of valuable metals. This paper gives an overview of the challenges in the design, commissioning and operation of the CERN radioactive waste treatment center. It outlines the methodology followed for the conception of the elimination processes, which can be of guidance for the development of similar facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid insulation coordination and optimisation for 1 MV operation of pulsed electron accelerator KALI-30GW

In a multi-gigawatt pulsed power system like KALI-30 GW, insulation coordination is required to achieve high voltages ranging from 0.3 MV to 1 MV. At the same time optimisation of the insulation parameters is required to minimize the inductance of the system, so that nanoseconds output can be achieved. The KALI-30GW pulse power system utilizes a combination of Perspex, delrin, epoxy, transformer oil, nitrogen/SF{sub 6} gas and vacuum insulation at its various stages in compressing DC high voltage to a nanoseconds pulse. This paper describes the operation and performance of the system from 400 kV to 1030 kV output voltage pulse and insulation parameters utilized for obtaining peak 1 MV output. (author)

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2008

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2008. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2008 Run II at the Tevatron Collider, MINOS using the Main Injector Neutrino Beam (NuMI), the MiniBooNE and SciBooNE experiments running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2011

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2011. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2011 Run II at the Tevatron Collider, the MINOS and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2012

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2012. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2012 MINOS and MINERνA experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2007

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2007. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2007 Run II at the Tevatron Collider, the MiniBooNE and SciBooNE experiments running in the Booster Neutrino Beam (BNB), MINOS using the Main Injector Neutrino Beam (NuMI), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2009

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2009. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2009 Run II at the Tevatron Collider, MINOS using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

43 PARTICLE ACCELERATORS↗