Current Overview of Neutron Moderator Thermal Scattering Kernels for HALEU-Fueled Advanced Reactors
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This is the licensing presentation for the Waste Management Symposia 2023. It covers licensing activities, LMP, and manufacturing licenses.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The traditional separation between safety, security, and operations teams has created significant barriers to achieving optimal outcomes. When security considerations are introduced late in the design process, they often conflict with already-established architectural, operational, or engineering parameters. Retrofitting security measures can lead to increased costs, schedule delays, and compromises in security effectiveness. For instance, the need to retrofit physical barriers or surveillance systems often results in trade-offs that could have been avoided with earlier input from security professionals. Delayed integration can also affect regulatory processes and result in licensing delays. Security reviews conducted at later stages frequently identify gaps that necessitate significant redesign efforts, impacting not only scope, schedule, and budget, but also adding risk and lowering stakeholder confidence in the project. This paper aims to address these challenges by identifying practical opportunities for integrating security considerations seamlessly with design and operations teams throughout the entire lifecycle of nuclear facilities—from conceptual design to commissioning and beyond. The research emphasizes the value of early and continuous collaboration among stakeholders to ensure that security measures are robust, operationally effective, and cost-efficient. By examining case studies, analyzing past incidents, and leveraging best practices from other high-security industries, this study highlights actionable strategies for bridging the gap between safety, security, and operations teams.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Powerpoint Presentation for Intern Technical Presentations; goes over my summer project
Powerpoint presentation for the 2025 NPIC-HMIT conference on barriers for adoption of DI&C systems in nuclear reactors.
Explore the source record for details and available documents.
Explore the source record for details and available documents.