Search NASA⌕ Search

SEARCH · Search NASA

Results for “communication constraints”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Administrative automation in a scientific environment

Although the scientific personnel at GSFC were advanced in the development and use of hardware and software for scientific applications, resistance to the use of automation or purchase of terminals, software and services, specifically for administrative functions was widespread. The approach used to address problems and constraints and plans for administrative automation within the Space and Earth Sciences Directorate are delineated. Accomplishments thus far include reduction of paperwork and manual efforts; improved communications through telemail and committees; additional support staff; increased awareness at all levels on ergonomic concerns and the need for training; better equipment; improved ADP skills through experience; management commitment; and an overall strategy for automating.

Jarrett, J. R.↗

Information-Theoretic Assessment of Sample Imaging Systems

By rigorously extending modern communication theory to the assessment of sampled imaging systems, we develop the formulations that are required to optimize the performance of these systems within the critical constraints of image gathering, data transmission, and image display. The goal of this optimization is to produce images with the best possible visual quality for the wide range of statistical properties of the radiance field of natural scenes that one normally encounters. Extensive computational results are presented to assess the performance of sampled imaging systems in terms of information rate, theoretical minimum data rate, and fidelity. Comparisons of this assessment with perceptual and measurable performance demonstrate that (1) the information rate that a sampled imaging system conveys from the captured radiance field to the observer is closely correlated with the fidelity, sharpness and clarity with which the observed images can be restored and (2) the associated theoretical minimum data rate is closely correlated with the lowest data rate with which the acquired signal can be encoded for efficient transmission.

Huck, Friedrich O.↗

Microwave Radiometers from 0.6 to 22 GHz for Juno, a Polar Orbiter around Jupiter

A compact radiometer instrument is under development at JPL for Juno, the next NASA New Frontiers mission, scheduled to launch in 2011. This instrument is called the MWR (MicroWave Radiometer), and its purpose is to measure the thermal emission from Jupiter's atmosphere at selected frequencies from 0.6 to 22 GHz. The objective is to measure the distributions and abundances of water and ammonia in Jupiter's atmosphere, with the goal of understanding the previously unobserved dynamics of the subcloud atmosphere, and to discriminate among models for planetary formation in our solar system. The MWR instrument is currently being developed to address these science questions for the Juno mission. As part of a deep space mission aboard a solar-powered spacecraft, MWR is designed to be compact, lightweight, and low power. The entire MWR instrument consists of six individual radiometer channels with approximately 4% bandwidth at 0.6, 1.25,2.6,5.2, 10,22 GHz operating in direct detection mode. Each radiometer channel has up to 80 dB of gain with a noise figure of several dB. The highest frequency channel uses a corrugated feedhorn and waveguide transmission lines, whereas all other channels use highly phase stable coaxial cables and either patch array or waveguide slot array antennas. Slot waveguide array antennas were chosen for the low loss at the next three highest frequencies and patch array antennas were implemented due to the mass constraint at the two lowest frequencies. The six radiometer channels receive their voltage supplies and control lines from an electronics unit that also provides the instrument communication interface to the Juno spacecraft. For calibration purposes each receiver has integrated noise diodes, a Dicke switch, and temperature sensors near each component that contributes to the noise figure. In addition, multiple sensors will be placed along the RF transmission lines and the antennas in order to measure temperature gradients. All antennas and RF transmission lines must withstand low temperatures and the harsh radiation environment surrounding Jupiter; the receivers and control electronics are protected by a radiation-shielding enclosure on the Juno spacecraft that also provides for a benign and stable operating temperature environment. This paper will focus on the concept of the MWR instrument and will present results of one breadboard receiver channel.

receiver↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Innovative Thermal Management & Control to Surmount Challenges of Exploring Ocean Worlds on Europa and Enceladus

Probes to penetrate the thick ice shells of our solar system’s Ocean Worlds have been studied for nearly 20 years, since scientific evidence strongly suggested a subsurface ocean on the Jupiter moon called Europa. There is keen scientific interest in exploring four significant themes on such proposed missions: 1) Geodynamics, 2) Geochemistry, 3) Habitability, and 4) Life Detection. The ice shells of Ocean Worlds are predicted to be up to 40 km thick; they exhibit extreme thermal environments, with ice temperatures from 100 K to 270 K, and extreme pressure environments from vacuum to 53 MPa. Jet Propulsion Laboratory has conducted a broad-look investigation of proposed mission concepts to Europa to identify the significant technology and operational challenges of Europa ice-penetration. The thermal-mechanical system (TMS) of an ice penetration probe (IPP) designed to access the ocean of an icy moon using radioisotope thermoelectric generators for heat and power faces technological hurdles exacerbated by severe thermal and volume constraints. This study identified thermal management and control (TMC) challenges that are strongly linked to: ice penetration start-up, mobility and navigation in the ice, communications while in the ice sheet, and detecting and avoiding in-ice hazards. The major objectives of the TMC system are: 1) Absorb internal thermal energy from the IPP radioisotope power source, 2) Maintain liquid water conditions around the IPP at all times, 3) Manage and control thermal flows from probe nose to tail, and 4) Provide pressure containment for all internal probe components. This work discusses the baseline TMC system architecture and design developed to accomplish these objectives, and survive and transit the extreme ice thicknesses in pursuit of Icy/Ocean Worlds science goals. The proposed TMC system consisting of an internal pumped two-phase fluid loop “thermal bus” for thermal energy capture, variable conductance heat pipe system for passively adaptive thermal energy transport around the probe, and water jetting system for ice cutting is described and discussed. Critical testing performed to date is described.

Lee, Kuan-Lin↗

Establishing Trust in NASA’s Artemis Program Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the moon. This time, with the help of commercial and international partners, the program’s objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, more onboard systems autonomy and functionality will be needed to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with-audio, video, lighting, and crew controls. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program-especially crew controls which is the focus of this paper. How does NASA ensure crew controls are reliable to control complex systems and prevent a catastrophic event due to human error-especially when the astronauts could be physiologically and/or psychologically impaired? NASA’s approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls is through a holistic system engineering and Human System Integration methodology that embraces NASA’s Human-Rating Requirements-ensuring human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering, and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

Human-Rating↗

Separation and communications geometry analysis for a Jupiter entry probe from a Pioneer spacecraft

The separation and communications geometry analysis is presented which shows that it is possible to target a Jupiter entry probe from a Pioneer spin-stabilized vehicle to desired entry conditions and maintain a continuous line-of-sight communications link while the probe descends to a pressure of 10 bars within the atmosphere. Such a targeting is possible with either the deflected probe mode or with the deflected bus mode. For the nominal mission studied, an 800 day trip in 1978 with the Pioneer type spacecraft flying by a 1.3 R(J), it was possible to achieve entries near zero angle of attack at about -25 deg relative entry flight path angle. Because of the constraint on the deflection maneuver for the deflected probe mode, the deflection and phasing velocity requirements are much larger for this mode. The geometry parameters, look angles, ranges and range rates, provided by this analysis permit the design of a functional communications system for the bus and probe. Avoiding a high trapped radiation belt hazard at Jupiter by flying the bus by at 6 R(J), however, requires using a despun antenna on the flyby bus.

Tindle, E. L.↗

System and method for improved rotor tip performance

The present invention discloses systems and methods for the performance enhancement of rotary wing aircraft through reduced torque, noise and vibration. In one embodiment, a system includes a sail having an aerodynamic shape positioned proximate to a tip of the rotor blade. An actuator may be configured to rotate the sail relative to the blade tip. a A control system receives information from a rotorcraft system and commands the actuator to rotate the sail to a predetermined favorable rotor blade operating condition. In another embodiment, a method includes configuring the rotorcraft in a selected flight condition, communicating input signals to a control system operable to position sails coupled to tips of blades of a rotor assembly, processing the input signals according to a constraint condition to generate sail positional information, and transferring the sail positional information to the sail.

Bussom, Richard↗

Establishing Trust in NASA’s Artemis Campaign Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the Moon. This time, with the help of commercial and international partners, the program's objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, the crew will need more onboard systems autonomy and functionality to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft to ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with: audio, video, lighting, and crew controls subsystems. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program--especially crew controls, which is the focus of this paper. How does NASA ensure crew controls are reliable enough to control complex systems and prevent a catastrophic event due to human error--especially when the astronauts could be physiologically and/or psychologically impaired? NASA's approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls, is through a holistic system engineering and Human System Integration methodology that focuses on incorporating NASA's Human-Rating Requirements-that ensures human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

artemis↗

Establishing Trust in NASA’s Artemis Campaign Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the Moon. This time, with the help of commercial and international partners, the program's objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, the crew will need more onboard systems autonomy and functionality to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft to ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with: audio, video, lighting, and crew controls subsystems. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program--especially crew controls, which is the focus of this paper. How does NASA ensure crew controls are reliable enough to control complex systems and prevent a catastrophic event due to human error--especially when the astronauts could be physiologically and/or psychologically impaired? NASA's approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls, is through a holistic system engineering and Human System Integration methodology that focuses on incorporating NASA's Human-Rating Requirements-that ensures human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

artemis↗

Integrated resource scheduling in a distributed scheduling environment

The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

Zoch, David↗

Space Shuttle Program: Automatic rendezvous, proximity operations, and capture (category 3)

The NASA Johnson Space Center is actively pursuing the development and demonstration of capabilities for automatic rendezvous, proximity operations, and capture (AR&C) using the Space Shuttle as the active vehicle. This activity combines the technologies, expertise, tools, and facilities of the JSC Tracking and Communications Division (EE), Navigation, Control and Aeronautics Division (EG), Automation and Robotics Division (ER), and Structures and Mechanics Division (ES) of the Engineering Directorate and the Flight Design and Dynamics Division (DM) of the Mission Operations Directorate. Potential benefits of AR&C include more efficient and repeatable rendezvous, proximity operations, and capture operations; reduced impacts on the target vehicles (e.g., Orbiter RCS plume loads); reduced flight crew work loads; reduced ground support requirements; and reduced operational constraints. This paper documents the current JSC capabilities/tools/facilities for AR&C and describes a proposed plan for a progression of ground demonstrations and flight tests and demonstrations of AR&C capabilities. This plan involves the maturing of existing technologies in tracking and communications; guidance, navigation and control; mechanisms; manipulators; and systems management and integrating them into several evolutionary demonstration stages.

Jackson, William L.↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Shortly after JPL’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission launches, separates, and commences its cruise phase, two CubeSats will deploy from the launch vehicle’s upper stage and begin independent flight to Mars (Fig. 1). During InSight’s entry, descent, and landing (EDL) sequence, these twin Mars Cube One (MarCO) spacecraft will fly 3,500 km above the Martian surface, recording and relaying InSight UHF radio data to the Deep Space Network (DSN) on Earth1. MarCO is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration. Originally slated to launch and reach Mars in 2016, the InSight mission schedule subsequently slipped to 2018. During the original landing of InSight, Earth would not be in view, and no orbiter around Mars would have been in position to both receive UHF EDL data and simultaneously relay it back to Earth. It was from this obstacle that MarCO was conceived. Regardless of any changes to InSight’s 2018 EDL configuration geometry, MarCO is still expected to fly and serve in the same capacity as originally designed: the first CubeSat mission to Mars. CubeSats have historically been firmly in the domain of universities and small companies. As first conceived, they served as a platform upon which to teach all aspects of the space mission lifecycle. JPL took on this mission type with Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment2 (INSPIRE), moving the concept into a new domain: deep space. Building from the INSPIRE platform and lessons learned, MarCO addressed new challenges in the domain of planetary missions: independent interplanetary flight and navigation, integration with a large-scale mission, long-distance and long-delay communication, short development time, and a small development team. Of these, the greatest constraint was schedule: only 18 months passed from conception of mission concept until delivery of fully assembled and tested flight hardware. Careful selection of mission team, along with extensive use of off-the-shelf equipment, and streamlining automated processes, was essential. This achievement represents the next step in the evolution of CubeSats beyond low-Earth orbit.

Werne, Thomas↗

NASA Extreme Environment Mission Operations: Science Operations Development for Human Exploration

The purpose of NASA Extreme Environment Mission Operations (NEEMO) mission 16 in 2012 was to evaluate and compare the performance of a defined series of representative near-Earth asteroid (NEA) extravehicular activity (EVA) tasks under different conditions and combinations of work systems, constraints, and assumptions considered for future human NEA exploration missions. NEEMO 16 followed NASA's 2011 Desert Research and Technology Studies (D-RATS), the primary focus of which was understanding the implications of communication latency, crew size, and work system combinations with respect to scientific data quality, data management, crew workload, and crew/mission control interactions. The 1-g environment precluded meaningful evaluation of NEA EVA translation, worksite stabilization, sampling, or instrument deployment techniques. Thus, NEEMO missions were designed to provide an opportunity to perform a preliminary evaluation of these important factors for each of the conditions being considered. NEEMO 15 also took place in 2011 and provided a first look at many of the factors, but the mission was cut short due to a hurricane threat before all objectives were completed. ARES Directorate (KX) personnel consulted with JSC engineers to ensure that high-fidelity planetary science protocols were incorporated into NEEMO mission architectures. ARES has been collaborating with NEEMO mission planners since NEEMO 9 in 2006, successively building upon previous developments to refine science operations concepts within engineering constraints; it is expected to continue the collaboration as NASA's human exploration mission plans evolve.

Bell, Mary S.↗

Biomedical Support of U.S. Extravehicular Activity

The world's first extravehicular activity (EVA) was performed by A. A. Leonov on March 18, 1965 during the Russian Voskhod-2 mission. The first US EVA was executed by Gemini IV astronaut Ed White on June 3, 1965, with an umbilical tether that included communications and an oxygen supply. A hand-held maneuvering unit (HHMU) also was used to test maneuverability during the brief EVA; however the somewhat stiff umbilical limited controlled movement. That constraint, plus difficulty returning through the vehicle hatch, highlighted the need for increased thermal control and improved EVA ergonomics. Clearly, requirements for a useful EVA were interrelated with the vehicle design. The early Gemini EVAs generated requirements for suits providing micro-meteor protection, adequate visual field and eye protection from solar visual and infrared radiation, gloves optimized for dexterity while pressurized, and thermal systems capable of protecting the astronaut while rejecting metabolic heat during high workloads. Subsequent Gemini EVAs built upon this early experience and included development of a portable environmental control and life support systems (ECLSS) and an astronaut maneuvering unit. The ECLSS provided a pressure vessel and controller with functional control over suit pressure, oxygen flow, carbon dioxide removal, humidity, and temperature control. Gemini EVA experience also identified the usefulness of underwater neutral buoyancy and altitude chamber task training, and the importance of developing reliable task timelines. Improved thermal management and carbon dioxide control also were required for high workload tasks. With the Apollo project, EVA activity was primarily on the lunar surface; and suit durability, integrated liquid cooling garments, and low suit operating pressures (3.75 pounds per square inch absolute [psia] or 25.8 kilopascal [kPa],) were required to facilitate longer EVAs with ambulation and significant physical workloads with average metabolic rates of 1000 BTU/hr and peaks of up to 2200 BTU/hr. Mobility was further augmented with the Lunar Roving Vehicle. The Apollo extravehicular mobility unit (EMU) was made up of over 15 components, ranging from a biomedical belt for capturing and transmitting biomedical data, urine and fecal containment systems, a liquid cooling garment, communications cap, a modular portable life support system (PLSS), a boot system, thermal overgloves, and a bubble helmet with eye protection. Apollo lunar astronauts performed successful EVAs on the lunar surface from a 5 psia (34.4 kPa) 100% oxygen environment in the Lunar Lander. A maximum of three EVAs were performed on any mission. For Skylab a modified A7LB suit, used for Apollo 15, was selected. The Skylab astronaut life support assembly (ALSA) provided umbilical support through the life support umbilical (LSU) and used open loop oxygen flow, rather than closed-loop as in Apollo missions. Thermal control was provided by liquid water circulated by spacecraft pumps and electrical power also was provided from the spacecraft via the umbilical. The cabin atmosphere of 5 psia (34.4 kPa), 70% oxygen, provided a normoxic atmosphere and because of the very low nitrogen partial pressures, no special protocols were required to protect against decompression sickness (DCS) as was the case with the Apollo spacecraft with a 5 psi, 100% oxygen environment.

Gernhardt, Michael L.↗

Planning assistance for the 30/20 GHz program, volume 2

In the baseline concept development the communications payload on Flight 1 was specified to consist of on-board trunking and emergency communications systems (ECS). On Flight 2 the communications payloads consisted of trunking and CPS on-board systems, the CPS capability replacing the Flight 1 ECS. No restriction was placed on the launch vehicle size. Constraints placed on multiple concept development effort were that launch vehicle size for Concept 1 was restricted to SUSS-D and for Concept 2 a SUSS-A. The design concept development was based on satisfying the baseline requirements set forth in the SOW for a single demonstration flight system. Key constraints on contractors were cost and launch vehicle size. Five major areas of new technology development were reviewed: (1) 30 GHz low noise receivers; (2) 20 GHz Power Amplifiers; (3) SS-TDMA switch; (4) Baseband Processor; (5) Multibeam Antennas.

Al-Kinani, G.↗

General Temporal Knowledge for Planning and Data Mining

We consider the architecture of systems that combine temporal planning and plan execution and introduce a layer of temporal reasoning that potential1y improves both the communication between humans and such systems, and the performance of the temporal planner itself. In particular, this additional layer simultaneously supports more flexibility in specifying and maintaining temporal constraints on plans within an uncertain and changing execution environment, and the ability to understand and trace the progress of plan execution. It is shown how a representation based on single set of abstractions of temporal information can be used to characterize the reasoning underlying plan generation and execution interpretation. The complexity of such reasoning is discussed.

Morris, Robert↗