Search NASA⌕ Search

SEARCH · Search NASA

Results for “cargo”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

A Joinable Undercarriage to Maximize Payload (JUMP) Lunar Lander for Cargo Delivery to the Lunar Surface

Currently, NASA has engaged industry to develop a series of small to medium capacity landers with payload capacities of up to 5-9 tons by the mid to late 2020s. This contrasts with the former Constellation program, where the Altair lunar lander was targeting a payload capability of roughly 14-20 tons. Investment in smaller landers may present future challenges in delivering habitat modules larger than lunar lander cabins or small logistics modules to the lunar surface. Additionally, given a projected SLS flight rate of 1-2 launches per year, a lunar surface buildup from small elements seems problematic at best. While commercial launchers provide a supplement to SLS, many of the current and projected launch vehicles deliver less than 20 tons to a Trans-Lunar Injection – even fewer to the lunar surface. However, a possible solution could emerge if the lander itself could be launched in pieces with a buildup in Cislunar space. Thus, launchers with these capacities could contribute to a lunar lander capable of delivering 30 tons or more to the lunar surface. This paper introduces the notional concept of a Joinable Undercarriage to Maximized Payload (JUMP) lander. Key elements of a proposed JUMP lander concept will be discussed, followed by recommendations and forward work.

Human spaceflight↗

Space Shuttle Cargo Integration Coupled Loads Analysis Lessons Learned

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis(CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks,planes, helicopters, spacecraft, etc. The Space Shuttle program used the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized CLA process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Space Shuttle Program and the payload developers to verify that the payloads were compatible with the flight loads environment and would not interact negatively with the vehicle. Over the course of the Space Shuttle Program, many improvements were made to the process, which reduced cycle time and improved manifest flexibility. There were several issues which were never fully addressed, but work-arounds were developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what to do to avoid the same issues.

ERICA E. BRUNO↗

Space Shuttle Cargo Integration Coupled Loads Analysis Lessons Learned

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis (CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks, planes, helicopters, spacecraft, etc. The Space Shuttle program used the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized CLA process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Space Shuttle Program and the payload developers to verify that the payloads were compatible with the flight loads environment and would not interact negatively with the vehicle. Over the course of the Space Shuttle Program, many improvements were made to the process, which reduced cycle time and improved manifest flexibility. There were several issues which were never fully addressed, but workarounds were developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what to do to avoid the same issues in the future.

Erica E. Bruno↗

Cargo Logistics for a Mars Base Using Solar Electric Propulsion

The current aim of NASA’s Journey to Mars is a stepwise approach towards landing humans on the Red Planet, culminating in a sustained presence. There are many recent studies on how this can be achieved in an evolvable and affordable manner. Most architectures begin with crewed missions to Phobos or Mars orbit in the mid-2030’s, progress toward short-stay missions on the surface, and then culminate with regular, long-stay missions at a permanent outpost in the 2040’s. A common factor of these architectures is that many robotic launches are required in order to support the crew by prepositioning mission elements and other needed supplies. In this paper, the use of 150 kW reusable Solar Electric Propulsion (SEP) tugs as a means to deliver elements both to orbit and the surface is studied. The SEP tugs make use of technology currently being developed for the proposed Asteroid Redirect Robotic Mission (ARRM). They would also be used to deliver food and supplies to sustain the crews similar to resupply missions for the International Space Station. These SEP tugs would cycle (with loitering) between staging orbits in cislunar space and Mars orbit.

Nicholas, Austin K.↗

Precious Cargo: Transporting Contamination-Sensitive Instruments & Optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

Precious Cargo: Transporting contamination-sensitive instruments & optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗