Search NASA⌕ Search

SEARCH · Search NASA

Results for “bandwidth optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Scheduling the NASA Deep Space Network with Deep Reinforcement Learning

With three complexes spread evenly across the Earth, NASA’s Deep Space Network (DSN) is the primary means of communications as well as a significant scientific instrument for dozens of active missions around the world. A rapidly rising number of spacecraft and increasingly complex scientific instruments with higher bandwidth requirements have resulted in demand that exceeds the network’s capacity across its 12 antennae. The existing DSN scheduling process operates on a rolling weekly basis and is time-consuming; for a given week, generation of the final baseline schedule of spacecraft tracking passes takes roughly 5 months from the initial requirements submission deadline, with several weeks of peer-to-peer negotiations in between. This paper proposes a deep reinforcement learning (RL) approach to generate candidate DSN schedules from mission requests and spacecraft ephemeris data with demonstrated capability to address real-world operational constraints. A deep RL agent is developed that takes mission requests for a given week as input, and interacts with a DSN scheduling environment to allocate tracks such that its reward signal is maximized. A comparison is made between an agent trained using Proximal Policy Optimization and its random, untrained counterpart. The results represent a proof-of-concept that, given a well-shaped reward signal, a deep RL agent can learn the complex heuristics used by experts to schedule the DSN. A trained agent can potentially be used to generate candidate schedules to bootstrap the scheduling process and thus reduce the turnaround cycle for DSN scheduling.

Wilson, Brian↗

Striped tertiary storage arrays

Data stripping is a technique for increasing the throughput and reducing the response time of large access to a storage system. In striped magnetic or optical disk arrays, a single file is striped or interleaved across several disks; in a striped tape system, files are interleaved across tape cartridges. Because a striped file can be accessed by several disk drives or tape recorders in parallel, the sustained bandwidth to the file is greater than in non-striped systems, where access to the file are restricted to a single device. It is argued that applying striping to tertiary storage systems will provide needed performance and reliability benefits. The performance benefits of striping for applications using large tertiary storage systems is discussed. It will introduce commonly available tape drives and libraries, and discuss their performance limitations, especially focusing on the long latency of tape accesses. This section will also describe an event-driven tertiary storage array simulator that is being used to understand the best ways of configuring these storage arrays. The reliability problems of magnetic tape devices are discussed, and plans for modeling the overall reliability of striped tertiary storage arrays to identify the amount of error correction required are described. Finally, work being done by other members of the Sequoia group to address latency of accesses, optimizing tertiary storage arrays that perform mostly writes, and compression is discussed.

Drapeau, Ann L.↗

An End-to-End Architecture for Science Goal Driven Observing

New observatories will have greater on-board storage capacity and on-board processing capabilities. The new bottleneck will be download capacity. The cost of downlink time and limitations of bandwidth will end the era where all exposure data is downloaded and all data processing is performed on the ground. In addition, observing campaigns involving inherently variable targets will need scheduling flexibility to focus observing time and data download on exposures that are scientifically interesting. The ability to quickly recognize and react to such events by re-prioritizing the observing schedule will be an essential characteristic for maximizing scientific returns. It will also be a step towards increasing spacecraft autonomy, a major goal of NASA's strategic plan. The science goal monitoring (SGM) system is a proof-of-concept effort to address these challenges. We are developing an interactive distributed system that will use on-board processing and storage combined with event-driven interfaces with ground-based processing and operations, to enable fast re-prioritization of observing schedules, and to minimize time spent on non-optimized observations. SGM is initially aimed towards time-tagged observing modes used frequently in spectroscopic studies of varying targets. In particular, the SGM is collaborating with the proposed MIDEX-class mission Kronos team. The variable targets that Kronos seeks to study make an adaptive system such as SGM particularly valuable for achieving mission goals. However, the architecture and interfaces will also be designed for easy adaptability to other observing platforms, including ground-based systems and to work with different scheduling and pipeline processing systems. This talk will focus on our strategy for developing SGM and the technical challenges that we have encountered. We will discuss the SGM architecture as it applies to the Kronos mission and explain how it is scalable to other missions.

Jones, Jeremy↗

Implementation of a three degree of freedom, motor/brake hybrid force output device for virtual environment control tasks

The advent of high resolution, physical model based computer graphics has left a gap in the design of input/output technology appropriate for interacting with such complex virtual world models. Since virtual worlds consist of physical models, it is appropriate to output the inherent force information necessary for the simulation to the user. The detailed design, construction, and control of a three degree freedom force output joystick will be presented. A novel kinematic design allows all three axes to be uncoupled, so that the system inertia matrix is diagonal. The two planar axes are actuated through an offset gimbal, and the third through a sleeved cable. To compensate for friction and inertia effects, this transmission is controlled by a force feedforward and a closed force feedback proportional loop. Workspace volume is a cone of 512 cubic inches, and the device bandwidth is maximized at 60 Hz for the two planar and 30 Hz for the third axis. Each axis is controlled by a motor/proportional magnetic particle brake combination fixed to the base. The innovative use of motors and brakes allows objects with high resistive torque requirements to be simulated without the stability and related safety issues involved with high torque, energy storing motors alone. Position, velocity, and applied endpoint force are sensed directly. Different control strategies are discussed and implemented, with an emphasis on how virtual environment force information, generated by the MIT Media Lab Computer Graphics and Animation Group BOLIO system, is transmitted to the device controller. The design constraints for a kinesthetic force feedback device can be summarized as: How can the symbiosis between the sense of presence in the virtual environment be maximized without compromising the interaction task under the constraints of the mechanical device limitations? Research in this field will yield insights to the optimal human sensory feedback mix for a wide spectrum of control and interaction problems. A flexible research tool that is designed as an easily reproducible product prototype has been constructed to explore the variety of possible force interaction.

Russo, Massimo↗

Calibration of the Geosar Dual Frequency Interferometric SAR

GeoSAR is an airborne, interferometric Synthetic Aperture Radar (INSAR) system for terrain mapping, currently under development by a consortium including NASA's Jet Propulsion Laboratory (JPL), Calgis, Inc., and the California Department of Conservation (CalDOC) with funding provided by the Topographic Engineering Center (TEC) of the U.S. Army Corps of Engineers and the Defense Advanced Research Projects Agency (DARPA). The radar simultaneously maps swaths on both sides of the aircraft at two frequencies, X-Band and P-Band. For the P-Band system, data is collected for two across track interferometric baselines and at the crossed polarization. The aircraft position and attitude are measured using two Honeywell Embedded GPS Inertial Navigation Units (EGI) and an Ashtech Z12 GPS receiver. The mechanical orientation and position of the antennas are actively measured using a Laser Baseline Metrology System (LBMS). In the GeoSAR motion measurement software, these data are optimally combined with data from a nearby ground station using Ashtech PNAV software to produce the position, orientation, and baseline information are used to process the dual frequency radar data. Proper calibration of the GeoSAR system is essential to obtaining digital elevation models (DEMS) with the required sub-meter level planimetric and vertical accuracies. Calibration begins with the determination of the yaw and pitch biases for the two EGI units. Common range delays are determined for each mode, along with differential time and phase delays between channels. Because the antennas are measured by the LBMS, baseline calibration consists primarily of measuring a constant offset between mechanical center and the electrical phase center of the antennas. A phase screen, an offset to the interferometric phase difference which is a function of absolute phase, is applied to the interferometric data to compensate for multipath and leakage. Calibration parameters are calculated for each of the ten processing modes, each of the operational bandwidths (80 and 160 MHZ), and each aircraft altitude. In this talk we will discuss the layout calibration sites, the synthesis of data from multiple flights to improve the calibration, methods for determining time and phase delays, and techniques for determining radiometric and polarimetric quantities. We will describe how calibration quantities are incorporated into the processor and pre-processor. We will demonstrate our techniques applied to GeoSar data and assess the stability and accuracy of the calibration. This will be compared to the modeled performance determined from calibrating the output of a point target simulator. The details of baseline determination and phase screen calculation are covered in related talks.

Chapine, Elaine↗

Navigating the Deployment and Downlink Tradespace for Earth Imaging Constellations

Distributed Spacecraft Missions (DSMs) are gaining momentum in their application to Earth Observation (EO) missions owing to their unique ability to increase observation sampling in spatial, spectral, angular and temporal dimensions simultaneously. DSM design includes a much larger number of variables than its monolithic counterpart, therefore, Model-Based Systems Engineering (MBSE) has been often used for preliminary mission concept designs, to understand the trade-offs and interdependencies among the variables. MBSE models are complex because the various objectives a DSM is expected to achieve are almost always conflicting, non-linear and rarely analytical. NASA Goddard Space Flight Center (GSFC) is developing a pre-Phase A tool called Tradespace Analysis Tool for Constellations (TAT-C) to initiate constellation mission design. The tool will allow users to explore the tradespace between various performance, cost and risk metrics (as a function of their science mission) and select Pareto optimal architectures that meet their requirements. This paper will describe the different types of constellations that TAT-C’s Tradespace Search Iterator is capable of enumerating (homogeneous Walker, heterogeneous Walker, precessing type, ad-hoc) and their impact on key performance metrics such as revisit statistics, time to global access and coverage. We will also discuss the ability to simulate phased deployment of the given constellations, as a function of launch availabilities and/or vehicle capability, and show the impact on performance. All performance metrics are calculated by the Data Reduction and Metric Computation module within TAT-C, which issues specific requests and processes results from the Orbit and Coverage module. Our TSI is also capable of generating tradespaces for downlinking imaging data from the constellation, based on permutations of available ground station networks - known (default) or customized (by the user). We will show the impact of changing ground station options for any given constellation, on data latency and required communication bandwidth, which in turn determines the responsiveness of the space system.

Nag, Sreeja↗

An All-Solid-State, Room-Temperature, Heterodyne Receiver for Atmospheric Spectroscopy at 1.2 THz

Heterodyne receivers at submillimeter wavelengths have played a major role in astrophysics as well as Earth and planetary remote sensing. All-solid-state heterodyne receivers using both MMIC (monolithic microwave integrated circuit) Schottky-diode-based LO (local oscillator) sources and mixers are uniquely suited for long-term planetary missions or Earth climate monitoring missions as they can operate for decades without the need for any active cryogenic cooling. However, the main concern in using Schottky-diode-based mixers at frequencies beyond 1 THz has been the lack of enough LO power to drive the devices because 1 to 3 mW are required to properly pump Schottky diode mixers. Recent progress in HEMT- (high-electron-mobility- transistor) based power amplifier technology, with output power levels in excess of 1 W recently demonstrated at W-band, as well as advances in MMIC Schottky diode circuit technology, have led to measured output powers up to 1.4 mW at 0.9 THz. Here the first room-temperature tunable, all-planar, Schottky-diode-based receiver is reported that is operating at 1.2 THz over a wide (≈20%) bandwidth. The receiver front-end (see figure) consists of a Schottky-diode-based 540 to 640 GHz multiplied LO chain (featuring a cascade of W-band power amplifiers providing around 120 to 180 mW at W-band), a 200-GHz MMIC frequency doubler, and a 600-GHz MMIC frequency tripler, plus a biasable 1.2-THz MMIC sub-harmonic Schottky-diode mixer. The LO chain has been designed, fabricated, and tested at JPL and provides around 1 to 1.5 mW at 540 o 640 GHz. The sub-harmonic mixer consists of two Schottky diodes on a thin GaAs membrane in an anti-parallel configuration. An integrated metal insulator metal (MIM) capacitor has been included on-chip to allow dc bias for the Schottky diodes. A bias voltage of around 0.5 V/diode is necessary to reduce the LO power required down to the 1 to 1.5 mW available from the LO chain. The epilayer thickness and doping profiles have been specifically optimized to maximize the mixer performance beyond 1 THz. The measured DSB noise temperatures and conversion losses of the receiver are 2,000 to 3,500 K and 12 to 14 dB, respectively, at 120 K, and 4,000 to 6,000 K and 13 to 15 dB, respectively, at 300 K. These results establish the state-of-the-art for all-solid-state, all-planar heterodyne receivers at 1.2 THz operating at either room temperature or using passive cooling only. Since no cryogenic cooling is needed, the receiver is eminently suited to atmospheric heterodyne spectroscopy of the outer planets and their moons.

Siles, Jose V.↗

Novel Micro Strip-to-Waveguide Feed Employing a Double-Y Junction

Previous micro strip -to -waveguide transitions either required a hermetically sealed waveguide configuration, or a balun that needed to be tuned according to the frequency band of interest. In this design, the balun is realized using a double -Y junction to transition from microstrip to coplanar strip feeding a quasi-Yagi dipole array (see figure). The length of the feed (Lf) extending into the waveguide is 15.54 mm. The length of the ground plane below the ULTRALAM substrate is 7.75 mm. The lengths L1 , L2, and L3 are 8.50 mm, 4.38 mm, and 2.14 mm, respectively. These lengths were computed via a preliminary optimization aimed at improving the return loss at the band edges. The waveguide feed was designed to excite the TE10 mode in a WR-90 waveguide, and to operate over the recommended frequencies of 8.2 to 12.4 GHz. The feed employs a Rogers 6010 substrate (dielectric constant Er approx. equals 10.2) bonded with a Rogers ULTRALAM substrate (Er approx. equals 2.5). The ULTRALAM substrate serves to provide mechanical strength for 6010 substrate, and to mitigate loses due to parasitic modes (the ground plane is etched on the bottom of this layer due to the topology of the double -Y balun). The double-Y balun transitioning from an unbalanced microstrip line to a balanced coplanar strip (CPS) line does not provide inherent impedance transformation; hence, Klopfenstein impedance tapers were synthesized to transition from 50 to 77 Ohms in the microstrip section and from 77 to 110 Ohms in the CPS section. At the balun junction, the CPS stub lengths were chosen such that the X/ 8 resonance is pushed outside the bandwidth of operation. Also, the smallest allowable conductor width and gap spacing were chosen to meet acceptable manufacturing tolerances.

Venkatesan, Jaikrishina↗

Assessment of Bulk Absorber Properties for Multi-Layer Perforates in Porous Honeycomb Liners

CONTINUING progress in materials technology provides potential for improved acoustic liners for attenuating broadband fan noise emissions from aircraft engine nacelles. Conventional liners (local-reacting perforate-over-honeycomb structures) provide significant narrow-band attenuation, but limited attenuation over wide bandwidths. Two approaches for increasing attenuation bandwidth are to (1) replace the honeycomb structure with bulk material, or (2) cascade multiple layers of perforate/honeycomb structures. Usage of the first approach is limited because of mechanical and maintenance reasons, while multi-layer liners are limited to about three layers because of their additional mechanical complexity, depth and weight. The current research concerns a novel approach reported by the University of Cincinnati, in which a single-layer conventional liner is converted into an extended-reaction, broadband absorber by making the honeycomb core structure porous. This modified single-layer liner requires no increase in depth and weight, and minimal increase in mechanical complexity. Langley has initiated research to identify potential benefits of liner structures with porous cell walls. This research has two complementary goals: (1) develop and validate experimental techniques for treating multi-layer perforates (representative of the internal cells of a liner with porous cell walls) as 1-D bulk materials, and (2) develop analytical approaches to validate this bulk material assumption. If successful, the resultant model can then be used to design optimized porous honeycomb liners. The feasibility of treating an N-layer perforate system (N porous plates separated by uniform air gaps) as a one-dimensional bulk absorber is assessed using the Two-Thickness Method (TTM), which is commonly used to educe bulk material intrinsic acoustic parameters. Tests are conducted with discrete tone and random noise sources, over an SPL range sufficient to determine the nonlinearity of the test specimens, for test specimens consisting of 5, 10 and 15% porous plates. Measured impedances for two liner thicknesses (e.g., 12 and 24 layers) are used as input to the TTM to determine the characteristic impedance and propagation constant that characterize these liners as bulk absorbers. These parameters are then used to calculate the predicted impedance of liners with different thicknesses (e.g., 36 layers), and a comparison of predicted and measured impedances for these other thicknesses is used to determine the efficacy of this approach. Finally, an independent method is used to educe the propagation constant for a single representative sample, and excellent comparison between the results for this method and those for the TTM provides increased confidence in the results achieved with the TTM. In general, the results demonstrate these multi-layer perforates can be acceptably treated as bulk absorbers.

Jones, Michael G.↗

Autonomous Spacecraft Communication Interface for Load Planning

Ground-based controllers can remain in continuous communication with spacecraft in low Earth orbit (LEO) with near-instantaneous communication speeds. This permits near real-time control of all of the core spacecraft systems by ground personnel. However, as NASA missions move beyond LEO, light-time communication delay issues, such as time lag and low bandwidth, will prohibit this type of operation. As missions become more distant, autonomous control of manned spacecraft will be required. The focus of this paper is the power subsystem. For present missions, controllers on the ground develop a complete schedule of power usage for all spacecraft components. This paper presents work currently underway at NASA to develop an architecture for an autonomous spacecraft, and focuses on the development of communication between the Mission Manager and the Autonomous Power Controller. These two systems must work together in order to plan future load use and respond to unanticipated plan deviations. Using a nominal spacecraft architecture and prototype versions of these two key components, a number of simulations are run under a variety of operational conditions, enabling development of content and format of the messages necessary to achieve the desired goals. The goals include negotiation of a load schedule that meets the global requirements (contained in the Mission Manager) and local power system requirements (contained in the Autonomous Power Controller), and communication of off-plan disturbances that arise while executing a negotiated plan. The message content is developed in two steps: first, a set of rapid-prototyping "paper" simulations are preformed; then the resultant optimized messages are codified for computer communication for use in automated testing.

Controls↗

Analytical prediction with multidimensional computer programs and experimental verification of the performance, at a variety of operating conditions, of two traveling wave tubes with depressed collectors

Experimental and analytical results are compared for two high performance, octave bandwidth TWT's that use depressed collectors (MDC's) to improve the efficiency. The computations were carried out with advanced, multidimensional computer programs that are described here in detail. These programs model the electron beam as a series of either disks or rings of charge and follow their multidimensional trajectories from the RF input of the ideal TWT, through the slow wave structure, through the magnetic refocusing system, to their points of impact in the depressed collector. Traveling wave tube performance, collector efficiency, and collector current distribution were computed and the results compared with measurements for a number of TWT-MDC systems. Power conservation and correct accounting of TWT and collector losses were observed. For the TWT's operating at saturation, very good agreement was obtained between the computed and measured collector efficiencies. For a TWT operating 3 and 6 dB below saturation, excellent agreement between computed and measured collector efficiencies was obtained in some cases but only fair agreement in others. However, deviations can largely be explained by small differences in the computed and actual spent beam energy distributions. The analytical tools used here appear to be sufficiently refined to design efficient collectors for this class of TWT. However, for maximum efficiency, some experimental optimization (e.g., collector voltages and aperture sizes) will most likely be required.

Dayton, J. A., Jr.↗

HTMT-class Latency Tolerant Parallel Architecture for Petaflops Scale Computation

Computational Aero Sciences and other numeric intensive computation disciplines demand computing throughputs substantially greater than the Teraflops scale systems only now becoming available. The related fields of fluids, structures, thermal, combustion, and dynamic controls are among the interdisciplinary areas that in combination with sufficient resolution and advanced adaptive techniques may force performance requirements towards Petaflops. This will be especially true for compute intensive models such as Navier-Stokes are or when such system models are only part of a larger design optimization computation involving many design points. Yet recent experience with conventional MPP configurations comprising commodity processing and memory components has shown that larger scale frequently results in higher programming difficulty and lower system efficiency. While important advances in system software and algorithms techniques have had some impact on efficiency and programmability for certain classes of problems, in general it is unlikely that software alone will resolve the challenges to higher scalability. As in the past, future generations of high-end computers may require a combination of hardware architecture and system software advances to enable efficient operation at a Petaflops level. The NASA led HTMT project has engaged the talents of a broad interdisciplinary team to develop a new strategy in high-end system architecture to deliver petaflops scale computing in the 2004/5 timeframe. The Hybrid-Technology, MultiThreaded parallel computer architecture incorporates several advanced technologies in combination with an innovative dynamic adaptive scheduling mechanism to provide unprecedented performance and efficiency within practical constraints of cost, complexity, and power consumption. The emerging superconductor Rapid Single Flux Quantum electronics can operate at 100 GHz (the record is 770 GHz) and one percent of the power required by convention semiconductor logic. Wave Division Multiplexing optical communications can approach a peak per fiber bandwidth of 1 Tbps and the new Data Vortex network topology employing this technology can connect tens of thousands of ports providing a bi-section bandwidth on the order of a Petabyte per second with latencies well below 100 nanoseconds, even under heavy loads. Processor-in-Memory (PIM) technology combines logic and memory on the same chip exposing the internal bandwidth of the memory row buffers at low latency. And holographic storage photorefractive storage technologies provide high-density memory with access a thousand times faster than conventional disk technologies. Together these technologies enable a new class of shared memory system architecture with a peak performance in the range of a Petaflops but size and power requirements comparable to today's largest Teraflops scale systems. To achieve high-sustained performance, HTMT combines an advanced multithreading processor architecture with a memory-driven coarse-grained latency management strategy called "percolation", yielding high efficiency while reducing the much of the parallel programming burden. This paper will present the basic system architecture characteristics made possible through this series of advanced technologies and then give a detailed description of the new percolation approach to runtime latency management.

Sterling, Thomas↗

Broadband Achromatic Phase Shifter for a Nulling Interferometer

Nulling interferometry is a technique for imaging exoplanets in which light from the parent star is suppressed using destructive interference. Light from the star is divided into two beams and a phase shift of radians is introduced into one of the beams. When the beams are recombined, they destructively interfere to produce a deep null. For monochromatic light, this is implemented by introducing an optical path difference (OPD) between the two beams equal to lambda/2, where lambda is the wavelength of the light. For broadband light, however, a different phase shift will be introduced at each wavelength and the two beams will not effectively null when recombined. Various techniques have been devised to introduce an achromatic phase shift a phase shift that is uniform across a particular bandwidth. One popular technique is to use a series of dispersive elements to introduce a wavelength-dependent optical path in one or both of the arms of the interferometer. By intelligently choosing the number, material and thickness of a series of glass plates, a nearly uniform, arbitrary phase shift can be introduced between two arms of an interferometer. There are several constraints that make choosing the number, type, and thickness of materials a difficult problem, such as the size of the bandwidth to be nulled. Several solutions have been found for bandwidths on the order of 20 to 30 percent (Delta(lambda)/lambda(sub c)) in the mid-infrared region. However, uniform phase shifts over a larger bandwidth in the visible regime between 480 to 960 nm (67 percent) remain difficult to obtain at the tolerances necessary for exoplanet detection. A configuration of 10 dispersive glass plates was developed to be used as an achromatic phase shifter in nulling interferometry. Five glass plates were placed in each arm of the interferometer and an additional vacuum distance was also included in the second arm of the interferometer. This configuration creates a phase shift of pi radians with an average error of 5.97 x 10(exp -8) radians and standard deviation of 3.07 x 10(exp -4) radians. To reduce ghost reflections and interference effects from neighboring elements, the glass plates are tilted such that the beam does not strike each plate at normal incidence. Reflections will therefore walk out of the system and not contribute to the intensity when the beams are recombined. Tilting the glass plates, however, introduces several other problems that must be mitigated: (1) the polarization of a beam changes when refracted at an interface at non-normal incidence; (2) the beam experiences lateral chromatic spread as it traverses multiple glass plates; (3) at each surface, wavelength- dependent intensity losses will occur due to reflection. For a fixed angle of incidence, each of these effects must be balanced between each arm of the interferometer in order to ensure a deep null. The solution was found using a nonlinear optimization routine that minimized an objective function relating phase shift, intensity difference, chromatic beam spread, and polarization difference to the desired parameters: glass plate material and thickness. In addition to providing a uniform, broadband phase shift, the configuration achieves an average difference in intensity transmission between the two arms of the interferometer of 0.016 percent with a standard deviation of 3.64 x 10(exp -4) percent, an average difference in polarization between the two arms of the interferometer of 5.47 x 10(exp -5) percent with a standard deviation of 1.57 x 10(exp -6) percent, and an average chromatic beam shift between the two arms of the interferometer of -47.53 microns with a wavelength-by-wavelength spread of 0.389 microns.

Bolcar, Matthew R.↗

Datascope to Enable Earth Independent Medical Operations (EIMO)

BACKGROUND: NASA has amassed sixty years of knowledge and experience relevant to maintenance of crew health and performance in low earth orbit. The Apollo Program introduced the importance of ensuring progressively autonomous operational capability. Earth Independent Medical Operations (EIMO) will require a gradual shift in the balance of medical responsibility, management, and authority from terrestrial to space-based assets. Terrestrial assets will continue to be essential for pre-mission screening and planning in addition to maintenance of crew health and performance. However, new capabilities are needed to enable EIMO and the amount of data required to support these systems, and mitigate the impacts of data transmission delays and reduced bandwidth coupled with lack of cloud-like resources and on-board computing capacity that is currently unclear or operationally insufficient. OVERVIEW: The overall goal of EIMO is to develop artificial intelligence (AI)-based solutions to analyze crew health and performance data utilizing a clinical decision support system (CDSS) to provide crew medical officers (CMO) with the equivalent of real-time, on-board medical consults. The EIMO ecosystem is envisioned as a “system of systems” where embedded reference databases and real-time data streams from multiple input vectors continuously and seamlessly assess crew health and performance. EIMO will be designed to make recommendations to the CMO using multi-modal AI-based natural language processing and machine learning methods with interoperability to push/pull data within and between multiple vehicle and habitat architectures. DISCUSSION: Data flows and storage/retrieval capacity are severely constrained during space missions and the challenges will become even greater during exploration missions. Just as each past program from Mercury to the International Space Station (ISS) required rethinking the interaction between ground-based controllers and space-based crew, so too will future missions to the Moon and Mars. While the NASA High-Performance Spaceflight Computing Processor project aims to increase computational capacity by 100 times over current spaceflight computers, the projected deliverable still lags considerably behind what will be needed to enable an AI-driven CDSS. Restrictions in processing speed and data storage capacity, coupled with transmission bottlenecks and delays, necessitate definition and optimization of an integrated data architecture to enable a progressively autonomous medical capability.

Medical operations↗

Wide-Band Radar for Measuring Thickness of Sea Ice

A wide-band penetrating radar system for measuring the thickness of sea ice is under development. The need for this or a similar system arises as follows: Spatial and temporal variations in the thickness of sea ice are important indicators of heat fluxes between the ocean and atmosphere and, hence, are important indicators of climate change in polar regions. A remote-sensing system that could directly measure the thickness of sea ice over a wide thickness range from aboard an aircraft or satellite would be of great scientific value. Obtaining thickness measurements over a wide region at weekly or monthly time intervals would contribute significantly to understanding of changes in the spatial distribution and of the mass balance of sea ice. A prototype of the system was designed on the basis of computational simulations directed toward understanding what signal frequencies are needed to satisfy partly competing requirements to detect both bottom and top ice surfaces, obtain adequate penetration despite high attenuation in the lossy sea-ice medium, and obtain adequate resolution, all over a wide thickness range. The prototype of the system is of the frequency-modulation, continuous-wave (FM-CW) type. At a given time, the prototype functions in either of two frequency-band/operational-mode combinations that correspond to two thickness ranges: a lower-frequency (50 to 250 MHz) mode for measuring thickness greater than about 1 m, and a higher frequency (300 to 1,300 MHz) mode for measuring thickness less than about 1 m. The bandwidth in the higher-frequency (lesser-thickness) mode is adequate for a thickness resolution of 15 cm; the bandwidth in the lower-frequency (greater-thickness) mode is adequate for a thickness resolution of 75 cm. Although a thickness resolution of no more than 25 cm is desired for scientific purposes, the 75-cm resolution was deemed acceptable for the purpose of demonstrating feasibility. The prototype was constructed as a modified version of a 500-to-2,000-MHz FM-CW radar system developed previously for mapping near-surface internal layers of the Greenland ice sheet. The prototype included two sets of antennas: one for each frequency-band/mode. For Arctic and Antarctic field tests, the prototype was mounted on a sled that was towed across the ice. The Arctic field test was performed in the lower-frequency mode on ice ranging in thickness from 1 to 4 m. In the analysis of the results of the Arctic field test, a comparison of the radar-determined ice thicknesses with actual ice thicknesses yielded an overall mean difference of 14 cm and standard deviation of 30 cm. The Antarctic field test was performed in the higher-frequency mode; analysis of the results led to the conclusion that this mode is useful for measuring thicknesses between 0.5 and 1 m. Several modifications have been conceived for implementation in further development toward an improved practical system: The system would function in a single frequency-band/mode (100 to 1,200 MHz) that would afford a resolution of about 15 cm. There would be a single antenna system that would be optimized for the entire 100-to-1,000-MHz frequency band. To enable ice-thickness surveys over larger areas, the system would be made capable of operating aboard a low-flying aircraft that could be either piloted or robotic. Data-processing techniques to deconvolve the system response have been developed on the basis of impulse-response measurements over a calm ocean. Implementation of these techniques in the system would enable correction for imperfections of the system and would thereby increase the effective sensitivity of the system.

Gogineni, Prasad↗

Thruster Limitation Consideration for Formation Flight Control

Physical constraints of any real system can have a drastic effect on its performance. Some of the more recognized constraints are actuator and sensor saturation and bandwidth, power consumption, sampling rate (sensor and control-loop) and computation limits. These constraints can degrade system s performance, such as settling time, overshoot, rising time, and stability margins. In order to address these issues, researchers have investigated the use of robust and nonlinear controllers that can incorporate uncertainty and constraints into a controller design. For instance, uncertainties can be addressed in the synthesis model used in such algorithms as H(sub infinity), or mu. There is a significant amount of literature addressing this type of problem. However, there is one constraint that has not often been considered; that is, actuator authority resolution. In this work, thruster resolution and controller schemes to compensate for this effect are investigated for position and attitude control of a Low Earth Orbit formation flight system. In many academic problems, actuators are assumed to have infinite resolution. In real system applications, such as formation flight systems, the system actuators will not have infinite resolution. High-precision formation flying requires the relative position and the relative attitude to be controlled on the order of millimeters and arc-seconds, respectively. Therefore, the minimum force resolution is a significant concern in this application. Without the sufficient actuator resolution, the system may be unable to attain the required pointing and position precision control. Furthermore, fuel may be wasted due to high-frequency chattering phenomena when attempting to provide a fine control with inadequate actuators. To address this issue, a Sliding Mode Controller is developed along with the boundary Layer Control to provide the best control resolution constraints. A Genetic algorithm is used to optimize the controller parameters according to the states error and fuel consumption criterion. The tradeoffs and effects of the minimum force limitation on performance are studied and compared to the case without the limitation. Furthermore, two methods are proposed to reduce chattering and improve precision.

Yunjun Xu↗

X-Band CubeSat Communication System Demonstration

Today's CubeSats mostly operate their communications at UHF- and S-band frequencies. UHF band is presently crowded, thus downlink communications are at lower data rates due to bandwidth limitations and are unreliable due to interference. This research presents an end-to-end robust, innovative, compact, efficient and low cost S-band uplink and X-band downlink CubeSat communication system demonstration between a balloon and a Near Earth Network (NEN) ground system. Since communication systems serve as umbilical cords for space missions, demonstration of this X-band communication system is critical for successfully supporting current and future CubeSat communication needs. This research has three main objectives. The first objective is to design, simulate, and test a CubeSat S- and X-band communication system. Satellite Tool Kit (STK) dynamic link budget calculations and HFSS Simulations and modeling results have been used to trade the merit of various designs for small satellite applications. S- and X-band antennas have been tested in the compact antenna test range at Goddard Space Flight Center (GSFC) to gather radiation pattern data. The second objective is simulate and test a CubeSat compatible X-band communication system at 12.5Mbps including S-band antennas, X-band antennas, Laboratory for Atmospheric and Space Physics (LASP) /GSFC transmitter and an S-band receiver from TRL-5 to TRL-8 by the end of this effort. Different X-band communication system components (antennas, diplexers, etc.) from GSFC, other NASA centers, universities, and private companies have been investigated and traded, and a complete component list for the communication system baseline has been developed by performing analytical and numerical analysis. This objective also includes running simulations and performing trades between different X-band antenna systems to optimize communication system performance. The final objective is to perform an end-to-end X-band CubeSat communication system demonstration between a balloon and/or a sounding rocket and a Near Earth Network (NEN) ground system. This paper presents CubeSat communication systems simulation results, analysis of X-band and S-band antennas and RF front-end components, transceiver design, analysis and optimization of space-to-ground communication performance, subsystem development, as well as the test results for an end-to-end X-band CubeSat communication system demonstration. The outcome of this work will be used to pave the way for next generation NEN-compatible X-band CubeSat communication systems to support higher data rates with more advanced modulation and forward error correction (FEC) coding schemes, and to support and attract new science missions at lower cost. It also includes an abbreviated concept of operations for CubeSat users to utilize the NEN, starting from first contact with NASA's communication network and continuing through on-orbit operations.

NEN↗

In-flight Testing of the Injection of the LISA Pathfinder Test Mass into a Geodesic

LISA Pathfinder is a technology demonstrator space mission, aimed at testing key technologies for detecting gravitational waves in space. The mission is the precursor of LISA, the first space gravitational waves observatory, whose launch is scheduled for 2034. The LISA Pathfinder scientific payload includes two gravitational reference sensors (GRSs), each one containing a test mass (TM), which is the sensing body of the experiment. A mission critical task is to set each TM into a pure geodesic motion, i.e. guaranteeing an extremely low acceleration noise in the sub-Hertz frequency bandwidth. The grabbing positioning and release mechanism (GPRM), responsible for the injection of the TM into a geodesic trajectory, was widely tested on ground, with the limitations imposed by the 1-g environment. The experiments showed that the mechanism, working in its nominal conditions, is capable of releasing the TM into free-fall fulfilling the very strict constraint imposed on the TM residual velocity, in order to allow its capture on behalf of the electrostatic actuation. However, the first in-flight releases produced unexpected residual velocity components, for both the TMs. Moreover, all the residual velocity components were greater than maximum value set by the requirements. The main suspect is that unexpected contacts took place between the TM and the surroundings bodies. As a consequence, ad hoc manual release procedures had to be adopted for the few following injections performed during the nominal mission. These procedures still resulted in non compliant TM states which were captured only after impacts. However, such procedures seem not practicable for LISA, both for the limited repeatability of the system and for the unmanageable time lag of the telemetry/telecommand signals (about 4400 s). For this reason, at the end of the mission, the GPRM was deeply tested in-flight, performing a large number of releases, according to different strategies. The tests were carried out in order to understand the unexpected dynamics and limit its effects on the final injection. Some risk mitigation maneuvers have been tested aimed at minimizing the vibration of the system at the release and improving the alignment between the mechanism and the TM. However, no overall optimal release strategy to be implemented in LISA could be found, because the two GPRMs behaved differently.

LISA↗